Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7546 DIRECTIONAL BORING & TRENCHING SERVICES (4)SECTION 00950 CHANGE ORDER NO. 1 PROJECT TITLE: Prospect/Timberline PO NUMBER: 9172964 CONTRACTOR: Colorado Boring PROJECT NUMBER: 1630-2672 DESCRIPTION: 1. Reason for change: Additional traffic control needed. Poor soil conditions that created extra work. Had to grout the sleeve which was an add. Concrete removal and re-poured the concrete. 2. Description of Change: Extra services for a directional bore 3. Change in Contract Cost: $12,906 4. Change in Contract Time: none ORIGINAL CONTRACT COST $ 167,088.00 TOTAL APPROVED CHANGE ORDER .00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER 12,906.00 TOTAL % OF THIS CHANGE ORDER 7.73% TOTAL C.O.% OF ORIGINAL CONTRACT 7.73% ADJUSTED CONTRACT COST $ 179,994.00 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative REVIEWED BY: DATE: Project Manager APPROVED BY: DATE: Buyer APPROVED BY: DATE: Title: Light & Power Operations MGR APPROVED BY: DATE: Purchasing Director (over $60,000) DocuSign Envelope ID: 3788B5A1-A636-4958-BD3E-7CE73EA49903     180828 Req# 56776 Heather 5/17/17 cc: City Clerk Contractor Engineer Project File Architect Purchasing DocuSign Envelope ID: 3788B5A1-A636-4958-BD3E-7CE73EA49903