WORK ORDER - RFP - 8115 ENGINEERING SERVICES FOR WATER RECLAMATION & BIOSOLIDS FACILITY DESIGN & CONSTRUCTION
WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CAROLLO ENGINEERS, INC. DATED: September 15, 2015 Work Order Number: C-WRF-2017-9 Purchase Order Number: Project Title: DWRF Design for Dewatering & Sludge Strain Press Original Bid/RFP Number & Name: 8115 Engineering Services for Water Reclamation and Biosolids Facility Design and Construction Services Commencement Date: May 1, 2017 Completion Date: March 1, 2018 Maximum Fee: (time and reimbursable direct costs): $612,878 Project Description: Engineering Design Services for 2017 Dewatering and Sludge Strain Press Projects Scope of Services: See Attached. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of nine (9) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. CAROLLO ENGINEERS, INC By:_______________________________ Jason Garside, Vice President Date:_____________________________ By:_______________________________ Anthony L. Morroni, P.E., Senior Vice President Date:_____________________________ CITY OF FORT COLLINS Submitted by: _________________________ Eileen Dornfest, Special Projects Manager Date: _________________________ CITY OF FORT COLLINS (CONT.) Reviewed By: _________________________ Pat Johnson, Senior Buyer Date: _________________________ Reviewed by: _________________________ Jason Graham, Water Reclamation & Biosolids Manager Date: _________________________ Reviewed by: _________________________ Owen L. Randall, Chief Engineer Date: _________________________ Accepted by: _________________________ Carol Webb, Water Resource & Treatment Operations Manager Date: ________________________ Approved by: _________________________ Gerry Paul, Purchasing Director (if over $60,000) Date: _______________________ DocuSign Envelope ID: E04E459B-68D1-4E6B-B28E-407465C3EF70 4/25/2017 4/25/2017 FINAL (4-21-17) pg. 1 Scope of Work - Dewatering and Strain Press Final Design FINAL - 4/21/2017 The City of Fort Collins (City) intends to install new dewatering equipment in the existing Dewatering Building at the Drake Water Reclamation Facility (DWRF). Existing ancillary facilities associated with the dewatering equipment (i.e., dewatering feed, polymer system, and cake load out) will be modified as needed. This project also includes installation of a strain press (size and manufacturer/model to match existing) in the Headworks Building. The existing metal platform will be modified as needed to accommodate the new unit. Piping modifications will be designed to allow either unit to be in- service and will include a bypass around both units. Lifting equipment will be installed to facilitate equipment removal. The purpose of this Work Order is to provide the technical analysis and engineering final design for the implementation of the proposed dewatering and strain press project (Project). This final design phase will include preparation of drawings and specifications, and equipment procurement and pre-construction support for the implementation of the Project. This Work Order does not include engineering services during construction. It is anticipated that this scope of work will proceed beginning May 8, 2017 and is required to be completed by March 1, 2018. The scope of work is divided into the following major