Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7575 CONSULTING ENGINEERING SERVICES FOR WATER TREATMENT FACILITY DESIGN & CONSTRUCTION SERVICES (2)EXHIBIT "A" WORK ORDER FORM PURSUANT TO AGREEMENT No. 7575 (AGREEMENT) BETWEEN THE CITY OF FORT COLLINS AND CH2M HILL Engineers, Inc. Per RFP #7575 Consulting Engineering Services for WTF Design and Construction Services DATED: February 24, 2014 Work Order Number: BPM-WTF-T2Conv Purchase Order Number: _ _ Project Title: T2 Conversion to Garage Facility Study Commencement Date: March 15, 2017 Completion Date: June 1, 2017 Maximum Fee: (time and reimbursable direct costs): $35,862 refer to Exhibit C – Compensation Project Description: Professional Engineering Services for T2 Conversion to Garage Facility Scope of Services: Refer to Exhibit B – Scope of Services Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of Exhibits B and C are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional: CH2M HILL Engineers, Inc. By: Date: _ Submitted By: _ Special Projects Manager Date: Reviewed by: Purchasing Agent Date: Approved by: ____________________ Chief Engineer Date: Approved by: Water Production Manager Date: Approved by: _ WR&T Manager Date: City of Fort Collins: PAGE 1 OF 5 DocuSign Envelope ID: 2D69F1B7-24B6-4026-B8B4-6F00A97B7023 2/23/2017 2/23/2017 3/3/2017 3/3/2017 3/3/2017 3/3/2017 PAGE 2 OF 5 Exhibit B - Scope of Services Exhibit B to the AGREEMENT between the City of Fort Collins, Colorado, a Municipal Corporation, hereinafter referred to as the City, and CH2M HILL Engineers, Inc., hereinafter referred to as the Professional, for a project generally described as: Professional Engineering Services for Evaluation of the T2 Conversion to Garage Facility The Professional’s services for the project are detailed hereinafter. Project Objective: To provide engineering services for the evaluation of the conversion of T2 to a garage and storage facility. It is understood the City will designate Mr. Brian Mulligan as the City Project Manager (PM) and primary point of contact with respect to the work performed under this AGREEMENT, with authority to transmit instructions, receive information, and interpret and define City policies and decisions relative to elements pertinent to the work covered by this AGREEMENT. Professional’s Project Manager (PM) shall prepare, implement, monitor, and update the project execution plan throughout the project. Professional’s PM will prepare and submit to the City’s PM, on a monthly basis, a brief cost and schedule status report. The report will include a narrative description of progress to-date, actual costs for each Task, estimates of percent complete, and potential cost variances. The Professional’s management, deliverable review, and coordination efforts are included in each of the tasks. Project Background T2 is an abandoned up flow clarification treatment train with dome cover adjacent to the administration building and water quality laboratory. The City has expressed interest in the conversion of the abandoned facility to provide covered parking and additional storage. Previously the T1 and T2 trains have been considered for demolition to provide space for new or future facilities. The goal of the project is to evaluate the feasibility of the conversion and to establish scope and budget to meet the City’s facility needs. Scope of Services Task 1 – Conceptual Evaluation of T2 Conversion Task 1.1 – Kick-Off Meeting A kickoff meeting shall be conducted with City staff to confirm the project scope, and discuss the evaluation approach. It is assumed the meeting will be held at the City’s Water Treatment Facility (WTF) offices. The Professional’s Principal Project Manager, Architect, Electrical Subconsultant and Engineer Specialist will attend the kick-off meeting. A walkthrough of the existing facilities will be performed following the meeting. The City will provide insight into the type of storage, parking, and access needed for the proposed garage and storage facility. Deliverables: The following deliverables are included under this task:  Meeting Agenda, Handouts, and Meeting Summary with action items DocuSign Envelope ID: 2D69F1B7-24B6-4026-B8B4-6F00A97B7023 PAGE 3 OF 5 Task 1.2 – Code Review The purpose of this task is to determine the feasibility of converting the T2 abandoned clarifier to a garage facility based upon current building codes. This task includes a building code review for the new occupancy type. Code review will consider the following adopted codes 2015 IBC; IPC; IMC; IECC; IEBC; 1997 UAC; (NEC, 2014 edition) as they relate to the renovation for a garage and storage facility. The electrical Subconsultant, Carollo, will provide the electrical code review. Deliverables: The following deliverable is included under Task 1.2  Building Code Review Technical Memorandum (TM) Task 1.3 – Conceptual Design and Evaluation Following the Code