Rolland Moore Ballfield Re-lighting
Scope of Work Proposal
May 22, 2017
AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND ARCHITECTURE WEST LLC.
Project Title: Rolland Moore Ballfields - Site re-lighting renovations
Commencement Date: March, 2017
Architect - Architecture West LLC; Assist with Project Team Coordination for the site re-
lighting for two of the four baseball fields. Coordinate with Musco Lighting, selected lighting
sub-contractor, designer & installer. Provide Schematic design and constructability review
meetings with Staff. Review DD design development and final CD construction documents,
as needed. Building Dept. and Planning amendment processing, is not included.
SCOPE of WORK - Basis of Design (BOD)
Architectural;
CD base CADD files - (20hrs.) = $ 1,620.
Design & drawing coordination - (16hrs.) = $ 1,680.
Meetings/Site visits - (20hrs.) = $ 2,100.
Coord. Design Team - (18hrs.) = $ 1890.
CA – (00hrs.) = $ TBD.
Sub-total_________________________________ $ 7,290.
Additional Provided Consultants
Electrical Engineering; - $ 5,750.
Professional Engineering Consultants
Electrical Engineering; - $9,380.
$ 7,620. reviews + $1,760. meetings
Clanton & Associates
TOTAL___________________________________ $22,420.
EXCLUSIONS -
M&P Engineering, lighting design and installation, landscape & irrigation, Civil, soils or structural Engineering, site
development, Planning/zoning submittals or public meetings, Construction Administration, bidding, shop drawing
reviews, etc., Art in Public Places, ADA Accessibility reviews or others not specifically noted above. Musco Lighting,
under separate contract.
Stephen J. Steinbicker, AIA, NCARB
LEED Accredited Professional BD+C
4699 Nautilus Court South, Suite 102, Boulder, CO 80301 T: 303-530-7229
www.clantonassociates.com
May 15, 2017
Steve Steinbicker
Architecture West, LLC
160 Palmer Drive
Fort Collins, CO, 80525
970-207-0424 | steve@architecturewestllc.com
Re: Rolland Moore Ballfields Lighting Peer Review
Scope & Fee Proposal
Clanton and Associates proposes to undertake the lighting peer review for the Rolland
Moore Ballfields Lighting Peer Review Project in Fort Collins, CO.
Estimated labor: $ 7,420
Estimated expenses: $ 200
Total Fee (labor and expenses): $ 7,620
Additional Site Visits/In-Person Meetings As Needed (4 hrs per person, per meeting)
• Nancy Only $ 1,040
• Dane Only $ 720
• Nancy & Dane $ 1,760
The scope of work includes:
1. Sports Lighting at Ballfields located at Rolland Moore Park in Fort Collins, CO
Fees are lump sum, with invoicing occurring monthly on a percentage of tasks
completed. Design services shall include the following:
Sports Lighting Peer Review
• Project kick-off meeting in Fort Collins (2 people, 4 hours)
• Review and recommend proposed lighting criteria
• Field sports lighting criteria
• Light trespass criteria
• Review sports lighting calculations provided by Musco Lighting (up to 2 reviews)
• Review and comment on sports lighting specifications
• Review and comment on lighting control system design
• Prepare sports lighting peer review memo (up to two (2) submittals)
• Attend up to three (3) design meetings by phone/web conference
This scope of work is based upon normal project progress and within the time schedule
agreed upon, without major redesign or change order work. Additional fees will be
required if project timing is extended or project is put on hold and restarted at later date.
If the project timing exceeds one year, then extra services rates may increase.
The scope is based on documents sent and conversation with client in May 2017.
Rolland Moore Ballfields Lighting Peer Review May 15, 2017
Architecture West, LLC Page | 2
4699 Nautilus Court South, Suite 102, Boulder, CO 80301 T: 303-530-7229
www.clantonassociates.com
Not included in this scope of work but is available for extra services:
• Lighting design
• Lighting calculations
• Electrical engineering
• Client presentations
• Documentation during Construction Documents phase
• Renderings
• Lighting equipment selection
• Architectural lighting controls design and specifications
• Cost analysis
• Additional meetings and site visits
• Energy code compliance documentation
• LEED credit analysis or documentation
• Life cycle costs
• Emergency and exit lighting
• Mock-ups
• Coordination during bid phase
• Assistance with value engineering
• Assistance with change order requests
Not included in this scope of work:
• Structural engineering
• Commissioning
• Equipment procurement
Client will supply Clanton and Associates with review materials and backgrounds in
AutoCAD format. Reimbursable expenses shall include printing costs; overnight delivery
and travel expenses associated with the project and shall be charged in addition to the
compensation for professional services. Payment for services is expected within 30 days
of invoice unless other arrangements are made in writing.
