HomeMy WebLinkAboutRESPONSE - BID - 8259 TRANSFORMERS 500 & 750 KVA THREE PHASE PADMOUNTEDFort Collins Utilities Transformer Bid Loss Data Sheet
FCU Stock #
T3000050
# Units
4
Bid #:
Preparer Name :
Trish Mak0usky, Irby
Size
500kVA
Date:
Preparer Contact Num:
303-222-5001
NIL Loss Cost
S 3.90
FL Loss Cost
$ 2.30
Includes Winding's
Stray Losses 8
Losses
Escalation
Losses Associated
associated
Base Bid
Base Bid
$ /
Guar No Load Guar Full Load Meet Specs?
(is / Is not) Guar Total
with Auxiliary
Winding's with Auxiliary NIL Loss' NIL
FL Loss' FL
Evaluated
Extended Cost
Supplier
Mir / Mfr#
Each
Del/Wks
Loss Loss Impedance (Yes / No)
a factor Load Loss
Devices (Yes / No)
Stray Losses Devices Loss Cost
Loss Cost
Bid
(Total $)
Irby Utilities
Cooper Power
$ 11,809.00 12 Weeks
HH3 3057 3.04 Yes
is nol 3940 Yee,
266 0 $ 3,443.70
$ 7,031.10
$ 22,283.80
$ 70,854.00
Supplier 2
Mir 2
S
- -
0 0 0.00
0 -
0 0 $
$
$
$
Supplier 3
Mir 3
$
- -
0 0 0.00 -
-
0 -
0 0 $
$ -
$ -
$
2) Full load losses — it shall be clearly stated whether this number includes the winding's expected stray losses and losses associated with auxiliary devices
3) Winding's expected stray losses related to quoted transformer design
4) Losses associated with auxiliary devices such as fuses, breakers, switches, etc.
quoted loss values shall be corrected to a reference temperature of 85'C. Quotations submitted during the bid process without the required losses information shall be deemed unresponsive and are subject
rejection by the City of Fort Collins.
Fill out the information in the cells with blue text.
Save the file using your company name and the bid number and e-mail it to: purchasing@fcgov.com
(Example: TransformerSales_Bid_58.xls)
To protect this file, take the following steps:
1) Select Tools, Options
2) Select Security Tab
3) Type your password in the "Password to Open" field.
4) Re-enter your password to confirm it.
Importantl Please remember to include this password in the bid information that will be sealed in the envelope that will be
unsealed at Bid Opening. This will secure your data until the time of the bid opening.
5) Save the file and e-mail it to: purchasing@fcgov.com
Cooper Power Systems
by FA-N
Cooper Power Systems Proposal Number: BE62686716 Date: March 08, 2016
Revision 00 Proposal Valid Through: April 23, 2016
Item Number: 00001
PERFORMANCE DATA:
"Losses are Guaranteed Average"
Target Impedance
3.04 % +/- 7.5%
No Load Losses @85 C
883 Watts
Load Losses @85 C
3057 Watts
Estimated Overall Height
62.89 inches
Estimated Overall Width
78.40 inches
Estimated Overall Depth
55.06 inches
1319 Lincoln Avenue Waukesha, WI 53186
Phone: (262) 524-3496 Fax: 770-268-7601 E-Mail: SonyaBroughton@Eaton.com
Page 6 of 10
This bid contains protected, proprietary and confidential material that constilutes either (1) trade secrets and (2) commercial or
financial info"atioo, the disclosure of which would cause substantial competitive harm to Cooper Power Systems. LLC.
