HomeMy WebLinkAboutCHANGE ORDER - RFP - 7421 CITY ARCHITECTURAL l& ENGINEERING WORK ORDER CONTRACTSECTION 00950 CHANGE ORDER NO. 2 PROJECT TITLE: Graves Camp Historic Structure Assessment CONTRACTOR: RB+B PROJECT NUMBER: PO 9154839 DESCRIPTION: 1. Reason for change: Additional funding has been requested to support the work of sub-consultants (Larsen and Wattle and Daub) and to enable RB+B to bring the report through completion and final approval with the State Historic Fund. Larsen’s scope shifted as they gained a more detailed understanding of the requirements of the Historic Structure Assessment, and expectations of the Natural Areas Department. Wattle and Daub are being engaged to fill a skills gap and complete the cost estimating section of the HSA. 2. Description of Change: Now-October 1, 2016 • Coordination of contributing disciplines and integration of their work into the Historic Structure Assessment draft (this includes the remaining pricing contribution from Wattle + Daub) • Edits to the draft based on feedback from the internal team (City + sub-consultants) • Submittal of the internally-approved HSA draft to the State Historic Fund for review • Payment of $7,953 [50% of the Change Order] will be made upon successful submittal of the HSA draft to the State Historical Fund October 1-December 31, 2016 • Coordination of contributing disciplines and edits to the submitted draft, and any subsequent drafts, based on feedback from the State Historic Fund • Resubmittal of revised drafts to occur no later than 15 calendar days after receipt of comments from the State • Submittals and subsequent resubmittals shall be completed no later than December 31st, 2016 • Digital delivery of all State approved submittals to the Natural Areas department (both in PDF and original file formats: e.g. CAD, InDesign, Word, etc.) All Work produced shall become the property of the City of Fort Collins • Final Payment of the remaining change order amount shall be withheld until final approval is secured by the State and all approved submittals have been received by the Natural Areas Department. • In the event that the State Historical Fund does not approve the plan by December 31, 2016 due to circumstances beyond RB+B’s reasonable control, the City shall pay RB+B $6,362.40 [40% of the Change Order] 3. Change in Contract Cost: $15,906 (See attached) 4. Change in Contract Time: December 31, 2016 ORIGINAL CONTRACT COST $ 20,980.00 TOTAL APPROVED CHANGE ORDER 16,550.00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER 15,906.00 TOTAL % OF THIS CHANGE ORDER 76% TOTAL C.O.% OF ORIGINAL CONTRACT 155% ADJUSTED CONTRACT COST $ 53,436.00 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative REVIEWED BY: _________________________________ DATE: _________________ Project Manager APPROVED BY: DATE: Director of Purchasing & Risk Management (over $60,000) September 9, 2016 To: Stephanie Kopplin, Project Manager City of Fort Collins Natural Areas Department 1745 Hoffman Road Fort Collins, CO 80524 Re: Graves Camp Historic Structure Assessment Subject: Additional services Dear Stephanie, Thank you for allowing us to present our proposal for additional services for the important work that the City of Fort Collins is doing at the Graves Camp site. Per our recent conversations, we feel that this request will provide the funding needed to complete this project (reports): Wattle & Daub for cost estimating: $ 6,220 Larsen Engineering for structural recommendations: $ 7,004 RB+B for additional consultant coordination, meetings, etc.: $ 1,812 Total Request: $15,906 Please let me know if there are any questions. Sincerely, Corky Bradley, AIA, LEED AP Principal PROPOSAL FOR STRUCTURAL ENGINEERING SERVICES Date: 23 August 2016 Client: City of Fort Collins Natural Areas Dept Project Name: Graves Camp Project GENERAL Location: SCOPE OF Larimer PROJECT: County, Colorado Structural investigation and analysis of the structures at the Graves Camp. An investigative report will be generated and will be based on the following:  The foundations, floor framing, roof framing, and wall framing of each structure will be analyzed to determine the structures theoretical capacities to withstand current building code prescribed loading with respective to gravity and lateral forces.  Design of reinforcing for inadequate structure will be completed and conveyed in written form in the report. No drawings will be produced.  The format of an example report will followed closely. SCOPE OF STRUCTURAL SERVICES:  Perform multiple site visits to document the existing foundation, floor framing, roof framing, wall framing, and sheathing/decking of the building and investigate the current structural condition of these items.  This investigation will be a “limited observation”. No load or destructive testing will be performed and we will only comment on those items which are readily visible or made evident by surface characteristics. Unseen defects may exist in the building structures that are not apparent due to them being concealed by the building’s finishes (drywall, siding, etc).  Perform an analysis to verify the adequacy of the structural components of each building. The currently adopted building code by Larimer County will be used to determine the loads/forces that the structures are required to resist.  Provide a report compiling the findings of the site investigation, the results of the analysis, and a recommended action to be taken for each structure.  The Base Fee includes reimbursables for mileage, copies, and normal printing. Printing above normal coordination and express delivery services will be billed at actual cost without markup. BASE FEE: $10,200 Breakdown: Fees previously invoiced and paid by RB+B = $3,196 Balance of fee to be paid by the city = $7,004