HomeMy WebLinkAboutCHANGE ORDER - RFP - 8127 ENGINEERING SERVICES FOR ELECTRIC FACILITIES CAPITAL IMPROVEMENTS (2)SECTION 00950 CHANGE ORDER NO. 02 PROJECT TITLE: Hwy 392 Timberline Rd to I-25 Duct Bank CONTRACTOR: Stanley Consultants, Inc PROJECT NUMBER: 501008-2554 PO NUMBER: 9161612 ORIGINAL BID/RFP NUMBER & NAME: 8127 Engineering Services DESCRIPTION: 1. Reason for change: Increase in scope 2. Description of Change: Adding design services and permitting services 3. Change in Contract Price: $30,530 4. Change in Contract Time: Extend 5 Months ORIGINAL CONTRACT PRICE $ 66,864.00 TOTAL APPROVED CHANGE ORDER 57,575.00 TOTAL PENDING CHANGE ORDER 0.00 TOTAL THIS CHANGE ORDER 30,530.00 TOTAL % OF THIS CHANGE ORDER % TOTAL C.O.% OF ORIGINAL CONTRACT % ADJUSTED CONTRACT COST $ 154,969.00 (Assuming all change orders approved) REVIEWED BY: DATE: Pat Johnson, Senior Buyer ACCEPTED BY: DATE: May 1, 2017 Contractor's Representative SUBMITTED BY: DATE: Rob Irish,Project Manager APPROVED BY: DATE: Tim McCullough, Light & Power Operations Manager APPROVED BY: DATE: Gerry Paul, Purchasing Director (over $60,000) John hnso son, Sen en enio ior Bu Buye ye yerr nt ct 's R ntativ Req# 56771 Heather 5/16/17 5010082554.521210.3660 564112 DocuSign Envelope ID: BCEC5273-314F-426A-B83E-3E53CA4FDFBE   Work Order No. 501008-2554 – Change Order No. 2: Hwy 392-Timberline Rd to I25 Duct Bank Project Page 1 WORK ORDER NO. 501008-2554 TASK AUTHORIZATION CHANGE ORDER NO. 2 Request for Additional Services To: STANLEY CONSULTANTS, INC. (Professional) From: THE CITY OF FORT COLLINS (City) Subject: AUTHORIZATION TO PERFORM ENGINEERING SERVICES Project Title: HWY 392-TIMBERLINE RD TO I-25 DUCT BANK PROJECT ORIGINAL TASK SUMMARY The City plans to install underground electric feeders along Highway 392 between Timberline Road and Interstate 25. The general alignment follows the north side of the Highway 392 and passes near Duck Pond and through Fossil Creek Reservoir Natural Area. Professional will provide design services, easement acquisition and permitting services to support the project. CHANGE ORDER NO. 2: Scope of Services 1. Design route changes for crossing Highway 392 at the frontage road, utility conflict resolution along I-25 off ramp, adjustments made for easement spacing near PVREA line and effort spent coordinating with bore contractor to adjust bore locations and lengths. This required extra effort by the Project Manager, Electric Designer, Civil Designer and Permit Specialist to reach resolution. Three rounds of revisions were made to the design drawings. 2. Three extra trips to the site were made by Electric Designer to coordinate utility conflicts, bore locations, design changes and to meet survey and utility locator subconsultants. 3. Additional utility potholes and traffic control were performed by USIC locators (Subconsultant) to provide information on existing utility crossings. 4. After the design changes were addressed, additional effort was needed to revise the Grading Erosion and Sediment Control drawings to reflect current alignment. 5. Permit Specialist performed research of land values in the area and calculated easement costs for the alternative route along the south side of Highway 392 to complete the alternative route analysis. 6. Additional effort was needed to do high level review of environmental impacts to alternate route on south side of Highway 392 to complete the alternative route analysis. 7. In an effort to increase communication, we began scheduling regular project status meetings with City Project Manager via conference call on a bi-monthly basis starting 12/20/2017, there have been nine meetings to date. The meetings include the Project Manager, Electric Designer and Permit Specialist. Additional time is also included to continue the bi-monthly meetings until 9/05/2017, estimated to be 9 more meetings. DocuSign Envelope ID: BCEC5273-314F-426A-B83E-3E53CA4FDFBE Work Order No. 501008-2554 – Change Order No. 2: Hwy 392-Timberline Rd to I25 Duct Bank Project Page 2 COMPENSATION The current fee is $124,439. The revised estimated fee is $154,969 which is an increase of $30,530. Compensation will be billed per Professional's hourly rate plus reimbursable expenses identified in the Professional Service Agreement. The Professional will submit monthly invoices to the City. The estimated fee will not be exceeded without a change order agreed upon by the City and Professional. Task Description Current Fee Increase Adjusted Fee Task 1.0 – Obtain New Easement $37,200 $4,600 $41,800 Task 2.0 – Environmental Review $17,664 $1,900 $19,564 Task 3.0 – SWMP/GESC & Report $11,038 $2,400 $13,438 Task 4.0 – Floodplain Permit & No Rise Cert $9,128 $0 $9,128 Task 5.0 – CDOT Utility Permit $6,948 $0 $6,948 Task 6.0 – Construction Dewatering Permit $2,816 $0 $2,816 Task 7.0 – Design & Profile $38,047 $14,300 $52,347 Task 8.0 – Project Status Meetings (New Task) $0 $6,930 $6,930 Reimbursable Expenses $1,598 $400 $1998 Totals $124,439 $30,530 $154,969 DocuSign Envelope ID: BCEC5273-314F-426A-B83E-3E53CA4FDFBE