HomeMy WebLinkAboutWORK ORDER - RFP - 7620 DRAKE & SHIELDS INTERSECTION IMPROVEMENTS PROJECTWORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND INTERWEST CONSULTING GROUP, INC DATED: AUGUST 1ST, 2016 Work Order Number: WO ICG TAD 7.16 Purchase Order Number: Project Title: Drake / Shields Intersection Improvements - Construction Administration Assistance Original Bid/RFP Project Number & Name: Bid # 7620 Drake & Shields Intersection Improvements Proj. Commencement Date: AUGUST 1ST, 2016 Completion Date: JUNE 1ST, 2017 Maximum Fee: (time and reimbursable direct costs): $13,793.00 Project Description: ICG will provide project level support and review or related project aspects and issues on an hourly rate with a not to exceed amount. Scope of Services: See Attached Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of three (3) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional By:_______________________________ Date:_____________________________ City of Fort Collins By: Project Manager Date: August 1st, 2016________________ By: _______________________________ Gerry Paul Director of Purchasing and Risk Management (over $60,000.00) Date: ____________________________ 8-1-16 Page 1 of 1 Drake and Shields Construction Scope Interwest Consulting Group 7/11/16 Project Description The Drake and Shields Intersection Improvement Project has been bid and awarded. Interwest and our team will be available to the City during the construction and closeout of the project. The contract will be an hourly-not-to-exceed contract. The Cost Plus Fixed Fee rates from the 2014 design contract will continue to be used. Construction Services Scope of Work Construction Meetings Interwest staff will attend weekly construction meetings and the Preconstruction meeting. Twelve (12) meetings are included in the budget. RFI and Shop Drawing Review Interwest staff will reply to any requests for information from the contractor and review applicable shop drawings. Record Drawings Interwest staff will prepare record drawings of the project for the City and CDOT with as built information provided by the City. Landscape and Irrigation Design Construction Assistance Allowances BHA Design and Hines Irrigation will be available through the Interwest contract to assist with any landscape or irrigation question that may occur during construction. Record drawing preparation for both consultants is assumed to be minimal. BHA Design Hines Irrigation $ 114.02 $ 86.82 $ 74.61 $ 69.76 CONSTRUCTION AND POST CONSTRUCTION Construction Site Meetings 9 36 $ 4,152 $ 300 $ 4,452 RFI, and Shop Drawing Review 12 24 $ 3,452 $ 300 $ 3,752 Record Drawings (As Built Information from City) 8 12 8 40 $ 5,341 $ 500 $ 5,841 Landscape Design Construciton Assistance Allowance $ 2,000 $ 2,000 $ 100 $ 2,100 Irrigation Design Construciton Assistance Allowance $ 2,000 $ 2,000 $ 100 $ 2,100 TOTAL $ 2,280 $ 3,126 $ 597 $ 2,790 $ 2,000 $ 2,000 $ 12,793 $ 1,000 $ 13,793 Total Cost Per Task Labor Cost Per Task Est. Reimb. Sr. Project Manager Sr. Project Engineer Project Engineer Engineering Services Interwest Consulting Group (2013 CDOT Rates + 10%) Drake and Shields - Construciton Services Interwest Team - Fee Estimate - 7/11/16 Project Engineer