Loading...
HomeMy WebLinkAboutBID - 8320 ASPHALT OVERLAY PROJECT (2)ADDENDUM NO. 2 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 8320: Asphalt Overlay OPENING DATE: 3:00 PM (Our Clock) June 3, 2016 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Revised Bid Schedule (also uploaded as a separate Microsoft Excel document). Please contact Elliot Dale, Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing EXHIBIT 1 – REVISED BID SCHEDULE 103.03 Bond Procurement and Mobilization Lump Sum 1 $ - 202.01 Planing and Surface Preparation: Depth <3" - Min Drum Width 70" Square Yard 57,000 $ - 202.02 Planing and Surface Preparation: Depth 3" < 5" - Min Drum Width 70" Square Yard 3,000 $ - 202.04 Taper Planing Adjacent to Gutter Lineal Foot 30,000 $ - 202.06 Bobcat Style Milling < 3" - Drum Width 18-24" Square Yard 1,500 $ - 202.07 Bobcat Style Milling - Additional Inch Thickness Square Yard/Per Inch 200 $ - 202.08 Additional Saw Cutting of Asphalt - 3" Minimum Lineal Foot 1,200 $ - 203.01 Excavation - General Less Than 100 CY Cubic Yard 500 $ - 203.04 Borrow (Complete in Place) - Less Than 100 Ton Ton 50 $ - 203.06 Borrow (Shouldering - Complete in Place) 3/4" Minus RAP Lineal Foot 1,000 $ - 208.01 Rock Wattle Lineal Foot 700 $ - 208.02 Crumb Rubber Wattle Lineal Foot 10 $ - 208.04 SWMP Maintenance Log - 14 Day Inspection Each 15 $ - 210.02 Adjust Valve Box Each 160 $ - 210.03 Adjust Valve Box with Ring Each 225 $ - 210.04 Adjust Valve Box-Tyler 6860 Series, Item R 69, Screw Type Adjustable Riser Each 37 $ - 210.05 Adjust and Replace Top Section of Valve Box Each 20 $ - 210.09 Total Valve Box Replacement, Tyler 6860 Series, 30" Bottom Section Each 7 $ - 210.10 Adjust Standard Manhole ≤24" Each 200 $ - 210.11 Adjust Special Manhole >24" Each 30 $ - 210.12 Adjust Manhole with Ring Each 35 $ - 210.13 Adjust Manhole with Locking Ring ≤24" dia, ≤ 3" height Each 150 $ - 210.14 Adjust Manhole with Locking Ring ≤24" dia, > 3" height Each 5 $ - 210.15 Adjust Manhole with Locking Ring >24" dia, ≤ 3" height Each 10 $ - 210.16 Adjust Manhole with Locking Ring >24" dia, > 3" height Each 5 $ - 210.17 Arterial Manhole Incentive Achieved $500/Each 30 $ 500.00 $ 15,000.00 403.02 HMA - Grading SX, (75) 64-22 Binder Ton 8,000 $ - 403.03 HMA - Grading S, (75) 58-28 Binder Ton 3,000 $ - 403.04 HMA - Grading S, (75) 64-22 Binder Ton 13,000 $ - 403.05 HMA - Grading S, (75) 64-28 Modified Binder Ton 4,500 $ - 403.07 HMA - Grading S 75/100 Hand Patching - Remove & Replace Ton 2,000 $ - 403.08 HMA Paver Patching - Remove & Replace Ton 1,000 $ - 403.09 HMA Grading SX, (75) 64-22 Leveling ≤ 50 Tons Tons/Project 200 $ - 403.10 HMA Grading SX, (75) 64-22 Leveling: 51 to 100 Tons Tons/Project 200 $ - 403.11 HMA Grading SX, (75) 64-22 Leveling: : > 100 Tons Tons/Project 400 $ - 403.12 HMA Grading SX, (75) 64-22 Leveling/Thin Overlay: 150 and Greater Tons/Day 1,000 $ - Item No. Item Description Unit 2016 Contract Proposed Unit Price Proposed Contract Price Quantities 403.13 HMA - Speed Humps, Grading S/SX (75) 64-22 Square Yard 600 $ - 420.01 Geotextile Paving Fabric Square Yard 12,000 $ - 420.02 GlassGrid® #8511 - Small Quantity Installation Square Yard 400 $ - 627.01 Installation of Thermoplastic Hour 20 $ - 627.02 Lead Worker for Striping Layout Hour 100 $ - 627.03 Support Workers for Striping Layout Hour 250 $ - 627.04 Pavement Marking Paint Gallon 1,000 $ - 627.05 Pavement Mark Removal 4in (Surface Grinding) Square Foot 200 $ - 627.06 6 Inch White Line (Thermo) Lineal Foot 1,450 $ - 627.07 18 Inch White Line (Thermo) Lineal Foot 4,750 $ - 627.08 24 Inch White Line (Thermo) Lineal Foot 200 $ - 627.09 Speed Bump Stencil (Thermo) Each 6 $ - 627.10 Bike Symbol (6 ft) W/ Arrow (Thermo) Each 90 $ - 627.11 Right/Left Arrow Stencil (Thermo) Each 115 $ - 627.12 8 ft "ONLY" Stencil (Thermo) Each 1 $ - 627.13 "RR Kit Narrow" Stencil (Thermo) Each 4 $ - 627.14 Temporary Yellow Striping Tape Roll Each Roll 3 $ - 627.15 Temporary White Striping Tape Roll Each Roll 3 $ - 630.01 Construction Zone Traffic Control Percent % $ - 630.02 Variable Message Board Per Each / Per Day 100 $ - 630.03 Flagging Hour 2,500 $ - IN WORDS: BASE BID CONTRACT TOTAL 202.03 Planing Surface Preparation 5" to 10" - Min Drum Width 70" Square Yard 3,000 $ - 202.05 Planing Support - Labor, Equipment, Materials Hour 30 $ - 203.02 Excavation - General Over 100 CY Cubic Yard 1,000 $ - 203.03 Excavation - Muck Cubic Yard 1,000 $ - 203.05 Borrow (Complete in Place) - Over 100 Ton Ton 105 $ - 208.03 Silt Fence Lineal Foot 50 $ - 210.01 Reset Mailbox Each 1 $ - 210.06 Tyler 6850 Series, Item 58, 14" Valve Box Extension (Part Only) Each 1 $ - 210.07 Tyler 6860 Series, 16" Valve Box Top Section Without Lid (Part Only) Each 15 $ - 210.08 Tyler 6860 Series, 26" Valve Box Top Section Without Lid (Part Only) Each 6 $ - 306.01 Subgrade Preparation Square Yard 10,000 $ - 306.02 Asphalt Recycling (5-12") Bomag and Prep Square Yard 5,000 $ - 307.10 Class C Fly Ash Delivered & Spread 12" Depth, 12% by weight Square Yard 15,000 $ - 307.20 Stabilize Subgrade - Tilled, Watered, & Compacted Square Yard 10,000 $ - 403.01 HMA - Grading SX, (75) 58-28 Binder Ton 1,000 $ - 403.06 HMA Grading SG, (75) 64-22 Binder Ton 1,000 $ - 630.04 Night Work Up-Charge Per Night Worked 1 $ - $ - Proposed Unit Price BID ALTERNATE - 1 Proposed Contract Price BID ALTERNATE - 1 CONTRACT COST Item No. Item Description Unit 2016 Contract Quantities