Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7445 CONSULTING ENGINEERING SERVICES FOR STREAM RESTORATION & HABITAT ENHANCEMENT CAPITAL IMPROVEMENTSWORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND AYRES Associates DATED: May 15, 2015 Work Order Number: SREP-FC-08262016 Purchase Order Number: Project Title: Stream Rehabilitation and Enhancement Program - Revegetation for Fossil Creek Upstream Of Lemay Avenue Original Bid/RFP Number & Name: 8073 Engineering Services For Future Water, Wastewater and Stormwater Facilities Capital Improvements Commencement Date: 9/1/2016 Completion Date: 5/1/2017 Maximum Fee: (time and reimbursable direct costs): $12,540 Project Description: Consultant to provide site revegetation planting, monitoring and administration for the Fossil Creek Stream Rehabilitation and Enhancement project. The project will stabilize eroding banks and rehabilitate and enhance habitat within reach 4-1 of Fossil Creek, just north of Fossil Creek Community Park, west of Lemay Avenue. Scope of Services: See attached Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of Two (2) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. PROFESSIONAL By:_______________________________ Dustin Robinson / AYRES Associates Date:_____________________________ CITY OF FORT COLLINS Submitted By: _____________________________ Jason Stutzman, Special Projects Manager Date: _____________________________ Reviewed by: _____________________________ Matt Fater for Owen L. Randall, Chief Engineer Date: _____________________________ Approved by: _____________________________ Jon Haukaas, Manager Water Engineering & Field Services Operations Date: _____________________________ Approved by: _________________________ Kevin R. Gertig, Utilities General Manager (over $1,000,000) Date: ________________________ Approved by: _________________________ Purchasing Director (if over $60,000) Date: _______________________ DocuSign Envelope ID: E2745555-5ACD-4073-A508-7447F7A1511F     August 18, 2016 1 SREP FOR FOSSIL CREEK REACH 4-1 REVEGETATION PROJECT OBJECTIVE: To rehabilitate and/or enhance Fossil Creek from near its confluence with Mail Creek downstream to Lemay Avenue (reach 4-1). GENERAL The following Scope of Services outlines the tasks required to complete the revegetation. 1 Task 1 – Revegetation 1.1 Wetland plugs, willows, and riparian shrub installation as needed. This task includes plant materials and installation as needed. Additional wetland plugs and willows will be installed along banks with little vegetation establishment. Riparian shrubs will be installed along the fringe of the wetland areas where previous plantings were thin and/or did not take. 1.2 Upland seeding on bare areas as needed. This task includes seeding upland bare areas as needed. 1.3 Weed Control. This task includes 1-2 weed treatments as necessary. 2 Task 2 – Monitoring 2.1 Site Visit and project coordination. This task includes general coordination and additional site visits. SUMMARY x Summary OF PROJECT of work and DELIVERABLES pictures. DocuSign Envelope ID: E2745555-5ACD-4073-A508-7447F7A1511F Task Description Manager (Dusty Robinson) Total Labor Cost Materials Total by Task AlpineEco and Nursery Labor Total by Task $130 Task 1 Revegetation 1.1 Wetland plugs, willows, and riparian shrub installlation as needed 6 $ 780 $ 2,000 $ 2,780 $ 2,000 $ 4,780 1.2 Upland seeding on bare areas as needed 4 $ 520 $ 500 $ 1,020 $ 1,000 $ 2,020 1.3 Weed Control (2 treatments) 4 $ 520 $ - $ 520 $ 1,500 $ 2,020 Subtotal 14 $ 1,820 $ 2,500 $ 4,320 $ 4,500 $ 8,820 Task 2 Monitroing 2.1 Site Visits and project coordination (assume 2 in addition to plantings) 24 $ 3,120 $ - $ 3,120 $ 600 $ 3,720 Subtotal 24 $ 3,120 $ - $ 3,120 $ 600 $ 3,720 Total 38 $ 4,940 $ 2,500 $ 7,440 $ 5,100 $ 12,540 Ayres Associates - Professional Services Fee Proposal SREP Fossil Creek Reach 4-1 Revegetation and Monitoring 8/18/2016 Phase III Revegetation and Monitoring DocuSign Envelope ID: E2745555-5ACD-4073-A508-7447F7A1511F N/A N/A 7445 Consulting Engineering Services for Stream Restoration & Habitat Enhancement Capital Improvements February 1, 2013