Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 8320 ASPHALT OVERLAY PROJECT (2)COFC ‐ East Harmony Duct Bank Revenue Summary K. Carter Description Qty UOM Unit Cost Total Cost 4.27.2017 ‐ T&M 1.00 LS $4,716.00 $4,716.00 4.28.2017 T&M 1.00 LS $3,439.00 $3,439.00 4.30.2017 T&M 1.00 LS $126.00 $126.00 5.1.2017 T&M 1.00 LS $1,512.23 $1,512.23 5.1.2017 ‐ 8" Lower Lift of Asphalt 616.54 TN $81.30 $50,124.70 5.3.2017 T&M 1.00 LS $5,641.00 $5,641.00 5.4.2017 ‐ 8" Lower Lift of Asphalt 525.71 TN $81.30 $42,740.22 5.5.2017 T&M 1.00 LS $2,166.00 $2,166.00 5.5.2017 ‐ 2" Top Lift of Asphalt 555.67 TN $100.00 $55,567.00 5.12.2017 T&M 1.00 LS $5,327.75 $5,327.75 5.12.2017 ‐ Kehn Milling / T&M 2200.00 LS $4.10 $9,020.00 5.13.2017 T&M 1.00 LS $3,050.00 $3,050.00 5.15.2017 ‐ 8" Lower Lift of Asphalt 1000.73 TN $81.30 $81,359.35 5.16.2017 ‐ Kehn Milling / T&M 430.00 SY $3.25 $1,397.50 5.16.2017 ‐ 2" Top Lift of Asphalt 277.29 TN $100.00 $27,729.00 5.17.2017 ‐ 2" Top Lift of Asphalt 80.12 TN $100.00 $8,012.00 Total $301,927.75