Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9165662 (2)Customer Name: City of Fort Collins Contact Name: Jared Contact Phone: 970-744-0836 Contact Email: jheveran@fcgov.com Project Address: Epic Center Date Received: Date Estimated: Estimated Lead Time: Labor Total: $4,810.00 Material Total: $3,132.89 Subtotal: $7,942.89 Tax: $0.00 Total: $7,942.89 Job Description: Demo existing stairs, measure, fabricate, Galvanize, and install new staircase. The stringers will be made using 12" channel. The guard rail and hand rail will be made using 1-1/4 grab pipe (1-5/8" OD). The treads will be 3" x 12" channel in order for concrete to be poured into. The toe kicks will be made using .16 gauge steel to cover the entire opening. Concrete to be poured by separate contractor, concrete not included. Estimate