HomeMy WebLinkAbout113752 B T CONSTRUCTION INC - CONTRACT - RFP - 7515 CONSULTING ENGINEERING SERVICES FOR FUTURE WACONTRACT DOCUMENTS FOR
Fossil Creek / BNSF Pedestrian Tunnel
JUNE 2016
Fort Collins Utilities
700 Wood Street
Fort Collins CO 80521
Stantec Consulting Services
2950 East Harmony Road
Fort Collins CO 80528
BT Construction
9885 Emporia Street
Henderson, CO 80640
Fossil Creek / BNSF Pedestrian Tunnel CONTRACT DOCUMENTS - TABLE OF CONTENTS
June 2016
CONTRACT DOCUMENTS - TABLE OF CONTENTS
AGREEMENT FORMS
00500 Agreement Forms 00500-1
00525 Work Order, Notice of Award, and Bid Schedule 00525-1 - 00525-3
00530 Notice to Proceed 00530-1
00600 Bonds and Certificates 00600-1
00610 Performance Bond 00610-1 – 00610-2
00615 Payment Bond 00615-1 – 00615-2
00630 Certificate of Insurance 00630-1
00635 Certificate of Substantial Completion 00635-1
00640 Certificate of Final Acceptance 00640-1
00650 Lien Waiver Release (CONTRACTOR) 00650-1 – 00650-2
00651 Lien Waiver Release (SUBCONTRACTOR) 00651-1 – 00651-2
00660 Consent of Surety 00660-1
00670 Application for Exemption Certificate 00670-1 – 00670-2
CONDITIONS OF THE CONTRACT
00800 Supplementary Conditions 00800-1 – 00800-8
00900 Addenda, Modifications and Payment 00900
00950 Work Order Change Order 00950-1
00960 Application for Payment 00960-1 – 00960-4
Fossil Creek / BNSF Pedestrian Tunnel Work Order, Notice of Award
June 2016 and Bid Schedule
00500-1
SECTION 00500
AGREEMENT FORMS
00525 Work Order, Notice of Award, and Bid Schedule
00530 Notice to Proceed
Fossil Creek / BNSF Pedestrian Tunnel Work Order, Notice of Award
June 2016 and Bid Schedule
00525-1
SECTION 00525
WORK ORDER, NOTICE OF AWARD AND BID SCHEDULE
TO: BT Construction
WORK ORDER: BTC–FCBNSF–2016–2
PURCHASE ORDER: ________________________
TITLE: Fossil Creek / BNSF Pedestrian Tunnel
ENGINEER: Stantec Engineering Consultants
OWNER’S REPRESENTATIVE: Jason Stutzman
NOTICE OF AWARD DATE: June 23, 2016
OWNER: City of Fort Collins (hereinafter referred to as OWNER)
1. WORK. You are hereby notified that your bid dated March 14, 2016 for the above Work Order has
been considered. Pursuant to your AGREEMENT with OWNER dated August 17, 2015, you have
been awarded a Work Order for this Work Order Description:
A. See Section 01100 – Summary of Work – The scope covered under this work order includes
all labor, equipment, and materials required to construct a 14-feet diameter steel pedestrian
tunnel 70 feet in length under the BNSF Railway embankment with two arched concrete
retaining walls at each end, storm sewer drainage improvements, a smaller concrete
retaining wall west of the tunnel, approximately 400 lineal feet of colored concrete trail,
seeding and landscape restoration.
2. CONTRACT PRICE, BONDS AND CERTIFICATES. The price of your Work Order is One million,
nine hundred twenty-three thousand, seven hundred sixty-six Dollars and No Cents
($1,923,766.00). Pursuant to the AGREEMENT and the Contract Documents, Performance and
Payment Bonds and insurance are required.
3. CONTRACT TIMES. Pursuant to the AGREEMENT and the Contract Documents, the date for
Substantial Completion of this Work Order is January 18, 2017, and after Substantial Completion, the
number of days for Final Acceptance 60 calendar days.
4. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the essence of
this Agreement and that OWNER will suffer financial loss if the Work is not completed within the
times specified in paragraph 3 above, plus any extensions thereof allowed in accordance with
Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties
involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not
completed on time. Accordingly instead of requiring any such proof, OWNER and CONTRACTOR
agree that as liquidated damages for delay (but not as penalty) CONTACTOR shall pay OWNER
the amounts set forth hereafter.
1) Substantial Completion: Five Hundred Dollars ($500.00) for each calendar day or
fraction thereof that expires after January 18, 2017 until the work is Substantially
Complete.
2) Final Acceptance: After Substantial Completion Two Hundred Dollars ($200.00) for
each calendar day or fraction thereof that expires after the 60 calendar day period for
Fossil Creek / BNSF Pedestrian Tunnel Notice to Proceed
June 2016
00530-1
SECTION 00530
WORK ORDER NOTICE TO PROCEED
Description of Work: Fossil Creek / BNSF Pedestrian Tunnel
To: BT Construction, Inc.
9885 Emporia Street
Henderson, CO 80640
This notice is to advise you:
That the contract covering the above described Work has been fully executed by the CONTRACTOR and
the OWNER.
That the required CONTRACTOR's Performance Bond and Payment Bond have been received by the
OWNER.
That the OWNER has approved the said Contract Documents.
Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to
proceed within fifteen (15) calendar days from receipt of this notice as required by the Agreement.
Dated this .
The dates for Substantial Completion and Final Acceptance shall be January 18, 2017 and March 18, 2017,
respectively.
City of Fort Collins
OWNER
By:
Jason Stutzman, P.E.
Title Special Projects Manager
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Notice to Proceed is hereby acknowledged this day of ,
2016.
CONTRACTOR
By: ____________________________
Title:
Fossil Creek / BNSF Pedestrian Tunnel Bonds and Certificates
June 2016
SECTION 00600
BONDS AND CERTIFICATES
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (CONTRACTOR)
00651 Lien Waiver Release (SUBCONTRACTOR)
00660 Consent of Surety
00670 Application for Exemption Certificate
SECTION 00610
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: that
(Firm) BT Construction, Inc.
(Address) 9885 Emporia Street, Henderson, CO 80640
Bond No. 34BCSHK9412
(an lndividuai), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and
(Firm) Hartford Fire Insurance Company
(Address) One Hartford Plaza, Hartford, CT 06155
hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 Lapdrte
Ave, Fort Collins. Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER''; in
the penal sum of One Million Nine Hundred Twenty-Three Thousand, Seven Hundred Sixty-six Dollars
and No Cents {$1.923, 766.00), in lawful money of the United States, for the payment of which sum well
and truly to be made, we bind ourselves, successors and assigns, jointly and sever~lly, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain
Agreement with the OWNER, dated August 17.2015. a copy of which is hereto attached and made a
part hereof for the performance of The City of Fort Collins project, Fossil Creek I BNSF Pedestrian
Tunnel.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the
undertakings. covenants, terms, conditions and agreements of said Agreement during the original term
thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the
Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims · and
demands incurred under such Agreement, and shall fully indemnify and save harmless the OWNER
from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and
repay the OWNER all outlay and expense which the OWNER may incur in making good any default
then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the .said Surety; for value received, hereby stipulates and agrees that no
change, extension of time, alteration or addition to the terms of the Agreeme11t or to the Work to be
performed thereunder or the Specifications accompanying the same shall in any way affect its
obligation on this bond; and it does hereby waive notice of any such change, extension of time,
alteration or addition to the terms of the Agreement or to the Work or to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall
abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State
of Colorado and be acceptable to the OWNER.
Fossil Creek I BNSF Pedestrian Tunnel
June 2016
00610-1
Perfonnance Bond
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall
be deemed an original, this 24th day of June 2016.
IN PRESENCE OF:
Attest:
(Corporate Seal)
IN PRESENCE OF:
Not Applicable
Not Applicable
IN PRESENCE OF:
c;S jliWM B rown 1Yfln
(Surety Seal)
Title
9885 Emporia Street, Henderson, CO 80640
Address
Other Partners
By: Not Applicable
By: Not Applicable
By:._~.£¥~11,.JL..L;~....P..:w.o~u.u....i...!!,,4,....;,1
Attorney-in-Fact
By: Not Applicable
Address One Hartford Plaza, Hartford, CT 06155
NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all
partners should execute Bond.
Fossil Creek I BNSF Pedestrian Tunnel
June 2016
00610-2
Performance Bond
SECTION 00615
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: that
(Firm) BT Construction, Inc.
(Address) 9885 Emporia Street, Henderson, CO
Bond No. 34BCSHK9412
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and
(Firm) Hartford Fire Insurance Company
(Address One Hartford Pla~a. Hartford, CT 06155
hereinafter referred to as "the Surety", are held and firmly bound unto the City of Fort Collins, 300
Laporte Ave., Fort Collins. Colorado 80522 a (Municipal Corporation) hereinafter referred to as "the
OWNER", in the penal sum of One Million Nine Hundred Twenty-Three Thousand, Seven Hundred
Sixty-six Dollars and No Cents ($1.923,766.00), in lawful money of the Unit~d States. for the payment
of which sum well and truly to. be made, we bind ourselves. successors and assigns, jointly and
severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain
Agreement with the OWNER, dated August 17.201 S, a copy of which is hereto attached and made a
part hereof for the performance of The City of Fort Collins project, Fossil Creek I BNSF Pedestrian
Tunnel.
NOW, THEREFORE; if the Principal shall make payment to all persons, firms, subcontractors, and
corporations furnishing materials for or performing labor in th!:l prosecution of the Work provided for in
such Agreement and any authorized extension or modification thereof, including all amounts due for
materials, lubricants. repairs on machinery, equipment and tools, consumed, rented or used in
connection with the construction of such Work, and all insurance premiums on said Work, and for all
labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void;
otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no
change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be
performed thereunder or the Specifications accompanying the same shall in any way affect its
obligation on this bond; and it does hereby waive notice of any such change, extension of time,
alteration or addition to the terms of the Agreement or to the Work or to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall
abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State
of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in four (4) counterparts, each one of which shall
be deemed an original, this 24th day of June , 2016.
Fossil Creek I BNSF Pedestrian Tunnel
June 2016
00615-1
Payment Bond
IN PRESENCE OF:
Attest:
(Corporate Seal)
IN PRESENCE OF:
Not Applicable
Not Applicable
IN PRESENCE OF:
(Surety Seal)
'
,,, ,, e:\\,I ,RUCr,ii II Ii It 0 I ,,,
,,,
~' c~ .......... 4' ,,.
:~,co: ~ .... <., .. · ,' \ 980 ·.; ·.· /. -,. ,~~ .~ :
~ ,:.. : . ·. SEAL ... . : : - =
~ ,,, ..,,,, ·.coLoRP.. ····· .... .~o,· .·· ,,,, ,~ ~
,,,,,,..,,,,,,,
Title
9885 Emporia Street, Henderson, CO 80640
Address
Other Partners
By: Not Applicable
By: Not Applicable
By:_ ~~~~-4---,~_.p..~p!l.lJu..u.&..e~
Attorney-in-Fact
By: Not Applicable
Address One Hartford Plaza, Hartford, CT 06155
NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all
partners should execute Bond.
Fossil Creek I BNSF Pedestrian Tunnel
June 2016
00615-2
Payment Bond
POWER OF ATTORNEY
Direct Inquiries/Claims to:
THE HARTFORD
Bond T-4
One Hartford Plaza
Hartford, Connecticut 06155
call: 888-266-3488 or tax: 860-757-5835)
KNOW ALL PERSONS BY TH ESE PRESENTS THAT: Agency Code: 3 4-3 4 6 2 0 5
~ Hartford Fire lm~urance Company, <\ corporation duly prganizei). under the laws of the State of Connecticut
L] Hartford Casualty lnsu ranee Corri pany, a corporation duly organized under the laws of the State of Indiana
CJ Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut
[:=] Hartford Underwriters Insurance Company, a corporati911 duly OIJ?;anized under the laws of the State ofConnedicut
[:=] Twin City F!r'e lnsuran.ce Company, a coq><?ration d,uly organized ~der the laws of the State oflndiana
C:J Hartford Insurance Company of llllnols, a coi:poration duly organized under the laws of the State oflllinois
C:J Hartford Insurance Company of the Midwest, a corpqration duly organized under fu.e laws of the State ofindiana
l==:J Hartford Insurance Company of the Southeast, a corporatioil duly OIJ?;lllUZed :under the laws of the State of Florida
having their home office in Hartford, .Gonnecticut {hereinafter collectiVely referred to as the "Companies") do hereby make, constitute and appoint,
up tQ the amount of Unlimited
Florietta Acosta, Don Appleby, Todd B'engford, Sarah Brown, Susan J.
Lattarulo, Mark Sweigart of GREENWOOD VILLAGE, Colorado
their true and lawfui ,Attorney(s)-in-Fact, each in their separale capacity if more than one is named above, to sign its name as s!Jrely(ies) only as delineated
above by~. and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments In the nature thereof, on behalf
of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds
and undertakings required or permitted in any actions or proceedings allowed by law.
In Witness Whereof, anc! as authorized by a Resolution .of the Board of Directors of the Companies on August 1, 2009, the Companies have
caused these presents to be signed by its Vice President and its corporaie seals to be hereto affixed, duly attested by its Assistant Secretary. Further,
pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any
mechanically applied signatures applied to this Power of Attorney.
John Gray, Assistant S~retary
STATE OF CONNECTICUT}
SS.