tasks, summarized below: Task 1 - Work Order Initiation and Administration Task 1.1 - Budget and Schedule Support Coordinate with City and Contractor to review and refine budget and schedule for the Project. Provide design layout(s) and analysis to support scheduling and budget development process. Task 1.2 - Coordination Meetings Prepare for and participate in sixteen (16) 2-hour meetings (bi-weekly over 8 month duration) with the Project Team to coordinate the design, procurement, and pre-construction issues. Appropriate Consultant staff and subconsultants will be in attendance based on the topics of discussion. Meeting agendas will be provided and a Decision Log will be kept up to date over the course of the Project. Prepare 6-week look-ahead schedules that document meeting purpose/objectives, and major milestones. Participate in sixteen (16) 1-hour conference calls (bi-weekly over 8 month duration) with the City’s Project Manager and the Contractor’s Project Manager to coordinate the design process. Task 1.3 - Quality Assurance/Quality Control (QA/QC) Perform quality assurance and quality control of all deliverables prepared by Consultant in accordance with Consultant's standard QA/QC policies and procedures. Task 1.4 - Progress Reporting Invoices will be submitted monthly in accordance with City payment protocols. Each invoice will be submitted with a progress report detailing the work executed during the invoice period and work remaining. DocuSign Envelope ID: E04E459B-68D1-4E6B-B28E-407465C3EF70 FINAL (4-21-17) pg. 2 Task 2 - Site Investigations NOT USED Task 3 - Preliminary Design NOT USED Task 4 –Design Development Task 4.1 - Design Drawings Develop 3D model in MicroStation for Belt Filter Press Room (which will house the dewatering centrifuges) and Conveyor Room based on laser scan files provided by the City. All other areas will be developed in 2D MicroStation. In lieu of a formal 30 percent design deliverable, Consultant will review the in-progress 3D model during the 30 percent Design Review Workshop. Prepare design drawings to progress the design of Project to 60 and 90 percent completion levels for all areas, with the exception of the polymer system, HVAC system, and conveyors. Proposed drawing list is attached for reference. CDPHE self-certification process (per Reg. No. 22) will be utilized; as such, final drawings stamped by CO PE will be submitted to CDPHE for self-certification during the construction phase of project. Task 4.1.1 – Conversion of Laser Scan Convert laser scan (.pod) file to MicroStation 3D model for belt filter press room and conveyor room. Task 4.1.2 – Final Design of Polymer, HVAC, Conveyor Drawings associated with the final design (60 percent and 90 percent) of the polymer system, HVAC system, and conveyors will only be prepared upon written authorization by the City. Task 4.2 - Design Specifications Develop specifications using current MasterFormat (Div 48) and with incorporation of City's standard specifications and preferences. Task 4.3 - Design Review Workshops Prepare for and conduct three (3), four (4)-hour design review workshops at the 30, 60, and 90 percent design milestones. Coordinate with City, Contractor, and Cost Estimator in review of cost submittal. If additional design review meetings are determined as necessary, the