Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7220 WATER WW TREATMENT & SITE INFRASTRUCTURE DESIGN CONSTRUCTION CONTRACTOR (23)WTF CCB Phase 3 Contract Change Order December 2016 00950-1 SECTION 00950 CHANGE ORDER NO. 3 PROJECT TITLE: WTF Chlorine Contact Basin Phase 3 Construction CONTRACTOR: Hydro Construction Purchase Order and Business Unit Numbers: PO9162138 and BU 5020331000 DESCRIPTION: 1. Reason for change: additional site work items to complete the construction of CCB project 2. Description of Change: additional site work identified during cathodic protection portion of CCB construction. New piping and test stations and junction boxes are connected into the WTF rectification system, so all new piping is cathodically protected. However, the 36” DIP north of the water reservoirs which is influent to the East reservoir and connected to the new CCB, is not bonded, so with the new piping connection to the rectifiers, stray current can quicken corrosion on unbonded ductile iron pipe. Thus, to protect this pipe, it must be bonded to prevent enhanced corrosion. This work will be completed within the substantial completion timeframe of change order #2. 3. Change in Contract Cost: with three change orders, including this one at $139,353, the new total contract amounts to $7,184,266.00. 4. Change in Contract Time: With these new work items, the master schedule for the substantial completion of the CCB construction will remain within change order #2 substantial completion, September 30, 2017. ORIGINAL CONTRACT COST $ 6,852,437.00 TOTAL APPROVED CHANGE ORDERS $331,730.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $139,353.00 TOTAL % OF THIS CHANGE ORDER 2.0% TOTAL C.O.% OF ORIGINAL CONTRACT 6.5% ADJUSTED CONTRACT COST $ 7,323,520.00 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative ACCEPTED BY: DATE: Special Projects Manager REVIEWED BY: DATE: Chief Engineer APPROVED BY: DATE: Water Production Manager APPROVED BY: DATE: Water Resources and Treatment Operations Manager APPROVED BY: DATE: Purchasing Agent over $60,000 APPROVED BY: DATE: Gerry Paul, Director of Purchasing (over $60,000) DocuSign Envelope ID: 43664849-A4EC-48B8-917D-8AB1EFFC8D17 5/30/2017 5/31/2017 6/1/2017 6/1/2017 6/1/2017 6/1/2017 6/6/2017