COUNTY OF HARTFORD
Hartford
CERTIFICATE
M. Ross Fisher, Vice President
Kathleen 'r. Maynard
N otBIY PubHc
My Commisi.ion Expires Jtily 31, 2016
I, the undersigned, Vice President of the Companies, DO HEREBY CERTIFY that the_above _and foregoing is a true and correct copy of the Power
of Attorney executed by said Companies, which is still in full force effective as of June 24, 2016
Signed arid sealed al the City .of Hartford.
Kevin Heckman, Assistant Vice President
POA2012
Fossil Creek / BNSF Pedestrian Tunnel Certificate of Insurance
June 2016
00630-1
SECTION 00630
CERTIFICATE OF INSURANCE
CONTRACTOR shall insert his own standard form for Certificate of Insurance.
Fossil Creek / BNSF Pedestrian Tunnel Certificate of Substantial Completion
June 2016
00635-1
SECTION 00635
CERTIFICATE OF SUBSTANTIAL COMPLETION
TO: City of Fort Collins PROJECT TITLE: Fossil Creek / BNSF
Pedestrian Tunnel
Date of Substantial Completion: LOCATION: Fort Collins, Colorado
OWNER: City of Fort Collins
Project or Specified Part Shall Include: CONTRACTOR: BT Construction, Inc.
CONTRACT DATE:
Work performed under this contract has been inspected by authorized representatives of the OWNER,
CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated
above) is hereby declared to be substantially completed on the above date.
A tentative list of items to be completed or corrected is appended hereto. This list may not be
exhaustive, and the failure to include an item on it does not alter the responsibility of the
CONTRACTOR to complete all the Work in accordance with the Contract Documents.
Stantec Consulting Services, Inc. By:
ENGINEER Authorized Representative Date
The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete
and correct the items on the tentative list within the time indicated.
BT Construction, Inc. By:
CONTRACTOR Authorized Representative Date
The OWNER accepts the project or specified area of the project as substantially complete and will
assume full possession of the project or specified area of the project at 12:01 a.m., on . The
responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set
forth under "Remarks" below.
CITY OF FORT COLLINS, COLORADO By:
OWNER Authorized Representative Date
REMARKS:
Fossil Creek / BNSF Pedestrian Tunnel Certificate of Final Acceptance
June 2016
00640-1
SECTION 00640
CERTIFICATE OF FINAL ACCEPTANCE
, 20
TO: BT Construction, Inc.
Gentlemen:
You are hereby notified that on the day of , 20 , the City of Fort
Collins, Colorado, has accepted the Work completed by BT Construction, Inc. for the City of Fort Collins
project, Fossil Creek / BNSF Pedestrian Tunnel.
A check is attached hereto in the amount of $ as Final Payment for all Work done,
subject to the terms of the Contract Documents which are dated .
In conformance with the Contract Documents for this project, your obligations and guarantees will
continue for the specified time from the following date: .
Sincerely,
OWNER: City of Fort Collins
By:
Title:
ATTEST:
Title:
Fossil Creek / BNSF Pedestrian Tunnel Lien Waiver Release (Contractor)
June 2016
00650-1
SECTION 00650
LIEN WAIVER RELEASE
(Contractor)
TO: City of Fort Collins, Colorado
(OWNER)
FROM: BT Construction, Inc.
(CONTRACTOR)
PROJECT: Fossil Creek / BNSF Pedestrian Tunnel.
1. The CONTRACTOR acknowledges having received payment, except retainage from the
OWNER for all work, labor, skill and material furnished, delivered and performed by the
CONTRACTOR for the OWNER or for anyone in the construction, design, improvement,
alteration, addition or repair of the above described project.
2. In consideration of such payment and other good and valuable consideration, the receipt and
adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights,
claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A.
270 a and b), stop notices, equitable liens and labor and material bond rights which the
CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor,
skill or materials furnished, delivered or performed for the construction, design, improvement,
alteration, addition or repair of the above described project, against the OWNER or its officers,
agents, employees or assigns, against any fund of or in the possession or control of the
OWNER, against the project or against all land and the buildings on and appurtenances to the
land improved by the project.
3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed
to or for the construction, design, improvement, alteration, addition or repair of the project were
furnished, delivered or performed by the CONTRACTOR or its agents, employees, and
servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or
their agents, employees and servants and further affirms the same have been paid in full and
have released in full any and all existing or possible future mechanic's liens or rights or claims
against the project or any funds in the OWNER'S possession or control concerning the project
or against the OWNER or its officers, agents, employees or assigns arising out of the project.
4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and
the Surety on the project against and from any claim hereinafter made by the CONTRACTOR'S
Subcontractors, materialmen, employees, servants, agents or assigns against the project or
against the OWNER or its officers, employees, agents or assigns arising out of the project for all
loss, damage and costs, including reasonable attorneys fees, incurred as a result of such
claims.
5. The parties acknowledge that the description of the project set forth above constitutes and
adequate description of the property and improvements to which this Lien Waiver Release
pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may
Fossil Creek / BNSF Pedestrian Tunnel Lien Waiver Release (Contractor)
June 2016
00650-2
be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds
for the project.
Signed this day of , ________
CONTRACTOR
By:
Title:
ATTEST:
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this day of , 20 ___,
By
Witness my hand and official seal.
My Commission Expires:
Notary Public
Fossil Creek / BNSF Pedestrian Tunnel Lien Waiver Release (Subcontractor)
June 2016
00651-1
SECTION 00651
LIEN WAIVER RELEASE
(Subcontractor)
TO: (CONTRACTOR)
FROM: (Subcontractor)
PROJECT: Fossil Creek / BNSF Pedestrian Tunnel.
1. The Subcontractor acknowledges having received payment, except retainage, from the
CONTRACTOR for all work, labor, skill and material furnished, delivered and performed by the
Subcontractor for the CONTRACTOR or for anyone in the construction, design, improvement,
alteration, addition or repair of the above described project.
2. In consideration of such payment and other good and valuable consideration, the receipt and
adequacy of which are hereby acknowledged, the Subcontractor voluntarily waives all rights, claims
and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b),
stop notices, equitable liens and labor and material bond rights which the Subcontractor may now
or may afterward have, claim or assert for all and any work, labor, skill or materials furnished,
delivered or performed for the construction, design, improvement, alteration, addition or repair of
the above described project, against the CONTRACTOR or its officers, agents, employees or
assigns, against the project or against all land and the buildings on and appurtenances to the land
improved by the project.
3. The Subcontractor affirms that all work, labor and materials, furnished, delivered or performed to or
for the construction, design, improvement, alteration, addition or repair of the project were
furnished, delivered or performed by the Subcontractor or its' agents, employees, and servants, or
by and through the Subcontractor by various sub-subcontractors or materialmen or their agents,
employees and servants and further affirms the same have been paid in full and have released in
full any and all existing or possible future mechanic's liens or rights or claims against the project or
against the CONTRACTOR or its officers, agents, employees or assigns arising out of the project.
4. The Subcontractor agrees to defend and hold harmless the CONTRACTOR, the lender, if any, and
the Surety on the project against and from any claim hereinafter made by the Subcontractor's sub-
subcontractors, materialmen, employees, servants agents or assigns against the project or against
the CONTRACTOR or OWNER, lender or Surety or their officers, employees, agents or assigns
arising out of the project for all loss, damage and costs, including reasonable attorneys fees,
incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth above constitutes and
adequate description of the property and improvements to which this Lien Waiver Release pertains.
It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied
upon by the CONTRACTOR, OWNER, the lender, if any, and Surety on any labor and material
bonds for the project.
Fossil Creek / BNSF Pedestrian Tunnel Lien Waiver Release (Subcontractor)
June 2016
00651-2
Signed this day of , 20
SUBCONTRACTOR:
By:
Title:
ATTEST:
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this day of , 20 ,
By
Witness my hand and official seal.
My Commission Expires:
Notary Public
Fossil Creek / BNSF Pedestrian Tunnel Consent of Surety
June 2016
00660-1
SECTION 00660
CONSENT OF SURETY
TO: City of Fort Collins, Colorado
(hereinafter referred to as the "OWNER")
CONTRACTOR: BT Construction, Inc.
PROJECT: Fossil Creek / BNSF Pedestrian Tunnel.
CONTRACT DATE:
In accordance with the provisions of the Contract between the OWNER and the CONTRACTOR as
indicated above, for Fossil Creek / BNSF Pedestrian Tunnel on
bond of (Surety)
hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the
CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set
forth in the said Surety Company's Bond.
IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this day of
, 20 .
(Surety Company)
By:
ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact.
Fossil Creek / BNSF Pedestrian Tunnel Contractor Application for Tax Exemption Certificate
June 2016
00670-1
DR 0172 (12/98)
COLORADO DEPARTMENT OF REVENUE
DENVER CO 80261
(303) 232-2416
DO NOT WRITE IN THIS SPACE
The exemption certificate for which you are applying must be used only for the purpose of purchasing construction and building
materials for the exempt project described below. This exemption does not include or apply to the purchase or rental of equipment,
supplies, and materials which are purchased, rented, or consumed by the contractor and which do not become part of the structure,
highway, road, street, or other public works owned and used by the exempt organization.
Any unauthorized use of the exemption certificate will result in revocation of your exemption certificate and other penalties provided by
law.
A separate certificate is required for each contract.
Subcontractors will not be issued Certificates of Exemption by the Department of Revenue. It is the responsibility of the prime
contractor to issue certificates to each of the subcontractors. (See reverse side).
FAILURE TO ACCURATELY COMPLETE ALL BOXES WILL CAUSE THE APPLICATION TO BE DENIED.
Registration/Account No. (to be assigned by DOR)
89 -
Period 0170-750 (999) $0.00
CONTRACTOR INFORMATION
Trade name/DBA: Owner, partner, or corporate name:
Mailing address (City, State, Zip): Contact Person
E-Mail address: Federal Employer’s Identification Number: Bid amount for your contract:
$
Fax Number:
( )
Business telephone number:
( )
Colorado withholding tax account number:
EXEMPTION INFORMATION Copies of contract or agreement pages (1) identifying the contracting parties
and (2) containing signatures of contracting parties must be attached.
Name of exempt organization (as shown on contract):
Exempt organization’s number:
98 -
Address of exempt organization (City, State, Zip):
Principal contact at exempt organization: Principal contact’s telephone number:
Physical location of project site (give actual address when applicable and Cities and/or County (ies) where project is located)
Scheduled
construction start date:
Month Day Year Estimated
completion date:
Month Day Year
I declare under penalty of perjury in the second degree that the statements made in this application are true and
complete to the best of my knowledge.
Signature of owner, partner or corporate officer: Title of corporate officer: Date:
DO NOT WRITE BELOW THIS LINE
CONTRACTOR APPLICATION
FOR
EXEMPTION CERTIFICATE
Pursuant to Statute
Section 39-26.114(1)(a)(XIX)
6
Fossil Creek / BNSF Pedestrian Tunnel Contractor Application for Tax Exemption Certificate
June 2016
00670-2
Special Notice
Contractors who have completed this application in the past, please note the following changes in procedure:
The Department will no longer issue individual Certificates of exemption to subcontractors. Only prime contrac-
tors will receive a Contractor’s Exemption Certificate on exempt projects.
Upon receipt of the Certificate, the prime contractor should make a copy for each subcontractor involved in the
project and complete it by filling in the subcontractor’s name and address and signing it.
The original Certificate should always be retained by the prime contractor. Copies of all Certificates that the
prime contractor issued to subcontractors should be kept at the prime contractor’s place of business for a
minimum of three years and be available for inspection in the event of an audit.
Once an 89# has been assigned to you, please use the next five numbers following it for any applications
submitted for future projects. This should be your permanent number. For instance, if you were assigned 89-
12345-0001, every application submitted thereafter should contain 89-12345 on the application. The succeed-
ing numbers will be issued by the Department of Revenue. DO NOT enter what you believe to be the next in
sequence as this may delay processing of your application.
Fossil Creek / BNSF Pedestrian Tunnel Supplementary Conditions
June 2016
SECTION 00800
SUPPLEMENTARY CONDITIONS
Fossil Creek / BNSF Pedestrian Tunnel Supplementary Conditions
June 2016
00800-1
SECTION 00800
SUPPLEMENTARY CONDITIONS
Conditions of the Contract
These Supplementary Conditions amend or supplement the General Conditions of the Construction
Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins modifications (rev.
9/99)) and other provisions of the Contract Documents executed under 8106 Utility Infrastructure
Construction Services for Water, Wastewater, and Stormwater Facilities Capital Improvements.
All work performed under this work order shall be conducted in accordance with the technical
specifications, included herein.
SC-1 DEFINITIONS
SC-1.38. Add the following language to the conclusion of paragraph 1.38 of the General Conditions:
1.38. Substantial Completion. … Substantial Completion is further defined as that degree of
completion of the operating facilities or systems of the Project defined in the Work Order sufficient
to provide the OWNER the full time, uninterrupted, continuous, beneficial operation of the
modifications, and all inspections required have been completed and identified deficiencies
corrected.
SC-1.43.A Add the following new paragraph immediately after paragraph 1.43 of the General Conditions:
1.43.A. Work Order – A written document executed by OWNER and CONTRACTOR that provides
for the construction of a portion of the Work, pursuant to the Agreement and all as required by the
Contract Documents, and that becomes a Contract Document when executed.