City will consider an amendment to this work order. Task 4.4 – Equipment Procurement Prepare drawings and specifications as required for early procurement of two (2) dewatering centrifuges and one (1) strain press. Procurement of the dewatering centrifuge will use either best value selection process or sole-source selection of a single manufacturer. For best value selection, assist City and Contractor in developing evaluation criteria for the Request for Proposals (RFP) issued to dewatering manufacturers. Review proposals submitted by manufacturers and assist City and Contractor perform best-value evaluation of centrifuges. Selection criteria such as service record, equipment warranties and performance, maintenance scheduling, and operator experience will be reviewed in detail. DocuSign Envelope ID: E04E459B-68D1-4E6B-B28E-407465C3EF70 FINAL (4-21-17) pg. 3 Task 4.5 - Process Design Report and CDPHE Review Coordination Prepare Process Design Report (PDR) for submittal to the Colorado Department of Public Health Environment (CDPHE) in accordance with the requirements of Policy 96-1. Review draft report, including 60 percent drawings and specifications, with City and Contractor prior to finalizing, and for City's submittal to the CDPHE. Assist City with coordination with CDPHE to facilitate review of PDR as necessary for the approval of an Amendment to an Existing Site Plan Approval. The following deliverables are included in this Work Order: • Process Design Report • Centrifuge Procurement Package • Strain Press Procurement Package • 60 percent Drawings and Specifications • 90 percent Drawings and Specifications ATTACHMENTS: 1. Drawing List DocuSign Envelope ID: E04E459B-68D1-4E6B-B28E-407465C3EF70 City of Fort Collins Drake WRF Dewatering and Strain Press Project Drawing List last revised: 4/13/17 Overall Sheet Pg # Count Dsgnt. Holder Sheet Description GENERAL 1 G 1 COVER SHEET 2 G 2 SHEET INDEX 3 G 3 DESIGN CRITERIA 4 G 4 GENERAL LEGENDS 5 G 5 ABBREVIATIONS TYPICALS (OTHER THAN EIC) 6 T 1 CIVIL TYPICAL DETAILS 7 T 2 STRUCTURAL TYPICAL DETAILS 1 8 T 3 STRUCTURAL TYPICAL DETAILS 2 9 T 4 STRUCTURAL TYPICAL DETAILS 3 10 T 5 MECHANICAL TYPICAL DETAILS 1 11 T 6 MECHANICAL TYPICAL DETAILS 2 12 T 7 MECHANICAL TYPICAL DETAILS 3 13 T 8 HVAC TYPICAL DETAILS 1 14 T 9 HVAC TYPICAL DETAILS 2 CIVIL 15 C 1 CIVIL LEGENDS AND ABBREVIATIONS 16 C 2 OVERALL SITE PLAN 17 C 3 PAVING AND GRADING PARTIAL PLAN AND DETAILS DEMOLITION 18 D 1 DEMOLITION LEGENDS AND ABBREVIATIONS 19 D 2 BELT FILTER PRESS ROOM DEMOLITION PLAN 20 D 3 BELT FILTER PRESS ROOM DEMOLITION SECTIONS AND DETAILS 21 D 4 CONVEYOR ROOM DEMOLITION PLAN 22 D 5 CONVEYOR ROOM DEMOLITION SECTIONS AND DETAILS 23 D 6 POLYMER STORAGE ROOM DEMOLITION PLAN 24 D 7 POLYMER STORAGE ROOM DEMOLITION SECTIONS AND DETAILS 25 D 8 POLYMER FEED ROOM DEMOLITION PLAN 26 D 9 POLYMER FEED ROOM DEMOLITION SECTIONS AND DETAILS 27 D 10 STRAIN PRESS DEMOLITION PLAN 28 D 11 STRAIN PRESS DEMOLITION SECTIONS AND DETAILS ARCHITECTURAL STRUCTURAL 29 S 1 STRUCTURAL LEGENDS AND ABBREVIATIONS 30 S 2 STRUCTURAL NOTES AND DESIGN CRITERIA 31 S 3 BELT FILTER PRESS ROOM PLAN 32 S 4 BELT FILTER PRESS ROOM SECTIONS AND DETAILS 33 S 5 STRAIN PRESS PLATFORM PLAN 34 S 6 STRAIN PRESS PLATFORM SECTIONS AND DETAILS 35 S 7 STRAIN PRESS MONORAIL PLAN AND SECTIONS MECHANICAL 36 M 1 