Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7515 CONSULTING ENGINEERING SERVICES FOR FUTURE WATER WW & SW FACILITIES CAPITAL IMPROVEMENTS (8)WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Stantec Consulting Services, INC. DATED: 07/22/13 Work Order Number: 201707 Purchase Order Number: Project Title: Azalea Drive Waterline Replacement – Final Design and Construction Services Original Bid/RFP Number & Name: 7515 Consulting Engineering Services for w/ww & Stormwater Facilities Capital Improvements Commencement Date: 04/15/17 Completion Date: 10/30/17 Maximum Fee: (time and reimbursable direct costs):$50,715.00 Project Description: Replacement of 8 inch Water Main and Valves in Azalea Drive Scope of Services: Design and Construction Services for above Project ( Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of U U U ) U pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. PROFESSIONAL By:_______________________________ Date:_____________________________ CITY OF FORT COLLINS Submitted By: _________________________ Jay Rose, Special Project Manager Date: _________________________ Reviewed by: _________________________ Pat Johnson, Senior Buyer Reviewed by: _________________________ Owen L. Randall, Chief Engineer Date: _________________________ Approved by: _________________________ Jon Haukaas, Water Engineering & Field Services Operations Manager Date: ________________________ Approved by: _________________________ Kevin Gertig, Utilities Executive Director Date: ________________________ Approved by: _________________________ Gerry Paul, Purchasing Director (if over $60,000) Date: _______________________ Seven 7 DocuSign Envelope ID: 3CEC4D58-CC59-4411-8D62-C6B987321700 4/11/2017 4/11/2017 4/12/2017 4/12/2017 4/12/2017 DocuSign Envelope ID: 3CEC4D58-F6D9F926-712A-CC59-4061-4411-AD8B-8D62-9F8EB0E4438D C6B987321700 DocuSign Envelope ID: 3CEC4D58-F6D9F926-712A-CC59-4061-4411-AD8B-8D62-9F8EB0E4438D C6B987321700 DocuSign Envelope ID: 3CEC4D58-F6D9F926-712A-CC59-4061-4411-AD8B-8D62-9F8EB0E4438D C6B987321700 DocuSign Envelope ID: 3CEC4D58-F6D9F926-712A-CC59-4061-4411-AD8B-8D62-9F8EB0E4438D C6B987321700 DocuSign Envelope ID: 3CEC4D58-F6D9F926-712A-CC59-4061-4411-AD8B-8D62-9F8EB0E4438D C6B987321700 DocuSign Envelope ID: 3CEC4D58-F6D9F926-712A-CC59-4061-4411-AD8B-8D62-9F8EB0E4438D C6B987321700 DocuSign Envelope ID: 3CEC4D58-F6D9F926-712A-CC59-4061-4411-AD8B-8D62-9F8EB0E4438D C6B987321700 PROJECT SCHEDULE EXHIBIT C TASK SCOPE April May June July August September October Task 1 Meetings 1.1 Kick-off Meeting 1.2 Progress Meetings (2) 1.3 HOA Meeting (1) Task 2 Design Geotechnical Investigation (4 boreholes) Field Survey 2.1 Coordination with Meter Shop 2.2 Utility Locates Mapping & Information Collection Prepare Alternatives 2.3 Coordinate with Hydro and Capstone on Construction Costs 2.4 Review Temporary Water Plan by Hydro Task 3 Specifications 3.1 Place Relevant specifications on Drawings 3.2 QC Task 4 Construction Drawings 4.1 Drawings Preparation (5 sheets) a. Cover (1 sheet) b. Overall Plan sheet (1 sheet) c. Plan & Profile (2 sheets) d. Detail Sheets (1 sheet) 4.2 QC Task 5 Administration - Design 5.1 Office Administration Task 6 Construction Administration 6.1 Pre-Construction Meeting (1) 6.2 Pre-Construction Site Video 6.3 Site Visits (Mark - 6 hours / week for 8 weeks) (inc. const. meetings) 6.4 RFI's 6.5 Submittal Review Task 7 Drawings of Record 7.1 Drawings Preparation (6 sheets) a. Cover (1 sheet) b. Overall Plan sheet (1 sheet) c. Plan & Profile (2 sheets) d. Detail Sheet (1 sheet) e. Photo Sheet (1 sheet) 7.2 QC Task 8 Administration - Construction 8.1 Office Administration DocuSign Envelope ID: 3CEC4D58-F6D9F926-712A-CC59-4061-4411-AD8B-8D62-9F8EB0E4438D C6B987321700 URequisition Form Vendor : Stantec Consulting Services Inc. Today’s Date: 04/07/2016 Requisition: 3325 south Timberline Road Ship To: Date Entered: Suite 156 Date Required: Date Approved: Fort Collins, Co 80025-2903 Special Instructions: Date Denied: Item # Quantity Unit Description Unit Price Total Charge Number 1 1 each Azalea Drive Waterline Replacement, - Final Design $25,537.00 $25,537.00 502.5020100005.521210.3 1 1 each Azalea Drive Waterline Replacement, - Construction $25,181.00 $25,181.00 502.5020100005.521210.6 Requested By: ____________________________________ Authorized By: ______________________________________ DocuSign Envelope ID: 3CEC4D58-F6D9F926-712A-CC59-4061-4411-AD8B-8D62-9F8EB0E4438D C6B987321700 4/12/2017 4/12/2017 DocuSign Envelope ID: F6D9F926-712A-4061-AD8B-9F8EB0E4438D