SC-2 PRELIMINARY MATTERS
SC-2.8. Delete paragraph 2.8 of the General Conditions entirely and replace it with the following
paragraph:
2.8 Preconstruction Conference. Within ten days after the Contract Times for a Work Order
start to run, but before any Work at the site is started, a conference attended by CONTRACTOR,
ENGINEER and others as appropriate will be held to establish a working relationship among the
parties as to the Work and to discuss the schedules referred to in paragraph 2.6, procedures for
handling Shop Drawing and other submittals, processing Applications for Payment, and maintaining
required records.
SC-2.10, Add the following new paragraph immediately after paragraph 2.9 of the General Conditions:
2.10 Work Order Required for All Work. References to the Agreement in this Article 2 and in
the General and Supplementary Conditions and Contract Documents notwithstanding, no Work
shall be initiated or performed until CONTRACTOR has received a signed and executed Work
Order, incorporating the Notice to Proceed, from OWNER; and no provision of the Article 2 or of the
General and Supplementary Conditions and Contract Documents shall permit or require any action
of CONTRACTOR in the absence of a signed and executed Work Order. All provisions of this
Article 2 and of the General and Supplementary Conditions and Contract Documents referencing
the Agreement or other parts of the Contract Documents, or permitting or requiring any action of
CONTRACTOR, shall be read as referencing and, as appropriate, requiring a signed and executed
Fossil Creek / BNSF Pedestrian Tunnel Supplementary Conditions
June 2016
00800-2
Work Order.
SC-4 AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS;
REFERENCE POINTS
SC-4.2.1.2. Add the following new paragraph immediately following paragraph 4.2.1.2 of the General
Conditions:
4.2.1.2.1 No drawing of physical conditions in or relating to existing surface or subsurface
structures (except Underground Facilities referred to in Paragraph 4.3) which are at or contiguous
to the site have been utilized by the Engineer in preparation of the Contract Documents, except the
following:
1. CTL Thompson
GEOTECHNICAL INVESTIGATION
PEDESTRIAN TRAIL UNDERPASS
FOSSIL CREEK TRAIL AT BNSF UNDERPASS
FORT COLLINS, COLORADO
CITY OF FORT COLLINS
Project No. FC06103-125
May 28, 2013
(Revised October 17, 2013)
2. BRIERLEY ASSOCIATES
BASIS OF DESIGN REPORT
FOSSIL CREEK PEDESTRIAN TUNNEL FORT COLLINS, COLORADO
May 21, 2014
3. CONSTRUCTION AND MAINTENANCE AGREEMENT FOR PEDESTRIAN/BIKE
UNDERPASS between BNSF RAILWAY COMPANY and THE CITY OF FORT
COLLINS, COLORADO
February 19, 2016
Contractor may rely upon the accuracy of the technical data contained in the documents, but not
upon non-technical data, interpretations or opinions contained therein or upon the completeness of
any information in the report.
SC-5 BONDS AND INSURANCE
SC-5.4.7. Include the following parties or entities as additional Insureds, as provided in paragraph
5.4.7 of the General Conditions:
5.4.7.1.The City of Fort Collins, Colorado, 4316 LaPorte Avenue, Fort Collins, Colorado 80522
SC-5.4.8.1. Add the following new paragraph immediately following paragraph 5.4.8 of the General
Conditions:
5.4.8.1.1. Limits of Liability. The limits of liability for the insurance required by the paragraph
numbers of the General Conditions listed below are as follows:
5.4.1 and 5.4.2
Coverage A - Statutory Limits
Fossil Creek / BNSF Pedestrian Tunnel Supplementary Conditions
June 2016
00800-3
Coverage B - $100,000 / $100,000 / $500,000.
5.4.3 and 5.4.5 Commercial General Liability policy will have limits of $1,000,000 combined single
limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage
unless waived by the Owner.
5.4.6: The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000
combined single limits (CSL).
5.4.9. This policy will include completed operations coverage / product liability coverage with limits
of $1,000,000 combined single limits (CSL). This policy shall also include an Umbrella Excess
Liability as follows: General liability and automobile liability insurance in an amount not less than
$1,000,000 per occurrence in excess of the above stated primary limits.
SC-6 CONTRACTOR’S RESPONSIBILITIES
SC-6.14.3. Add the following new paragraph immediately following paragraph 6.14.2 of the General
Conditions:
6.14.3.1. The following Laws or Regulations are included in the Contract Documents as
mandated by statute or for the convenience of the CONTRACTOR. Other Laws and
Regulations apply which are not included herein, and are within the CONTRACTOR’S duty
and responsibility for compliance thereto:
6.14.3.2. Notice to owners of Underground Facilities is required prior to excavations in the
vicinity of such facilities.
6.14.3.2. Unless otherwise decided by reason of the amount of the Contract Price involved, or
other good reason, before or at the time that the contract is awarded to a corporation
outside the State of Colorado, such corporation must carry out the proper procedure to
become authorized to do business in the State of Colorado, designate a place of business
therein, and appoint an agent for service of process. Such corporation must furnish the
OWNER with a certificate from the Secretary of State of Colorado, has been issued by its
office and there shall also be procured from the Colorado Secretary of State a photostatic or
certified copy of the designated place of business and appointment of agent for service of
process, or a letter from the Colorado Secretary of State that such designation of place of
business and agent for service of process have been made.
6.14.3.3 The CONTRACTOR must conform to the rules and regulations of the Industrial
Commission of Colorado. Particular reference is made to rules and regulations governing
excavation Work adopted by the Industrial Commission of Colorado.
SC-6.35. Add the following new paragraphs immediately following paragraph 6.34 of the General
Conditions:
6.35 Federal Requirements. As applicable, and as may be required for any Work Order,
CONTRACTOR agrees to the following additional requirements.
6.35.1. CONTRACTOR agrees that he is subject to the provisions of the Williams-Steiger
Occupational Safety and Health Act of 1970 and related program requirements, as included
in Appendix A of the Supplementary Conditions.
Fossil Creek / BNSF Pedestrian Tunnel Supplementary Conditions
June 2016
00800-4
6.35.2. CONTRACTOR agrees to utilize the rural Area business Development Plan, as included in
Appendix B of the Supplementary Conditions.
6.35.3. CONTRACTOR agrees to the Prohibition Against Listed Violated Facilities, as included in
Appendix C of the Supplementary Conditions.
6.35.4. CONTRACTOR agrees to the provisions of the Notice of Requirement for Affirmative Action
to ensure equal employment opportunity and related attached documents, as included in
Appendix D of the Supplementary Conditions
SC-11 CHANGE OF CONTRACT PRICE
SC-11.6.2.7. Add the following new paragraph to paragraph 11.6.2 of the General Conditions.
11.6.2.7. Cost of the Work. Allowances for profit, overhead and mark-up prescribed by
Article 4 of the Agreement shall be used in lieu of any CONTRACTOR’S fee, overhead,
profit or mark-up allowances as prescribed in paragraphs 11.6.2.1, 11.6.2.2 and 11.6.2.3.
SC-12 CHANGE OF CONTRACT TIMES
SC-12.3. Add the following language to the end of paragraph 12.3 of the General Conditions.
12.3 … Lost days due to abnormal weather conditions will be allocated as required.
SC-14 PAYMENTS TO CONTRACTOR AND COMPLETION
SC- 14.1. Add the following language to the end of paragraph 14.1 of the General Conditions.
14.1. Schedule of values … Progress payments on the negotiated not-to-exceed fee shall be
based on a time and materials basis.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Supplementary Conditions
June 2016
00800-5
APPENDIX A
WILLIAMS-STEIGER OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970
A. AUTHORITY
(1) The CONTRACTOR is subject to the provisions of the Williams-Steiger Occupational Safety
and Health Act of 1970.
(2) These construction documents and the joint and several phases of construction hereby
contemplated are to be governed, at all times, by applicable provisions of the Federal
law(s), including but not limited to the latest amendment of the following:
a. Williams-Steiger Occupational Safety and Health Act of 1970, Public Law 94-596;
b. Part 1910 - Occupational Safety and Health Standards, Chapter XVII of the Title 29,
Code of the Federal Regulations.
c. Part 1926 - Safety and Health Regulations for Construction, Chapter XVII of Title 29,
Code of Federal Regulations.
B. SAFTEY AND HEALTH PROGRAM REQUIREMENTS
(1) This project, its prime contractor and its subcontractors, shall at all times be governed by
Chapter XVII of Title 29, Code of Federal Regulations, Part 1926 - Safety and Health
Regulations for Construction (29 CFR 22801), as amended to date.
(2) To implement the program and to provide safe and healthful working conditions for all
persons, general project safety meetings will be conducted at the site at least once each
month during the course of the construction, by the construction superintendent or his/her
designated safety officer. Notice of such meeting shall be issued not less than three (3)
days prior, stating the exact time, location and agenda to be included. Attendance by the
OWNER, architect, general foreman, shop steward(s) and trades, or their designated
representatives, witnessed in writing as such, shall be mandatory.
(3) To further implement the program, each trade shall conduct a short gang meeting, not less
than once a week, to review project safety requirements mandatory for all persons during
the coming week. The gang foremen shall report the agenda and specific items covered to
the project superintendent, who shall incorporate these items in his/her daily log or report.
(4) The prime contractor and all subcontractors shall immediately report all accidents, injuries
or health hazards to the owner and architect or their designated representatives, in writing.
This shall not obviate any mandatory reporting under the provisions of the Occupational
Safety and Health Act of 1970.
(5) This program shall become a part of the contract documents and the contract between the
owner and prime contractor, prime contractor and all subcontractors, as though fully written
therein.
Fossil Creek / BNSF Pedestrian Tunnel Supplementary Conditions
June 2016
00800-6
APPENDIX B
RURAL AREA BUSINESS ENTERPRISE DEVELOPMENT PLAN
The Contractor agrees and is required to utilize the following affirmative steps:
A. Placing Small Businesses in Rural Areas (SBRA) on solicitation lists;
B. Ensuring that SBRAs are solicited whenever they are potential sources;
C. Dividing total requirements, when economically feasible, into small tasks or quantities to
permit maximum participation by SBRAs;
D. Establishing delivery schedules, where the requirements of work will permit, which would
encourage participation by SBRAs;
E. Requiring the contractors if it awards subcontracts, to take the affirmative steps in
subparagraphs A. through E. of this condition.
Fossil Creek / BNSF Pedestrian Tunnel Supplementary Conditions
June 2016
00800-7
APPENDIX C
PROHIBITION AGAINST LISTED VIOLATED FACILITIES
A. REQUIREMENTS
(1) To comply with all the requirements of section 114 of the Clean Air Act, as amended (42
U.S.C. 1857, et seq., as amended by Pub. L. 92-604) and section 308 of the Clean Water
Act (33 U.S.C. 1251, as amended), respectively, which relate to inspection, monitoring,
entry, reports and information, as well as other requirements specified in section 114 and
section of the Air Act and the Water Act, respectively, and all regulations and guidelines
issued thereunder before the award of this contract.
(2) That no portion of the work required by this prime contract will be performed in a facility
listed on the Environmental Protection Agency list of violating facilities on the date when this
contract was awarded unless and until the EPA eliminates the name of such facility or
facilities from the listing.
(3) That the best efforts to comply with clean air and clean water standards at the facilities in
which the contract is being performed.
(4) To insert the substance of the provisions of this clause, including this paragraph (4), in any
nonexempt subcontract.
B. DEFINITIONS
(1) Air Act means the Clean Air Act, as amended (42 U.S.C. 1857 et seq.).
(2) Water Act means the Clean Water Act, as amended (33 U.S.C. 1251 et seq.).
(3) Clean Air Standards means any enforceable rules, regulations, guidelines, standards,
limitations, orders, controls, prohibitions or other requirements which are contained in,
issued under or otherwise adopted under the Air Act or Executive Order 11738, an
applicable implementation plan as described in section 110(d) of the Air Act (42 U.S.C.
1857c-5(d), an approved implementation procedure or plan -under section 111(c) or section
111(d), or an approved implementation procedure under section 112(d) of the Air Act (42
U.S.C. 1857c-7(d).
(4) Clean Water Standards means any enforceable limitation, control, condition, prohibition,
standard or other requirement which is promulgated under the Water Act or contained in a
permit issued to a discharger by the Environmental Protection Agency or by a State under
an approved program, as authorized by section 402 of the Water Act (33 U.S.C. 1342), or
by a local government to ensure compliance with pretreatment regulations as required by
section 307 of Water Act (33 U.S.C. 1317).
(5) Compliance means compliance with clean air or water standards. Compliance shall also
mean compliance with a schedule or plan ordered or approved by a court of competent
jurisdiction, the Environmental Protection Agency in accordance with the requirements of
the Air Act or Water Act and regulations.
(6) Facility means any building, plant, installation, structure, mine, vessel or other floating craft,
location or site of operations, owned leased or supervised by a contractor or subcontractor,
Fossil Creek / BNSF Pedestrian Tunnel Supplementary Conditions
June 2016
00800-8
to be used in the performance of a contract or subcontract. Where a location or site of
operations contains or includes more than one building plant, installation or structure, the
entire location or site shall be deemed to be a facility except where the Director, Office of
Federal Activities, Environmental Protection Agency, determines that independent facilities
are located in one geographical area.