MECHANICAL LEGENDS AND ABBREVIATIONS 37 M 2 CENTRIFUGE PROCESS FLOW DIAGRAM 38 M 3 CAKE LOADOUT PROCESS FLOW DIAGRAM 39 M 4 POLYMER PROCESS FLOW DIAGRAM 40 M 5 STRAIN PRESS PROCESS FLOW DIAGRAM 41 M 6 BELT FILTER PRESS ROOM PLAN 42 M 7 BELT FILTER PRESS ROOM SECTIONS 1 43 M 8 BELT FILTER PRESS ROOM SECTIONS 2 44 M 9 BELT FILTER PRESS ROOM DETAILS 45 M 10 CONVEYOR ROOM PLAN 46 M 11 CONVEYOR ROOM SECTIONS 47 M 12 CONVEYOR ROOM DETAILS City of Fort Collins Drake WRF Dewatering and Strain Press Project Drawing List last revised: 4/13/17 Overall Sheet Pg # Count Dsgnt. Holder Sheet Description HVAC 54 H 1 HVAC LEGEND AND ABBREVIATIONS 55 H 2 HVAC SCHEMATIC 56 H 3 HVAC SCHEDULES 57 H 4 BELT FILTER PRESS ROOM PLAN 58 H 5 BELT FILTER PRESS ROOM SECTIONS 59 H 6 CONVEYOR ROOM PLAN AND SECTIONS 60 H 7 TRUCK LOADOUT ROOM PLAN AND SECTIONS 61 H 8 CONTROL ROOM PLAN AND SECTIONS 62 H 9 DEWATERING FACILITY ROOF SECTIONS AND SECTIONS ELECTRICAL 63 E 1 ELECTRICAL LEGEND AND ABBREVIATIONS 64 E 2 ELECTRICAL LEGEND AND ABBREVIATIONS 65 E 3 TYPICALS 66 E 4 TYPICALS 67 E 5 TYPICALS 68 E 6 SCHEDULES 69 E 7 SITE ELECTRICAL KEY PLAN 70 E 8 SITE PLAN 1 71 E 9 SITE PLAN 2 72 E 10 SSB1214 ONE-LINE DIAGRAM 73 E 11 MCC1202 ELEVATION 74 E 12 MCC1202 ONE-LINE DIAGRAM 1 75 E 13 MCC1202 ONE-LINE DIAGRAM 2 76 E 14 MCC1225 ELEVATION 77 E 15 MCC1202 ONE-LINE DIAGRAM 1 78 E 16 PANELBOARD SCHEDULE 79 E 17 HEADWORKS POWER AND CONTROL PLAN 80 E 18 CENTRIFUGE ROOM POWER AND CONTROL PLAN 81 E 19 CENTRIFUGE ROOM LIGHTING, RECEPACLE, AND HVAC PLAN 82 E 20 ELECTRICAL ROOM POWER AND CONTROL PLAN 83 E 21 CONVEYOR ROOM POWER AND CONTROL PLAN INSTRUMENTATION 84 I 1 INSTRUMENTATION LEGEND AND ABBREVIATIONS 85 I 2 INSTRUMENTATION LEGEND AND ABBREVIATIONS 86 I 3 INSTRUMENTATION LEGEND AND ABBREVIATIONS 87 I 4 INSTRUMENTATION LEGEND AND ABBREVIATIONS 88 I 5 INSTRUMENTATION LEGEND AND ABBREVIATIONS 89 I 6 NETWORK DIAGRAM 90 I 7 TYPICAL DETAILS 91 I 8 TYPICAL DETAILS 92 I 9 STRAIN PRESS 93 I 10 STRAIN PRESS CONNECTIONS 94 I 11 CENTRIFUGE 1 95 I 12 CENTRIFUGE 1 96 I 13 CENTRIFUGE 1 97 I 14 CENTRIFUGE 2 98 I 15 CENTRIFUGE 2 99 I 16 CENTRIFUGE 2 100 I 17 CONVEYORS 101 I 18 POLYMER CONNECTIONS 102 I 19 POLYMER PUMPS 103 I 20 POLYMER PUMPS 104 I 21 HVAC - BFP ROOM, TRUCK LOAD, CONTROL ROOM City of Fort Collins Dewatering and Strain Press Project Final Design Fee FINAL 4/21/17 Rashi / Anthony Becky Jason Jeff Mark Chris Jason Carter DEWATERING AND STRAIN PRESS PROJECT (FINAL DESIGN PHASE) LABOR HOURS AND ENGINEERING FEE Senior Professional Senior Professional Lead Project Professional Professional (PE + Mech) Disciplines (Structural+Arch) Disciplines (EIC) Disciplines (Structural) Disciplines (Civil, HVAC, Demo) Senior Technician Technician Document Processing/Clerical Billing Rate $238 $238 $219 $147 $206 $171 $147 $147 $162 $110 $96 Task 1 - Project Coordination 80 152 26 80 48 60 60 8 8 0 8 530 $104,878 $4,452 $4,480 $6,201 $120,011 Task 1.1 - Budget and Schedule Support 0 16 2 0 0 0 0 0 0 0 0 18 $4,246 $504 $0 $211 $4,961 Task 1.2 - Bi-Weekly Coordination Meetings (16) 0 96 0 80 8 60 60 8 0 0 0 312 $56,512 $2,121 $4,480 $3,650 $66,763 Task 1.3 - Quality Assurance/Quality Control 80 24 16 0 40 0 0 0 8 0 0 168 $37,792 $1,008 $0 $1,966 $40,766 Task 1.4 - Progress Reporting 0 16 8 0 0 0 0 0 0 0 8 32 $6,328 $819 $0 $374 $7,521 Task 2 - Site Investigations 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 Not Used Task 3 - Preliminary Design 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 Not Used Task 4 - Design Development 4 301 8 619 90 391 243 166 418 623 56 2920 $452,675 4536 $1,490 $34,166 $492,867 Task 4.1 - Design Drawings 0 143 0 285 48 238 143 95 303 454 0 1708 $260,344 $1,008 $400 $19,985 $281,738 Task 4.1.1 Conversion of Laser Scan 0 4 0 0 0 0 0 0 20 16 0 40 $5,952 $0 $0 $468 $6,420 Task 4.1.2 Final Design of Polymer, HVAC, Conveyor 0 43 0 86 14 71 43 29 92 137 0 514 $78,289 $0 $100 $6,014 $84,403 Task 4.2 - Design Specifications 0 40 0 80 16 40 24 24 0 0 40 264 $42,312 $1,008 $0 $3,089 $46,409 Task 4.3 - Design Review Workshops (3) 0 24 0 48 8 24 24 8 0 0 0 136 $23,224 $2,016 $840 $1,591 $27,671 Task 4.4 - Equipment Procurement 4 24 4 80 4 16 8 8 4 16 8 176 $28,388 $504 $100 $2,059 $31,051 Task 4.5 - PDR and CDPHE Design Review Coord. 0 24 4 40 0 2 2 2 0 0 8 82 $14,166 $0 $50 $959 $15,175 PROJECT TOTALS - TASKS 1-4 84 453 34 699 138 451 303 174 426 623 64 3450 $557,553 $8,988 $5,970 $40,367 $612,878 TOTAL COST LABOR HOURS Total Direct Labor Hours Total Labor Cost Ditesco Other Direct Costs (ODCs) PECE PROJECT COSTS DocuSign Envelope ID: E04E459B-68D1-4E6B-B28E-407465C3EF70 Activity ID Activity Name Original Duration Start Finish Total Float Predecessors Successors DWRF - D Dewatering & Sludge Strain Press 465 01-Jan-17 A 11-Dec-18 12 Prelimina Preliminary Design 224 01-Jan-17 A 02-Jan-18 253 A1530 Release of 50% Funds for Dewatering & Sludge Strain 0 01-Jan-17 A A1000 A1000 Kickoff Meeting 1 26-Jan-17 A 26-Jan-17 A A1530 A1010, A103 A1690 Laser Scan 15 03-Mar-17 A 10-Mar-17 A A1030 A1090 A1010 Deliverable: Alternatives Memo 1 08-Mar-17 A 08-Mar-17 A A1000 A1030 A1680 Site Visits 15 09-Mar-17 A 20-Mar-17 A A1000 A1620 A1030 Meeting: Workshop #1 1 21-Mar-17 A 21-Mar-17 A A1000, A101 A1050, A169 A1790 Bi-Weekly Meeting #1 0 04-Apr-17 A A1030 A1800 A1550 Develop and Approve Final Design Contract 15 10-Apr-17 A 04-May-17 14 A1000 A1090 A1040 Meeting: WEF Conference 3 15-Apr-17 A 18-Apr-17 A A1000 A1620 A1050 Deliverable: DRAFT Basis of Design 0 18-Apr-17 A A1030 A1060, A107 A1670 Bench Testing 10 18-Apr-17 A 02-May-17 61 A1030 A1620 A1540 Draft Basis of Design Review 15 20-Apr-17 A 05-May-17 13 A1050 A1090 A1800 Bi-Weekly Meeting #2 1 25-Apr-17* 25-Apr-17 425 A1790 A1060 Deliverable: Final Basis of Design 0 08-May-17* 12 A1050 A1090 A1780 Release of Remaining 50% Funds for Dewatering & Slu 0 02-Jan-18* 0 A1700, A171 Design 145 09-May-17 04-Dec-17 126 A1090 30% Design Development & Specification T.O.C. 40 09-May-17 05-Jul-17 12 A1540, A155 A1100, A1110 A1100 30% Design Review 5 06-Jul-17 12-Jul-17 115 A1090 A1560 A1110 30% Design Estimate Generation 10 06-Jul-17 19-Jul-17 195 A1090 A1140 A1120 60% Design Development 40 13-Jul-17 07-Sep-17 115 A1560 A1130, A114 A1560 30% Design Workshop 0 13-Jul-17 115 A1100 A1120 A1130 60% Design Review 10 08-Sep-17 21-Sep-17 115 A1120 A1150, A157 A1140 60% Design Estimate Generation 10 08-Sep-17 21-Sep-17 160 A1120, A111 A1170 A1150 90% Design Development 20 22-Sep-17 19-Oct-17 115 A1130, A157 A1170, A158 A1570 60% Design Workshop 0 22-Sep-17 115 A1130 A1150 A1170 90% Design Estimate Generation 20 20-Oct-17 16-Nov-17 140 A1150, A114 A1420 A1580 Carollo