Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 8115 ENGINEERING SERVICES FOR WATER RECLAMATION & BIOSOLIDS FACILITY DESIGN & CONSTRUCTION (8)WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CAROLLO ENGINEERS, INC. DATED: September 15, 2015 Work Order Number: UC-WRF-2017-15 Purchase Order Number: Project Title: U DWRF Digester Building HVAC Improvements Original Bid/RFP Number & Name: U8115 Engineering Services for Water Reclamation and Biosolids Facility Design and Construction Services Commencement Date: UAugust 1, 2017 Completion Date: UDecember 31, 2017 Maximum Fee: (time and reimbursable direct costs): U$26,046. Project Description: UEngineering Services During Construction of Digester Building HVAC Improvements Scope of Services: USee Attached for project scope, schedule and cost estimateU. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of seven (7) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. CAROLLO ENGINEERS, INC By:_______________________________ Jason Garside, Vice President Date:_____________________________ By:_______________________________ Anthony L. Morroni, P.E., Senior Vice President Date:_____________________________ CITY OF FORT COLLINS Submitted By: _____________________________ Eileen Dornfest, Project Manager Date: _____________________________ Reviewed by: _____________________________ Pat Johnson, Senior Buyer Date: _____________________________ Reviewed by: _____________________________ Jason Graham, Water Reclamation & Biosolids Manager Date: _____________________________ Reviewed by: _____________________________ Owen L. Randall, Chief Engineer Date: _____________________________ Approved by: _____________________________ Carol Webb, Water Resources & Treatment Operations Manager Date: ____________________________ Approved by: _____________________________ Gerry Paul, Purchasing Director (if over $60,000) Date: _____________________________ DocuSign Envelope ID: 13CC0FBD-2807-431F-9CAB-B494455FAD90 7/14/2017 Exhibit A Scope of Work DocuSign Envelope ID: 13CC0FBD-2807-431F-9CAB-B494455FAD90 FINAL (7-13-17) pg. 1 Scope of Work - MCC Room HVAC Replacement Project - ESDC FINAL - 7-13-17 The City of Fort Collins (City) through the assistance with Carollo Engineers (Consultant and Engineer of Record) and Hydro Construction Company (Contractor) has completed the design for the implementation of HVAC improvements within the Digester Building MCC Room. The improvements consist of the conversion of an existing ductless HVAC system to a conventional HVAC system with an air handling unit and distribution ductwork. The purpose of this Work Order is to provide the engineering services during construction (ESDC) of the proposed MCC Room HVAC Improvements project (Project). The construction phase of the Project is estimated to occur from July 15, 2017 to October 15, 2017 (approximately 3 month duration). The scope of work is divided into the following major tasks, summarized below: Task 1 - Project Administration and Coordination Task 1.1 - Coordination Meetings Prepare for and participate in two (2), two (2) hour meetings with the Project Team to coordinate construction activities. Appropriate Consultant staff and subconsultants will be in attendance based on the topics of discussion. Meeting agendas will be provided. Task 1.2 - Progress Reporting Invoices will be submitted monthly in accordance with City payment protocols. Each invoice will be submitted with a progress report detailing the work executed during the invoice period and work remaining. Task 2 - Resident Engineer Onsite resident engineering is not part of scope of services for this Project. Task 3 - Engineering Services during Construction Task 3.1 - Shop Drawing Review Consultant assumes reviews of up to six (6) shop drawing submittals including the following: Air Handling Unit; Condenser; Ductwork; Exhaust Fan; Damper; and LEL. Consultants estimates that each shop drawing submittal will require an average of six (6) hours to receive, process, review, verify, respond, document, and return. Task 3.2 - Interpretations/Clarifications Consultant assumes that up to five (5) interpretations and clarifications of design documents are required. Consultant estimates that each interpretation and clarification will require up to four (4) hours to research, respond, and document. Task 3.3 - Start-Up/Commissioning Assistance Consultant shall provide startup assistance to City and Contractor on critical process, systems, and equipment installed under this work order. Consultant assumes that an Electrical and Instrumentation Engineer onsite for a total of eight (8) hours; and a Mechanical/HVAC Engineer onsite for a total of eight (8) hours. DocuSign Envelope ID: 13CC0FBD-2807-431F-9CAB-B494455FAD90 FINAL (7-13-17) pg. 2 Task 3.4 - Record Drawings Consultant shall develop Record Drawings based on the field hand markups provided by Contractor. DocuSign Envelope ID: 13CC0FBD-2807-431F-9CAB-B494455FAD90 Exhibit B Cost Estimate DocuSign Envelope ID: 13CC0FBD-2807-431F-9CAB-B494455FAD90 FINAL - 7/13/17 DRAKE DIGESTER BLDG MCC ROOM HVAC IMPROVEMENTS PROJECT (CONSTRUCTION PHASE) LABOR HOURS AND ENGINEERING FEE Senior Professional Project Manager Project Professional Professional (PE + HVAC) Disciplines (EIC) Disciplines (HVAC) Disciplines (staff engineers) Senior Technician Technician Document Processing/Clerical Billing Rate $238 $219 $238 $171 $171 $171 $147 $162 $110 $96 Task 1 - Project Coordination 2 10 0 8 8 0 0 0 0 1 29 $5,498 $0 $0 $0 $200 $339 $6,037 Task 1.1 - Coordination Meetings and Site Visits 0 6 0 8 8 0 0 0 0 0 22 $4,050 $0 $0 $0 $200 $257 $4,507 Task 1.2 - Progress Reporting 2 4 0 0 0 0 0 0 0 1 7 $1,448 $0 $0 $0 $0 $82 $1,530 Task 2 - Resident Engineering 00000000000$0$0$0$0$0$0$0 NOT USED 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 Task 3 - Engineering Services During Construction 0 6 2 46 38 0 0 8 8 2 110 $18,522 $0 $0 $0 $200 $1,287 $20,009 Task 3.1 - Shop Drawing Review 0 2 2 20 14 0 0 0 0 0 38 $6,728 $0 $0 $0 $0 $445 $7,173 Task 3.2 - Interpretations/Clarifications and Field Change Directives 0 2 0 10 8 0 0 0 0 0 20 $3,516 $0 $0 $0 $0 $234 $3,750 Task 3.3 - Start-Up/Commissioning Assistance 0 0 0 8 8 0 0 0 0 0 16 $2,736 $0 $0 $0 $200 $187 $3,123 Task 3.4 - Record Drawings 0 2 0 8 8 0 0 8 8 2 36 $5,542 $0 $0 $0 $0 $421 $5,963 PROJECT TOTALS - TASKS 1-3 2 16 2 54 46 0 0 8 8 3 139 $24,020 $0 $0 $0 $400 $1,626 $26,046 $445 LABOR HOURS PROJECT COSTS Total Direct Labor Hours Total Labor Cost Ditesco Lithos King Surveying Other Direct Costs (ODCs) PECE DocuSign Envelope ID: 13CC0FBD-2807-431F-9CAB-B494455FAD90 Exhibit C Schedule DocuSign Envelope ID: 13CC0FBD-2807-431F-9CAB-B494455FAD90 Aug‐17 Sep‐17 Oct‐17 Nov‐17 Dec‐17 Equipment Procurement Construction APPROXIMATE CONSTRUCTION SCHEDULE Digester Bldg MCC Room HVAC Improvements SCHEDULE J:\WRF Master Documentation\Projects\DWRF\Digester\DWRF Digester HVAC 2017\PM\Work Orders\Construction\Carollo\Construction Schedule.xlsx DocuSign Envelope ID: 13CC0FBD-2807-431F-9CAB-B494455FAD90 7/14/2017 7/14/2017 7/18/2017 7/20/2017 7/20/2017 7/20/2017