Fossil Creek / BNSF Pedestrian Tunnel Addenda, Modifications &
June 2016 Payment Table of Contents
SECTION 00900
ADDENDA, MODIFICATIONS, AND PAYMENT
00950 Contract Change Order
00960 Application for Payment
PROJECT TITLE:
CONTRACTOR:
PROJECT NUMBER:
PURCHASE ORDER NO.:
DESCRIPTION:
1. Reason for
2. Description of Change:
3. Change in Contract Cost:
4. Change in Contract Time:
ORIGINAL CONTRACT COST $0.00
TOTAL APPROVED CHANGE ORDER $0.00
TOTAL PENDING CHANGE ORDER $0.00
TOTAL THIS CHANGE ORDER $ -
TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0.00%
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 0.00%
ADJUSTED CONTRACT COST $0.00
(Assuming all change orders approved)
ACCEPTED BY: DATE:
Contractor's Representative
ACCEPTED BY: DATE:
Project Manager
REVIEWED BY: DATE:
Title:
APPROVED BY: DATE:
Title:
APPROVED BY: DATE:
Purchasing Agent over $30,000
cc: City Clerk
Contractor
Project File
$0.00
SECTION 00950
CHANGE ORDER NO.
Fossil Creek / BNSF Pedestrian Tunnel
Fossil Creek / BNSF Pedestrian Tunnel
June 2016 00950‐1 Contract Change Order
PROJECT:
OWNER: City of Fort Collins Utilities CONTRACTOR: APPLICATION NUMBER:
700 Wood Street APPLICATION DATE:
Fort Collins, CO 80522 PERIOD BEGINNING:
PERIOD ENDING:
ENGINEERS: PURCHASE ORDER #:
PROJECT NUMBER:
CHANGE ORDERS: PAY APPLICATION:
NUMBER DATE AMOUNT Application is made for Payment as shown below in connection with the Contract.
The present status of the account for this Contract is as follows.
Original Contract Amount:
Net Change by Change Order: $ -
Revised Current Contract Amount: $0.00
Total Work Completed to Date:
Total Change Order Work to Date:
Total Stored to Date:
Total Completed and Stored Materials to Date: $0.00
Less Previous Payments:
Amount due this Pay Application (before retainage): $0.00
Less Retainage: $ -
Net Change by Change Order: $ - AMOUNT DUE THIS APPLICATION: $0.00
Change Order %: 0.00%
CERTIFICATION:
The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with
the WORK have been satisfied as required in paragraph 14.3 of the General Conditions of the Contract.
The above Amount Due this Application is requested by the CONTRACTOR's Project Manager.
Date: By:
Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager.
Date: By:
Jason Stutzman, Special Projects Manager
Payment of the above Amount Due This Application is approved by the OWNER.
Date: By:
Owen L. Randall, Chief Engineer
Fossil Creek / BNSF Pedestrian Tunnel
Page 1 of 1
Fossil Creek / BNSF Pedestrian Tunnel Attachment A
June 2016
ATTACHMENT A
Fossil Creek / BNSF Pedestrian Tunnel
Drawings
Dwg Sheet Sheet Title DATE
# # (YY.MM.DD)
CIVIL DRAWINGS
1 C-100 COVER 15.06.11
2 C-101 PROJECT GENERAL INFORMATION 15.06.11
3 C-102 RAILROAD GENERAL NOTES 15.06.11
4 C-103 TUNNEL SCHEMATIC 15.06.11
5 C-104 GENERAL LAYOUT 15.06.11
6 C-105 PHASING PLAN 15.06.11
7 C-106 STAGING PLAN 15.06.11
8 C-200 PEDESTRIAN UNDERPASS / TRAIL PLAN AND PROFILE 15.06.11
9 C-201 TUNNEL PLAN AND PROFILE 15.06.11
10 C-202 STORM SEWER PLAN AND PROFILE 15.06.11
11 C-400 OVERALL GRADING PLAN 15.06.11
12 C-401 DETAILED GRADING PLAN – EAST 15.06.11
13 C-402 DETAILED GRADING PLAN – WEST 15.06.11
14 C-403 WALL PLAN AND PROFILES 15.06.11
15 C-404 RAILROAD CENTERLINE PLAN AND PROFILE 15.06.11
16 C-500 DETAILS - DRAINAGE, TRAIL AND MISC 15.06.11
17 C-501 DETAILS - SHEET PILE LAYOUT 15.06.11
18 C-502 DETAILS - DRAINAGE, TRAIL AND MISC 15.06.11
19 C-503 DETAILS - DRAINAGE, TRAIL AND MISC 15.06.11
20 C-504 EAST ACCESS ROAD PLAN AND PROFILE 16.06.01
21 C-505 WEST ACCESS ROAD PLAN AND PROFILE 16.06.01
TUNNEL DRAWINGS
22 C-700 INSTRUMENTATION PLAN 15.06.11
23 C-701 INSTRUMENTATION DETAILS 15.06.11
24 SH-1 GENERAL NOTES 15.06.11
25 SH-2 SEQUENCE OF CONSTRUCTION 15.06.11
26 SH-3 ARCH WALL, JACK BOX AND TUNNEL LAYOUT 15.06.11
27 SH-4 GENERAL ARCH WALL PROFILE 15.06.11
28 SH-5 TEMPORARY JACKING PIT AND THRUST BLOCK 15.06.11
29 SH-6 TUNNEL CROSS SECTION AND DETAILS 15.06.11
30 SH-7 DETAILS 15.06.11
31 SH-8 GEOLOGIC PROFILE 15.06.11
Fossil Creek / BNSF Pedestrian Tunnel Division 1 Table of Contents
June 2016
Division 1 TOC - 1
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01110 SUMMARY OF WORK
SECTION 01140 CONTRACTOR’S USE OF PREMISES
SECTION 01180 UTILITY SOURCES
SECTION 01270 MEASUREMENT AND PAYMENT
SECTION 01310 PROJECT MEETINGS
SECTION 01320 CONSTRUCTION SCHEDULES
SECTION 01330 SUBMITTALS
SECTION 01425 STANDARD REFERENCES
SECTION 01450 MATERIALS TESTING
SECTION 01520 FIELD OFFICES FOR OWNER
SECTION 01555 TRAFFIC REGULATIONS
SECTION 01635 SUBSTITUTIONS AND PRODUCT OPTIONS
SECTION 01650 MATERIAL DELIVERY, STORAGE, AND HANDLING
SECTION 01710 SITE CONDITIONS
SECTION 01715 TREE, LANDSCAPE, VEGETATION, AND WETLAND PROTECTION
SECTION 01720 FIELD ENGINEERING AND SURVEYING
SECTION 01745 ENVIRONMENTAL CONTROLS
SECTION 01780 CONTRACT CLOSE-OUT
Fossil Creek / BNSF Pedestrian Tunnel Summary of Work
June 2016
01110-1
SECTION 01110
SUMMARY OF WORK
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Site location and description.
B. Project description.
C. Scope of work and work sequence.
D. Underground utilities.
1.02 SITE LOCATION AND DESCRIPTION
A. Fossil Creek / BNSF Pedestrian Tunnel
1. The site of the work is located along the BNSF Railroad line in Fort Collins, between
Harmony Road and Trilby Road and between College Avenue and Shields Street as
shown on the Drawings.
2. The site is in the Fossil Creek Basin in south central Fort Collins.
3. The site as described by the BNSF Railway Company in the Construction and
Maintenance Agreement is located under the track at Line Segment 476, Mile Post 68.78,
located on the Powder River Division, Front Range Subdivision, approximately halfway
between the major cross streets of Harmony Road (National Crossing ID No. 244620N,
BNSF MP 69.78) and West Trilby Road (National Crossing ID No. 244618M, BNSF MP
67.68) in the City of Fort Collins, Larimer County, Colorado.
1.03 PROJECT DESCRIPTION
A. The Fossil Creek / BNSF Pedestrian Tunnel work includes but is not limited to:
1. Mobilization to the site, erosion control, and limits of disturbance delineation.
2. Acquisition and purchase of insurance, training, access permitting and other
miscellaneous requirements necessary for performing work within the railroad
Right-of-Way as determined by the BNSF railway, including but not limited to the
terms and conditions of the “Construction and Maintenance Agreement for
Pedestrian/Bike Underpass between the City and BNSF dated February 19, 2016,
attached and incorporated herein by reference.
3. Installation of two construction access roads across the City of Fort Collins Redtail
Grove Natural Area to the underpass site location at the BNSF Railway track
embankment.
Fossil Creek / BNSF Pedestrian Tunnel Summary of Work
June 2016
01110-2
4. Installation of Geotechnical Instrumentation and Monitoring
5. Installation of caissons, steel sheet piling, rebar and shotcrete for construction of
two arched headwalls located on the east and west sides of the tunnel and railroad
tracks.
6. Dewatering and surface runoff management
7. Installation of a thrust block platform for pipe jacking operation.
8. Installation of GBM guide rails for pipe casing
9. Complete installation of a 14-feet diameter, 70-feet long steel pipe casing tunnel
under the railroad track embankment.
10. Installation of a concrete retaining wall for along the west side of the tracks for
flood protection.
11. Installation of storm sewer improvements.
12. Installation of flow-fill and colored concrete trail inside the pipe tunnel
13. Installation of colored concrete trail outside of the tunnel on both the east and west
sides.
14. Post construction demobilization, access roadway removals, landscaping and
restoration seeding.
15. All other required items set forth in the Specifications, Drawings and the
Construction and Maintenance Agreement for Pedestrian/Bike Underpass
documents.
1.04 WORK SEQUENCE
A. The Work Sequence is to be submitted as part of the construction schedule required in
Section 01320 (Construction Schedules) and Section 01330 (Submittals). Construction
of the project shall begin within seven (7) calendar days of the date of Notice to Proceed.
1.05 UNDERGROUND UTILITIES
A. It shall be the responsibility of the CONTRACTOR to verify the existence and location of
all underground utilities along the route of the work and to coordinate the construction
schedules with these utility owners. See Section 01180 for a list of Utility Sources.
B. Known utilities and structures adjacent to or encountered in the work are shown on the
Drawings. The locations shown are taken from existing records and the best information
available from existing utility plans, however, there may be some discrepancies and
omissions in the locations and quantities of utilities and structures shown. Those shown
Fossil Creek / BNSF Pedestrian Tunnel Summary of Work
June 2016
01110-3
are for the convenience of the CONTRACTOR only, and no responsibility is assumed by
either the OWNER or the ENGINEER for their accuracy or completeness.
C. The CONTRACTOR shall field verify all utilities and coordinate construction with utility
owners prior to starting construction. The CONTRACTOR shall be responsible for
protecting utilities during construction and scheduling utility adjustments to eliminate
conflict with progress of the work. Any damage to existing utilities shall be repaired at no
additional cost to the OWNER.
D. The CONTRACTOR shall notify the ENGINEER immediately of any field condition not
consistent with the contract documents.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Summary of Work
June 2016
01110-4
THIS PAGE INTENTIONALLY LEFT BLANK
Fossil Creek / BNSF Pedestrian Tunnel Contractor’s Use of Premises
June 2016
01140-1
SECTION 01140
CONTRACTOR’S USE OF PREMISES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. The CONTRACTOR may use the OWNER’s property designated within the construction
limits shown on the Drawings for equipment and materials as long as he confines his
operations to those permitted by local laws, ordinance and permits and meets the
following requirements:
1. Do not unreasonably encumber site with materials or equipment.
2. Assume full responsibility for protection and safekeeping of products stored on
premised.
3. Move any stored products which interfere with operations of the OWNER.
4. Obtain and pay for use of additional storage or work areas needed for
operations.
1.02 LIMITS OF CONSTRUCTION
A. The CONTRACTOR must maintain all construction activities within the OWNER’s
property and/or construction easements and limits of the project, or other stated areas,
unless permits and/or written permission are obtained by the CONTRACTOR, from
appropriate authorities or private property owners, outside of these areas. Contractor
shall fence all easements and work areas. Fences shall be substantial in size and type
to prevent injury to persons and animals and prevent domestic animals (i.e. horses,
cattle, livestock, etc.) from entering in or across the construction site. The temporary
permits must be secured and paid for by the CONTRACTOR at no extra cost to the
OWNER. Any temporary permits secured must be in writing and a copy of same
provided to the ENGINEER.
1.03 SECURITY
A. The CONTRACTOR shall at all times be responsible for the security of his facilities and
equipment. The OWNER will not take responsibility for missing or damaged equipment,
tools, or personal belongings of the CONTRACTOR.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Contractor’s Use of Premises
June 2016
01140-2
THIS PAGE INTENTIONALLY LEFT BLANK
Fossil Creek / BNSF Pedestrian Tunnel Utility Sources
June 2016
01180-1
SECTION 01180
UTILITY SOURCES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Names and telephone numbers of affected agencies and utilities in the area are listed
below for the CONTRACTOR’s convenience. The CONTRACTOR assumes all
responsibility of contacting these agencies and verification of telephone numbers.
