Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7073 MASON CORRIDOR MAX BRT FINAL DESIGNCOFC2014.04_CO1.docx March 31, 2017 375 East Horsetooth Road, Bldg. 5  Fort Collins, Colorado  80525 Phone: (970) 226-0120  Fax: (970) 226-0121  www.acewater.com March 31, 2017 Mr. Brad Buckman City of Fort Collins, Engineering 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522 RE: Spring Creek LOMR at the Mason Street Corridor: Change Order #2 (ACE Project No. COFC2014.04) Dear Brad: This letter represents our request for a change order for the Mason Street Corridor crossing of Spring Creek LOMR application. The original scope and budget for the project identified addressing FEMA review comments as being the subject of a change order. However, following the submittal of the LOMR application to FEMA a small budget surplus was available, allowing ACE to largely complete and submit a response to FEMA for their first round of review comments. Unfortunately, on March 29, 2017 a second round of review comments was issued by FEMA. Therefore, we respectfully request a change order for a time and materials budget not to exceed $5,000 in order to respond to this second round of FEMA review comments. We respectfully submit this change order based on our understanding of FEMA’s requirements for bringing the project to successful conclusion. Please do not hesitate to contact me if you have any questions or comments. Sincerely, Anderson Consulting Engineers, Inc. Jamis D. Darrow, P.E. Senior Engineer