Review in Task 1.2, the Professional will conduct a general overview of conversion feasibility in relation to site constraints, alternative uses and impact on future on-site hypochlorite generation that was proposed to be located in T1 or T2. A brief TM summarizing the design criteria and conceptual design exhibits for the conversion of T2 to a garage facility will be prepared. Conceptual design elements will include: demolition of the existing tube settler and mechanical, access, garage door and personnel access doors, height clearance, vehicle parking, heating, ventilation, electrical/lighting, equipment provisions, lifts, racks, hoists, electrical charging stations and other amenities to support the parking and storage priorities determined by the team. The Professional shall organize and facilitate one Conceptual Design Workshop up to 2 hours in length with the following Professional’s staff in attendance, Principal Project Manager, Engineer Specialist. The purpose of the workshop will be to discuss the conceptual design elements. Deliverables: The following deliverables are included under this task:  Meeting Agenda, Handouts, and Meeting Summary with action items  Draft and Final Technical Memorandum with conceptual design exhibits– PDF Format Schedule A project schedule has been developed according to the task descriptions and is as follows: TABLE 1 – PROJECT SCHEDULE T2 Conversion Task Date Task 1.1 – Project Kick-off March 1, 2017 Task 1.2 – Code Review March 6-20, 2017 Task 1.3 – Conceptual Design and Evaluation April-May, 2017 Project Management Throughout Project The schedule is based on an assumed date for the project kickoff meeting as shown on the schedule, which in turn is based on an assumed date for the Notice to Proceed. Any changes in the date of DocuSign Envelope ID: 2D69F1B7-24B6-4026-B8B4-6F00A97B7023 PAGE 4 OF 5 commencement of the project that are beyond the control of the Professional will result in a revised project schedule that is based on the same task durations and sequencing. The final Completion is anticipated to be in May 2017. Assumptions Used in Developing this Scope of Services The Professional’s estimate of engineering costs for the project is based on the elements included in task descriptions above, and the following assumptions: 1. The City and the City’s Alternative Product Delivery System (APDS) Contractor, Hydro Construction will provide cost estimating under the City’s separate contract with Hydro Construction. 2. City will examine information submitted by Professional and render in writing or otherwise provide decisions within two weeks. 3. City will give prompt notice to Professional whenever City observes or becomes aware of any development that affects the scope or timing of Professional’s services, or of any defect in the work of Professional. 4. Professional will provide the City with deliverables as defined respectively in this scope of work. Deliverables will be distributed electronically via email (pdf format). 5. Meetings with the City will be held at the City’s service center office or Water Treatment Facility. 6. In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the project, Professional has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by operating personnel or third parties; and other economic and operational factors that may materially affect the ultimate project cost or schedule. Therefore, Professional makes no warranty that City's actual project costs, financial aspects, economic feasibility, or schedules will not vary from Professional’s opinions, analyses, projections, or estimates. If City wishes greater assurance as to any element of project cost, feasibility, or schedule, City will employ an independent cost estimator, contractor, or other appropriate advisor. DocuSign Envelope ID: 2D69F1B7-24B6-4026-B8B4-6F00A97B7023 PAGE 5 OF 5 Exhibit C – Compensation DocuSign Envelope ID: 2D69F1B7-24B6-4026-B8B4-6F00A97B7023 Exhibit C Compensation Schedule Al Paquet Principal Project Manager Brad Schutt Engineer Specialist Steve Silkworth Sr. Architect Mark Merklein Sr. Structural Engineer Scott Hoffman, Mechanical Engineer Erik Neparud Site Civil Chuck Sinclair Technician 5 Craig Van Horn Corrosion Engineer Gretchen Sage Contracts Administration/ Accounting Labor Hours Labor Expense Total Cost Per Diem Code/Classification 03 05 04 04 07 06 11 06 05 19 Task 1.1 1 Conceptual Kick-Off Meeting Evaluation of T2 Conversion 2017 Labor Rates $235 2 $185 6 $205 4 $205 $ 142 $ 160 $152 $160 2 $185 4 $90 4 22 $3,820 $200 $4,020 1.2 Code Review 1 8 4 4 4 21 $3,923 $200 $4,123 1.3 Conceptual Design and Evaluation 6 24 12 12 12 16 40 122 $21,114 $200 $21,314 1.4 Electrical Subconsultant $6,405 $6,405 Total 9 38 20 16 16 16 40 2 4 4 165 $28,857 $7,005 $35,862 Exhibit_C_Fee_WTF_T1_T2_Conversion_rev2.xlsx\Fee Estimate 2/21/2017 DocuSign Envelope ID: 2D69F1B7-24B6-4026-B8B4-6F00A97B7023