Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 8371 ARCHITECTURAL & ENGINEERING SERVICES ON-CALLEXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND AU Workshop, LLC DATED: TBD Work Order Number: OP-467521 Purchase Order Number: TBD Project Title: Utilities Cut-to-Length Shop Commencement Date: January 9, 2017 Completion Date: July 31, 2017 Maximum Fee: (time and reimbursable direct costs): $56,215.00 Project Description: The project is a new cut-to-length shop addition to the existing City of Fort Collins Utility Service Center at 700 Wood Street. The new shop will house wire reel spooling and cutting equipment for the Light & Power groups. The shop will not be continually staffed and conditioning requirements are a minimum, maintaining 50 degrees Fahrenheit in winter months. The anticipated scope encompasses approximately 5,184 square feet. Scope of Services: Services to be provided by the design team include the following: • Space planning • Architecture design • Civil engineering • Structural engineering • Electrical engineering • Mechanical and plumbing engineering • Cost Estimating The City has retained the services of a Building Commissioning Agent, energy modeler, and sustainable design consultant. The design team will cooperate with the City’s consultants in all matters relating to the design including a peer review. ______________________________________________________________________ Facilities Project Manager: Chad Mapp Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of _three__ (3) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. City of Fort Collins By:_________________________________ Date:_______________________________ By: ________________________________ Director of Purchasing and Risk Management (over $60,000.00) Date: ______________________________ AU Workshop Rep: ________________________ Signature: ________________________ Date:_________________________ Jason Kersley, Member 22 December 2016 12/23/16 December  9,  2016 Chap  Mapp City  of  Fort  Collins Operation  Services Fort  Collins,  CO  80521 RE:  Utility  Services  Center,  Light  &  Power  Cut-­‐to-­‐Length  Shop Chad, Outlined  below  is  our  project  understanding  and  scope  of  service  for  the  L&P  Cut-­‐to-­‐Length  Shop Addition  to  the  Utility  Services  Center  at  700  Wood  Street. PROJECT  UNDERSTANDING The  Project  is  a  new  addition  to  the CoFC  L&P  Cut-­‐to-­‐Length  Shop  December  9,  2016 Page  2  of  3 Outline  Specifications; Estimate  of  probable  cost. Approval  of  documents  is  required  for  commencement  of  Construction  Documents. CD  Documents  provided  at  the  end  of  Construction  Documents  will  be  for  bidding  and  permitting: Fully  executed  plans  and  specifications. We  will  provide  a  90%  CD  set  for  owner  review  prior  to  completion  of CoFC  L&P  Cut-­‐to-­‐Length  Shop  December  9,  2016 Page  3  of  3 REIMBURSABLE  EXPENSES Expenses  related  to  modeling  and  professional  renderings,  etc.  are  not  anticipated,  but  if  incurred will  be  in  addition  to  the  fees  stated  above.  These  fees  will  be  billed  per  the  Hourly  Rate  Chart,  and will  only  be  incurred  with  prior  approval  by  you. Reimbursable expenses, such as reproductions, will be billed at their actual cost plus a 5% administrative  fee. AGREEMENT By Proposal for Design Services City of Fort Collins Utility Services Center L&P Cut-to-Length Shop 9-Dec-16 New Addition to Existing Facility Project gsf 5,184 Estimate of Construction Costs with Contingency Addition @ 135.00 $ per gsf $ 699,840 Site improvements lump sum $ 20,000 <–for utility extensions Design Contingency 5.0% $ 35,992 Construction Contingency 5.0% $ 35,992 SUBTOTAL $ 791,824 $ 153 per SF Esimate of Development Costs Survey and Geotech lump sum $ 5,000 Equipmnent lump sum $ 150,000 Printing lump sum $ 2,000 Design Fees 7.10% $ 56,215 CA Fees 1.83% 14,475 Testing & Inspection 1.25% $ 9,898 <–includes blower door test Commissioning lump sum $ 0 <–assumed not required Permits & Fees 4.5% $ 35,632 SUBTOTAL $ 273,220 Project Costs TOTAL $ 1,065,044 Costs provided are assumed probable costs and are not verified Proposal for Design Services City of Fort Collins Utility Services Center L&P Cut-to-Length Shop 9-Dec-16 New Addition to Existing Facility Project gsf 5,184 SF Estimated Construction Costs $ 791,824 Design Fee Schedule ARCH CIVIL STRUCT M·P ELEC ESTIMATING Phase TOTAL 4 weeks SD 5,325 2,000 750 350 600 1,920 10,945 5 weeks DD 8,875 3,250 1,000 1,350 2,200 2,070 18,745 6 weeks CD 12,425 5,750 2,250 2,100 4,000 26,525 TOTALS $ 26,625 $ 11,000 $ 4,000 $ 3,800 $ 6,800 $ 3,990 $ 56,215 CA per Future Agreement Bidding 1,775 0 0 0 0 0 1,775 CA 7,100 3,000 1,000 400 1,200 0 12,700 $ 8,875 $ 3,000 $ 1,000 $ 400 $ 1,200 $ - $ 14,475  signing  below,  you  agree  to  the  provisions  of  this  Proposal  and  agree  to  pay  [au]workshop  in  a timely  manner  in  accordance  with  the  terms  stated.  