HomeMy WebLinkAboutBID - 8320 ASPHALT OVERLAY PROJECT (3)Addendum 3 Page 1 of 2 ADDENDUM NO. 3 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 8320: Asphalt Overlay OPENING DATE: 3:00 PM (Our Clock) June 3, 2016 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Questions & Answers Please contact Elliot Dale, Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 3 Page 2 of 2 EXHIBIT 1 - QUESTIONS & ANSWERS 1. Based on the verbiage in the contract for the City overlay project bidding on June 3rd asphalt material coming out of the asphalt plant on North Taft Hill Road is not allowed to enter the city from North Taft Hill Road. Correct. Asphalt material utilized by the City cannot be hauled on North Taft Hill Road. Asphalt material must be hauled to the north on Taft Hill Road to County Road 54G. 2. I would like know all the restricted haul routes into the city of Fort Collins from Martin Marietta plant, Connell plant and Kehn plant. Currently, the only restricted haul route is on North Taft Hill Road. However, in accordance with Section 01560, paragraph 1.6 the City reserves the right to set haul routes. 3. What is the criteria used to determine accessible haul routes? Different factors are considered when establishing restricted haul routes, however, the primary consideration as stated in Section 01560, paragraph 1.6 is β€œβ€¦in order to protect pavements, both new and old, from heavy loads. These pavements may include, but are not limited to, recently constructed pavements, recently overlaid pavements, and/or pavements whose condition would be significantly damaged by heavy loads.” The North Taft Hill Road route restriction has been established to address concerns raised by residents in close proximity to the Martin Marietta plant and is consistent with the terms of a collaborative agreement between the City and Martin Marietta. 4. What are the accessible haul routes from the asphalt plants in NW Fort Collins and SE Fort Collins? At this time, there are no other haul route restrictions. 5. Can a contractor use North Taft Hill Road to haul asphalt mix from another asphalt plant into the City for a city project? No. The haul route restriction for North Taft Hill Road is applicable to all City contractors hauling asphalt mix.