HomeMy WebLinkAboutWORK ORDER - RFP - 7445 CONSULTING ENGINEERING SERVICES FOR STREAM RESTORATION & HABITAT ENHANCEMENT CAPITAL IMPROVEMENTSWORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND AYRES Associates DATED: February 1, 2013 Work Order Number: SC-Edora-AYRES-022817 Purchase Order Number: Project Title: Spring Creek Rehab at Riverside Bridge Replacement Original Bid/RFP Number & Name: 7445 - Consulting Engineering Services for Stream Restoration & Habitat Enhancement Capital Improvements Commencement Date: April 2017 Completion Date: January 2018 Maximum Fee: (time and reimbursable direct costs): $98,268. Project Description: To finalize the site design for Reaches 1-6 and 2-1, just upstream and downstream of the bridge over Spring Creek going into EPIC Recreation Center and Edora Park off of Riverside. This stream rehab project is being designed concurrently and cooperatively with the Riverside Bridge Replacement project. Michael Baker International will be providing all of the design services for the bridge under a separate contract with City Engineering. MBI was selected for RFP #7522. Scope of Services: Design assistance and pre-construction coordination anticipated in support of the APDS process. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of two (2) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. PROFESSIONAL By:_______________________________ Date:_____________________________ CITY OF FORT COLLINS Submitted By: _________________________ Jason Stutzman, P.E., Special Project Manager Date: _________________________ Reviewed by: _________________________ Pat Johnson, Senior Buyer Reviewed by: _________________________ Owen L. Randall, Chief Engineer Date: _________________________ Approved by: _________________________ Jon Haukaas, Water Engineering & Field Services Operations Manager Date: ________________________ Approved by: _________________________ Kevin Gertig, Utilities Executive Director Date: ________________________ Approved by: _________________________ Gerry Paul, Purchasing Director (if over $60,000) Date: _______________________ DocuSign Envelope ID: C1C6A1E6-DAE1-467C-ACD1-31A85C9851B5 4/24/2017 April 10, 2017 1 STREAM REHABILITATION & ENHANCEMENT FINAL DESIGN FOR SPRING CREEK AT EPIC PROJECT OBJECTIVE: To finalize the site design for Reaches 1-6 and 2-1, just upstream and downstream of the bridge over Spring Creek going into EPIC and Edora Park off Riverside. GENERAL Ayres will provide planning, site design, and management services required to complete the final design, of the Stream Rehabilitation & Enhancement Project. The project team consists of Ayres Associates and, AlpineEco, Miller Ecological, (the Consultants). The Core Team consists of Ayres, City Utilities staff, and the contractor, Connell. Team members will be involved on an as-needed basis in the design process. The following Scope of Services outlines the tasks required to complete the final design. 1 Task 1 – Administrative 1.1 Management – This task covers general project management, contracting, invoicing, internal and sub-consultant coordination. 1.2 Progress meetings - Team progress meetings will be held including the Core Team and other team members as needed. These meetings may also include Potentially Affected Individuals (PAIs). A total of 10 progress meetings and 1 site visit are included in this scope. Ayres will provide and agenda and submit meeting minutes for progress meetings. 1.3 Riverside Bridge design coordination – Close coordination with the Riverside Bridge design team (Michael Baker) will be required. This task covers regular communication, sharing design data, and meetings related to project coordination. 1.4 Public outreach – It is assumed that public outreach will be required as part of this project. This task covers preparation for and attending 1 public outreach event. 2 Task 2 – Site Design and Plans 2.1 Final design - The Consultants will develop the final site design. Including the following items as noted in the 75% design report.  Adjustments to grading due to final Riverside Bridge and Roadway design  Adjustments to the pedestrian trail as needed  Adjustment/additions due to final hydraulic conditions  Adjustments to water quality pond if needed  Design of erosion protection for 42” sanitary line  Design of water quality pond spillway  Design detail of rock steps It is understood that Ayres will design all components related to stream restoration and Michael Baker will design all components related to the bridge replacement, roadway embankment, trail regrading associated with the new roadway, sidewalks, and stormwater infrastructure changes related to the new roadway. DocuSign Envelope ID: C1C6A1E6-03BCFC29-E036-DAE1-4371-467C-9D0D-ACD1-68293D98956C 31A85C9851B5 April 10, 2017 2 2.2 Final design plans - 75% design plans currently exist. Final plans will be developed based on the final design items listed in Task 2.1. It is assumed that this will be a multi-step process with input from the City and Contractor. 2.3 Specification – Specifications developed for Fossil Creek will be reviewed and edited and/or updated as needed for this project. 