HomeMy WebLinkAboutWORK ORDER - RFP - 8073 ENGINEERING SERVICES FOR WATER, WASTEWATER & STORMWATER FACILITIES CAPITAL IMPROVEMENTS PROJECTS (8)Vendor: Ayres Associates Today's Date: May 30, 2017 Requisition No.: Ship To: Date Entered: Date Required: ASAP Date Approved: Special Instructions: Date Denied: Item # Quantity Unit Description Unit Price Total Charge Numbers 1 1 EA $14,701.00 $14,701.00 502.234201.521210 Requested By: Approved By: Owen Randall Date Mark Kempton Date Approved By: Carol Webb, Water Resources and Treatment Operations Manager Date Joe Wright Masterplan Work Order DocuSign Envelope ID: 852AC112-C4DE-4104-965E-0DF52FCC5BA3 6/6/2017 6/7/2017 6/12/2017 PROFESSIONAL SERVICES AGREEMENT WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Ayres Associates DATED: May 15, 2015 Work Order Number: MD-Ayres-Joe Wright-1 Purchase Order Number: Project Title: Joe Wright Reservoir and Michigan Ditch Master Plan Original Bid/RFP Number & Name: 8073-Consulting Engineers for future W/WW & Stormwater Facilities Capital Improvements Commencement Date: June 2017 Completion Date: August 2017 Maximum Fee: $14,701 (See Attached Exhibit B) (time and reimbursable direct costs) Project Description: (See Attached Exhibit A and B) Scope of Services: (See Attached Exhibit A and B) Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of 3 (three) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional-Ayres Associates By:_______________________________ Date:_____________________________ CC: Purchasing Submitted By: _________________________ Owen L. Randall, Chief Engineer Date: _________________________ Reviewed by: _________________________ Pat Johnson, Senior Buyer Date: _________________________ Approved by: _________________________ Mark Kempton, Water Production Division Manager Date: _________________________ Approved by: _________________________ or Carol Webb, Water Resources/Treatment Operations Manager Date: ________________________ Approved by: Gerry Paul, Director of Purchasing & Risk Management (if over $60,000) Date: Professional Services Agreement – Work Order Type 8073 Engineering Services for Future Water, Wastewater & Stormwater Facilities CIP DocuSign Envelope ID: 852AC112-C4DE-4104-965E-0DF52FCC5BA3 6/6/2017 6/6/2017 6/7/2017 6/7/2017 6/12/2017 June 6, 2017 1 EXHIBIT A JOE WRIGHT RESERVOIR AND MICHIGAN DITCH MASTER PLAN SCOPE OF WORK FOR: CITY OF FORT COLLINS PROJECT OBJECTIVE: To supplement the Master Plans for both Joe Wright Reservoir and the Michigan Ditch with additional information from on-site inspection, from comparison with similar dam facilities, and from the City’s Water Treatment Facility Master Plan. Phase 1 – 3 – under previous work order Phase 4 – Additional Work GENERAL DESCRIPTION: This scope covers the time required to supplement and finalize the Master Plans for both Joe Wright Reservoir and the Michigan Ditch. The Ayres Project Manager will be: Dale Mathison (970)797-3540 direct (916)607-3774 cell The Ayres Group Manager will be: Chris Pletcher (970)797-3528 direct (970)218-5546 cell The Lithos Geotechnical Engineer will be: Robin Dornfest (970)567-9877 cell PHASE 4 – Additional Work 4.1 Joe Wright Reservoir – The City’s water storage facility at Joe Wright Reservoir is in very good condition and is well maintained. Initial site inspections and discussions with City operations staff did not reveal any apparent deficiencies, and only provided a short list of ongoing maintenance items to be addressed annually. As an additional measure to confirm that there were no latent deficiencies or life cycle equipment replacements within the planning horizon, Ayres Associates will bring Jim Bakken, a Senior Water Resource Engineer with 40 years’ experience with dam safety inspections to the site for an independent second inspection. Mr. Bakken will review existing documents compiled for this project and also talk with City staff to gather a complete picture of the initial dam construction, operational practices, annual maintenance issues, and current condition. Mr. Bakken will then contribute his opinion of the current and expected maintenance needs to the Master Plan Report. This effort will involve two additional progress meetings with City staff and two additional site visits as one of the original site visits was accelerated to coincide with an annual inspection of the outlet pipe by the State Engineer. 4.2 Comparison to Similar Dams – The fundamental embankment and outlet works design used for Joe Wright Reservoir was also used for two other dams constructed at about the same time in the Steamboat Springs area – Lester Creek Dam and Steamboat Lake Dam. Geotechnical Engineer Robin Dornfest and Dale Mathison will request maintenance records from these two similar dams and will review them for relevant design concerns and maintenance needs to develop a sense of the vulnerabilities of this particular dam design. Areas of potential vulnerability will be reviewed at Joe Wright to determine if additional preventive maintenance or equipment replacement may be warranted. This will require two additional progress meetings to discuss the similarities between the dams and the results of follow up investigations. 4.3 Coordination with the Water Treatment Facility Master Plan – ongoing operation and maintenance of the Michigan Ditch and Joe Wright Reservoir are completed by the Water Utility as part of the Water Treatment Facility. An update to the Water Treatment Facility Master Plan is underway by CH2M Hill, and this task will coordinate the predicted operation and maintenance work and costs with the Treatment Facility Master Plan so that the Joe Wright Reservoir and Michigan Ditch Master Plan and the Treatment Facility Master Plan are DocuSign Envelope ID: 852AC112-C4DE-4104-965E-0DF52FCC5BA3 June 6, 2017 2 synchronized. This effort will also involve coordination with Hydro Construction to define maintenance projects so that Hydro can provide expected project costs. Two additional progress meetings are expected for this effort. 4.4 City Comment Review and Revision – Ayres will respond to City comments on the draft final Master Plan report and revise the document accordingly. Since this master plan effort spans the time period planned for construction of a new tunnel on the Michigan Ditch and annual repair efforts on Joe Wright, we anticipate that two additional coordination meetings will be required to facilitate review and discussion of the Master Plan and incorporate any additional considerations that are developed during the planned construction work. DocuSign Envelope ID: 852AC112-C4DE-4104-965E-0DF52FCC5BA3 Task Description Senior Engineer (Chris Pletcher, PE, Jim Bakken, PE) Senior Project Manager (Dale Mathison, PE) Staff Engineer (Pat Schoenecker) CAD / GIS Clerical Total Labor Cost Direct Costs Indirect Costs Lithos Total by Task $185 $170 $95 $120 $75 Phase 4 Data Gathering 4.1 Joe Wright Reservoir - Additional Inspection 24 4 $ 5,120 $ 381 $ - $ 5,501 4.2 Comparison to Similar Dams 2 2 $ 710 $ 530 $ 1,240 4.3 Coordination with WTF Master Plan 0 4 $ 680 $ - $ 680 4.4 City Comment Review and Revision 2 24 24 4 $ 7,030 $ 250 $ 7,280 Subtotal 28 34 24 4 $ 13,540 $ 381 $ 780 $ 14,701 Ayres Associates - Professional Services Fee Proposal Joe Wright Reservoir and Michigan Ditch Master Plan - Additional Work Based on Scope of Services dated 6/6/17 LABOR DETAIL AND SUMMARY OF DIRECT AND SUBCONSULTING COSTS BY TASK ATTACHMENT B DocuSign Envelope ID: 852AC112-C4DE-4104-965E-0DF52FCC5BA3 DocuSign Envelope ID: 852AC112-C4DE-4104-965E-0DF52FCC5BA3