Cooper Power Systems Proposal Number: BEB2686716
Revision 00
Item Details
Item Number: 00002
Cooper Power Systems
by E:T•N
Date: March 08, 2016
Proposal Valid Through: April 23, 2016
Customer Stock Code Number: T3000075
Customer RFQ Information: Specification: 368-300; Rev PP; Dated: 5/9/2014
Quantity Unit Price Extended Price
3
Lead-time (Per Lead-time definition in Proposal Details):
Product Lead-time (X): 12 weeks ex -factory
kVA
Temperature Rise
Cooling Class
Insulating fluid
Efficiency Standard
High Voltage
kV Class
High Voltage Configuration
Taps
High Voltage Bushings
Overcurrent Protection
Expulsion fuses
Bayonet Holder
Low Voltage
Low Voltage kV Class
LV Bushing Arrangement
Low Voltage Bushings
Bushing Supports
Cabinet hardware
IEEE K-Dimension
Coatings
Gauges & Fittings
Gauges & Fittings
Gauges & Fittings
Gauges & Fittings
Gauges & Fittings
Tank accessories
Packaging
Cover
750 kVA 3 Phase Pad -Mounted Transformer
65 degree average winding rise
ONAN
Mineral Oil
DOE 2016
13200GY/7620 Volts, 95 kV BIL
15 kV
Dead Front, Loop Feed
2 - 2.5% taps above and 2 - 2.5% taps below nominal
200 amp Cooper bushing wells (Qty: 6)
Bayonet Fuses in series with Partial -Range Current -Limiting Fuses (Qty:
3)
Bayonet fuses (Qty: 3)
Copper Bayonet Fuse Holder (Qty: 3)
208Y1120 Volts, 30 kV BIL
1.2 kV
Staggered
Integral aluminum 12-hole spade bushing(s) (Qty: 4)
Standard LV Bushing Support Assembly
Penta-head cabinet door bolts
Loop feed per IEEE C57.12.34-2009 Figure 14A specific dimensions
(without bails)
Special paint color Desert Tan - Munsell 10YR6.013.0 Glossy
Liquid level gauge
Thermometer, dial -type
Drain plug in LV compartment
Drain valve (1") with sampler in LV compartment
Internal Fault Detector (IFD)
IEEE standard two -hole ground pads (Qty: 3)
Pallet
Bolted cover
1319 Lincoln Avenue Waukesha, WI 53186
Phone: (262) 524-3496 Fax: 770-268-7601 E-Mail: SonyaBroughton@Eaton.com
Page 7 of 10
This bid contains protected. proprietary and confidential material that constitutes either (1) trade secrets and (2) commercial or
financial information, the disclosure of which would cause substantial competitive harm to Cooper Power Systems, LLC,
Cooper Power Systems
by FA-11111
Cooper Power Systems Proposal Number: BEB2686716 Date: March 08, 2016
Revision 00 Proposal Valid Through: April 23, 2016
Item Number: 00002
PERFORMANCE DATA:
"Losses are Guaranteed Average"
Target Impedance
5.72 % +l- 7.5%
No Load Losses @85 C
935 Watts
Load Losses @85 C
5440 Watts
Estimated Overall Height
73.39 inches
Estimated Overall Width
76.49 inches
Estimated Overall Depth
59.86 inches
1319 Lincoln Avenue Waukesha, WI 53186
Phone: (262) 524-3496 Fax: 770-268-7601 E-Mail: SonyaBroughton@Eaton.com
Page 8 of 10
This bid contains protected, propnelary and confidential matenal that constitutes either (1) trade secrets and (I) commercial or
Snancial information. the disclosure of which would cause substantial compelitive harm to Cooper Power Systems. LLC.
Fort Collins Utilities Transformer Bid Loss Data Sheet
FCU Stock #
T30D0075
# Units
3
Bid #:
Preparer Name :
Tristl Makousky, Irby
Size
750 kVA
Date:
.._. Preparer Contact Num:
:303-222-5001
NL Loss Cost
is 3.90
FL Loss Cost
S 2.30
Includes Winding's
Stray Losses 8
Losses
Escalation
Losses Associated
associated
Base Bid
Base Bid
$ /
Guar No Load Guar Full Load Meet Specs?
(is / is not) Guar Total
with Auxiliary
Winding's with Auxiliary NL Loss - NL
FL Loss - FL
Evaluated
Extended Cost
Supplier
Mfr / Mtr#
Each
DeVWks
Loss Loss Impedance (Yes / No)
a lector Load Loss
Devices (Yes / No)
Stray Losses Devices Loss Cost
Loss Cost
Bid
(Total $)
Irby Utilities
Cooper Power
$ 15,434.00 12 Weeks
03b 5440 ti.71 Yes,
is not 6375
Vas
5118 0 $ 3,646.50
$ 12,512.00
$ 31,592.50
$ 46,302.00
Supplier 2
Mfr 2
S
- -
0 0 0.00 -
-
0 -
0 0 $ -
$ -
$ -
$ -
Supplier 3
Mfr 3
$
- -
a 0 0.00 -
0
0 0 $ -
$ -
$ -
$ -
2) Full load losses — it shall be clearly stated whether this number includes the winding's expected stray losses and losses associated with auxiliary devices
3) Winding's expected stray losses related to quoted transformer design
4) Losses associated with auxiliary devices such as fuses, breakers, switches, etc.