1. Water Fort Collins Utilities (970) 221-6700
2. Sanitary Sewer Fort Collins Utilities (970) 221-6700
3. Stormwater Fort Collins Utilities (970) 221-6700
4. Electrical Fort Collins Utilities (970) 221-6700
5. Engineering City of Fort Collins (970) 221-6605
6. Traffic City of Fort Collins (970) 221-6615
7. Gas Xcel Energy (800) 895-2999
8. Telephone Qwest (800) 573-1311
9. Cable TV/Broadband Comcast (800) 266-2278
10. Water Fort Collins Loveland Water District (970) 226-3104
11. Sewer South Fort Collins Sanitation District (970) 226-3104
12. One-Call Utility Locates (800) 922-1987
13. BNSF Grade Crossing BNSF Railway (800)-832-5452
& Signal Hotline
14. BNSF Fiber Optic Engineering BNSF Railway (800) 533-2891
“CALL BEFORE YOU DIG”
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Measurement and Payment
June 2016
01270 -1
SECTION 01270
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.01 SECTION INCLUDES
A. The work performed under this Agreement shall be paid for on a Time and Materials
basis. The quantities provided on the Bid Schedule are only estimates of the actual
quantities of the work to be performed, and are only included for purposes of making the
award and establishing a basis for estimating the probable cost of the Work. The actual
amounts of work performed and materials furnished may differ from the estimated
quantities. The basis of payment for work and materials bid as time and materials will be
the actual amount of approved work done and materials furnished. The CONTRACTOR
agrees that he will make no claim for damages, anticipated profits, or otherwise on
account of any difference between the amounts of work actually performed and
materials actually furnished and the estimated amount for bid items.
Payment shall be made only for those items included in the Bid Schedule. All costs
incurred shall comply with the provisions of these Specifications and shall be included in
the price bid for the associated items in the Bid Schedule. Except as may be otherwise
stipulated, the OWNER will furnish no material, labor or equipment. The quantity of
work, which will be considered for payment, is the actual cost of the work plus
CONTRACTOR’S markups in accordance with all relative Specifications and
Agreements.
Fossil Creek / BNSF Pedestrian Tunnel Project Meetings
June 2016
01310-1
SECTION 01310
PROJECT MEETINGS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Pre-Construction Conference: A Pre-Construction Conference will be held after Notice
of Award and before the Notice to Proceed, the date, time and location will be
determined after Notice of Award.
The conference shall be attended by:
1. CONTRACTOR and CONTRACTOR’s Superintendent
2. CONTRACTOR’s Surveyor and Subcontractors
3. ENGINEER
4. OWNER
5. BNSF Railway
6. Others as requested by the CONTRACTOR, OWNER, or ENGINEER.
Unless previously submitted to the OWNER, the CONTRACTOR shall bring to the
conference a tentative schedule of the construction project, include in the schedule shop
drawings and other submittals.
The purpose of the conference is to designate responsible personnel and establish a
working relationship. Matters requiring coordination will be discussed and procedures
for handling such matters established. The agenda will include:
1. CONTRACTOR’s tentative Schedule
2. Permit applications and submittals, including 402 Permit, SWMP, and Traffic
Control Plan
3. Transmittal, review and distribution of CONTRACTOR’s submittals
4. Processing applications for payment
5. Maintaining record documents
6. Critical work sequencing
7. Field decision and change orders
8. Use of premises, office and storage areas, staging area, security, housekeeping,
and OWNER’s needs
9. CONTRACTOR’s assignment of safety and first aid
B. Construction Progress Meetings: Progress meetings will be conducted weekly or at
some other frequency, if approved by the OWNER, ENGINEER and CONTRACTOR.
These meetings shall be attended by the OWNER, the ENGINEER, the
CONTRACTOR’s representative and any others invited by these people.
The meeting will be conducted by the ENGINEER and the ENGINEER will arrange for
keeping the minutes and distributing the minutes to all persons in attendance.
Fossil Creek / BNSF Pedestrian Tunnel Project Meetings
June 2016
01310-2
The agenda of these project meetings will include construction progress, the status of
submittal reviews, status of information requests, critical work sequencing, review of
strategies for connections into existing facilities, status of field orders and change orders,
and any general business.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Construction Schedules
June 2016
01320-1
SECTION 01320
CONSTRUCTION SCHEDULES
1.01 SECTION INCLUDES
A. Prepare detailed schedule of all construction operations and procurements to be reviewed
by parties attending the preconstruction conference.
Schedule shall be approved by the OWNER and ENGINEER prior to Notice to Proceed.
1.02 FORMAT AND SUBMISSIONS
A. Prepare construction and procurement schedules in a graphic format suitable for displaying
scheduled and actual progress.
B. Submit four (4) copies of each schedule to the OWNER and ENGINEER for review.
The ENGINEER will return one copy to the CONTRACTOR with revisions suggested or
necessary for coordination of the Work with the needs of the OWNER or others.
1.03 CONTENT
A. Construction Progress Schedule
1. Show the complete work sequence of construction by activity and location.
2. Show projected percentage of completion for each item as of the first day of the
month.
B. Report of delivery of equipment and materials.
1. Show delivery status of critical and major items of equipment and materials.
2. Include a schedule which includes the critical path for Shop Drawings, tests, and
other submittal requirements for equipment and materials.
1.04 PROGRESS REVISIONS
A. Submit revised schedules and reports when changes are foreseen, when requested by
OWNER or ENGINEER, and with each application for progress payment.
B. Show changes occurring since previous submission.
1. Actual progress of each item to date.
2. Revised projections of progress and completion.
Fossil Creek / BNSF Pedestrian Tunnel Construction Schedules
June 2016
01320-2
C. Provide a narrative report as needed to define:
1. Anticipated problems, recommended actions, and their effects on the schedule.
2. The effect of changes on schedules of others.
1.05 OWNER'S RESPONSIBILITY
A. OWNER's review is only for the purpose of checking conformity with the Contract
Documents and assisting CONTRACTOR in coordinating the Work with the needs of the
Project.
B. It is not to be construed as relieving CONTRACTOR from any responsibility to determine the
means, methods, techniques, sequences and procedures of construction as provided in the
General Conditions.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Submittals
June 2016
01330-1
SECTION 01330
SUBMITTALS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Requirements:
1. Where required by the Specifications, the CONTRACTOR shall submit
descriptive information that will enable the ENGINEER to determine whether the
CONTRACTOR’s proposed materials, equipment, methods of work are in
general conformance to the design concept and in accordance with the Drawings
and Specifications. The information submitted may consist of drawings,
specifications, descriptive data, certificates, samples, test results, product data,
and such other information, all as specifically required in the Specifications. In
some instances, specified submittal information describes some, but not all
features of the material, equipment, or method of work.
2. The CONTRACTOR shall be responsible for the accuracy and completeness of
the information contained in each submittal and shall assure that the material,
equipment, or method of work shall be as described in the submittal. The
CONTRACTOR shall verify that all features of all products conform to the
requirements of the Drawings and Specifications. The CONTRACTOR shall
ensure that there is no conflict with other submittals and notify the ENGINEER in
each case where its submittal may affect the work of another CONTRACTOR or
the OWNER. The CONTRACTOR shall ensure coordination of submittals
among the related crafts and subcontractors.
3. Submittals will be reviewed for overall design intent and returned to
CONTRACTOR with action to be indicated by the ENGINEER. It shall be the
CONTRACTOR’s responsibility to assure that previously accepted documents
are destroyed when they are superseded by a resubmittal as such.
4. It shall be the CONTRACTOR’s responsibility to ensure that required items are
corrected and resubmitted. Any work done before approval shall be at the
CONTRACTOR’s own risk.
B. Submittal Procedure:
1. Unless a different number is called for in the individual sections, six (6) copies of
each submittal and sample are required, four (4) of which will be retained by the
ENGINEER. The CONTRACTOR shall receive two (2) copies in return. Faxed
submittals will not be accepted. As an alternate, submittals may be posted on a
“share site” such as Sharepoint, for review by the ENGINEER or OWNER. All
other requirements of this section shall apply.
Fossil Creek / BNSF Pedestrian Tunnel Submittals
June 2016
01330-2
2. Submittals that are related to or affect each other shall be forwarded
simultaneously as a package to facilitate coordinated review. Uncoordinated
submittals will be rejected.
3. If the items or system proposed are acceptable but the major part of the
individual drawings or documents are incomplete or require revision, the
submittal will be returned with requirements for completion.
4. The right is reserved for the ENGINEER to require submittals in addition to those
called for in individual sections.
5. Submittals regarding material and equipment shall be submitted directly to the
ENGINEER and will be accompanied by a transmittal form. A separate form
shall be used for each specific item, class of material, equipment, and items
specified in separate discrete sections for which the submittal is required.
Submittals for various items shall be made with a single form when the items
taken together constitute a manufacturer’s package or are so functionally related
that expediency indicates checking or review of the group or package as a whole.
6. A unique number, sequentially assigned, shall be noted on the transmittal form
accompanying each item submitted. Original submittal numbers shall have the
following format: “XXX-Y;” where “XXX” is the originally assigned submittal
number and “Y” is a sequential letter assigned for resubmittals (i.e., A, B, or C
being the first, second and third resubmittals, respectively). Submittal 25B, for
example, is the second resubmittal of Submittal 25.
7. If the CONTRACTOR proposes to provide material, equipment, or method of
work that deviates from the Contract Documents, it shall indicate so under
“deviations” on the transmittal form accompanying the submittal copies.
8. Submittals that do not have all the information required to be submitted, including
deviations, are not acceptable and will be returned without review.
C. Review Procedure:
1. Submittals are specified for those features and characteristics of materials,
equipment, and methods of operation that can be selected based on the
CONTRACTOR’s judgment of their conformance to the requirements of the
Drawing and Specifications. Other features and characteristics are specified in a
matter that enables the CONTRACTOR to determine acceptable options without
submittals. The review procedure is based on the CONTRACTOR’s guarantee
that all features and characteristics not requiring submittals conform to the
Drawings and Specifications. Review shall not extend to means, methods,
techniques, sequences, or procedures of construction or to verifying quantities,
dimensions, weights or gages, or fabrication processes (except where
specifically indicated or required by the Specifications) of separate items, and as
such, will not indicate approval of the assembly in which the item functions.
Fossil Creek / BNSF Pedestrian Tunnel Submittals
June 2016
01330-3
2. Unless otherwise specified, within twenty-one (21) calendar days after receipt of
the submittal, the ENGINEER will review the submittal and return copies. The
returned submittal will indicate one of the following actions:
a) If the review indicates that the material, equipment, or work method complies
with the Specifications, submittal copies will be marked “NO EXCEPTIONS
TAKEN”. In this event, the CONTRACTOR may begin to implement the work
method or incorporate the material or equipment covered by the submittal.
b) If the review indicates limited corrections are required, copies will be marked
“FURNISH AS NOTED”. The CONTRACTOR may begin implementing the
work method or incorporating the material and equipment covered by the
submittal in accordance with the noted corrections. Where submittal
information will be incorporated in Operation and Maintenance data, a
corrected copy shall be provided.
c) If the review indicates that the submittal is insufficient or contains incorrect
data, copies will be marked “REVISE AND RESUBMIT”. Except at its own
risk, the CONTRACTOR shall not undertake work covered by this submittal
until it has been revised, resubmitted and returned marked either “NO
EXCEPTIONS TAKEN” or “FURNISH AS NOTED”.
d) If the review indicates that the material, equipment, or work method do not
comply with the Specifications, copies of the submittal will be marked
“REJECTED”. Submittals with deviations that have not been identified clearly
may be rejected.
e) Except at its own risk, the CONTRACTOR shall not undertake the work
covered by such submittals until a new submittal is made and returned
marked either ”NO EXCEPTIONS TAKEN” or “FURNISH AS NOTED”.
D. Drawing:
1. The term “shop drawings” includes drawings, diagrams, layouts, schematic,
descriptive literature, illustrations schedules performance and test data, and
similar materials furnished by CONTRACTOR to explain in detail specific
portions of the work required by the Contract
2. CONTRACTOR shall coordinate all such drawings, and review them for legibility,
accuracy, completeness and compliance with contract requirements and shall
indicate this approval thereon as evidence of such coordination and review.
Shop drawing submitted to the ENGINEER without evidence of CONTRACTOR’s
approval will be returned for resubmission.
3. Shop drawing shall be clearly identified with the name and project number of this
contract, and references to applicable specification paragraphs and contract
drawings. When catalog pages are submitted, applicable items shall be clearly
identified.
Fossil Creek / BNSF Pedestrian Tunnel Submittals
June 2016
01330-4
4. CONTRACTOR shall stamp his approval on shop drawings prior to submission to
the ENGINEER as indication of his checking and verification of dimensions and
coordination with interrelated items. Stamp shall read:
“(CONTRACTOR’s Name) represents that we have determined and
verified all field dimensions and measurements, field construction
criteria, materials, catalog numbers and similar data, and that we
have checked with the requirements of the Specifications and
Drawings, the Contract Documents, and General Conditions”.
Marks on drawings by CONTRACTOR shall not be in red. Any marks by
CONTRACTOR shall be duplicated on all copies submitted.
5. If shop drawings show variations from contract requirements, CONTRACTOR
shall describe such variations in writing, separate from the drawings, at time of
submission. All such variations must be approved by the ENGINEER. If
ENGINEER approves any such variations, he shall issue an appropriate contract
modification, except that, if the variation is minor and does not involve a change
in price or in time of performance, a modification need not be issued.
6. Should the CONTRACTOR propose any item on his shop drawings or
incorporate an item into the work, and that item should subsequently prove to be
defective or otherwise unsatisfactory, (regardless of the ENGINEER’s preliminary
review), the CONTRACTOR shall, at his own expense, replace the item with
another item that will perform satisfactorily.
E. Certificates:
For those items called for in individual sections, furnish six (6) certificates of compliance
from manufacturers or suppliers certifying that materials or equipment being furnished
under the Contract comply with the requirements of these Specifications.
