Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 8127 ENGINEERING SERVICES FOR ELECTRIC FACILITIES CAPITAL IMPROVEMENTSStanleyConsultantsInc. CityofFortCollinsLight&Power Hwy392TimberlinetoIͲ25PermittingͲFeeEstimateͲWorkOrderNo.1630Ͳ2554 CHANGEORDER1 MarvHartwig DaveDyer TonyPollack NoelleHoelsken JamieWilson JesseZellmer ShawnBuell GenoWilson MaryDolhancey NathalieDuran StanleyBillingClass(BC) BC21 BC19 BC14 BC8 BC16 BC12 BC11 Totals $237 $212 $156 $95 $177 $134 $123 TASK1ͲObtainEasementthruFossilCreek Task1.1ͲContactOwnersforneweasements 16 60 0 0 8,196.00 Task1.2ͲPrarieDogVendorCoordination 2 10 0 5 1,932.00 HoursͲStanley 18 70 0 5 0 93 Task1.0Subtotal $2,808.00 $6,650.00 $0.00 $670.00 $0.00 $10,128.00 TASK2ͲEnvironmental HoursͲStanley 0 0 0 0 0 0 Task2.0Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TASK3ͲCityErosionControlPlanandReport HoursͲStanley 0 0 0 0 0 0 Task3.0Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TASK4ͲFloodplainPermit HoursͲStanley 0 0 0 0 0 0 Task4.0Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Task5ͲCDOTPermit HoursͲStanley 2 4 0 0 0 16 0 22 SubtotalStanleyCostTask5 $474.00 $848.00 $0.00 $0.00 $0.00 $2,144.00 $0.00 $3,466.00 TerraconͲSubconsultant $2,650.00 Task5.0Subtotal $6,116.00 Task6ͲConstructionDewateringPermit HoursͲStanley 0 0 0 24 0 4 0 28 Task6.0Subtotal $0.00 $0.00 $0.00 $2,280.00 $0.00 $536.00 $0.00 $2,816.00 Task7ͲDesignServices HoursͲStanley 0 0 6 6 16 106 50 184 SubtotalStanleyCostTask7 $0.00 $0.00 $936.00 $570.00 $2,832.00 $14,204.00 $6,150.00 $24,692.00 SafesiteͲSubconsultant $5,000.00 PrecisionSurveyͲSubconsultant $8,355.00 Task7.0Subtotal $38,047.00 SubtotalAllStanleyCosts $41,102.00 SubtotalAllConsultantsCosts $16,005.00 ReimbursableExpenses $468.00 TaskEstimateTotal $57,575.00 11/9/2016 1 DocuSign Envelope ID: 37C97471-6C7D-4EC3-8737-C3A609F5D7DB WORK ORDER NO. 1630-2554 TASK AUTHORIZATION CHANGE ORDER NO. 1 Request for Additional Services To: STANLEY CONSULTANTS, INC. (Professional) From: THE CITY OF FORT COLLINS (City) Subject: AUTHORIZATION TO PERFORM ENGINEERING SERVICES Project Title: HWY 392-TIMBERLINE RD TO I-25 DUCT BANK PROJECT TASK SUMMARY The City plans to install underground electric feeders along Highway 392 between Timberline Road and Interstate 25. The general alignment follows the north side of the Highway 392 and passes near Duck Pond and through Fossil Creek Reservoir Natural Area. Professional will provide design services, easement acquisition and permitting services to support the project. CHANGE ORDER No. 1: Scope of Services This change order provides additional professional services requested by the City to provide engineering design and permitting support necessary to complete the project. Task 1.0 – Obtain Easement through Fossil Creek Reservoir Natural Area 1. City requested Professional to contact approximately six property owners along the south side of Highway 392 to see if they were open to granting a new easement to the City for the purpose of exploring an alternate design route on the south side of the highway. Professional performed research of parcel information to identify property owners, searched for phone numbers, made multiple phone calls and prepared and mailed letters to contact owners. Professional had several discussions with each owner and provided brief report and map to City. 2. Professional will locate a third party vendor to obtain a plan for mitigating impact to prairie dogs colonies. City will provide a list of contacts and Professional will coordinate and obtain a proposal from qualified vendor(s). Information will be relayed back to the City for its review and approval. The findings will be incorporated into the natural areas application. Deliverables: x x x Ownership Status Proposal Updates for List, Prairie Contacts Dog Mitigation & Map Task 2.0 - Environmental