Additional services shall be charged at the following hourly rates:
Senior Principal $260 / hr
Principal $180 / hr
Senior Engineer $115 / hr
Senior Designer $115 / hr
Engineer $ 95 / hr
Designer $ 95 / hr
Intern $ 80 / hr
Production Manager $115 / hr
Senior CADD Technician $ 95 / hr
CADD Technician $ 70 / hr
Administration $ 65 / hr
Rolland Moore Ballfields Lighting Peer Review May 15, 2017
Architecture West, LLC Page | 3
4699 Nautilus Court South, Suite 102, Boulder, CO 80301 T: 303-530-7229
www.clantonassociates.com
Work shall commence upon receipt of a signed copy of this agreement. This agreement
must be signed within 60 days or it is invalid.
5/15/2017
_____________________________________ __________________
CLANTON & ASSOCIATES DATE
_____________________________________ __________________
ARCHITECTURE WEST, LLC DATE
Clanton Associates, Inc. Project Fee Estimation 5/15/2017
Rolland Moore Ballfields Lighting Peer Review
Architecture West, LLC
15-May-17
RATE TABLE USED
Task Description
Hrs $ 260 Hrs $ 180 Hrs $ 115 Hrs $ 95 Hrs $ 80 Hrs $ 115 Hrs $ 95 Hrs $ 70 Hrs $ 65 Hrs Fee
Sports Lighting Peer Review
Project kick-off meeting in Fort Collins (2 people, 4 hours) 4 $ 1,040 4 $ 720 $ - $ - $ - $ - $ - $ - $ - 8 $ 1,760
Review and recommend proposed lighting criteria 1 $ 260 2 $ 360 $ - $ - $ - $ - $ - $ - $ - 3 $ 620
Field sports lighting criteria 1 $ 260 1 $ 180 $ - $ - $ - $ - $ - $ - $ - 2 $ 440
Light trespass criteria 1 $ 260 1 $ 180 $ - $ - $ - $ - $ - $ - $ - 2 $ 440
Review sports lighting calculations provided by Musco Lighting (up to 2
reviews) 1 $ 260 2 $ 360 $ - $ - $ - $ - $ - $ - $ - 3 $ 620
Review and comment on sports lighting specifications 1 $ 260 2 $ 360 $ - $ - $ - $ - $ - $ - $ - 3 $ 620
Review and comment on lighting control system design 1 $ 260 2 $ 360 $ - $ - $ - $ - $ - $ - $ - 3 $ 620
Prepare sports lighting peer review memo (up to two (2) submittals) 1 $ 260 4 $ 720 $ - $ - $ - $ - $ - $ - $ - 5 $ 980
Attend up to three (3) design meetings by phone/web conference 3 $ 780 3 $ 540 $ - $ - $ - $ - $ - $ - $ - 6 $ 1,320
$ - $ - $ - $ - $ - $ - $ - $ - $ - 0 $ -
Hour Totals 14210000000
Cost Totals $ 3,640 $ 3,780 $ - $ - $ - $ - $ - $ - $ -
Hours subtotal 35 35
Fee subtotal $ 7,420 $ 7,420
Additional Site Visits or In-Person Meetings as needed
Additional Site Visit or In-Person Meeting (Nancy only) 4 $ 1,040 $ - $ - $ - $ - $ - $ - $ - $ - 4 $ 1,040
Additional Site Visit or In-Person Meeting (Dane only) $ - 4 $ 720 $ - $ - $ - $ - $ - $ - $ - 4 $ 720
Additional Site Visit or In-Person Meeting (Nancy & Dane) 4 $ 1,040 4 $ 720 $ - $ - $ - $ - $ - $ - $ - 8 $ 1,760
$ - $ - $ - $ - $ - $ - $ - $ - $ - 0 $ -
Hour Totals 880000000
Cost Totals $ 2,080 $ 1,440 $ - $ - $ - $ - $ - $ - $ -
Hours subtotal 16 16
Fee subtotal $ 3,520 $ 3,520
2017 Standard <----- Click to change the rate table
Senior CADD
Technician
CADD
Senior Principal Principal Technician Administration TASK TOTALS
Senior Engineer /
Designer
Engineer /
Designer Intern
Production
Manager
Prepared by
Nancy Clanton Page 1 Rolland Moore Ballfields_Lighting Peer Review Task-Hour Worksheet_2017-05-15.xlsm