F. Samples:
Samples shall be sufficient in size to clearly illustrate functional characteristics and full
range of color, texture, and pattern.
G. Effect of Review of CONTRACTOR’s Submittals:
Review of drawings, data, methods of work, or information regarding materials or
equipment the CONTRACTOR proposes to provide, shall not relieve the contractor of its
responsibility for errors therein and shall not be regarded as an assumption of risks or
liability by the ENGINEER or the OWNER, or by any officer or employee thereof, and the
CONTRACTOR shall have no claim under the Contract on account of the failure or
partial failure, of the method of work, material, or equipment so reviewed. A mark of “NO
EXCEPTIONS TAKEN” or “FURNISH AS NOTED” shall mean that the OWNER has no
objection to the CONTRACTOR, upon its own responsibility, using the plan or method of
work proposed, or providing the materials or equipment proposed.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Standard References
June 2016
01425-1
SECTION 01425
STANDARD REFERENCES
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Reference to standards, specifications, manuals, or codes of any technical society,
organization, or association, or to the laws or regulations of any governmental authority,
whether such reference be specific or by implication, shall mean the latest standard
specification, manual, code, or laws or regulations in effect at the time of opening of
Bids, except as may be otherwise specifically stated. However, no provision of any
referenced standard, specifications manual or code (whether or not specially
incorporated by reference in the Contact Documents) shall be effective to change the
duties and responsibilities of OWNER, CONTRACTOR, or ENGINEER, or any of their
consultants, agents or employees from those set forth in the Contract Documents, nor
shall it be effective to assign to ENGINEER, or any of ENGINEER’s Consultants, agents,
or employees, any duty or authority to supervise or direct the furnishing or performance
of the Work.
Whenever used in the Contract Documents, the following abbreviations will have the
meanings listed:
AASHTO American Association of State Highway and Transportation Officials
444 North Capital Street, N.W., Suite 225
Washington, DC 20001
ACI American Concrete Institute
POB 19150
Detroit, MI 48331
ACPA American Concrete Pipe Association
AISC American Iron and Steel Institute
150 East 42nd Street
New York, NY 10017
AISI American Iron and Steel Institute
150 East 42nd Street
New York, NY 10017
ANSI American National Standards Institute, Inc.
1430 Broadway
New York, NY 10017
AREMA American Railway Engineering and Maintenance-of-Way Association
8201 Corporate Drive, Suite 1125
Landover, MD 20785
Fossil Creek / BNSF Pedestrian Tunnel Standard References
June 2016
01425-2
ASCE American Society of Civil Engineers
345 East 47th Street
New York, NY 10017
ASTM American Society of Testing and Materials
1916 Race Street
Philadelphia, PA 19103
ATSSA American Traffic Safety Services Association
BOCA Building Officials and Code Administrators
17926 Halstead
Homewood, IL 60430
CCA Colorado Contractors Association
CISPI Cast Iron Soil Pipe Institute
CRSI Concrete Reinforcing Steel Institute
180 North LaSalle Street
Chicago, IL 60601
CSI Construction Specifications Institute
DIPRA Ductile Iron Pipe Research Associations
EPA Environmental Protection Agency
FEDSPEC Federal Specifications
General Services Administration Specification
and Consumer Information Distribution Branch
Washington Navy Yard, Building 197
Washington, DC 20407
FEDSTDS Federal Standards (see FEDSPEC)
ICBO International Conference of Building Officials
5360 South Workman Mill Road
Whittier, CA 90601
MILSPEC Military Specifications
Naval Publications and Forms Center
5801 Tabor Avenue
Philadelphia, PA 19120
NIST National Institute of Standards and Technology
NPC National Plumbing Code
NSC National Safety Council
Fossil Creek / BNSF Pedestrian Tunnel Standard References
June 2016
01425-3
OSHA Occupational Safety and Health Act
U.S. Department of Labor
Occupational and Health Administration
San Francisco Regional Office
450 Golden Gate Avenue, Box 30617
PCA Portland Cement Association
PCI Prestressed Concrete Institute
PS Products Standards Section - U.S. Depart. of Commerce
SSPC Steel Structures Painting Council
SSPWC Standard Specifications for Public Works Construction
Building News, Inc.
3055 Overhead Avenue
Los Angeles, CA 90034
TCA Title Council of America
UBC Uniform Building Code
Published by ICBO
UL Underwriter’s Laboratory
207 East Ohio Street
Chicago, IL 60611
UMC Uniform Mechanical Code
Published by ICBO
UPC Uniform Plumbing Code
Published by IAPMO
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Materials Testing
June 2016
01450-1
SECTION 01450
MATERIALS TESTING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Provide such equipment and facilities as are required for conducting field tests and for
collecting and forwarding samples. Do not use any materials or equipment represented
by samples until tests, if required, have been made and the materials or equipment
found to be acceptable. Any product which becomes unfit for use after approval thereof
shall not be incorporated into the work.
B. Tests shall be made by an accredited testing laboratory selected by the OWNER.
Except as otherwise provided, sampling and testing of all materials and the laboratory
methods and testing equipment shall be in accordance with the latest standards and
tentative methods of the American Society for Testing Materials (ASTM), and the
American Association of Highway and Transportation Officials (AASHTO).
C. Where additional or specific information concerning testing methods, sample sizes, etc.,
is required, such information is included under the applicable sections of the
Specifications. Any modification of, or elaboration on, these test procedures which may
be included for specific materials under their respective sections in the Specifications
shall take precedence over these procedures.
1.02 OWNER’S RESPONSIBILITIES
A. The OWNER shall be responsible for and shall pay all costs in connection with the
following testing:
1. Soils compaction tests
2. Trench backfill
3. Pipe and structural bedding
4. Tests not called for by the Specifications of materials delivered to the site
5. Concrete tests
6. Pavement tests
1.03 CONTRACTOR’S RESPONSIBILITIES
A. In addition to those inspections and tests called for in the General Conditions,
CONTRACTOR shall also be responsible for and shall pay all costs in connection with
testing required for the following:
Fossil Creek / BNSF Pedestrian Tunnel Materials Testing
June 2016
01450-2
1. Concrete materials and mix designs.
2. Design of asphalt mixtures.
3. Gradation tests for embankment, fill and backfill materials.
4. All performance and field testing specifically called for by the Specifications.
5. All retesting for work or materials found defective or unsatisfactory, including
tests covered under 1.02 above.
6. Water quality testing required by discharge permits.
1.04 TRANSMITTAL OF TEST REPORTS
Written reports of tests and engineering data furnished by CONTRACTOR for ENGINEER’s
review of materials and equipment proposed to be used in the work shall be submitted as
specified for Shop Drawings.
The testing laboratory retained by the OWNER will furnish six (6) copies of a written report of
each test performed by laboratory personnel in the field or laboratory. Three (3) copies of each
test report will be transmitted to the ENGINEER, one (1) copy to the CONTRACTOR, and two
(2) copies to the OWNER within seven (7) days after each test is completed. Results of tests
performed on site will be relayed to the ENGINEER and CONTRACTOR before the testing
firm’s personnel leave the work site.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Field Offices for Owner
June 2016
01520-1
SECTION 01520
FIELD OFFICES FOR OWNER
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Description:
1. The CONTRACTOR shall provide set-up for OWNER’s field offices for the
OWNER and ENGINEER, which shall be separate from the CONTRACTOR’s
facilities. The CONTRACTOR shall maintain these field offices for the OWNER
during the entire construction period, including providing and paying for utility
hook-up to include power, water, sanitary facilities and heat.
B. Location:
1. Field office and storage facilities will be determined by CONTRACTOR subject to
the OWNER’s acceptance.
PART 2 PRODUCTS
2.01 MATERIALS
A. May be new or used, but must be serviceable, adequate for the required purpose, and
must not violate applicable codes or regulations.
PART 3 EXECUTION
3.01 PREPARATION
A. Fill and grade sites for temporary structures to provide surface drainage away from the
field office.
3.02 INSTALLATION
A. Construct temporary field office on proper foundations, provide connections for utility
services.
1. Secure portable or mobile buildings when used.
2. Provide steps and landings at entrance doors.
B. Mount thermometer at convenient outside locations, not in direct sunlight.
Fossil Creek / BNSF Pedestrian Tunnel Field Offices for Owner
June 2016
01520-2
3.03 MAINTENANCE AND CLEANING
A. Provide periodic maintenance and cleaning at least weekly.
B. Maintenance entrance area to be dry and free of mud and debris.
1.04 REMOVAL
A. Remove temporary field offices, contents, and services at a time they are no longer
needed as determined by the OWNER.
B. Remove foundations and debris, grade the site to required elevations, and clean the
areas and restore to original condition or better.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Traffic Regulations
June 2016
01555-1
SECTION 01555
TRAFFIC REGULATION
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Conformance: City of Fort Collins Work Area Traffic Control Handbook, Larimer County
Urban Area Street Standards, Manual of Uniform Traffic Control Devices (U.S. Department
of Transportation), or applicable statutory requirements of authority having jurisdiction.
Fort Collins Handbook takes precedence over Manual of Uniform Traffic Control Devices.
B. Operations on or about traffic areas and provisions for regulating traffic will be subject to
the regulation of governmental agencies having jurisdiction over the affected areas.
C. Keep traffic areas free of excavated material, construction equipment, pipe, and other
materials and equipment.
D. Keep fire hydrants and water control valves free from obstruction and available for use at
all times.
E. Conduct operations in a manner to avoid unnecessary interference with public and private
roads and drives.
1. Provide and maintain temporary access for businesses and residences.
1.02 TRAFFIC CONTROL PLAN
A. The Traffic Control Plan provided by the OWNER is to be used as a guideline for the
CONTRACTOR. Adjustments to the approved plan may be required by the OWNER based
on actual traffic operation.
B. Traffic control shall be provided by the City of Fort Collins.
1.03 FLAGMEN
A. Required where necessary to provide for public safety, or the regulation of traffic, or by
jurisdictional authorities.
B. Shall be properly equipped and certified by American Traffic Safety Services
Associations (ATSSA) and/or Colorado Contractors Association (CCA).
1.04 WARNING SIGNS AND LIGHTS
A. Provide barricades and warning signs for:
1. Open trenches and other excavations.
2. Obstructions, such as material piles, equipment (moving or parked), piled
embankment.
Fossil Creek / BNSF Pedestrian Tunnel Traffic Regulations
June 2016
01555-2
B. Illuminate by means of warning lights all barricades and obstructions from sunset to
sunrise.
C. Protect roads and driveways by effective barricades on which are placed acceptable
warning signs.
D. Barricades and warning signs must be acceptable to the ENGINEER.
1.05 PARKING
A. The CONTRACTOR shall designate parking areas with the approval of the OWNER for
the use of all construction workers and others performing work or furnishing services in
connection with the project so as avoid interference with public traffic, OWNER's
operations, or construction activities.
1.06 ROADWAY USAGE BETWEEN OPERATIONS
A. At all times when work is not actually in progress, CONTRACTOR shall make passable
and shall open to traffic such portions of the project and temporary roadways or portions
thereof as may be agreed upon between CONTRACTOR and OWNER and all
authorities having jurisdiction over any properties involved.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Substitutions and Product Options
June 2016
01635-1
SECTION 01635
SUBSTITUTIONS AND PRODUCT OPTIONS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Description:
1. This section describes the procedure required by the CONTRACTOR for product
substitutions.
2. Requests for Substitution:
a. Base all bids on materials, equipment and procedures specified.
b. Certain types of equipment and kinds of material are described in
specifications by means of trade names and catalog numbers, and/or
manufacturer’s names. Where this occurs, it is not intended to exclude
from consideration such types of equipment and kinds of material bearing
other trade names, catalog numbers and/or manufacturer’s names,
capable of accomplishing purpose of types of equipment or kinds of
material specifically indicated.
c. Other types of equipment and kinds of material may be acceptable to the
OWNER and ENGINEER.
d. Types of equipment, kinds of material and methods of construction, if not
specifically indicated must be approved in writing by ENGINEER and the
OWNER.
3. Submission of Requests for Substitution:
a. After Notice to Proceed, the OWNER/ENGINEER will consider written
requests for substitutions of products, materials, systems or other items.
b. The ENGINEER reserves the right to require substitute items to comply
color and pattern-wise with base specified items, if necessary to secure
“design intent”.
c. Submit six (6) copies of request for substitution. Include in request:
1) Complete data substantiating compliance of proposed substitute
with Contract Documents.
2) For products:
i. Product identification, including manufacturer’s name.
Fossil Creek / BNSF Pedestrian Tunnel Substitutions and Product Options
June 2016
01635-2
ii. Manufacturer’s literature, marked to indicate specific
model, type, size, and options to be considered: Product
description; performance and test data; reference
standards; difference in power demand; dimensional
differences for specified unit.
iii. Name and address of similar projects on which product
was used, date of installation, and field performance data.
3) For construction methods:
i. Detailed description of proposed method.
ii. Drawings illustrating methods.
4) Itemized comparison of proposed substitution with product or
method specified.
5) Data relating to changes in construction schedule.
6) Relation to separate contracts.
7) Accurate cost data on proposed substitution in comparison with
product or method specified.
d. In making request for substitution, or in using an approved substitute
item, Supplier/Manufacturer represents:
1) He has personally investigated proposed product or method, and
has determined that it is equal or superior in all respects to that
specified and that it will perform function for which it is intended.