Assessment and Agency Consultation 1. No additional services for this task Task 3.0 – Storm Water Management Plan (SWMP) & Report 1. No additional services for this task Work Order No. 1630-2554 – Change Order No. 1: Hwy 392-Timberline Rd to I25 Duct Bank Project Page 1 DocuSign Envelope ID: 37C97471-6C7D-4EC3-8737-C3A609F5D7DB Task 4.0 – Floodplain Permit/No Rise Certification 1. No additional services for this task. Task 5.0 – CDOT Special Use Utility Permit Due to the increasing number of problems with Horizontal Directional Drilling installations of utilities in CDOT Region 4 and throughout the State, the State Utility Engineer has directed the Region Utility Offices to require that larger bored utility installations be designed and stamped by a Licensed Professional Engineer. Professional will coordinate and oversee geotechnical testing services for the project by contracting with Terracon Engineering. 1. Professional will provide stamped design for bored utility crossing Highway 392 (CDOT ROW). The installation shall comply with the provisions of the CDOT State Highway Utility Manual. 2. Terracon will perform up to 2 soil borings approximately 10 feet in depth and provide a geotechnical report of its findings. Professional will use the information to prepare its bore design required to satisfy CDOT requirements. Deliverables: x x x x x x Permit Work Traffic Bore Approved Geotechnical Design Area Application Control Permit Map – Report Signed Plan for – and 2 review Borings Sealed – by Provided PE by Terracon Task 6.0 – Construction Dewatering Permit - (New Task) A construction dewatering permit will be required from the Colorado Department of Public Health and Environment (CDPHE) if ground water needs to be diverted as part of the project. 1. Professional will complete and file the application with CDPHE and provide coordination with City and CDPHE to obtain approval. 2. Professional will perform a review of online resources to determine if there are issues in the area such as leaking underground storage tank (LUST) sites, superfund sites and/or other ground contaminants in the project area. 3. City will provide ground water discharge locations. Deliverables: x x Permit Approved Application Permit for review Task 7.0 – Electric Distribution Design - (New Task) 1. Contact City’s engineering staff to confirm or refine issues during conceptual stage. 2. Begin (8-5” & 4-5”) conduit duct bank from 10’X10’ vault (SP60008) located at the intersection of HWY 392 & S Timberline Rd. Continue duct bank approximately 13,200’ landing conduit Work Order No. 1630-2554 – Change Order No. 1: Hwy 392-Timberline Rd to I25 Duct Bank Project Page 2 DocuSign Envelope ID: 37C97471-6C7D-4EC3-8737-C3A609F5D7DB bank in 10’X10’ vaults spaced out approximately 1,100’ apart. Ending duct bank at the intersection of HWY 392 & SW Frontage Road. Directional boring wetlands and entrances along HWY 392 the way staying within utility easements until reaching Fossil Creek Regional Open Space bring duct bank into road right of way. Continue duct bank in road right of way until reaching South Fort Collins Sanitation district bringing duct bank back into utility easement approximately 900’ past sanitation facility. Continue duct bank to the intersection of SW Frontage Rd and HWY 392. Continuing into road right of way. 3. Install 8’X13’ vault for future switch gear at the intersection of SW Frontage Rd and HWY 392. Connecting vault with (6-5”) conduits from 10’X10’ main line vault. Directional bore (2-4” & 1- 2”) approximately 200’ south across HWY 392 for future single phase primary. Install electronic marker balls at the end of conduit. 4. Continue conduit bank (8-5” & 4-5”) from 10’X10’ main line vault at the intersection of HWY 392 & SW Frontage Rd approximately 800’ north to the construction entrance to Swede Lake ending a 10’X10’ vault. 