All quoted loss values shall be corrected to a reference temperature of 85°C. Quotations submitted during the bid process without the required losses information shall be deemed unresponsive and are subject to
rejection by the City of Fort Collins.
Fill out the information in the cells with blue text.
Save the file using your company name and the bid number and e-mail it to: purchasing@fcgov.com
(Example: TransformerSales_Sid_58.xis)
protect this file, take the following steps:
Select Tools, Options
Select Security Tab
Type your password in the "Password to Open" field.
Re-enter your password to confirm it.
Important! Please remember to include this password in the bid information that will be sealed in the envelope that will be
unsealed at Bid Opening. This will secure your data until the time of the bid opening.
Save the file and e-mail it to: purchasing Ofcgov.com
EXHIBIT A
BID ACKNOWLEDGEMENT
Contractor hereby acknowledges receipt of the City of Fort Collins Utilities' Request for Bids for
the Transformers and acknowledges that it has read and agrees to be fully bound by all of the
terms, conditions and other provisions set forth in the Bid. Additionally, the Contractor hereby
makes the following representations to Utilities:
a. All of the statements and representations made in this bid are true to the best of the
Contractor's knowledge and belief.
b. The Contractor has obtained all necessary authorizations and approvals that will enable
the Contractor to commit to the terms provided in this bid submittal.
c. This bid submittal is a firm and binding offer, for a period of 45 days from the date
hereof.
d. I further agree that the method of award is acceptable to my company.
e. I acknowledge receipt of I addenda.
Contractor Firm Name: :S Z3y
Physical Address: �4 ri a (� �Y� ¢e�—+ \ )2Q\yLy-�
Remit to Address: _1O f ox Li 39 SDI ( X ' Z�;Q 9
Phone:
Authorized Agent of Firm Name. � V-
Signature of Authorized Agent: ,
Primary Contact for Project:
Title: Email Address: YnG�L,5
Phone: 303 -d?-D--SOOt Cell Phone: 1Q3—�o%I--Y1d"a
BID 8259 Transformers, 500kVA & 750kVA, Three Phase, Padmounted Page 4 of 31
8259 TRANSFORMERS, 50KVA SUBMERSIBLE, SINGLE PHASE
WITH OVERCURRENT PROTECTION
WE HEREBY ENTER OUR BID FOR THE CITY OF FORT COLLINS' REQUIREMENTS FOR
8259 TRANSFORMERS, 500KVA and 750KVA, THREE PHASE, PAD -MOUNTED PER THE
BID INVITATION AND ANY REFERENCED SPECIFICATIONS.
QUANTITY: DESCRIPTION:
6 ea. T3000050 Transformer, 500 kVA pad -mounted compartmental
type, three phase distribution with separable insulated load break
high voltage connectors. High voltage rating: 13200 GRDY/7620.
Low voltage rating: 208Y/120. serial number 050 to be in
accordance with specification #368-300-050, Revision PP.
3 ea. T3000075 Transformer, 750 kVA pad -mounted compartmental
type, three phase distribution with separable insulated load break
high voltage connectors. High voltage rating: 13200 GRDY/7620.
Low voltage rating: 208Y/120. serial number 075 to be in
accordance with specification #368-300-075, Revision PP.
Please complete the Excel spreadsheet issued separately for
bid submittal. The spreadsheet MUST be submitted in Excel
format only. Failure to submit in the format requested may cause
the submittal to be deemed incomplete and may be subject to
rejection.
IF YOU ELECT TO PASSWORD PROTECT YOUR BID, PLEASE
NOTE THAT PASSWORD IN A SEPARATE EMAIL TO
purchasing(a-fcgov.com at the time of bid submittal.
*Any surcharges or additional costs shall be noted & included in bid submittal
Delivery lead time may be a consideration of bid award
For purposes of warranty and service ONLY approved manufacturers or distributors authorized
by an approved manufacturer to serve the Fort Collins area may bid.
Awards from this bid will be based primarily on the evaluated bid price. Delivery lead times,
escalation and exceptions taken will also be considered. The City of Fort Collins reserves the
right to split the bid award in whatever percentages are most advantageous to the City.