QA/QC 20 20-Oct-17 16-Nov-17 115 A1150 A1160 A1160 90% Design Review 10 17-Nov-17 04-Dec-17 115 A1580 A1400, A125 Permitting 170 25-Apr-17 02-Jan-18 253 A1070 Prepare CDPHE Site Application 10 25-Apr-17 08-May-17 281 A1050 A1080 A1810 Coordination Meeting w/ CDPHE 0 05-May-17* 418 A1080 Submit Site Application to CDPHE 0 09-May-17 281 A1070 A1590 A1590 CDPHE Site Application Review 40 09-May-17 05-Jul-17 281 A1080 A1180 A1180 Site Application Approval by CDPHE 0 06-Jul-17 281 A1590 A1190 A1190 Prepare Process Design Report - DRAFT 15 06-Jul-17 26-Jul-17 281 A1180, A109 A1200 A1200 Review of Process Design Report - DRAFT 10 27-Jul-17 09-Aug-17 281 A1190 A1210 A1210 Prepare Process Design Report - FINAL 10 10-Aug-17 23-Aug-17 281 A1200 A1220 A1220 Review of Process Design Report - FINAL 10 24-Aug-17 07-Sep-17 281 A1210 A1230 A1230 Submit Process Design Report to CDPHE 0 08-Sep-17 281 A1220 A1600 A1600 CDPHE Process Design Report Review 30 08-Sep-17 19-Oct-17 281 A1230 A1240 A1240 Process Design Report Approval by CDPHE 0 19-Oct-17 281 A1600 A1250 A1250 CDPHE Self-Certification 5 19-Dec-17 02-Jan-18 256 A1160, A124 Jan F Mar Apr M Jun Jul A S Oct N D Jan F Mar Apr M Jun Jul A S Oct N D Jan F Mar Apr M Jun Jul A S Oct Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019 2019 DWRF - Dewatering & Sludge Strain Press Preliminary Design Release of 50% Funds for Dewatering & Sludge Strain Press Kickoff Meeting Laser Scan Deliverable: Alternatives Memo Site Visits Meeting: Workshop #1 Bi-Weekly Meeting #1 Activity ID Activity Name Original Duration Start Finish Total Float Predecessors Successors Procurem Procurement 289 09-May-17 03-Jul-18 37 A1400 Capstone Project Review 0 05-Dec-17 115 A1160 A1410 A1410 Capstone Estimate Generation 15 05-Dec-17 02-Jan-18 115 A1400 A1420 A1420 Estimate Reconciliation 2 02-Jan-18 03-Jan-18 115 A1410, A117 A1430 A1430 Develop Construction Work Order 5 02-Jan-18 08-Jan-18 115 A1420 A1440 A1440 Procure Construction Bonds & Insurance 3 08-Jan-18 10-Jan-18 115 A1430 A1450 A1450 Execute Construction Work Order 15 11-Jan-18 31-Jan-18 115 A1440 A1460 A1460 Notice to Proceed 1 01-Feb-18 01-Feb-18 115 A1450 A1700, A171 DDeewwaatteerriinngg Equipment Procurement 78 09-May-17 29-Aug-17 12 A1270 Develop Dewatering Equipment Specification 20 09-May-17 06-Jun-17 12 A1090 A1610 A1610 Dewatering Equipment Specification Review 10 07-Jun-17 20-Jun-17 12 A1270 A1280 A1280 Dewatering Equipment Procurement Estimate Generati 15 21-Jun-17 12-Jul-17 12 A1610 A1620 A1620 Dewatering Equipment Best Value Selection 10 13-Jul-17 26-Jul-17 12 A1280, A167 A1290 A1290 Develop Dewatering Equipment Procurement Work Ord 5 27-Jul-17 02-Aug-17 12 A1620 A1300 A1300 Procure Payment Bond for Dewatering Equipment Work 3 03-Aug-17 07-Aug-17 12 A1290 A1310 A1310 Execute Dewatering Equipment Procurement Work Ord 15 08-Aug-17 28-Aug-17 12 A1300 A1320 A1320 Issue Dewatering Equipment Purchase Order 0 29-Aug-17 12 A1310 A1630 Sludge SludgeStra Strain Press Procurement 68 09-May-17 15-Aug-17 163 A1340 Develop Sludge Strain Press Specification 15 09-May-17 30-May-17 167 A1090 A1640 A1640 Sludge Strain Press Specification Review 10 31-May-17 13-Jun-17 167 A1340 A1350 A1350 Sludge Strain Press Procurement Estimate Generation 10 14-Jun-17 27-Jun-17 167 A1640 A1650 A1650 Sludge Strain Press Best Value