4. Professional will coordinate and oversee utility locating and potholing services for the project by contracting with Safesite Utility Field Services. Safesite will perform pot-holing and existing conditions documentation. Identify existing utilities horizontal and vertical locations. This task includes 10 potholes on soft surface, 4 potholes on hard surface and 1000 linear feet of locating. 5. Additional survey services will be needed to prepare a detailed design package, locate existing utilities and facilitate the CDOT boring requirements. Professional will coordinate and oversee survey services by contracting with Precision Survey and Mapping. a) All existing above ground features will be survey located including but not limited to existing roadways, sidewalks, structures, parking lots, driveways, utility boxes, utility poles, trees and bushes. Tree stands will be located by edge of trees only and individual trees in groups of trees will not be specifically located. Standalone trees will be located. b) Survey locate buried utilities as indicated by painted and pin flagged marks as provided by professional utility locator. Utilities of public record will be shown and a diligent effort will be made to locate private utilities. Precision Survey & Mapping can’t guarantee that all private utilities will be shown because of lack of records. c) A topographic survey will not be provided but elevations will be collected on all shots. Stanley Consultants will be utilizing the City of Fort Collins’ GIS Data for contour information. d) For Storm & Sanitary lines, the survey will identify alignment, pipe size, pipe material, inverts, rim elevations and accurate alignments between manholes, inlets, etc. All storm and sanitary sewer will be labeled with leaders identifying, Type of structure, Rim/Inlet elevation, Pipe diameter and material, Inverts in and out and directions. e) The location of subsurface waterline services, gas services, and sanitary sewer laterals are not included as a part of this scope of work. These items would need to be specifically addressed if desired. f) Provide a 50’ cross-section on the crossing of Hwy 392 on the east side of the project. Work Order No. 1630-2554 – Change Order No. 1: Hwy 392-Timberline Rd to I25 Duct Bank Project Page 3 DocuSign Envelope ID: 37C97471-6C7D-4EC3-8737-C3A609F5D7DB g) Survey and plot existing Poudre Valley overhead electric easements as provided by Stanley Consultants. Deliverables: x x x x Design Profile Pothole Survey base Maps Locations map (8)– Provided by Safesite SCHEDULE We estimate the additional services in this change order to commence on October 15, 2016 and will be completed by March 15, 2017. COMPENSATION Original fee was $66,864. The revised estimated fee is $124,439 which is an increase of $57,575. Compensation will be billed per Professional's hourly rate plus reimbursable expenses identified in the Professional Service Agreement. The Professional will submit monthly invoices to the City. The estimated fee will not be exceeded without a change order agreed upon by the City and Professional. Task Description Original Fee Increase Adjusted Fee Task 1.0 – Obtain New Easement $27,072 $10,128 $37,200 Task 2.0 – Environmental Assessment $17,664 $0 $17,664 Task 3.0 – SWMP & Report – State Permit $11,038 $0 $11,038 Task 4.0 – Floodplain Permit & No Rise Cert $9,128 $0 $9,128 Task 5.0 – CDOT Utility Permit (Includes Subconsultant) $832 $6116 $6,948 Task 6.0 – Construction Dewatering Permit $0 $2,816 $2,816 Task 7.0 – Design & Profile (Includes Subconsultants) $0 $38,047 $38,047 Reimbursable Expenses $1,130 $468 $1,598 Totals $66,864 $57,575 $124,439 Work Order No. 1630-2554 – Change Order No. 1: Hwy 392-Timberline Rd to I25 Duct Bank Project Page 4 DocuSign Envelope ID: 37C97471-6C7D-4EC3-8737-C3A609F5D7DB