Future orders of 500KVA and 750KVA, THREE PHASE, PAD -MOUNTED may be authorized,
at the option of the City, from this bid for a period of five years after bid closing date.
Satisfactory pricing, losses and delivery are required for future orders based on this bid.
BID 8259 Transformers, 500kVA & 750kVA, Three Phase, Padmounted Page 3 of 31
Eaton's Cooper Power Systems Business
Proposal Number BES2686716
Revision 00
ATTN: TRISH MAKOUSKY
STUART C IRBY 573
4720 LIMA STREET
DENVER, CO 80239-2614
End User: CITY OF FORT COLLINS
Product(s): 3Ph-Pad
Identifier: CITY OF FORT COLLINS
Cooper Power Systems
by E:T•N
Date: March 08, 2016
Proposal Valid Through: April 23, 2016
Eaton's Cooper Power Systems Business is pleased to present our response to your request. The
attached proposal is based on our interpretation of any specifications, drawings and/or other information
provided to Eaton's Cooper Power Systems Business.
Should you have any questions or require any additional information, please feel free to contact me at
(262) 524-3496, Eaton's Cooper Power Systems Business appreciates the opportunity to provide a
response to your Inquiry and looks forward to receiving your order.
Sincerely,
SONYA BROUGHTON
ISR
cc: - MARY MIOLEN
Revisions:
1319 Lincoln Avenue Waukesha, WI 53186
Phone: (262) 524-3496 Fax: 770-268-7601 E-Mail: SonyaBroughton@Eaton.com
Page 1 of 10
This bid contains protected, proprietary and confidential material that constitutes either (1) trade secrets and (2) commercial or
financial information, the disclosure of which would cause substantial competitive harm to Cooper Power Systems, LLC.
Cooper Power Systems Proposal Number: BEB2686716
Revision 00
Proposal Details
Terms of Sale: FOB Destination - Freight Prepaid and Allowed
Payment Terms: Net 30 days from invoice date
Proposal Valid Through: April 23, 2016
Cooper Power Systems
by ll
Date: March 08, 2016
Proposal Valid Through: April 23, 2016
Written notification of award must be received by 4/23/2016 unless extended in writing by Cooper Power
Systems. If written notification of award is not received by Cooper Power Systems prior to this date, the
pricing and terms of this quotation will be considered expired.
Base Price
Prices quoted are firm and are valid for orders through 3/3112017.
Base Price Adjustment
Contract will be subject to base price adjustments for shipments beyond 3131/2017, and every 12 months
thereafter.
Contract Duration
Commercial terms and conditions of this contract are valid for products shipped through 3/31/2017.
Orders are accepted subject to Eaton's Cooper Power Systems Terms and Conditions of Sale that are
included or have been provided previously to the buyer.
Proposal number and item number should be referenced on purchase order.
Quoted lead-times are based on current factory loading and are subject to change.
Lead-time: Shipment is based on receipt of all required order information at Cooper Power Systems. X
and Y (where applicable) are defined in the Item Details for each line item on this proposal.
We now offer complete services for all your power distribution and automation needs. We have the
industry's largest Electrical Power Equipment Manufacturer's Service Team, which provides 24 hour
service. We provide start-up and commissioning; power system analysis including Arc Flash, Harmonics
and other studies; preventive maintenance, testing and field trouble -shooting; multi -year service
contracts; power system automation engineering, monitoring and training: aftermarket life extension
solutions; as well as turnkey project capabilities. In addition to the services that we can provide for the
equipment contained within this proposal, our Service Team is experienced on all manufacturers'
electrical power distribution equipment, so please contact us about any electrical system problem. If you
need immediate service, you can contact the Representative who provided this proposal,
The prices on this quote are valid per the Proposal Validity listed in the Proposal Details section of this
proposal unless extended explicitly by Cooper Power Systems. Prices quoted are for shipment per lead-
time shown on this Cooper Power Systems proposal. If there is a need to schedule the shipment later
than the quoted lead-time, such as the use of the Approval drawing process, the price will be adjusted per
the Commodity Price Index (CPI) in effect at the time of shipment. The CPI is available for your review on
the Cooper Power Systems web site: www.cooperpower.com/cpi
In the event Buyer cancels this agreement after award, the following will be charged as a percentage of
the order price of each item cancelled: After award, before engineering has begun: 20%. After
1319 Lincoln Avenue Waukesha, WI 53186
Phone: (262) 524-3496 Fax: 770-268-7601 E-Mail: SonyaBroughton@Eaton.com
Page 2 of 10
This bid contains protected. proprietary and confidential material [hat constitutes either (1) trade secrets and (2) commercial or
financial information, the Cisclosure of which would cause substantial competitive harm to Cooper Power Systems, LC.
