Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (2)Invoice Date 4/21/2017 Invoice # 1932 Bill To Greg Oakes bannerconcrete@gmail.com 1313 Duff Drive Unit 3 Fort Collins, CO 80524 P.O. No. Terms Total QuantityDescription Rate Amount Avery Park Phase 2 additional work 10 Place boulder retaining walls unit price per boulder 375.00 3,750.00 1 Remove and discard existing pedestrian bridge 1,550.00 1,550.00 1 Place new pedestrian bridge to be onsite by others 1,550.00 1,550.00 1 Import and install 12" thick topsoil +/- 1" 250 sqft. 1,200.00 1,200.00 140 Non reinforced concrete wall--8" per sq face ft 16.45 2,303.00 156 Reinforcing steel per pound 2.19 341.64 36.8 Excavation-General less than 50 cu yd 98.71 3,632.53 1,ft109 Remove concrete sidewalk per sq 3.57 3,959.13 86 Sawcut concrete/asphalt 4"<6" per lf 4.94 424.84 144 Remove block wall 4.25 612.00 2,340.5 Flatwork--6" per sq ft 3.84 8,987.52 47 Aggregate base course/Recycled base >5 tons 38.39 1,804.33 171 Pedestrian access ramp per sq ft 6.04 1,032.84 10 Truncated dome panel per sq ft 32.90 329.00 19 Asphalt pavement preservation per lf 4.39 83.41 15 Dump fee per ton 21.94 329.10 6 Caissons Excavate, form, and pour 500.00 3,000.00 6 Foreman per hour 43.87 263.22 6 Finisher per hour 38.39 230.34 6 Laborer per hour 32.90 197.40 1 Pump truck 1 pour 2,000.00 2,000.00 10 Traffic control supervisor per hour 36.06 360.60 24 Size A sign with stand per each per day 1.74 41.76 765 Cone with reflective strip per each per day 0.76 581.40 935 Channelizing barrels per each per day 0.92 860.20 48 "No Parking" sign with stand per each per day 2.03 97.44 30 Safety fence per roll per day 4.07 122.10 $39,643.80