HomeMy WebLinkAboutWORK ORDER - RFP - 8254 PARK ARCHITECTURAL SERVICES ON-CALLCity of Fort Collins Park Planning and Development Rolland Moore Ballfield Re-lighting Scope of Work Proposal May 22, 2017 AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND ARCHITECTURE WEST LLC. Project Title: Rolland Moore Ballfields - Site re-lighting renovations Commencement Date: March, 2017 Architect - Architecture West LLC; Assist with Project Team Coordination for the site re- lighting for two of the four baseball fields. Coordinate with Musco Lighting, selected lighting sub-contractor, designer & installer. Provide Schematic design and constructability review meetings with Staff. Review DD design development and final CD construction documents, as needed. Building Dept. and Planning amendment processing, is not included. SCOPE of WORK - Basis of Design (BOD) Architectural; CD base CADD files - (20hrs.) = $ 1,620. Design & drawing coordination - (16hrs.) = $ 1,680. Meetings/Site visits - (20hrs.) = $ 2,100. Coord. Design Team - (18hrs.) = $ 1890. CA – (00hrs.) = $ TBD. Sub-total_________________________________ $ 7,290. Additional Provided Consultants Electrical Engineering; - $ 5,750. Professional Engineering Consultants Electrical Engineering; - $9,380. $ 7,620. reviews + $1,760. meetings Clanton & Associates TOTAL___________________________________ $22,420. EXCLUSIONS - M&P Engineering, lighting design and installation, landscape & irrigation, Civil, soils or structural Engineering, site development, Planning/zoning submittals or public meetings, Construction Administration, bidding, shop drawing reviews, etc., Art in Public Places, ADA Accessibility reviews or others not specifically noted above. Musco Lighting, under separate contract. Stephen J. Steinbicker, AIA, NCARB LEED Accredited Professional BD+C 4699 Nautilus Court South, Suite 102, Boulder, CO 80301 T: 303-530-7229 www.clantonassociates.com May 15, 2017 Steve Steinbicker Architecture West, LLC 160 Palmer Drive Fort Collins, CO, 80525 970-207-0424 | steve@architecturewestllc.com Re: Rolland Moore Ballfields Lighting Peer Review Scope & Fee Proposal Clanton and Associates proposes to undertake the lighting peer review for the Rolland Moore Ballfields Lighting Peer Review Project in Fort Collins, CO. Estimated labor: $ 7,420 Estimated expenses: $ 200 Total Fee (labor and expenses): $ 7,620 Additional Site Visits/In-Person Meetings As Needed (4 hrs per person, per meeting) • Nancy Only $ 1,040 • Dane Only $ 720 • Nancy & Dane $ 1,760 The scope of work includes: 1. Sports Lighting at Ballfields located at Rolland Moore Park in Fort Collins, CO Fees are lump sum, with invoicing occurring monthly on a percentage of tasks completed. Design services shall include the following: Sports Lighting Peer Review • Project kick-off meeting in Fort Collins (2 people, 4 hours) • Review and recommend proposed lighting criteria • Field sports lighting criteria • Light trespass criteria • Review sports lighting calculations provided by Musco Lighting (up to 2 reviews) • Review and comment on sports lighting specifications • Review and comment on lighting control system design • Prepare sports lighting peer review memo (up to two (2) submittals) • Attend up to three (3) design meetings by phone/web conference This scope of work is based upon normal project progress and within the time schedule agreed upon, without major redesign or change order work. Additional fees will be required if project timing is extended or project is put on hold and restarted at later date. If the project timing exceeds one year, then extra services rates may increase. The scope is based on documents sent and conversation with client in May 2017. Rolland Moore Ballfields Lighting Peer Review May 15, 2017 Architecture West, LLC Page | 2 4699 Nautilus Court South, Suite 102, Boulder, CO 80301 T: 303-530-7229 www.clantonassociates.com Not included in this scope of work but is available for extra services: • Lighting design • Lighting calculations • Electrical engineering • Client presentations • Documentation