HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8106 UTILITY INFRASTRUCTURE CONSTRUCTION SERVICES FOR WATER, WASTEWATER, AND STORMWATER FACILITIES CAPITAL IMPROVEMENTS (2)July 7, 2017
BT Construction, Inc.
Attn: Steven Tucker
9885 Emporia St
Henderson, CO 80540
RE: 8106 Utility Infrastructure Construction Services for Water, Wastewater & Stormwater
Facilities Capital Improvements
Dear Mr. Tucker:
The City of Fort Collins wishes to extend the agreement term for the above captioned
proposal per the existing terms and conditions and the following:
1) The term will be extended for one (1) additional year, August 17, 2017 through
August 16, 2018.
2) Revised contract rates, as per attached, effective August 17, 2017.
If the renewal is acceptable to your firm, please sign this letter in the space provided
and include a current copy of insurance certificate naming the City as an
additional insured for General and Automotive Liability within the next fifteen (15)
days.
If this extension is not agreeable with your firm, we ask that you send us a written notice
stating that you do not wish to renew the contract and state the reason for non-renewal.
Please contact Pat Johnson, CPPB, Senior Buyer at (970)221-6816 if you have any
questions regarding this matter.
Sincerely,
Gerry S. Paul
Director of Purchasing
________________________________________ ______________________
Signature Date
(Please indicate your desire to renew 8106 by signing this letter and returning it to
Purchasing Division within the next fifteen days.)
GSP: jg
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707- fax
fcgov.com/purchasing
Renewal - 8106 Utility Infrastructure Construction Services for Water, WW & Stormwater Facilities CIP
Page 1 of 3
DocuSign Envelope ID: 3CBE6CFA-85F8-4C96-8F2E-2989840E50B7
7/10/2017
City of Fort Collins
2017 Revised Rates
8106 Utility Infrastructure Construction Services
For Water, Wastewater, Stormwater Facilities Capital Improvements
Construction Cost Factors T&M GMP
General Office Overhead and Profit Margin 15% 18%
Field Office Overhead and Profit Margin** N/A N/A
Margin on Subcontractors 6% 10%
Materials and Equipment Margin on Base Cost 6% 10%
Additional Factors (Bond) 1% 1%
Change Order Margin 15% 15%
Incidental Tools and Materials 15% 15%
Design Phase and Construction Phase General Conditions Billable Hourly Rates*
Key Staff Member Position Rate
Buck Bergstrom President/Executive Sponsor $150/HR
Dave Emm Senior Estimating Manager $95/HR
John Beckos Project Manager $95/HR
Shawn August Project Engineer $75/HR
Eric Peterson General Superintendent $95/HR
Don Meyer Trenchless Superintendent $95/HR
Mark Wellensiek Trenchless Superintendent $95/HR
Marco Johnson Safety Manager $80/HR
Cliff Mondragon Traffic Control Supervisor $75/HR
BT Construction/BTrenchless Owned Equipment rates for Design Phase and General Conditions*
Office Vehicle $15/HR
Supervisor Pickup $18/HR
Field Billable Hourly Rates* Rate OT Rate
FOREMAN $69.30/HR $92.10/HR
OPERATOR Cat 245/365 (or equivalent) $54.40/HR $73.20/HR
OPERATOR REG $44.80/HR $60.00/HR
LABORER $35.90/HR $48.90/HR
PIPELAYER $40.55/HR $54.25/HR
DRIVER $43.10/HR $57.80/HR
*Not including overhead and profit
**Assumes Jobsite office only
Renewal - 8106 Utility Infrastructure Construction Services for Water, WW & Stormwater Facilities CIP
Page 2 of 3
DocuSign Envelope ID: 3CBE6CFA-85F8-4C96-8F2E-2989840E50B7
City of Fort Collins
2017 Revised Rates
8106 Utility Infrastructure Construction Services
For Water, Wastewater, Stormwater Facilities Capital Improvements
EQUIPMENT RATES
Description* Charge Rate *or equivalent size from other manufacturer
Excavators – 302 (Mini) $43.00
Excavators – 310 $63.00
Excavators – 320 $73.00
Excavators – 325, 33s $124.00
Excavators – 345 $215.00
Excavators – 365 $270.00
Skidsteers $50.00
Loaders – 928 (2.5 – 3.0 CY) $60.00
Loaders – 938 (3.0 – 4.0 CY) $72.00
Loaders – 950 (4.0 – 6.0 CY) $80.00
Backhoes 420 $41.00
Compactors 323 $40.00
Compactors 433 $61.00
Compactors 563 $72.00
Ford F150 $16.00
Ford F250 $19.00
Ford F350 $19.00
25 KW Generator $16.00
36 KW Generator $19.00
56 KW Generator $23.00
185 CFM Air Compressor $32.00
Lowboy Trailer $26.00
Flatbed Trailer $15.00
Tool Trailer/Connex Box $10.00
Side Dump Trailer $30.00
Boom Truck $45.00
Water Truck $26.00
Truck Tractor $40.00
Trenchless Equipment and Shoring is all job dependent. Various equipment configurations along with
supplemental rental items make a standard rate structure impractical. This equipment will be
determined for each project and the rates presented to the City for approval.