Cooper Power Systems
by F:i-M
Cooper Power Systems Proposal Number: BEB2686716 Date: March 08, 2016
Revision 00 Proposal Valid Through: April 23. 2016
engineering has begun, before production firm schedule date: 50%. After production firm schedule date,
before fabrication: 70%. After fabrication has begun: 100%
Only routine tests as defined per IEEE C57.12.00-2010, Table 18 shall be performed on all transformers.
Additional design tests can be provided at additional cost. Short circuit testing shall not be performed.
All 3 phase padmount transformers will be designed and manufactured in accordance with the latest
revision of IEEE Standards C57.12.34 and C57.12.28.
Lead times quoted are based on accurate and complete information from the customer. If additional
information or clarifications are required, a delayed response from the customer may affect the ship
date(s) of the unit(s). The manufacturer cannot be held accountable for such delays.
Spec #368-300, Rev PP Clarifications / Exceptions:
Spec Section 5.1.2: Certified test reports shall be sent at the time of transformer shipment.
Spec Section 5.4.3: Eaton's Cooper Power Systems shall provide its standard leak testing procedures.
Spec Section 3.1.5: Eaton's Cooper Power Systems shall design to the ambient temperatures listed in
IEEE C57.12.00. Exception is taken to designing to an ambient temperature of — 32C.
Spec Section 3.1.5: Eaton's Cooper Power Systems shall design to the top oil rise temperatures listed in
IEEE C57.12.00. Exception is taken to designing to a top oil rise temperature of — 32C.
Cooper Power Systems' paint system, without undercoating, meets all criteria set forth in IEEE C57.12.28
Enclosure Integrity. This includes Direct Impact, Tabor Abrasion, Cross Hatch Adhesion, Humidity, Salt
Spray, QUV and Oil Resistance. Due to the quality of our standard coating process, there is no additional
value to an extra layer of a coating of any type underneath the transformer. For this reason, undercoating
will not be provided.
Nameplate shall include wording that reads "PCB content less than 1 PPM at time of manufacture."
Test witnessing at the factory by the customer or their representative can be performed for $2000 on one
unit per design which is not included in the quoted price. Estimated shipment will be extended one week
on each transformer tested.
Cooper performs the routine tests as defined in the current IEEE standards C57.12.00 and C57.12.90,
which include:
• Ratio, Polarity, and Phase Relation: Ensures correct winding ratios, phase shift, and tap voltages.
Tested at a maximum of 100V.
• Winding Resistance: Verifies the integrity of internal HV and LV connections; provides data for loss
upgrade calculations.
• Insulation Power Factor: This test verifies that vacuum processing has thoroughly dried the insulation
system to required limits. Please note ECPS does not utilize Doble testing equipment.
• Routine Impulse Tests: The most severe test, simulating a lightning surge. Applies one reduced wave
and one full wave to verify the BIL rating.
• Applied Potential. Applied to both high -voltage and low -voltage windings, this test stresses the entire
insulation system to verify all live -to -ground clearances.
• Induced Potential: 3.46 times normal plus 1000 volts for reduced neutral designs, twice normal voltage
for full -neutral designs.
1319 Lincoln Avenue Waukesha, WI 53186
Phone: (262) 524-3496 Fax: 770-268-7601 E-Mail: SonyaBroughton@Eaton.com
Page 3 of 10
This bid contains protected, proprietary and confidential material [hat constitutes either (1) trade secrets and (2) commercial or
financial information. the disclosure of which wouttl cause substantial competitive harm to Cooper Power Systems, LLC.
Cooper Power Systems
by E-T•N
Cooper Power Systems Proposal Number: BEB2686716 Date: March 08, 2016
Revision 00 Proposal Valid Through: April 23, 2016
• Loss Test: These design verification tests are conducted to ensure that guaranteed loss values are met
and that test values are within design tolerances. Tests include no-load loss and excitation current along
with impedance voltage and load loss.
