Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 8286 CONSTRUCTION CONTRACTOR FOR PROJECTS AT THE WATER & WASTEWATER TREATMENT FACILITIES (10)WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND HYDRO CONSTRUCTION COMPANY, INC DATED: JUNE 20, 2016 Work Order Number: H-WRF-2017-12 Purchase Order Number: Project Title: 2017 MSR Stock Tank Original Bid/RFP Number & Name: 8286 Construction Contractor for Projects at the Water and Wastewater Treatment Facilities Commencement Date: May 31, 2017 Completion Date: July 15, 2017 Maximum Fee: (time and reimbursable direct costs): $27,042.00 Project Description: This work order is for construction of one 21-foot diameter bottomless tank in the South Benson pasture of the Meadow Springs Ranch Scope of Services: See attached _____________________________________________________________________________________________ Contractor agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Construction Work Order Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Construction Work Order Agreement and this work order (including the attached forms) the Construction Work Order Agreement shall control. The attached forms consisting of seven (7) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. HYDRO CONSTRUCTION, INC By:_______________________________ Stanley A. Javernick III, Vice President of Operations Date:_____________________________ CITY OF FORT COLLINS Submitted By: _________________________ Nathan Ader, Resource Recovery Chief Date: _________________________ Reviewed by: _________________________ Pat Johnson, Senior Buyer Date: _________________________ Accepted by: _________________________ Jason Graham, Water Reclamation & Biosolids Manager Date: _________________________ Accepted by: _________________________ Owen Randall, Chief Engineer Date: ________________________ Accepted by: _________________________ Carol Webb, Water Engineering and Field Services Operations Manager Date: ________________________ DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B 5/22/2017 5/22/2017 5/23/2017 5/23/2017 5/24/2017 Scope of Work South Benson Pasture Stock Tank 1. General conditions include Project management, daily site supervision, fuel and equipment to complete the project 2. 21-foot diameter galvanized watering stock tank set in concrete slab with water stop 3. 1 inch galvanized waterline buried 4 feet deep under tank to center of tank. 1 inch HDPE to existing Ranch water connection approximately 100 feet away. 4. Ranch standard tank level float switch 5. 7 ea. 2-inch galvanized posts with 3/8 inch stainless steel cable surrounding tank 6. Mobilization/Demobilization DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B HYDRO CONSTRUCTION CO., INC. Standard Estimate Report Page 1 MSR - 2017 Stock Tank 4/11/2017 4:48 PM Project name MSR - 2017 Stock Tank Labor rate table Labor - Bare Equipment rate table Equipment Report format Sorted by 'Structure/Phase' 'Phase' summary Allocate addons Print sort level notes Paginate DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B HYDRO CONSTRUCTION CO., INC. Standard Estimate Report Page 2 MSR - 2017 Stock Tank 4/11/2017 4:48 PM Description Quantity Labor Amount Material Amount Subcontract Amount Equipment Amount Other Amount Total Amount G General Conditions 1100.100 Project Management 4,692 558 5,250 1102.100 Site Supervision 4,692 751 5,443 1110.100 Travel 300 300 1622.100 Fuels 547 547 1900.100 Skidsteers 1,502 1,502 1900.110 Excavators 1,172 1,172 G General Conditions 9,384 300 3,984 547 14,216 160.00 Labor hours 160.00 Equipment hours DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B HYDRO CONSTRUCTION CO., INC. Standard Estimate Report Page 3 MSR - 2017 Stock Tank 4/11/2017 4:48 PM Description Quantity Labor Amount Material Amount Subcontract Amount Equipment Amount Other Amount Total Amount ST01 Tank #01 - Includes 21' diameter metal bottomless tank to be set in concrete slab - Includes water supply line with isolation ball valves - Water line estimated to be about 4' deep, tie in point approxamatly 100' from tank. - Includes basic water level float - Tank includes posts surrounding tank and cable 2317.105 Building Excavation 359 359 2502.010 Pipe Trenching 186 54 240 2517.101 Copper Water Pipe 250 250 2841.100 Guard Rails 790 162 952 3210.208 Rebar- SOG 100 100 3220.110 Wire Mesh- Rolls 30 30 3300.990 Conc Subs- Flatwork 2,600 2,600 3310.100 Concrete- Buy 1,800 1,800 11501.006 Storage Tanks 442 1,700 2,142 15060.366 Rod All Thread 46 50 96 ST01 Tank #01 1,822 4,092 2,600 54 8,568 76.57 Labor hours 27.94 Equipment hours DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B HYDRO CONSTRUCTION CO., INC. Standard Estimate Report Page 4 MSR - 2017 Stock Tank 4/11/2017 4:48 PM Estimate Totals Description Amount Totals Hours Rate Cost Basis Cost per Unit Percent of Total Labor 11,206 236.569 hrs 41.44% Material 4,392 16.24% Subcontract 2,600 9.61% Equipment 3,984 187.940 hrs 14.73% Other 601 2.22% 22,783 22,783 84.25 84.25% Perform & Payment Bond - 2 yr. 419 B 1.55% 419 23,202 1.55 85.80% Contingency 1,160 5.000 % T 4.29% 1,160 24,362 4.29 90.09% Profit & Overhead 2,680 11.000 % T 9.91% 2,680 27,042 9.91 100.00% Total 27,042 DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B 1st wk June 17 2nd wk June17 3rd wk June17 4th wk June17 1st wk July 17 2nd wk July 17 Material Procurement Mobilization Construction DeMobilization Key Dates NTP: May 31, 2017 SCHEDULE CAPITAL PROJECTS Schedule 2017 MSR Stock Tank DocuSign Envelope ID: E740A958-9FA2-44BD-A9E1-B05A97DA0E6B 5/24/2017