2.4 Update draft report - The 75% design draft report will be updated to describe all items included in the final design, hydraulic analysis, and design calculations. 2.5 Final report – After the City has reviewed the report and provided comments, Ayres will revise the draft report and submit a final design report. 3 Task 3 – Hydraulic Analysis 3.1 Proposed conditions model - Michael Baker will be conducting hydraulic modeling for the Riverside bridge replacement project and will be submitting the CLOMR package associated with that project. The proposed Stream Rehabilitation project will be included in the CLOMR package. Hydraulic modeling performed by Ayres Associates will still be required for rehabilitation design purposes as well as attempting to create a design with a no-rise condition. Ayres will work with Michael Baker to create the final HEC-RAS model for the CLOMR. Ayres created a preliminary 2D model for this reach while pursuing the Riverside bridge replacement project. Ayres will use this model as a reference during the SREP design. The 2D model provides more accurate and complete hydraulic results such as velocities and shear stresses as well as requiring less assumptions by the modeler. 3.2 Scour and rock sizing calculations – Ayres will calculate scour and rock (or other erosion mitigation measure) requirements. Calculations will inform the final design of restoration features. 4 Task 4 – Permitting 4.1 Coordination with permitting agencies – Meetings (or phone/email correspondence) will be held with pertinent agencies including USACE, CDPHE, USFWS, and others as appropriate. 4.2 Prepare and submit permits – The Consultants will complete and submit all appropriate environmental permit applications. It is understood that Ayres will submit the final 404 permit documents. It is understood that Michael Baker will provide permit documentation specifically required by CDOT. It is also understood that Michael Baker will submit the CLOMR and LOMR documents. 4.3 Respond to comments – The Consultant will address any comments related to permits. DocuSign Envelope ID: C1C6A1E6-03BCFC29-E036-DAE1-4371-467C-9D0D-ACD1-68293D98956C 31A85C9851B5 April 10, 2017 3 SUMMARY OF PROJECT DELIVERABLES  Meeting minute summaries  Final Construction Plans and specifications, pdf  All electronic hydraulic modeling files, CADD drawings, and data files  Maps and Figures  Final design report  Submittals to permitting agencies DocuSign Envelope ID: C1C6A1E6-03BCFC29-E036-DAE1-4371-467C-9D0D-ACD1-68293D98956C 31A85C9851B5 Fee Task # Task Description Total By Task Direct Costs Sub- Consultant Fee Total Labor Costs Senior Engineer Project Manager Project Engineer CAD/GIS Admin 1 Project Name: Spring Creek Final Design rates $165 $130 $110 $95 $75 2 City Manager: Jason Stutzman 3 Ayres Manager: Dusty Robinson 4 Project Totals $98,268 $198 $15,150 $82,920 26 272 312 80 18 5 Task 1 Administrative $27,228 $198 $3,000 $24,030 14 110 42 20 12 6 1.1 Management $8,420 $1,000 $7,420 8 40 12 7 1.2 Progress meetings (10 + site visit) $9,208 $148 $2,000 $7,060 4 34 18 8 1.3 Riverside Bridge design coord. $6,350 $6,350 2 24 16 12 9 1.4 Public outreach $3,250 $50 $3,200 12 8 8 10 Task 2 Site Design and Plans $44,220 $0 $4,200 $40,020 10 98 184 52 6 11 2.1 Final design $13,280 $2,300 $10,980 4 32 56 12 2.2 Final plan set $9,600 $750 $8,850 2 16 24 40 13 2.3 Specifications $5,220 $500 $4,720 16 24 14 2.4 Update draft report $11,500 $500 $11,000 4 24 56 8 4 15 2.5 Final report $4,620 $150 $4,470 10 24 4 2 16 Task 3 Hydraulic Analysis $13,610 $0 $0 $13,610 2 32 76 8 0 17 3.1 Proposed conditions model $10,810 $10,810 2 24 60 8 18 3.2 Scour and rock sizing calculations $2,800 $2,800 8 16 19 Task 4 Permitting $13,210 $0 $7,950 $5,260 0 32 10 0 0 20 4.1 Coordination with permit agencies $4,760 $3,200 $1,560 12 21 4.2 Prepare and Submit permits $6,960 $4,000 $2,960 16 8 22 4.3 Respond to comments $1,490 $750 $740 4 2 23 24 25 Exported on April 10, 2017 2:12:39 PM MDT DocuSign Envelope ID: C1C6A1E6-03BCFC29-E036-DAE1-4371-467C-9D0D-ACD1-68293D98956C 31A85C9851B5 Schedule Exported on April 10, 2017 2:06:57 PM MDT DocuSign Envelope ID: C1C6A1E6-03BCFC29-E036-DAE1-4371-467C-9D0D-ACD1-68293D98956C 31A85C9851B5 VENDOR: AYRES Associates DATE ENTERED: REQ #: VENDOR #: FOR: ADDRESS: 3665 JFK Parkway, Bld #2, Suite 200 BID #: Fort Collins, CO 80525-3152 INSTRUCTIONS: PHONE #: (970) 223-5556 FAX #: VENDOR CONTACT Dustin Robinson Today's Date: April 6, 2017 Date Approved: Ship To: Date Denied: Date Required: asap QUANTITY DESCRIPTION TOTAL PRICE 1 $98,268.00 Total $98,268.00 Requested By: Reviewed By: Jason Stutzman, Project Manager Authorized By: Spring Creek Stream Rehabilitation at Edora Final Design 7084 - Consulting Engineering Services for Water Utilities Capital Improvements CHARGE NUMBER CITY OF FORT COLLINS REQUISITION Owen L. Randall, Chief Engineer Jon Haukaas, Manager, Water Engineering & Field Operations Provide final design services for Spring Creek SRE at Riverside Bridge / EPIC 5040440034.521210.3 P.O. # DocuSign Envelope ID: C1C6A1E6-03BCFC29-E036-DAE1-4371-467C-9D0D-ACD1-68293D98956C 31A85C9851B5 4/24/2017 4/24/2017 4/25/2017 4/25/2017 DocuSign Envelope ID: 03BCFC29-E036-4371-9D0D-68293D98956C 5/1/2017