HomeMy WebLinkAboutRFP - 8292 PHOTO VOLTAIC SOLAR FOR UTILITIES ADMINISTRATION BUILDINGADDENDUM NO. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of RFP 8292: Photo Voltaic Solar for Utilities Administration Building
OPENING DATE: 3:00 PM (Our Clock) May 20, 2016
To all prospective bidders under the specifications and contract documents described above,
the following changes/additions are hereby made and detailed in the following sections of this
addendum:
Exhibit 1 – Questions & Answers
Exhibit 2 – Updated Roof Plan showing all roof items
Exhibit 3 – Roof Warranty
Please contact Elliot Dale, Buyer at (970) 221-6777 with any questions regarding this
addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
EXHIBIT 1 – QUESTIONS & ANSWERS
Questions/Clarifications from Pre-Proposal meeting (5/5/16, 10AM):
1. Where are the dedicated spaces for the battery pack location?
There is limited room in the mechanical yard, so if the inverter can be located
somewhere other than the mechanical yard, we could use that dedicated space for
the battery pack location. Otherwise we’re looking to our successful vendor to
help us determine the location for both the inverter and batteries.
2. What is the roof deck material and manufacturer?
The roof system is a white TPO roof. The manufacturer of the roof material is
Firestone. See attached documentation for roof warranty.
3. What are the expected PV installation project dates, and will the building be occupied during
work?
Refer to the RFP for exact details. Expected PV installation start date range is late
August to Early September, 2016. The expected occupant move-in date range is
Mid-September.
4. What are the Performance and Payment bonding requirements?
Performance and Payment bonding is required for all City of Fort Collins
construction projects over $100,000. If the total construction cost for PV
installation, including material and labor, is more than $100,000, the contractor
will be required to include Performance and Payment bonding with the Services
Agreement.
Additional Proposal Submittal Requirement: Provide the name, address and
phone number of the firm’s bonding agent. Provide a letter from the bonding
agent indicating the firm’s bonding capacity is adequate to undertake this work.
5. What is the roof structure support design?
The roof was designed to carry 10 lbs/SF for the PV panels.
Additionally Submitted Questions
6. The RFP asks for a PPA. However an ESA, or energy savings agreement, will be more
economical for this size of system. The differences are lower legal costs for the investor, a
lower payment, and a fixed monthly payment rather than one fluctuating monthly with
production. Would you entertain an ESA offer?
The City of Fort Collins is more familiar and comfortable with PPA’s, but we are
willing to review an ESA and determine if it would be beneficial to our needs.
7. We want to recommend a particular roof- an Energy Star rated white TPO. This allows us to
use a bifacial module with significant extra production, by a US manufacturer. They have a
written ruling from the IRS that part of the roof cost will earn the tax credit, because the roof
boosts the production and is therefore a part of the solar system. Will this recommendation
be entertained?
A white TPO is already included in the project. The City of Fort Collins welcomes
proposals including new and innovative technologies and products.
8. We usually include specific energy efficiency equipment in commercial solar projects. In
particular USES Power Conditioners. These are GSA rated and have been installed on
numerous government buildings over the past 30 years. They are effective at reducing both
peak electrical loads and kWh usage, substantially improving the economics of solar
projects. Our financing partner has accepted this equipment. Would you allow this
equipment to be included?
At this time, the City of Fort Collins is not interested in including power
conditioning equipment into the RFP.