Authorizing  services  described  in  this  Proposal shall  be  construed  to  mean  agreement  with  its  provisions.  Please  return  a  signed  copy  of  this agreement  for  our  records. We  trust  these  terms  meet  your  expectations.  Should  you  have  any  inquiries,  please  do  not  hesitate to  contact  us  at  your  convenience. Sincerely, [au]workshop,  llc. Jason  Kersley,  AIA  NCARB  LEED  AP Member A  G  R  E  E  D: By:  (signature) ________________________________  Date:  ______________________ Title: ________________________________ Attachments: None  documents. SCHEDULE We  anticipate  the  following  durations  for  each  phase: SD: 4  weeks; DD: 5  weeks; CD: 6  weeks. FEES Refer  to  attached  fee  schedule.  We  are  providing  full  design  services  at  a  lump  sum  total  of  $56,215. This  is  based  upon  7.1%  of  estimated  construction  costs  of  $791,824  (refer  to  attached  project  cost estimate).  If  construction  cost  is  determined  to  be  more  than  10%  different  than  estimated,  then fees  shall  be  adjusted  relative  to  higher  or  lower  construction  costs. Additional  work  in  excess  of  the  total  above  will  be  undertaken  on  an  hourly  basis  based  on  our standard  Hourly  Rate  Chart  (included  with  Professional  Service  Agreement). Fees  and  expenses  are  subject  to  the  Professional  Service  Agreement. EXCLUSIONS • Renderings  or  presentation  boards  –  if  requested,  these  will  be  negotiated  as  a  separate agreement; • Equipment,  other  than  building  systems,  or  furnishings; • Landscape  Architectural  Design; • Telephone,  Data,  and  Communication  design; • Security  system  design; • Fire  suppression  system  designs; • Fire  alarm  system  design; • Site  Survey; • Soils  testing; • LEED  Certification; • Testing  and  Inspection. DESIGN  CREDIT All  images  prepared  by  [au]workshop  and  used  for  publication  in  websites,  news  releases, newspapers,  publications,  marketing  materials,  etc.  shall  be  credited  to  “[au]workshop Architects+Urbanists”.  existing  facility.  The  new  shop  will  house  wire  reel  spooling  and cutting  equipment  for  the  Light  &  Power  group.  The  shop  will  need  overhead  door  connection  to  the adjacent  storage  yard.  Overhead  door  must  accommodate  13-­‐foot  wide  reels  and  a  forklift  with  a 16-­‐foot  mast.  Additionally  a  new  overhead  door  that  connects  the  existing  warehouse  to  the  new shop  is  desired. The  shop  will  not  be  continually  staffed  and  conditioning  requirements  are  a  minimum,  maintaining 50  degrees  Fahrenheit  in  winter  months. There  should  be  a  floor  drain  or  trench  drain  for  drainage  of  snow  or  water  from  forklift  traffic. Exterior  lights  need  to  be  on  a  full  cut-­‐off  per  agreement  with  neighboring  properties. As  an  alternate,  provide  a  new  taller  overhead  door  at  existing  east  dock  warehouse  entry. SCOPE  OF  WORK We  will  provide  full  design  services  from  pre-­‐design  through  Construction  Documents. As  a  stipulation  to  signing  this  agreement  [au]workshop  will  be  contracted,  per  a  future  agreement, to  provide  Construction  Administration  services. The  design  intent  is  to  provide  a  pre-­‐fabricated  metal  building  with  insulated  metal  panel  exterior finish.  Coordination  between  metal  building  fabricator  and  structural  engineer  designing foundations  may  require  early  initiation  of  a  contractor  to  bring  on  a  metal  building  manufacturer. Estimate  of  Project  Cost  will  be  provided  at  the  end  of  Schematic  Design  and  Design  Development. DELIVERABLES SD  Documents  for  review  at  the  end  of  Schematic  Design: Plans,  sections,  elevations,  narrative  explanations  of  building  systems; Estimate  of  probable  cost. Approval  of  documents  is  required  for  commencement  of  Design  Development. DD  Documents  for  review  at  the  end  of  Design  Development: Plans,  sections,  elevations,  general  details; Consultant  plans  and  general  details;