HomeMy WebLinkAboutWORK ORDER - RFP - 8047 ENVIRONMENTAL SERVICES (3)LT Environmental Inc.
4600 West 60th Avenue
Arvada, Colorado 80003
T 303.433.9788 / F 303.433.1432
COMPLIANCE / ENGINEERING / REMEDIATION
July 28, 2016
Mr. Chad Mapp
Project Manager
City of Fort Collins Operation Services
300 Laporte Avenue, Building B
Fort Collins, Colorado 80521
RE: Project Management
Asbestos Abatement Oversight and Final Visual and Air Clearance Monitoring
Utility Service Center – Main Building Final Work Areas 1, 3 and 5
700 Wood Street
Fort Collins, Colorado
Dear Mr. Mapp:
LT Environmental, Inc. (LTE) is pleased to provide this proposal to the City of Fort Collins (the
City) to complete project management, asbestos abatement oversight, and final visual and air
clearance monitoring at the Utility Service Center located at 700 Wood Street in Fort Collins,
Colorado.
PROJECT BACKGROUND
The structure is used as a Utility Service Center for the City. The City informed LTE that it plans
to renovate certain areas within the building as part of three Work Areas (Work Areas 1, 3 and 5).
In general, the renovation activities within Work Area 1 include the removal of concrete masonry
unit (CMU) block filler, floor tile, and drywall joint compound, all of which contain asbestos but
at concentrations below what is defined as an asbestos-containing material (ACM). The
renovation includes the removal of carpet mastic which does contain asbestos at concentrations
greater than 1 percent (%) by weight and defined as an ACM. Renovation within Work Area 3
may include removal of Occupational Safety and Health Administration (OSHA) drywall, ACM
duct sealant, ACM duct mastic and CMU at less than 1% ACM. Renovation within Work Area 5
will include the removal of CMU containing less than 1% ACM and possibly areas of OSHA
drywall.
SCOPE OF WORK
Task 1 – Project Management
LTE will provide project management and overall project planning for the duration of abatement
activities associated with remaining work within Work Areas 1, 3 and 5. This will include
attending meetings and overseeing environmental staff who will be conducting oversight and daily
inspections of the General Abetment Contractor (GAC) to ensure that abatement activities are
Mapp, C.
Page 2
Utility Service Center
Fort Collins, Colorado
completed in compliance with Colorado Department of Public Health and Environment (CDPHE)
Regulation 8.
Task 2 – Abatement Oversight and Collect Daily Ambient Air Samples
LTE staff environmental scientists will provide oversight of the GAC during abatement activities
and collect ambient air samples to verify that the air quality outside of the containment area is
below the maximum allowable asbestos level (MAAL) of 0.01 fibers per cubic centimeter (f/cc).
Ambient air samples collected will be submitted to Reservoirs Environmental, Inc., located in
Denver, Colorado, for phase contrast microscopy (PCM) analysis. If sample results indicate an
exceedance of the MAAL, LTE will have the sample reanalyzed by transmission electron
microscopy (TEM) to verify the number of asbestos fibers present and compare the TEM results
to the MAAL value of 70 structures per millimeter squared (mm
2
).
Task 3 – Final Visual And Air Clearance Monitoring of Abated ACM
Upon completion of abatement activities, LTE will conduct a final visual and air clearance
monitoring via PCM of the containment area. Final air clearance samples collected will be
submitted to Reservoirs Environmental, Inc. for analysis. The results of the sampling will be
compared with the MAAL. If all samples collected are found to be below the MAAL, the work
areas will be deemed ready for re-occupancy by the public and/or other contractors. If any of the
PCM samples are determined to be greater than 0.01 f/cc the contractor will be required to re-clean
the work area and an additional final visual inspection and clearance sampling will need to be
completed.
Task 4 - Reporting
Upon completion of all work, LTE will prepare a final summary report detailing all of the sampling
results.
COST ESTIMATE
LTE has developed the following cost estimate for each of the tasks.
