Loading...
HomeMy WebLinkAboutRESPONSE - BID - 8288 BORE GUARD8288 BORE GARD BID SCHEUDLE WE HEREBY ENTER OUR BID FOR THE CITY OF FORT COLLINS' REQUIREMENTS FOR 8288 BORE GARD PER THE BID INVITATION AND ANY REFERENCED SPECIFICATIONS. Quantities are an estimate of what could be ordered in a year's time. There are no guarantees that any orders will be placed in a given year. ITEM #: QUANTITY: DESCRIPTION: 1 10,000 ft. 65411116 Conduit, 4" x 20' overall length, schedule 40 pvc with water -tight locking ring joints for directional boring applications. Approved Products: Certainteed 667237; Prime Conduit BG440SP-D20, 46071ift Manufacturer PniMc- Ca,va/vi� Full load is lys60IFf /ft. Partial load price $ _�313% FF /ft. Full load price $ y �• � Ff _ /ft..f•3yW.I. �o Are you willing to hold these prices through 2016? yes _ ✓ no If no, what is the firm price Itrvv& L*J date? The City intends to order 105,800' of the following 5" product initially. There is the possibility that a second order of up to 105,800' could be placed in late summer. Additional projects may cause additional smaller orders throughout 2016. 2 105,800 ft. Conduit, 5" x 20' overall length, schedule 40 pvc with water -tight locking ring joints for directional boring applications. Approved Products: Certainteed 667275; Prime Conduit B G540S P-020. 46071ift Manufacturer X;rne Ce„io�v;f Full load is 92o h54 /ft. Partial load price $ 3•Z0F* Full load price $ 3.20IF4 /ft. What would the cost be for the 105,800 in late summer? $ 3.2o IF4 /ft, 4;zq-qqo Are you willing to hold these prices through 2016? yes �/ no if no, what is the firm price PR'-JtAKk t°oJ date? For both products: What will be the expected lead time from date of order? S?ort 4t) lwk fto- 2 TirrrS aer ,,j,-" a-o FidFFd order Where is the manufacturing firm located and how many days would a full load be in transit to us? 6LIWA001 CiiGi. Ok /-.Z dAv5, BID 8275 BORE GARD Page 3 of 5 Freight is to be included in the cost of the items. Any surcharges or additional costs shall be noted & included in bid submittal. For purposes of warranty and service ONLY approved manufacturers or distributors authorized by an approved manufacturer to serve the Fort Collins area may bid. Awards from this bid will be based primarily on the bid price. Delivery lead times and exceptions taken will also be considered. The City may also take into consideration the length of time the price will be held firm. The City of Fort Collins reserves the right to split the bid award in whatever percentages are most advantageous to the City. Future orders of Bore Gard may be authorized, at the option of the City, from this bid for a period of five years after bid due date. Satisfactory pricing and delivery will be required for future orders based on this bid. The Bid Schedule is comprised of pages 3 and 5. Vendors must submit both. BID 8275 BORE GARD Page 4 of 5