HomeMy WebLinkAboutWORK ORDER - RFP - 8115 ENGINEERING SERVICES FOR WATER RECLAMATION & BIOSOLIDS FACILITY DESIGN & CONSTRUCTION (7)WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CAROLLO ENGINEERS, INC. DATED: September 21, 2015 Work Order Number: C-WRF-2017-10 Purchase Order Number: Project Title: DWRF UV System Engineering Construction Services Original Bid/RFP Number & Name:8115 Engineering Services for Water Reclamation and Biosolids Facility Design and Construction Services Commencement Date: May 1, 2017 Completion Date: December 31, 2017 Maximum Fee: (time and reimbursable direct costs):$64,020 Project Description: Design and Engineering Construction Services for the replacement of chlorine gas with hypochlorite (bleach) system for the disinfection of the non-pot and RAS in the NPT and SPT Scope of Services: See Attached Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of four (4) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. CAROLLO ENGINEERS, INC By:_______________________________ Jason Garside, Vice President Date:_____________________________ By:_______________________________ Anthony L. Morroni, P.E., Senior Vice President Date:_____________________________ CITY OF FORT COLLINS Submitted By: _________________________ Link Mueller, Special Project Manager Date: _________________________ CITY OF FORT COLLINS (CONT’D) Reviewed By: ______________________ Pat Johnson, Senior Buyer Date: _________________________ Reviewed by: _________________________ Jason Graham, Water Reclamation & Biosolids Manager Date: _________________________ Reviewed by: _________________________ Owen L. Randall, Chief Engineer Date: _________________________ Accepted by: _________________________ Carol Webb, Water Resource & Treatment Operations Manager Date: ________________________ Approved by: _________________________ Gerry Paul, Purchasing Director (if over $60,000) Date: _______________________ DocuSign Envelope ID: DD42C271-A9F0-4AFF-8A73-3A15CD73C1CA 4/27/2017 FINAL (4-25-17) pg. 1 Scope of Work – DWRF UV System, Non-pot and RAS Disinfection Replacement FINAL – 4/25/2017 The City of Fort Collins (City) intends to implement the following project at the Drake Water Reclamation Facility (DWRF): In conjunction with the DWRF UV project, the City of Fort Collins (City), Carollo Engineers (Consultant and Engineer of Record), and Hydro Construction (Contractor) will design and construct a liquid hypochlorite (bleach) storage, transfer, and dosing system. This system will be sized to handle DWRF’s non-pot system, and RAS chlorination, both low-dose and RASassination dose, for DWRF’s north process train (NPT) and south process train (SPT). The purpose of this Work Order is to provide the technical analysis and engineering, and preparation of drawings and specifications for the proposed project. The level of detail for drawings and specifications will be similar to past replacement projects. It is anticipated that this design work will proceed beginning May, 2017 and construction will be completed by the end of 2017. Construction-related services are included in the cost estimate attached. The scope of work is divided into the following major tasks, summarized below: Task 1 - Project Administration and Coordination Task 1.1 - Coordination Meetings Prepare for and participate in three (3), two (2) hour meetings with the Project Team to coordinate the pre-design and design activities. Appropriate Consultant staff and subconsultants will be in attendance based on the topics of discussion. Meeting agendas will be provided and a Decision Log will be kept up to date over the course of the Project. Task 1.2 - Quality Assurance/Quality Control (QA/QC) Perform quality assurance and quality control of all deliverables prepared by Consultant in accordance with Consultant's standard QA/QC policies and procedures. Task 1.3 - Progress Reporting Invoices will be submitted monthly in accordance with City payment protocols. Each invoice will be submitted with a progress report detailing the work executed during the invoice period and work remaining. Task 2 - Facility Investigations and Existing Documentation Review Task 2.1 - Facility Investigations Conduct walkthrough of facilities with plant staff to develop understanding of existing conditions and preferences for implementation of proposed improvements. Assume one (1), two (2) hour walkthrough. Consultant's Project Manager (PM), Mechanical Engineer and Electrical/Instrumentation/Controls (EIC) Engineer will attend walkthrough. Consultant will prepare a written summary of information gathered and findings of walkthrough. Task 2.2 - Existing Documentation Review Consultant will review existing documentation available for replacement project. City will provide existing documentation. DocuSign Envelope ID: DD42C271-A9F0-4AFF-8A73-3A15CD73C1CA FINAL (4-25-17) pg. 2 Task 3 - Design Development Task 3.1 - Engineering Analyses Consultant will perform engineering analyses necessary for determining the appropriate solution for replacement project. Specific analysis includes the following: Process Calculations: 1. Confirm demand for each of the processes: a. Non-pot (min-max). b. NPT (RAS winter low dose, RASassination). c. SPT (RAS winter low dose, RASassination). 