HomeMy WebLinkAboutWORK ORDER - RFP - 8286 CONSTRUCTION CONTRACTOR FOR PROJECTS AT THE WATER & WASTEWATER TREATMENT FACILITIES (10)WORK ORDER
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
HYDRO CONSTRUCTION COMPANY, INC
DATED: JUNE 20, 2016
Work Order Number: H-WRF-2017-12
Purchase Order Number:
Project Title: 2017 MSR Stock Tank
Original Bid/RFP Number & Name: 8286 Construction Contractor for Projects at the Water and Wastewater Treatment
Facilities
Commencement Date: May 31, 2017
Completion Date: July 15, 2017
Maximum Fee: (time and reimbursable direct costs): $27,042.00
Project Description: This work order is for construction of one 21-foot diameter bottomless tank in the South Benson
pasture of the Meadow Springs Ranch
Scope of Services: See attached
_____________________________________________________________________________________________
Contractor agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Construction Work
Order Agreement between the parties. In the
event of a conflict between or ambiguity in the
terms of the Construction Work Order Agreement
and this work order (including the attached forms)
the Construction Work Order Agreement shall
control.
The attached forms consisting of seven (7) pages
are hereby accepted and incorporated herein, by
this reference, and Notice to Proceed is hereby
given.
HYDRO CONSTRUCTION, INC
By:_______________________________
Stanley A. Javernick III, Vice President of Operations
Date:_____________________________
CITY OF FORT COLLINS
Submitted By: _________________________
Nathan Ader, Resource Recovery Chief
Date: _________________________
Reviewed by: _________________________
Pat Johnson, Senior Buyer
Date: _________________________
Accepted by: _________________________
Jason Graham, Water Reclamation &
Biosolids Manager
Date: _________________________
Accepted by: _________________________
Owen Randall, Chief Engineer
Date: ________________________
Accepted by: _________________________
Carol Webb, Water Engineering and Field
Services Operations Manager
Date: ________________________
DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B
5/22/2017
5/22/2017
5/23/2017
5/23/2017
5/24/2017
Scope of Work
South Benson Pasture Stock Tank
1. General conditions include Project management, daily site supervision, fuel and equipment to
complete the project
2. 21-foot diameter galvanized watering stock tank set in concrete slab with water stop
3. 1 inch galvanized waterline buried 4 feet deep under tank to center of tank. 1 inch HDPE to
existing Ranch water connection approximately 100 feet away.
4. Ranch standard tank level float switch
5. 7 ea. 2-inch galvanized posts with 3/8 inch stainless steel cable surrounding tank
6. Mobilization/Demobilization
DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B
HYDRO CONSTRUCTION CO., INC. Standard Estimate Report Page 1
MSR - 2017 Stock Tank 4/11/2017 4:48 PM
Project name MSR - 2017 Stock Tank
Labor rate table Labor - Bare
Equipment rate table Equipment
Report format Sorted by 'Structure/Phase'
'Phase' summary
Allocate addons
Print sort level notes
Paginate
DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B
HYDRO CONSTRUCTION CO., INC. Standard Estimate Report Page 2
MSR - 2017 Stock Tank 4/11/2017 4:48 PM
Description Quantity
Labor
Amount
Material
Amount
Subcontract
Amount
Equipment
Amount
Other
Amount
Total
Amount
G General Conditions
1100.100 Project Management 4,692 558 5,250
1102.100 Site Supervision 4,692 751 5,443
1110.100 Travel 300 300
1622.100 Fuels 547 547
1900.100 Skidsteers 1,502 1,502
1900.110 Excavators 1,172 1,172
G General Conditions 9,384 300 3,984 547 14,216
160.00 Labor hours
160.00 Equipment hours
DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B
HYDRO CONSTRUCTION CO., INC. Standard Estimate Report Page 3
MSR - 2017 Stock Tank 4/11/2017 4:48 PM
Description Quantity
Labor
Amount
Material
Amount
Subcontract
Amount
Equipment
Amount
Other
Amount
Total
Amount
ST01 Tank #01
- Includes 21' diameter metal bottomless tank to be set in concrete slab
- Includes water supply line with isolation ball valves
- Water line estimated to be about 4' deep, tie in point approxamatly 100' from tank.
- Includes basic water level float
- Tank includes posts surrounding tank and cable
2317.105 Building Excavation 359 359
2502.010 Pipe Trenching 186 54 240
2517.101 Copper Water Pipe 250 250
2841.100 Guard Rails 790 162 952
3210.208 Rebar- SOG 100 100
3220.110 Wire Mesh- Rolls 30 30
3300.990 Conc Subs- Flatwork 2,600 2,600
3310.100 Concrete- Buy 1,800 1,800
11501.006 Storage Tanks 442 1,700 2,142
15060.366 Rod All Thread 46 50 96
ST01 Tank #01 1,822 4,092 2,600 54 8,568
76.57 Labor hours
27.94 Equipment hours
DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B
HYDRO CONSTRUCTION CO., INC. Standard Estimate Report Page 4
MSR - 2017 Stock Tank 4/11/2017 4:48 PM
Estimate Totals
Description Amount Totals Hours Rate Cost Basis Cost per Unit Percent of Total
Labor 11,206 236.569 hrs 41.44%
Material 4,392 16.24%
Subcontract 2,600 9.61%
Equipment 3,984 187.940 hrs 14.73%
Other 601 2.22%
22,783 22,783 84.25 84.25%
Perform & Payment Bond - 2 yr. 419 B 1.55%
419 23,202 1.55 85.80%
Contingency 1,160 5.000 % T 4.29%
1,160 24,362 4.29 90.09%
Profit & Overhead 2,680 11.000 % T 9.91%
2,680 27,042 9.91 100.00%
Total 27,042
DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B
DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B
1st wk June
17
2nd wk
June17
3rd wk
June17
4th wk
June17
1st wk July
17
2nd wk July
17
Material Procurement
Mobilization
Construction
DeMobilization
Key Dates NTP: May 31, 2017
SCHEDULE
CAPITAL PROJECTS Schedule
2017 MSR Stock Tank
DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B
5/24/2017