Selection 10 28-Jun-17 12-Jul-17 167 A1350 A1360 A1360 Develop Sludge Strain Press Procurement Work Order 5 13-Jul-17 19-Jul-17 167 A1650 A1370 A1370 Procure Payment Bond for Sludge Strain Press Work O 3 20-Jul-17 24-Jul-17 167 A1360 A1380 A1380 Execute Sludge Strain Press Procurement Work Order 15 25-Jul-17 14-Aug-17 167 A1370 A1390 A1390 Issue Sludge Strain Press Purchase Order 0 15-Aug-17 167 A1380 A1660 Submittal G Generation 51 15-Aug-17 25-Oct-17 143 A1660 Sludge Strain Press Pre-Submittal Meeting 1 15-Aug-17 15-Aug-17 167 A1390 A1500 A1500 Sludge Strain Press Equipment Submittal Generation 30 16-Aug-17 27-Sep-17 167 A1660 A1510 A1630 Dewatering Equipment Pre-Submittal Meeting 1 29-Aug-17 29-Aug-17 12 A1320 A1470 A1470 Dewatering Equipment Submittal Generation 40 30-Aug-17 25-Oct-17 12 A1630 A1480 Submittal R Review 30 28-Sep-17 08-Nov-17 143 A1510 Sludge Strain Press Equipment Submittal Review 10 28-Sep-17 11-Oct-17 167 A1500 A1520 A1480 Dewatering Equipment Submittal Review 10 26-Oct-17 08-Nov-17 12 A1470 A1490 FFaabbrriiccaattiioonn & Delivery 180 12-Oct-17 03-Jul-18 37 A1520 Sludge Strain Press Equipment Fabrication & Delivery 50 12-Oct-17 22-Dec-17 167 A1510 A1700 A1490 Dewatering Equipment Fabrication & Delivery 160 09-Nov-17 03-Jul-18 12 A1480 A1710 Construc Construction 218 02-Feb-18 11-Dec-18 12 Sludge SludgeStra Strain Press 90 02-Feb-18 08-Jun-18 140 A1700 Sludge Strain Press Installation 60 02-Feb-18 26-Apr-18 140 A1520, A146 A1720 A1720 Sludge Strain Press Start-up & Commissioning 10 27-Apr-18 10-May-18 140 A1700 A1740 A1740 Sludge Strain Press Substantial Completion 0 11-May-18 140 A1720 A1750 A1750 Sludge Strain Press Final Completion 0 08-Jun-18 140 A1740 DDeewwaatteerriinngg 115 28-Jun-18 11-Dec-18 12 A1710 Dewatering Installation 80 28-Jun-18 19-Oct-18 12 A1490, A146 A1730 Jan F Mar Apr M Jun Jul A S Oct N D Jan F Mar Apr M Jun Jul A S Oct N D Jan F Mar Apr M Jun Jul A S Oct Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019 2019 Procurement Capstone Project Review Capstone Estimate Generation Estimate Reconciliation Develop Construction Work Order Procure Construction Bonds & Insurance Execute Construction Work Order Notice to Proceed Activity ID Activity Name Original Duration Start Finish Total Float Predecessors Successors A1730 Dewatering Start-up & Commissioning 15 22-Oct-18 09-Nov-18 12 A1710 A1760 A1760 Dewatering Substantial Completion 0 12-Nov-18 12 A1730 A1770 A1770 Dewatering Final Completion 0 11-Dec-18 12 A1760 Jan F Mar Apr M Jun Jul A S Oct N D Jan F Mar Apr M Jun Jul A S Oct N D Jan F Mar Apr M Jun Jul A S Oct Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019 2019 Dewatering Start-up & Commissioning Dewatering Substantial Completion Dewatering Final Completion Data Date:25-Apr-17 DWRF - Dewatering Sludge Strain Press Current Date:20-Apr-17 Remaining Level of Effort Actual Level of Effort Actual Work Remaining Work Critical Remaining Work Milestone Page 3 of 3 TASK filter: All Activities © Oracle Corporation DocuSign Envelope ID: E04E459B-68D1-4E6B-B28E-407465C3EF70 Dewatering Equipment Procurement Develop Dewatering Equipment Specification Dewatering Equipment Specification Review Dewatering Equipment Procurement Estimate Generation Dewatering Equipment Best Value Selection Develop Dewatering Equipment Procurement Work Order