Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 8106 UTILITY INFRASTRUCTURE CONSTRUCTION SERVICES FOR WATER, WASTEWATER, AND STORMWATER FACILITIES CAPITAL IMPROVEMENTS (14)WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CONNELL RESOURCES, INC. DATED: August 17, 2015 Work Order Number: WO# Halligan-Connell-ICE1 Purchase Order Number: Project Title: Halligan Independent Cost Estimate Original Bid/RFP Number & Name: 8106 / Water Wastewater & Stormwater Utilities Infrastructure Design & Construction Services Contractor Commencement Date: June 30, 2017 Completion Date: October 31, 2017 Maximum Fee: (time and reimbursable direct costs): $18,530 Project Description: Independent cost estimate for Halligan reservoir construction Scope of Services: Development of independent cost estimate for construction of Halligan Reservoir enlargement. Project will include a site visit, meeting attendance, and cost estimating services. See Exhibits A and B attached for fee estimate and schedule. Contractor agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Construction Work Order Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Construction Work Order Agreement and this work order (including the attached forms) the Construction Work Order Agreement shall control. The attached forms consisting of two (2) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. CONNELL RESOURCES, INC. By:_______________________________ Date:_____________________________ CITY OF FORT COLLINS Submitted By: _____________________________ Eileen Dornfest, Project Manager Date: _____________________________ Reviewed by: _____________________________ Pat Johnson, Senior Buyer Date: _____________________________ Reviewed by: _____________________________ Owen L. Randall, Chief Engineer Date: _____________________________ Approved by: _____________________________ Carol Webb, Water Resources & Treatment Operations Manager Date: ____________________________ Approved by: _____________________________ Gerry Paul, Purchasing Director (if over $60,000) Date: _____________________________ DocuSign Envelope ID: 1A248739-18A6-431A-8976-18F2A0F85BBB 6/27/2017 6/27/2017 6/27/2017 6/29/2017 Exhibit A Cost Estimate DocuSign Envelope ID: 1A248739-18A6-431A-8976-18F2A0F85BBB EXHIBIT B HALLIGAN DAM DESIGN - CONNELL RESOURCES, INC. WORK PLAN Labor Category or Sub-consultant Proj Mgr Construction Super Construction Manager EHS / CAD / Proj Eng Pothole Crew Expenses TASK TOTAL TOTAL Individual Dan G. Clint F. / Shawn O John W. / Bill Anderson Todd F./ Lisa K Connell Rate / hour $95 $88 $120 $58 $230 INVESTIGATION AND DESIGN PHASE SERVICES Task 1 Preliminary Final Design Meetings 1.1 Design Meeting 6 $720 1.2 Final Design Meetings $0 1.3 Public Outreach Meeting / Schedule $0 1.4 Site Meetings $0 Subtotal: 006000Task 1 subtotal: $720 Task 2 Field Investigation 2.1 Site Visit 6 $720 2.2 Potholing / Test Digging $0 2.3 Geotech Bore Test holes $0 Subtotal: 006000Task 2 subtotal: $720 Task 3 Cost Estimates for Alternatives 3.1 $0 3.2 $0 3.3 $0 $0 $0 Subtotal: 000000Task 3 subtotal: $0 Task 4 Cost Estimating / Contract Negotiation 5.1 Kick-off meeting with Independent Estimators $0 5.2 Estimate Preparation 6 128 20 $17,090 5.3 Estimate Reconcilliation $0 Subtotal: 6 0 128 20 0 0 Task 5 subtotal: $17,090 Task 5 Administration 6.1 Administration $0 6.2 Permits (SWMP/ Construction Dewatering/ APEN) $0 Subtotal: 000000Task 6 subtotal: $0 level of effort per labor category (hours): 6 0 140 20 0 166 <<Total Manhours total costs per labor category, sub-consult. & expenses: $ 570 $ - $ 16,800 $ 1,160 $ - $ - Total Costs>> $ 18,530 staff-weeks: 0.15 0.00 3.50 0.50 0.00 Total Man-weeks: 4.15 Page 1 DocuSign Envelope ID: 1A248739-18A6-431A-8976-18F2A0F85BBB Exhibit B Schedule DocuSign Envelope ID: 1A248739-18A6-431A-8976-18F2A0F85BBB 7/1/2017 8/1/2017 Draft ICE Review ICE Finalize ICE Halligan Independent Cost Estimate SCHEDULE C:\Users\edornfest\Desktop\ToDo\Halligan ICE schedule.xls DocuSign Envelope ID: 1A248739-18A6-431A-8976-18F2A0F85BBB 6/29/2017