2) He will provide same guarantee for substitute item as for product
or method specified.
3) He will coordinate installation of accepted substitution into work, to
include building modifications if necessary, making such changes
as may be required for work to be complete in all aspects.
4) He waives all claims for additional costs related to substitution
which subsequently become apparent.
4. Substitutions:
a. Request sufficiently in advance to avoid delay in construction.
5. CONTRACTOR’s Option:
a. For products specified only by reference standards, select any product
meeting standards by any manufacturer indicate selected type in
submission.
Fossil Creek / BNSF Pedestrian Tunnel Substitutions and Product Options
June 2016
01635-3
b. For products specified by naming several products or manufacturers,
select any product and manufacturer named, indicate selected type in
submission.
c. For products specified by naming one or more products, but indicating
option of selecting equivalent products by stating “or equivalent” after
specified product, CONTRACTOR must submit request, as required for
substitution, for any product not specifically named.
6. Rejection of Substitution or Optional Item:
a. Substitutions and/or options will not be considered if:
1) They are indicated or implied on shop drawings, or project data
submittals, without formal request submitted in accordance with
this section.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Material Delivery, Storage, and Handling
June 2016
01650-1
SECTION 01650
MATERIAL DELIVERY, STORAGE AND HANDLING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Equipment, products and materials shall be shipped, handled, stored, and installed in
ways which will prevent damage to the items. Damaged items will not be permitted
as part of the work except in cases of minor damage that have been satisfactorily
repaired and are acceptable to the ENGINEER.
B. Pipe: Pipe and appurtenances shall be handled, stored, and installed as
recommended by the manufacturer. Pipes with paint, tape coatings, linings or
the like shall be stored to protect the coating or lining from physical damage
or other deterioration. Pipe shipped with interior bracing shall have the
bracing removed only when recommended by the pipe manufacturer.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Site Conditions
June 2016
01710-1
SECTION 01710
SITE CONDITIONS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General:
1. The CONTRACTOR acknowledges that he has satisfied himself as to the nature and
location of the work, the general and local conditions, particularly those bearing upon
access to the site; handling, storage, and disposal of materials; availability of water,
electricity and roads; uncertainties of weather, river stages, water flow rates and levels in
irrigation ditches and canals or similar physical conditions at the site; the conformation and
conditions of the ground; the equipment and facilities needed preliminary to and during the
execution of the work; and all other matters which can in any way affect the work or the cost
thereof under this Contract.
2. The CONTRACTOR further acknowledges that he has satisfied himself as to the character,
quality and quantity of surface and subsurface materials to be encountered from his
inspection of the site and from reviewing any available records of exploratory work furnished
by the OWNER or included in these Documents. Failure by the CONTRACTOR to acquaint
himself with the physical conditions of the site and all the available information will not
relieve him from responsibility for properly estimating the difficulty or cost of successfully
performing the work.
3. The CONTRACTOR warrants that as a result of his examination and investigation of all the
aforesaid data that he can perform the work in a good and workmanlike manner and to the
satisfaction of the OWNER. The OWNER assumes no responsibility for any representations
made by any of its officers or agents during or prior to the execution of this Contract, unless
(1) such representations are expressly stated in the Contract, and (2) the Contract expressly
provides that the responsibility therefore is assumed by the OWNER.
PART 2 PRODUCTS
2.01 INFORMATION ON SITE CONDITIONS
A. Any information obtained by the ENGINEER regarding site conditions, subsurface
information, groundwater elevations, existing construction of site facilities, and similar data
will be available for inspection, as applicable, at the office of the ENGINEER upon request.
Such information is offered as supplementary information only. Neither the ENGINEER nor
the OWNER assumes any responsibility for the completeness or interpretation of such
supplementary information.
1. Differing Subsurface Conditions:
a. In the event that the subsurface or latent physical conditions are found
materially different from those indicated in these Documents, and differing
materially from those ordinarily encountered and generally recognized as
Fossil Creek / BNSF Pedestrian Tunnel Site Conditions
June 2016
01710-2
inherent in the character of work covered in these Contract Documents, the
CONTRACTOR shall promptly, and before such conditions are disturbed,
notify the ENGINEER in writing of such changed conditions.
b. The ENGINEER will investigate such conditions promptly and following this
investigation, the CONTRACTOR shall proceed with the work, unless
otherwise instructed by the ENGINEER. If the ENGINEER finds that such
conditions do so materially differ and cause an increase or decrease in the
cost of or in the time required for performing the work, the ENGINEER will
recommend to the OWNER the amount of adjustment in cost and time he
considers reasonable. The OWNER will make the final decision on all
Change Orders to the Contract regarding any adjustment in cost or time for
completion.
2. Underground Utilities:
a. Known utilities and structures adjacent to or encountered in the work are
shown on the Drawings. The locations shown are taken from existing
records and the best information available from existing utility plans,
however, it is expected that there may be some discrepancies and
omissions in the locations and quantities of utilities and structures shown.
Those shown are for the convenience of the CONTRACTOR only, and no
responsibility is assumed by either the OWNER or the ENGINEER for their
accuracy or completeness.
PART 3 EXECUTION
3.01 GENERAL
A. Where the CONTRACTOR's operations could cause damage or inconvenience to railway,
telegraph, telephone, television, oil, gas, electricity, water, sewer, or irrigation systems, the
operations shall be suspended until all arrangements necessary for the protection of these
utilities and services have been made by the CONTRACTOR.
B. Notify all utility offices which are affected by the construction operation at least 48 hours in
advance. Under no circumstances expose any utility without first obtaining permission from
the appropriate agency. Once permission has been granted, locate, expose, and provide
temporary support for all existing underground utilities.
C. The CONTRACTOR shall protect all utility poles from damage. If interfering power poles,
telephone poles, guy wires, or anchors are encountered, notify the ENGINEER and the
appropriate utility company at least 48 hours in advance of construction operations to permit
the necessary arrangements for protection or relocation of the interfering structure.
D. The CONTRACTOR shall be solely and directly responsible to the owner and operators of
such properties for any damage, injury, expense, loss, inconvenience, delay, suits, actions,
or claims of any character brought because of any injuries or damage which may result from
the construction operations under this Contract.
Fossil Creek / BNSF Pedestrian Tunnel Site Conditions
June 2016
01710-3
E. Neither the OWNER nor its officers or agents shall be responsible to the CONTRACTOR for
damages as a result of the CONTRACTOR's failure to protect utilities encountered in the
work.
F. If the CONTRACTOR while performing the Contract discovers utility facilities not identified in
the Drawings or Specifications, he shall immediately notify the OWNER, utility, and the
ENGINEER in writing.
G. In the event of interruption to domestic water, sewer, storm drain, or other utility services as
a result of accidental breakage due to construction operations, promptly notify the proper
authority. Cooperate with said authority in the restoration of service as promptly as possible
and bear all costs of repair.
H. The CONTRACTOR shall replace, at his own expense, any and all other existing utilities or
structures removed or damaged during construction, unless otherwise provided for in these
Contract Documents or ordered by the ENGINEER.
3.02 INTERFERING STRUCTURES
A. The CONTRACTOR shall take necessary precautions to prevent damage to existing
structures whether on the surface, aboveground, or underground. An attempt has been
made to show major structures on the Drawings. The completeness and accuracy cannot
be guaranteed, and it is presented simply as a guide to avoid known possible difficulties.
3.03 FIELD RELOCATION
A. During the progress of construction, it is expected that minor relocations of the work will be
necessary. Such relocations shall be made only by direction of the ENGINEER. If existing
structures are encountered that prevent the construction, and that are not properly shown
on the Drawings, notify the ENGINEER before continuing with the construction in order that
the ENGINEER may make such field revision as necessary to avoid conflict with the existing
structures. If the CONTRACTOR shall fail to so notify the ENGINEER when an existing
structure is encountered, and shall proceed with the construction despite the interference,
he shall do so at his own risk.
3.04 EASEMENTS
A. Where portions of the work are located on public or private property, easements and
permits will be obtained by the OWNER. Easements will provide for the use of the property
for construction purposes to the extent indicated on the easements. Copies of these
easements and permits are available upon request to the OWNER. It shall be the
CONTRACTOR's responsibility to determine the adequacy of the easement obtained in
every case and to abide by all requirements and provisions of the easement. The
CONTRACTOR shall confine his construction operations to within the easement limits or
make special arrangements with the property owners or appropriate public agency for the
additional area required. Any damage to property, either inside or outside the limits of the
easements provided by the OWNER, shall be the responsibility of the CONTRACTOR as
specified herein. The CONTRACTOR shall remove, protect, and replace all fences or other
items encountered on public or private property. Before final payment will be authorized by
the ENGINEER, the CONTRACTOR will be required to furnish the OWNER with written
Fossil Creek / BNSF Pedestrian Tunnel Site Conditions
June 2016
01710-4
releases from property owners or public agencies where side agreements or special
easements have been made by the CONTRACTOR or where the CONTRACTOR's
operations, for any reason, have not been kept within the construction right-of-way obtained
by the OWNER.
B. It is anticipated that the required easements and permits will be obtained before
construction is started. However, should the procurement of any easement or permit be
delayed, the CONTRACTOR shall schedule and perform the work around these areas until
such a time as the easement or permit has been secured.
3.05 LAND MONUMENTS
A. The CONTRACTOR shall notify the ENGINEER of any existing Federal, State, City, County,
and private land monuments encountered. Private monuments shall be preserved, or
replaced by a licensed surveyor at the CONTRACTOR's expense. When Government
monuments are encountered, the CONTRACTOR shall notify the ENGINEER at least two
(2) weeks in advance of the proposed construction in order that the ENGINEER will have
ample opportunity to notify the proper authority and reference these monuments for later
replacement.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Tree, Landscape, Vegetation,
June 2016 and Wetland Protection
01715-1
SECTION 01715
TREE, LANDSCAPE, VEGETATION, AND WETLAND PROTECTION
PART 1 GENERAL
1.01 SECTION INCLUDES
A. The work for this section consists of protecting existing trees, landscape, wetlands and
adjacent vegetation. The CONTRACTOR must take special care to avoid damaging
existing trees and vegetation in areas that do not need to be disturbed to complete
construction.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.01 SUBMITTAL REQUIREMENTS
A. The CONTRACTOR shall submit a plan for on-site haul of materials prior to construction.
The plans shall include points of access to and from the site and shall show a workable
system of on-site haul routes that protect existing landscaped and wetland areas. This plan
shall be submitted to the ENGINEER for his review and comment prior to the
commencement of any work. The plan will be discussed with the CONTRACTOR to insure
protection of existing vegetation, but the ENGINEER shall not dictate haul routes or
construction methods to the CONTRACTOR.
3.02 CONSTRUCTION REQUIREMENTS
A. Protected areas will be marked in the field, one time, by the OWNER and ENGINEER. No
access of construction vehicles or workers on foot is permitted through protected areas. No
material shall be stockpiled; no equipment shall be parked or repaired within these areas.
B. Trees and vegetation to be saved that do not fall within the limits of protected areas shall be
marked one time in the field by the OWNER and ENGINEER. The CONTRACTOR shall
erect fencing if there is risk of damage caused by construction operations. Vehicular and
pedestrian traffic shall be limited to performing work in areas marked. Through traffic, and
stock piling of equipment and materials are not permitted within marked areas.
C. No construction roads are to be created within the drop lines of any trees or other
vegetation designated to be saved without approval of the ENGINEER.
D. All trees which will be preserved, but are within the limits of construction, must be protected
from all damage associated with construction. A sturdy, physical barrier (florescent orange
in color) must be fixed in place around each tree for the duration of construction. This
barrier will be placed no closer than 6 feet from the trunk, or the drip line, whichever is
greater. The barrier itself must be fixed so it cannot be moved easily, but the material can
be flexible, such as orange snow fence attached to T-posts driven into the ground, and must
act as an effective deterrent to deliberate or accidental damage of each tree. Actual
materials and location of barrier must be approved by the OWNER’s representatives (i.e.
Fossil Creek / BNSF Pedestrian Tunnel Tree, Landscape, Vegetation,
June 2016 and Wetland Protection
01715-2
Utilities and City Forrester) and ENGINEER.
E. The movement or storage of equipment, material, debris, or fill within these required
protective barriers is completely prohibited.
F. Any trees damaged during construction shall be immediately repaired by an approved tree
surgeon. Any tree judged by the ENGINEER to be damaged beyond repair shall be
removed at the CONTRACTOR’s expense. For each tree erroneously removed or
damaged beyond repair, an assessment shall be immediately withheld from the
CONTRACTOR’s progress payments. This assessment shall be equal to the value of the
tree prior to damage. This assessment shall be determined by a tree appraiser, selected by
the OWNER and paid for by the CONTRACTOR. The cost for hiring the appraiser shall also
be withheld from the CONTRACTOR’s progress payments.
In addition to the paying of the assessment, the CONTRACTOR shall replace each
damaged tree per OWNER’S standards for tree mitigation.
G. The CONTRACTOR shall pay an assessment if he disturbs any grasses, shrubs and/or
cattails located within the protected areas. The assessment shall not exceed one dollar
($1.00) per square foot of disturbance, and will be immediately withheld from the
CONTRACTOR’s progress payments.
