HomeMy WebLinkAboutPrebid - BID - 8344 CONCRETE MAINTENANCE PROJECT PHASE III7/14/2016 1 Streets Department Phase 3 Concrete July 14, 2016 Tom Knostman Overview 2 Mountain Area Drake Area 7/14/2016 2 W Mountain 3 W Mountain Example of corner reconstruction 4 Before After (For illustration only – these are not pictures of the same corner.) 7/14/2016 3 W Mountain 5 EW NS NS EW EW NS NS EW 12345678 Dome qty Recon qty Shields D D D D 4 0 N Mack St R DRD R 13 S Mack St D RRR 13 Washington Ave DDDDDDDD 80 Grant Ave RRDDRRDD 44 Loomis Ave RRDDDDDD 62 Whitcomb St R RDDDDDRDR 44 Sherwood St D D RD RRRD D D 4 4 Meldrum St RD R DDDDRDR 44 Howes St R DDDDRRD5 3 Total 41 27 Intersection NW SW SE NE Corner These classifications of Dome Repair ("D") or Reconstruction ("R") are based solely on ramp slope, with 1:12 being the distinction. "RD" means that the ramp slope was less than 1:12, but it will likely need reconstruction because of drainage issues that will likely be created by reconstructing the other adjacent ramp. Howes 6 Concrete pavement repair on Whedbee; will be similar on Howes 7/14/2016 4 Challenges with retrofits Why “standards” may not work 7 Drainage issues (New ramp at Prospect and Whedbee) Space constraints, safe crossings (New ramp at Prospect and Circle Dr) Working Hours 8 ANTICIPATED WORKING HOURS FOR EACH PROJECT LISTED IN SECTION 03500 MAPS  Howes: 7am to 6pm  W Mountain: 7am to 6pm  Shields NS: 8:30am to 3:30pm  Cherry 1: 7am to 6pm  Constitution Ramps and Bulb outs : 7am to 6pm  Drake 1: 7am to 6pm, UNLESS working near signalized Taft intersection which shall be 8:30am to 3:30pm 7/14/2016 5 100 Working Day & Milestones 9 Milestones for this contract are outlined below. If the milestones are not met without reasonable justification and/or approval determined by the City Engineer, the City reserves the right to collect liquidated damages of one-thousand ($1000) dollars per day, and remove any or all future projects from the contract and allow another Contractor to complete said work under a different contract. The milestones shall be based off of the allotted working days described in section 108.08 above. The contracted working days shall commence upon a written or verbal Notice to Proceed given to the Contractor by the City Engineer. The working days shall be monitored on a daily basis by the City Representative, and written on a weekly tracking sheet. This sheet shall be signed by a representative of the Contractor at the weekly progress meetings. Any change to the contract amounts during the construction season will be accompanied by a negotiated change in working days for the contract.  Milestone 1: o Upon reaching one-third (1/3) of the contractual days allotted to complete the contracted work, one fourth (1/3) or thirty-three percent (33%) of the contracted monies shall be exhausted.  Milestone 2: o Upon reaching two-thirds (2/3) of the contractual working days allotted to complete the contracted work, two-thirds (2/3) or sixty-seven (67%) of the contracted monies shall be exhausted.  Milestone 3 o Upon working for the total amount of contractual working days, the Contractor must have reached substantial completion of the contracted project areas located in section 3500 of the contract documents. o If the City Engineer determines the Contractor cannot and/or will not meet the needs of the contractual obligations in terms of production and/or resources, the City reserves the right to remove remaining projects and have a different contractor perform that work. This action will not relieve the Contractor from any assessed liquidated damage charges. o Conversely, if the City Engineer determines that the Contractor is performing at a high level and can take on additional work that other contractors are not able to complete and/or a City addition of newly identified projects, the City reserves the right to add projects to the contract quantities without line item price negotiations upon an agreement with the Contractor to take on the additional work.