A-201
A1
A-202
A4
A
1
A-201
H1
C
A-301
H8
A-301
H8
A-301
A2
A-301
A2
A-202
H1
2 3
4
4 5 6 7
B
2.6 3.4 4.6 5.4
A.2
4.4
29'-11 5/8" 30'-0" 30'-0" 30'-0" 30'-0" 29'-11 5/8"
183'-4"
1'-8 1/2" 1'-8 1/2"
73'-4"
25'-1 1/2" 48'-2 1/2"
18'-0 3/8" 20'-0" 20'-0" 18'-0 3/8"
76'-0 3/4"
72'-0"
33'-7 3/4" 34'-11 3/4"
1'-8 1/2"
0' - 0 1/4" / 1' - 0"
0' - 0 1/2" / 1' - 0"
0' - 0 1/4" / 1' - 0"
0' - 0 1/2" / 1' - 0"
0' - 0 1/4" / 1' - 0"
0' - 0 1/4" / 1' - 0"
0' - 0 1/2" / 1' - 0"
0' - 0 1/2" / 1' - 0"
0' - 0 1/4" / 1' - 0" 0' - 0 1/4" / 1' - 0"
0' - 0 1/4" / 1' - 0" 0' - 0 1/4" / 1' - 0"
5"
0' - 0 1/4" / 1' - 0"
A15
A-313
A15
A-312
A15
A-315
A8
A-313
A15
A-313
A15
A-314
EXHIBIT 3 - ROOF WARRANTY
A8
A-314
A4
A-314
0' - 0 1/2" / 1' - 0" 0' - 0 1/2" / 1' - 0"
0' - 0 1/4" / 1' - 0"
07.54
07.54
ROOF HATCH
0' - 0 1/4" / 1' - 0"
7 1/2"
7 1/2"
7"
ROOF HATCH
METAL GUARDRAIL
A-504
K1
A-503
G1 SIM
A-503
G1 SIM
A-503
G7 SIM
A-503
G7 SIM
A-503
G7 SIM
A-503
G7 SIM
A-503
G1 SIM
G-103
E10
G-103
E10
G-103
J10
G-103
J10
10'-0"
TYPICAL
16'-0"
8'-0" 16'-0"
16'-0" 8'-0"
10'-0"
TYPICAL
16'-0"
6'-8" 16'-0" 16'-0" 8'-0"
ROOF TIE OFF ANCHOR (26)
THUS; PROVIDE FLASHING
PER ROOFING
MANUFACTURE STANDARD
PIPE PENETRATION DETAIL
1050 17th STREET
SUITE A200
DENVER, CO 80265
303 295 1717 t
303 292 0845 f
No REVISION/SUBMISSION DATE
PROJECT No:
COPYRIGHT 2013 - RNL. This document, and the ideas and design concepts incorperated herein, as an
instrument of professional service, can not be used, in whole or in part for this or any other project, without the
written authorization of RNL.
DRAWN BY: CHECKED BY:
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
K K
16 17 18
L
M
N
L
M
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/25/2015 3:20:33 PM
\\psf\Home\Documents\UAB_ARCH_jkersley.rvt
A-104
ROOF PLAN
3618-03
CITY OF FORT COLLINS
222 Laporte Avenue
Fort Collins, CO 80524
ARCHITECTURE/INTERIORS - RNL DESIGN
ASSOCIATE ARCHITECT - AU WORKSHOP
LANDSCAPE - LOGAN SIMPSON DESIGN
CIVIL - NORTHERN ENGINEERING
STRUCTURAL - JVA, INCORPORATED
MEP -MKK CONSULTING ENGINEERS, INC.
LEED ADMINISTRATION - INSTITUTE FOR THE BUILT ENVIRONMENT
SUSTAINABILITY - ARCHITECTURAL ENERGY CORPORATION
ENERGY MODELING - AMBIENT ENERGY
UTILITY ADMINISTRATION
BUILDING
100% CONSTRUCTION DOCUMENTS
Author Checker
A1 ROOF 1/8" = 1'-0" PLAN
SHEET NOTES
07.54 WHITE TPO MEMBRANE ROOFING, MECHANICALLY
FASTENED OVER ½” PROTECTION BOARD ON RIGID
INSULATION (R-30 MIN)
1 100% CONSTRUCTION
DOCUMENTS
06/26/2015
2 BID PACKAGE #3 09/23/2015