• Leak Test: Pressurizing the tank for approximately 4 to 6 hours to ensure a complete seal, with no weld
or gasket leaks, to eliminate the possibility of moisture infiltration or oil oxidation.
Quality Control impulse tests are performed at no additional charge. These standard tests apply one
reduced wave and one full wave to the high voltage windings.
The ANSI impulse test consists of one reduced wave, two chopped waves, and one full wave applied to
windings of 60 kV and higher BIL with terminals of 600V or greater. If full ANSI impulse tests are
required, they may be performed for a price adder of $2500 for the high voltage side, $2500 for the low
voltage side, or $4000 for both the high and low voltage sides for each transformer. Please indicate on
the purchase order if this is desired.
Front of wave tests will not be performed.
Noise level or audible sound level tests may be performed for a price adder of $2500 per transformer and
an increase in lead time of two weeks. Please indicate on the purchase order if this is desired.
Data Sheet
Column K
Answer is YES for all items
Column L
Item 1: Winding's Stray Losses = 266 watts
Item 2: Winding's Stray Losses = 588 watts
Column M
This information is not available.
1319 Lincoln Avenue Waukesha, WI 53186
Phone: (262) 524-3496 Fax: 770-268-7601 E-Mail: SonyaBroughton@Eaton.com
Page 4 of 10
This bid contains protected, proprietary and confidenlial material that constitutes either (1) trade secrets and (2) commercial or
financial information, the disclosure of which would cause substantial competitive harm to Cooper Power Systems, LLC.
Cooper Power Systems Proposal Number: BEB2686716
Revision 00
Item Details
Item Number: 00001
Cooper Power Systems
by F.T-N
Date: March 08, 2016
Proposal Valid Through: April 23, 2016
Customer Stock Code Number: T3000050
Customer RFQ Information: Specification: 368-300, Rev PP; Dated: 5/9/2014
Quantity Unit Price Extended Price
6
Lead-time (Per Lead-time definition in Proposal Details):
Product Lead-time (X): 12 weeks ex -factory
Description:
kVA
500 kVA 3 Phase Pad -Mounted Transformer
Temperature Rise
65 degree average winding rise
Cooling Class
ONAN
Insulating fluid
Mineral Oil
Efficiency Standard
DOE 2016
High Voltage
13200GY/7620 Volts, 95 kV BIL
kV Class
15 kV
High Voltage Configuration
Dead Front, Loop Feed
Taps
2 - 2.5% taps above and 2 - 2.5% taps below nominal
High Voltage Bushings
200 amp Cooper bushing wells (Qty: 6)
Overcurrent Protection
Bayonet Fuses in series with Partial -Range Current -Limiting Fuses (Qty:
3)
Expulsion fuses
Bayonet fuses (Qty: 3)
Bayonet Holder
Copper Bayonet Fuse Holder (Qty: 3)
Low Voltage
208Y/120 Volts, 30 kV BIL
Low Voltage kV Class
1.2 kV
LV Bushing Arrangement
Staggered
Low Voltage Bushings
Integral aluminum 6-hole spade bushing(s) (Qty: 4)
Bushing Supports
Standard LV Bushing Support Assembly
Cabinet hardware
Penta-head cabinet door bolts
IEEE K-Dimension
Loop feed per IEEE C57.12.34-2009 Figure 14A specific dimensions
(without bails)
Coatings
Special paint color Desert Tan - Munsell 10YR6.013.0 Glossy
Gauges & Fittings
Liquid level gauge
Gauges & Fittings
Thermometer, dial -type
Gauges & Fittings
Drain plug in LV compartment
Gauges & Fittings
Drain valve (1 ") with sampler in LV compartment
Gauges & Fittings
Internal Fault Detector (IFD)
Tank accessories
IEEE standard one -hole ground pads (Qty: 3)
Packaging
Pallet
Cover
Bolted cover
1319 Lincoln Avenue Waukesha, WI 53186
Phone: (262) 524-3496 Fax: 770-268-7601 E-Mail: SonyaBroughton@Eaton.com
Page 5 of 10
This bid contains protected, proprietary and confitlenlial material that constitutes either (1) trade secrets and (2) commercial or
financial information, the disclosure of which would cause substantial competitive harm to Cooper Power Systems, LLC.