2. Confirm volume required for 30 day storage assuming 6% hypochlorite 3. Determine Day Tank Volumes for NPT and SPT; possibly, 12% tote in SPT. 4. Determine Pipe sizing for transfer from bleach storage to NPT/SPT. Mechanical Analysis 1. Transfer Pump sizing (plant staff will prefer duplex magnetic drive pumps. Will also want recirculation line plumbed back to tank for mixing/off-gassing. 2. Determine if the single storage tank is adequate or if additional tank is recommended. 3. Determine if 3-way valve in polymer batching room is feasible to direct flow between north and south. 4. Evaluate alternatives for routing hypochlorite from dewatering building to digester building for SPT. 5. Determine optimum number of peristaltic pumps required to meet all the pumping demands. Electrical/Instrumentation Analysis 1. Determine if additional existing level sensors for existing storage tanks are operational or if new ones. 2. Determine if additional instrumentation is needed for hypochlorite loading and storage. 3. Determine if adequate electrical support is available in the old Odor Control MCC room. 4. If 3-way valve is determined feasible, determine electrical and control support points. 5. For both NPT and SPT evaluate power, instrumentation and control requirements for day storage and dosing equipment. Task 3.2 - Design Drawings and Specifications Prepare design drawings and specifications to progress the design of Project to 30 and 90 percent completion levels. The 90 percent drawings and specifications will be reviewed by City and revised by Consultant to produce the Issued for Construction documents. Prepare individual equipment specifications, if required. The drawings and specifications required for replacement project are assumed as the following: 1 civil/mechanical drawing showing piping routing and overall location of improvements; 2 mechanical (plan view) drawings (Odor Control Bldg, NPT tunnel and SPT together on 1 sheet); 1 electrical one-line drawing 1 electrical elevation; and DocuSign Envelope ID: DD42C271-A9F0-4AFF-8A73-3A15CD73C1CA FINAL (4-25-17) pg. 3 3 process instrumentation diagram (P&ID) drawings. Specifications for the following equipment: peristaltic pumps; mag drive pumps; specialized valves and related appurtenances specific to bleach; and an FRP tank (may not be required). Task 4 - Engineering Services during Construction The majority of construction-related services related for the hypo project are assumed to be included within the UV project services since the construction of the two project will be concurrent. Additional services include the following: • Review shop drawings (5 total); • Request for information coordination; and • Start-up assistance with hypo system. DocuSign Envelope ID: DD42C271-A9F0-4AFF-8A73-3A15CD73C1CA FINAL - 4/25/17 DWRF UV SYSTEM – NON-POT AND RAS DISINFECTION REPLACEMENT (2017) LABOR HOURS AND ENGINEERING FEE Senior Professional Lead Project Professional Project Professional Professional (PE - Mech) Disciplines (Structural+Arch) Disciplines (EIC) Disciplines (Civil, HVAC, Mech) Senior Technician Technician Document Processing/Clerical Billing Rate $238 $219 $238 $171 $171 $171 $147 $162 $110 $96 Task 1 - Project Administration and Coordination 4 16 4 14 0 10 0 0 0 1 49 $9,608 $0 $0 $0 $200 $573 $10,381 Task 1.1 - Coordination Meetings 0 10 0 10 0 10 0 0 0 1 31 $5,706 $0 $0 $0 $200 $363 $6,269 Task 1.2 - Quality Assurance/Quality Control 3 2 4 4 0 0 0 0 0 0 13 $2,788 $0 $0 $0 $0 $152 $2,940 Task 1.3 - Progress Reporting 1 4 0 0 0 0 0 0 0 0 5 $1,114 $0 $0 $0 $0 $59 $1,173 Task 2 - Facility Investigations and Exist Doc Review 0 5 0 9 4 9 0 0 0 0 27 $4,857 $0 $0 $0 $200 $316 $5,373 Task 2.1 - Facility Investigations 0 5 0 5 0 5 0 0 0 0 15 $2,805 $0 $0 $0 $200 $176 $3,181 Task 2.2 - Existing Documentation Review 0 0 0 4 4 4 0 0 0 0 12 $2,052 $0 $0 $0 $0 $140 $2,192 Task 3 - Design Development 0 12 4 52 12 52 0 44 44 8 228 $36,152 $0 $0 $0 $0 $2,668 $38,820 Task 3.1 - Engineering Analyses 0 6 2 12 4 12 0 0 0 0 36 $6,578 $0 $0 $0 $0 $421 $6,999 Task 3.2 - Design Drawings and Specifications 0 6 2 40 8 40 0 44 44 8 192 $29,574 $0 $0 $0 $0 $2,246 $31,820 Task 4 - Engineering Services During Construction 0 7 0 20 0 20 0 0 0 3 50 $8,661 $0 $0 $0 $200 $585 $9,446 Task 3.1 - ESDC 0 7 0 20 0 20 0 0 0 3 50 $8,661 $0 $0 $0 $200 $585 $9,446 PROJECT TOTALS - TASKS 1-4 4 40 8 95 16 91 0 44 44 12 354 $59,278 $0 $0 $0 $600 $4,142 $64,020 TOTAL COST LABOR HOURS PROJECT COSTS Total Direct Labor Hours Total Labor Cost Ditesco Lithos King Surveying Other Direct Costs (ODCs) PECE DocuSign Envelope ID: DD42C271-A9F0-4AFF-8A73-3A15CD73C1CA May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Design Kick-off Preliminary Design Final Design Engineering Construction Services Key Dates: Commencement Date: 5/6/2017 Completion Date: December 31, 2017 DWRF UV System- Non-Pot and RAS Disinfection Replacement Project Schedule SCHEDULE DocuSign Envelope ID: DD42C271-A9F0-4AFF-8A73-3A15CD73C1CA 4/27/2017 4/28/2017 5/1/2017 5/1/2017 5/1/2017 5/1/2017 5/8/2017