Procure Payment Bond for Dewatering Equipment Work Order Execute Dewatering Equipment Procurement Work Order Issue Dewatering Equipment Purchase Order Sludge Strain Press Procurement Develop Sludge Strain Press Specification Sludge Strain Press Specification Review Sludge Strain Press Procurement Estimate Generation Sludge Strain Press Best Value Selection Develop Sludge Strain Press Procurement Work Order Procure Payment Bond for Sludge Strain Press Work Order Execute Sludge Strain Press Procurement Work Order Issue Sludge Strain Press Purchase Order Submittal Generation Sludge Strain Press Pre-Submittal Meeting Sludge Strain Press Equipment Submittal Generation Dewatering Equipment Pre-Submittal Meeting Dewatering Equipment Submittal Generation Submittal Review Sludge Strain Press Equipment Submittal Review Dewatering Equipment Submittal Review Fabrication & Delivery Sludge Strain Press Equipment Fabrication & Delivery Dewatering Equipment Fabrication & Delivery Construction Sludge Strain Press Sludge Strain Press Installation Sludge Strain Press Start-up & Commissioning Sludge Strain Press Substantial Completion Sludge Strain Press Final Completion Dewatering Dewatering Installation Data Date:25-Apr-17 DWRF - Dewatering Sludge Strain Press Current Date:20-Apr-17 Remaining Level of Effort Actual Level of Effort Actual Work Remaining Work Critical Remaining Work Milestone Page 2 of 3 TASK filter: All Activities © Oracle Corporation DocuSign Envelope ID: E04E459B-68D1-4E6B-B28E-407465C3EF70 Develop and Approve Final Design Contract Meeting: WEF Conference Deliverable: DRAFT Basis of Design Bench Testing Draft Basis of Design Review Bi-Weekly Meeting #2 Deliverable: Final Basis of Design Release of Remaining 50% Funds for Dewatering & Sludge Strain Press Design 30% Design Development & Specification T.O.C. 30% Design Review 30% Design Estimate Generation 60% Design Development 30% Design Workshop 60% Design Review 60% Design Estimate Generation 90% Design Development 60% Design Workshop 90% Design Estimate Generation Carollo QA/QC 90% Design Review Permitting Prepare CDPHE Site Application Coordination Meeting w/ CDPHE Submit Site Application to CDPHE CDPHE Site Application Review Site Application Approval by CDPHE Prepare Process Design Report - DRAFT Review of Process Design Report - DRAFT Prepare Process Design Report - FINAL Review of Process Design Report - FINAL Submit Process Design Report to CDPHE CDPHE Process Design Report Review Process Design Report Approval by CDPHE CDPHE Self-Certification Data Date:25-Apr-17 DWRF - Dewatering Sludge Strain Press Current Date:20-Apr-17 Remaining Level of Effort Actual Level of Effort Actual Work Remaining Work Critical Remaining Work Milestone Page 1 of 3 TASK filter: All Activities © Oracle Corporation DocuSign Envelope ID: E04E459B-68D1-4E6B-B28E-407465C3EF70 105 I 22 ODOR CONTROL 106 I 23 ODOR CONTROL 107 I 24 ODOR CONTROL DocuSign Envelope ID: E04E459B-68D1-4E6B-B28E-407465C3EF70 48 M 13 POLYMER STORAGE ROOM PLAN 49 M 14 POLYMER STORAGE ROOM SECTIONS AND DETAILS 50 M 15 POLYMER FEED ROOM PLAN 51 M 16 POLYMER FEED ROOM SECTIONS AND DETAILS 52 M 17 STRAIN PRESS PLAN 53 M 18 STRAIN PRESS SECTIONS AND DETAILS DocuSign Envelope ID: E04E459B-68D1-4E6B-B28E-407465C3EF70 4/25/2017 4/25/2017 4/27/2017 4/27/2017 4/27/2017 4/27/2017