Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 8106 UTILITY INFRASTRUCTURE CONSTRUCTION SERVICES FOR WATER, WASTEWATER, AND STORMWATER FACILITIES CAPITAL IMPROVEMENTS (13)WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Connell Resources, Inc. DATED: 08/17/2015 Work Order Number: 201706 Purchase Order Number: Project Title: Walnut / Pine Street Water Main Rehabilitation Original Bid/RFP Number & Name: 8106 Construction Services for w/ww & Stormwater Facilities Capital Improvements Commencement Date: 04/15/17 Completion Date: 08/01/17 Maximum Fee: (time and reimbursable direct costs):$16,990.00 Project Description: Replacement of 100 year old Water Mains and Services in Walnut / Pine Streets. Scope of Services: Design Phase Services for above Project Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of one (1) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. CONTRACTOR By:_______________________________ Date:_____________________________ CITY OF FORT COLLINS Submitted By: _________________________ Jay Rose, Special Project Manager Date: _________________________ Reviewed by: _________________________ Pat Johnson, Senior Buyer Reviewed by: _________________________ Owen L. Randall, Chief Engineer Date: _________________________ Approved by: _________________________ Jon Haukaas, Water Engineering & Field Services Operations Manager Date: ________________________ Approved by: _________________________ Kevin Gertig, Utilities Executive Director Date: ________________________ Approved by: _________________________ Gerry Paul, Purchasing Director (if over $60,000) Date: _______________________ DocuSign Envelope ID: 90A5047E-3655-4F36-8750-BEDE1B0DB94D 4/7/2017 4/7/2017 4/9/2017 4/9/2017 4/10/2017 DocuSign Envelope ID: 90A5047E-3655-4F36-8750-BEDE1B0DB94D Requisition Form Vendor : Connell Resources, Inc. Today’s Date 04/05/2017 Requisition 7785 Highland Meadows, PKWY. Ship To: Date Entered: Suite 100 Date Required: Date Approved: Fort Collins, CO 80528 Special Instructions: Date Denied: Item # Quantity Unit Description Unit Price Total Charge Number 1 1 each Pine Street Water Main Rehabilitation $16,990.00 $16,990.00 502.5026410128.535010.3 Contractor’s Design Phase Services Requested By: ____________________________________ Authorized By: ______________________________________ DocuSign Envelope ID: 6FB7F5C2-90A5047E-3655-CFB7-4F36-4E84-8750-9293-BEDE1B0DB94D 368A31AAA88A