during Construction Documents phase • Renderings • Lighting equipment selection • Architectural lighting controls design and specifications • Cost analysis • Additional meetings and site visits • Energy code compliance documentation • LEED credit analysis or documentation • Life cycle costs • Emergency and exit lighting • Mock-ups • Coordination during bid phase • Assistance with value engineering • Assistance with change order requests Not included in this scope of work: • Structural engineering • Commissioning • Equipment procurement Client will supply Clanton and Associates with review materials and backgrounds in AutoCAD format. Reimbursable expenses shall include printing costs; overnight delivery and travel expenses associated with the project and shall be charged in addition to the compensation for professional services. Payment for services is expected within 30 days of invoice unless other arrangements are made in writing. Additional services shall be charged at the following hourly rates: Senior Principal $260 / hr Principal $180 / hr Senior Engineer $115 / hr Senior Designer $115 / hr Engineer $ 95 / hr Designer $ 95 / hr Intern $ 80 / hr Production Manager $115 / hr Senior CADD Technician $ 95 / hr CADD Technician $ 70 / hr Administration $ 65 / hr Rolland Moore Ballfields Lighting Peer Review May 15, 2017 Architecture West, LLC Page | 3 4699 Nautilus Court South, Suite 102, Boulder, CO 80301 T: 303-530-7229 www.clantonassociates.com Work shall commence upon receipt of a signed copy of this agreement. This agreement must be signed within 60 days or it is invalid. 5/15/2017 _____________________________________ __________________ CLANTON & ASSOCIATES DATE _____________________________________ __________________ ARCHITECTURE WEST, LLC DATE Clanton Associates, Inc. Project Fee Estimation 5/15/2017 Rolland Moore Ballfields Lighting Peer Review Architecture West, LLC 15-May-17 RATE TABLE USED Task Description Hrs $ 260 Hrs $ 180 Hrs $ 115 Hrs $ 95 Hrs $ 80 Hrs $ 115 Hrs $ 95 Hrs $ 70 Hrs $ 65 Hrs Fee Sports Lighting Peer Review Project kick-off meeting in Fort Collins (2 people, 4 hours) 4 $ 1,040 4 $ 720 $ - $ - $ - $ - $ - $ - $ - 8 $ 1,760 Review and recommend proposed lighting criteria 1 $ 260 2 $ 360 $ - $ - $ - $ - $ - $ - $ - 3 $ 620 Field sports lighting criteria 1 $ 260 1 $ 180 $ - $ - $ - $ - $ - $ - $ - 2 $ 440 Light trespass criteria 1 $ 260 1 $ 180 $ - $ - $ - $ - $ - $ - $ - 2 $ 440 Review sports lighting calculations provided by Musco Lighting (up to 2 reviews) 1 $ 260 2 $ 360 $ - $ - $ - $ - $ - $ - $ - 3 $ 620 Review and comment on sports lighting specifications 1 $ 260 2 $ 360 $ - $ - $ - $ - $ - $ - $ - 3 $ 620 Review and comment on lighting control system design 1 $ 260 2 $ 360 $ - $ - $ - $ - $ - $ - $ - 3 $ 620 Prepare sports lighting peer review memo (up to two (2) submittals) 1 $ 260 4 $ 720 $ - $ - $ - $ - $ - $ - $ - 5 $ 980 Attend up to three (3) design meetings by phone/web conference 3 $ 780 3 $ 540 $ - $ - $ - $ - $ - $ - $ - 6 $ 1,320 $ - $ - $ - $ - $ - $ - $ - $ - $ - 0 $ - Hour Totals 14210000000 Cost Totals $ 3,640 $ 3,780 $ - $ - $ - $ - $ - $ - $ - Hours subtotal 35 35 Fee subtotal $ 7,420 $ 7,420 Additional Site Visits or In-Person Meetings as needed Additional Site Visit or In-Person Meeting (Nancy only) 4 $ 1,040 $ - $ - $ - $ - $ - $ - $ - $ - 4 $ 1,040 Additional Site Visit or In-Person Meeting (Dane only) $ - 4 $ 720 $ - $ - $ - $ - $ - $ - $ - 4 $ 720 Additional Site Visit or In-Person Meeting (Nancy & Dane) 4 $ 1,040 4 $ 720 $ - $ - $ - $ - $ - $ - $ - 8 $ 1,760 $ - $ - $ - $ - $ - $ - $ - $ - $ - 0 $ - Hour Totals 880000000 Cost Totals $ 2,080 $ 1,440 $ - $ - $ - $ - $ - $ - $ - Hours subtotal 16 16 Fee subtotal $ 3,520 $ 3,520 2017 Standard <----- Click to change the rate table Senior CADD Technician CADD Senior Principal Principal Technician Administration TASK TOTALS Senior Engineer / Designer Engineer / Designer Intern Production Manager Prepared by Nancy Clanton Page 1 Rolland Moore Ballfields_Lighting Peer Review Task-Hour Worksheet_2017-05-15.xlsm