SUMMARY BY TASK LABOR EXPENSE TOTAL
TASK 1 - PROJECT MANAGEMENT $2,235 $0 $2,235
TASK 2 - ABATEMENT OVERSIGHT AND COLLECT DAILY
AMBIENT AIR SAMPLES $4,635 $2,698 $7,333
TASK 3 - FINAL VISUAL AND AIR CLEARANCE MONITORING
OF ABATED ACM $2,391 $1,198 $3,589
TASK 4 - REPORTING $891 $0 $891
TOTAL: $10,152 $3,895 $14,047
Mapp, C.
Page 3
Utility Service Center
Fort Collins, Colorado
The cost estimate is based on time and materials. The detailed cost estimate is attached.
ASSUMPTIONS
Based on the scope of work and our walkthrough of the facility, LTE has developed the following
assumptions:
• LTE will provide project management for the duration of abatement activities for Work
Areas 1, 3; and 5;
• LTE will provide oversight throughout the duration of the abatement project;
• LTE will collect no more than four ambient air samples each day during abatement
activities with the assumption that only one containment will be erected at a time;
• Only five ambient samples will require further analysis by TEM;
• LTE will conduct five final visual inspection and air clearance monitoring events via PCM
upon completion of abatement within each containment area;
• Each containment area will only require one final visual inspection and air clearance via
PCM. LTE has assumed 21 additional PCM samples will be necessary to resample
containment areas that will require additional clearance.
LTE appreciates the opportunity to provide this proposal to the City and looks forward to working
on this project. Please feel free to contact LTE at 303-962-5542 should you have any questions.
Sincerely,
LT ENVIRONMENTAL, INC.
Nick Talocco, P.E .
Senior Engineer
Attachment:
Table 1 – Estimated Cost Table
ATTACHMENT 1
ESTIMATED COST TABLE
ESTIMATED COST TABLE
PROJECT MANAGEMENT, ABATEMENT OVERSIGHT, FINAL VISUAL AND AIR CLEARANCE MONITORING
CITY OF FORT COLLINS - UTILITY SERVICE CENTER
LABOR PRINCIPAL SR. STAFF STAFF CADD/ CLERICAL
SCI/ENG II SCI/ENG II SCI/ENG IIIDRAFTING
TASK 1: PROJECT MANAGEMENT 0 4 20 0 0 1
TASK 2: ABATEMENT OVERSIGHT AND COLLECT
DAILY AMBIENT AIR SAMPLES 0 2 0 60 0 1
TASK 3: FINAL VISUAL AND AIR CLEARANCE
MONITORING OF ABATED ACM 0 4 8 16 0 1
TASK 4 - REPORTING
2 8 1
TOTAL HOURS 0 12 28 84 0 4
RATE ($) $140.00 $130.00 $83.00 $72.00 $64.00 $55.00
LABOR COST $0.00 $1,560.00 $2,324.00 $6,048.00 $0.00 $220.00
SUBTOTAL $10,152
UNIT PRICE UNIT FEE COST
PCM ANALYSIS OF AMBIENT AIR SAMPLES 60 SAMPLES $15.00 $1.50 $990.00
TEM ANALYSIS 5 SAMPLES $120.00 $1.50 $607.50
VEHICLE 10 DAYS $110.00 $1,100.00
SUBTOTAL $2,698
UNIT PRICE UNIT FEE COST
PCM ANALYSIS OF FINAL AIR CLEARANCE SAMPLES 49 SAMPLES $15.00 $1.50 $757.50
VEHICLE 4 DAYS $110.00 $440.00
SUBTOTAL $1,198
TOTAL ESTIMATED COST: $14,047
SUMMARY BY TASK LABOR EXPENSE TOTAL
$2,235 $0 $2,235
$4,635 $2,698 $7,333
$2,391 $1,198 $3,589
TASK 4 - REPORTING $891 $0 $891
TOTAL: $10,152 $3,895 $14,047
TABLE 1
FORT COLLINS, COLORADO
TASK 1: PROJECT MANAGEMENT
TASK 2: ABATEMENT OVERSIGHT AND COLLECT DAILY AMBIENT
AIR SAMPLES
TASK 3: FINAL VISUAL AND AIR CLEARANCE MONITORING OF
ABATED ACM
TASK 2: ABATEMENT OVERSIGHT AND COLLECT DAILY AMBIENT AIR SAMPLES
TASK 3: FINAL VISUAL AND AIR CLEARANCE MONITORING OF
ABATED ACM