In addition to the paying of the assessment, the damaged vegetation shall be replaced with
an equal value per square foot of damage. Replacements shall be planted in accordance
with the provisions outlined in these Specifications. Damaged wetland areas shall be
replaced and then seeded with a wetland seed mix in accordance with these Specifications
or as directed by the ENGINEER.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Field Engineering and Surveying
June 2016
01720-1
SECTION 01720
FIELD ENGINEERING AND SURVEYING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Surveying: It shall be the responsibility of the CONTRACTOR to provide construction
staking for horizontal and vertical alignment of the centerline, grading, and all
appurtenant features of the work including all offset lines necessary for construction.
The CONTRACTOR shall be responsible for staking the limits of construction.
All construction surveying provided by the CONTRACTOR shall be completed under the
supervision of a Colorado Registered Land Surveyor.
The ENGINEER will provide the elevations and descriptions of the original and
temporary project benchmarks. The ENGINEER will also provide two (2) additional
benchmarks in a location within the limits of construction at the request of the
CONTRACTOR.
B. Supervision: The CONTRACTOR shall have supervision, knowledge of the project
requirements and proper installation, and construction procedures, available in the field
at all times that work is progressing.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Environmental Controls
June 2016
01745-1
SECTION 01745
ENVIRONMENTAL CONTROLS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. The work of this section consists of obtaining permits and providing
environmental controls consistent with regulatory permits through the duration of
the work required under this project.
PART 2 PRODUCTS
2.01 MATERIALS
A. Dust Control: Dust control agents may be necessary in addition to wetting down
with water. Dust control agents may be used only after prior approval by the
OWNER.
PART 3 EXECUTION
3.01 Dust Control Application:
A. The CONTRACTOR shall execute work by methods to minimize raising dust
from construction operations.
B. The CONTRACTOR shall provide and apply dust control at all times, including
evenings, holidays and weekends, as required to abate dust nuisance on and
about the site that is a direct result of construction activities. The use of non-
approved chemicals, oil, or similar palliatives will not be allowed. Dust control
agents may be used only after prior approval of the OWNER. The
CONTRACTOR shall be required to provide sufficient quantities of equipment
and personnel for dust control sufficient to prevent dust nuisance on and about
the site.
C. The OWNER will have authority to order dust control work whenever in its
opinion it is required, and there shall be no additional cost to the OWNER. The
CONTRACTOR shall be expected to maintain dust control measures effectively
whether the OWNER or ENGINEER specifically orders such Work.
3.02 PRESERVATION OF NATURAL FEATURES
A. Confine operations as much as possible. Exercise special care to maintain
natural surroundings in an undamaged condition. Within the work limits,
barricade trees, rock outcroppings, and natural features to be preserved.
3.03 HOUSEKEEPING
A. Keep project neat, orderly, and in a safe condition at all times. Store and use
equipment, tools, and materials in a manner that does not present a hazard.
Fossil Creek / BNSF Pedestrian Tunnel Environmental Controls
June 2016
01745-2
Immediately remove all rubbish. Do not allow rubbish to accumulate. Provide
on-site containers for collection of rubbish and dispose of it at frequent intervals
during progress of work.
3.04 DISPOSAL
A. Disposal of Waste (Unsuitable) Materials: All material determined by the
ENGINEER to be waste will be disposed of in approved landfill in a manner
meeting all regulations. Dispose of waste materials, legally, at public or private
dumping areas. Do not bury wastes inside of the limits of construction. All costs
for dump fees, permits, etc., to be borne by the CONTRACTOR.
B. Disposal of Garbage and Other Construction Materials: Provide sanitary
containers/dumpsters and haul away contents such that no overflow exists.
C. Excess excavation shall become the property of the CONTRACTOR and shall be
legally disposed of by him outside the limits of construction to an approved
disposal site. Excess excavated material suitable for backfill shall not be
disposed of until all backfill operations are complete.
D. The CONTRACTOR is to immediately inform ENGINEER of any hazardous
materials encountered during construction. Dispose of waste materials legally at
private or public facilities.
3.05 BURNING
A. No burning of debris will be permitted.
3.06 WATER CONTROL
A. The project work is located within a natural drainage course is subject to periodic
flooding due to rainfall and snowmelt, flows for adjacent developed areas and
storm water pipes and ground water flows from saturated soils or other ground
water sources. Refer to Section 02240 for Water Control and Dewatering
requirements.
3.07 NOISE CONTROL
A. All mechanical equipment shall be equipped with the best available mufflers to
reduce noise. The CONTRACTOR shall be responsible for obtaining any
necessary permits and shall limit noise to the permitted levels. Noise level
monitoring shall be performed by the CONTRACTOR as necessary to show that
the permitted levels are not being exceeded.
3.08 PERMITS
A. All work must be performed in accordance with all applicable regulatory permits.
It shall be the responsibility of the CONTRACTOR to obtain a Groundwater
Discharge (402) Permit from the Colorado Department of Public Health and
Fossil Creek / BNSF Pedestrian Tunnel Environmental Controls
June 2016
01745-3
Environment for any dewatering operations that will be discharged into any
drainageways, open channels, or irrigation ditches. The CONTRACTOR shall be
responsible for any testing required under the 402 Permit.
B. The OWNER will obtain the following permits:
1. Floodplain Use Permit.
C. It shall be the responsibility of the CONTRACTOR to prepare and maintain a
Stormwater Management Plan (SWMP). The CONTRACTOR must obtain all
other applicable permits.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Contract Closeout
June 2016
01780-1
SECTION 01780
CONTRACT CLOSEOUT
PART 1 GENERAL
1.01 SECTION INCLUDES
A. The following project closeout procedure defines the responsibilities of the
CONTRACTOR, OWNER, and ENGINEER in closing the project:
Step 1: CONTRACTOR advises the ENGINEER in writing that he has reached
"Substantial Completion" and provides a list of items to be completed or
corrected.
Closeout may be conducted by areas or portions of the work if requested by the
OWNER.
Step 2: ENGINEER inspects the work to determine if it is substantially complete,
and issues a Certificate of Substantial Completion plus a "Punch List" of items to
be completed or corrected.
Step 3: CONTRACTOR completes and/or corrects all punch list items and
notifies the ENGINEER in writing that his work is ready for final inspection. At
this time, a final application for payment is submitted.
Step 4: ENGINEER makes final inspection. When the work is found to be
acceptable under the Contract Documents, and the Contract fully performed, the
ENGINEER will issue a final Certificate of Final Completion.
B. Final Paperwork:
Prior to Final Payment and Acceptance, the CONTRACTOR shall deliver the
following items to the ENGINEER:
1. CONTRACTOR's Two-Year Guarantee of Materials and Workmanship
2. All Guarantees, Warranties and Submittals, as specified
3. Receipts for Extra Materials Delivered to the OWNER
4. Final Application for Payment
5. Consent of Surety to Final Payment
6. CONTRACTOR's Lien Waiver
7. SUBCONTRACTOR’s Lien Waivers
8. Releases from Property Owners for Special Easements
9. Project Record Documents
10. Red-lined as-built drawings (a.k.a. “Drawings of Record” or “Record
Drawings”)
Fossil Creek / BNSF Pedestrian Tunnel Contract Closeout
June 2016
01780-2
C. Definition for Substantial Completion
1. See General Conditions
D. Definition for Final Completion
1. All Work must be complete for Final Completion.
END OF SECTION
TECHNICAL SPECIFICATIONS
TABLE OF CONTENTS
Fossil Creek / BNSF Pedestrian Tunnel Table of Contents
June 2016 Page-1 Technical Specifications
DIVISION 2
SECTION 02100 SITE PREPARATION
SECTION 02200 EARTHWORK
SECTION 02220 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
SECTION 02225 TRENCHING, BEDDING AND BACKFILL
SECTION 02230 CLEARING AND GRUBBING
SECTION 02231 TREE PROTECTION
SECTION 02235 TOPSOIL
SECTION 02240 WATER CONTROL AND DEWATERING
SECTION 02305 TUNNEL EXCAVATION BY TUNNEL BORING MACHINE
SECTION 02315 WALL EXCAVATION AND SUPPORT
SECTION 02321 CONTROLLED LOW STRENGTH MATERIAL BACKFILL (FLO‐FILL)
SECTION 02370 EROSION AND SEDIMENT CONTROL
SECTION 02375 RIPRAP, BEDDING AND FEATURE BOULDERS
SECTION 02410 TUNNEL EXCAVATION AND GROUTING
SECTION 02415 INSTALLATION OF STEEL PIPE GUIDE RAILS
SECTION 02465 DRILLED SHAFTS
SECTION 02470 GEOTECHNICAL INSTRUMENTATION AND MONITORING
SECTION 02530 BASE COURSE
SECTION 02622 PLASTIC NON‐PRESSURE PIPE
SCETION 02710 AGGREGATE BASE COURSE
SECTION 02770 SIDEWALK, CURB AND GUTTER, AND MISCELLANEOUS CONCRETE
SECTION 02832 WOOD FENCES
SECTION 02921 GROUND PREPARATION FOR SEEDING
DIVISION 3
SECTION 03110 STRUCTURAL CAST‐IN‐PLACE CONCRETE FORMS
SECTION 03151 HYDROPHILIC RUBBER WATERSTOP
SECTION 03210 REINFORCING STEEL
SECTION 03220 WELDED WIRE FABRIC
TECHNICAL SPECIFICATIONS
TABLE OF CONTENTS
Fossil Creek / BNSF Pedestrian Tunnel Table of Contents
June 2016 Page-2 Technical Specifications
SECTION 03240 FIBROUS CONCRETE REINFORCING
SECTION 03310 STRUCTURAL CONCRETE
SECTION 03320 CONSTRUCTION JOINTS
SECTION 03350 CONCRETE FINISHING
SECTION 03360 SHOTCRETE
SECTION 03390 CONCRETE CURING
SECTION 03615 GROUT
APPENDIX A
CTL Thompson
GEOTECHNICAL INVESTIGATION
PEDESTRIAN TRAIL UNDERPASS
FOSSIL CREEK TRAIL AT BNSF UNDERPASS
FORT COLLINS, COLORADO
CITY OF FORT COLLINS
Project No. FC06103‐125
May 28, 2013
(Revised October 17, 2013)
BRIERLEY ASSOCIATES
BASIS OF DESIGN REPORT
FOSSIL CREEK PEDESTRIAN TUNNEL FORT COLLINS, COLORADO
November 14, 2014
CONSTRUCTION AND MAINTENANCE AGREEMENT FOR
PEDESTRIAN/BIKE UNDERPASS
Between BNSF RAILWAY COMPANY and THE CITY OF FORT
COLLINS, COLORADO
February 19, 2016
DIVISION 2
SECTION 02100 SITE PREPARATION
SECTION 02200 EARTHWORK
SECTION 02220 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
SECTION 02225 TRENCHING, BEDDING AND BACKFILL
SECTION 02230 CLEARING AND GRUBBING
SECTION 02231 TREE PROTECTION
SECTION 02235 TOPSOIL
SECTION 02240 WATER CONTROL AND DEWATERING
SECTION 02315 WALL EXCAVATION AND SUPPORT
SECTION 02321 CONTROLLED LOW STRENGTH MATERIAL BACKFILL (FLO-
FILL)
SECTION 02370 EROSION AND SEDIMENT CONTROL
SECTION 02375 RIPRAP, BEDDING AND FEATURE BOULDERS
SECTION 02410 TUNNEL EXCAVATION AND GROUTING
SECTION 02415 INSTALLATION OF STEEL PIPE GUIDE RAILS
SECTION 02465 DRILLED SHAFTS
SECTION 02470 GEOTECHNICAL INSTRUMENTATION AND MONITORING
SECTION 02530 BASE COURSE
SECTION 02622 PLASTIC NON-PRESSURE PIPE
SECTION 02770 SIDEWALK, CURB AND GUTTER, AND MISCELLANEOUS
CONCRETE
SECTION 02832 WOOD FENCES
SECTION 02921 GROUND PREPARATION FOR SEEDING
Fort Collins Utilities Master Specifications Site Preparation
June 2012 02100 - 1
SECTION 02100
SITE PREPARATION
PART 1 - GENERAL
1.01 DESCRIPTION
A. This Section covers the removal, stockpiling, replacement and disposal of materials
existing on site.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
3.01 STRIPPING
A. Any material containing roots, grasses and other deleterious or organic matter
generally found in the top twelve inches of undisturbed natural terrain shall be
stripped from all areas requiring excavation, grading, trenching, subgrade
preparation for foundations and embankment work. The Engineer will require
stripped top soil deemed suitable for spading over the finished grades to be
stockpiled and preserved until the finished grading operation, at which time it shall be
spread uniformly over areas to be seeded or sodded.
B. Whenever it is necessary to disturb existing grass or soil, from the yards of existing
residences, care shall be taken so as to strip existing grass and topsoil in a manner
that will permit the replacement thereof as close as possible to the original condition
and to the satisfaction of the homeowner and Engineer. Tarps or suitable drop
cloths shall be spread over all undisturbed areas in such a manner that will protect
all areas adjacent to excavations.
3.02 REMOVAL OF EXISTING IMPROVEMENTS
A. Bituminous Pavement - Bituminous pavement and concrete pans (and sidewalks, if
required).
1. The Contractor shall be responsible for removal and disposal of all
bituminous pavements and concrete to be removed as part of the project.
3.03 PROTECTION OF TREES, SHRUBS, AND ALL PRIVATE PROPERTY AND APPURTEN-
ANCES THERETO
A. The Contractor shall take whatever steps and precautions necessary to protect all
trees, shrubs, flowers, fences, sidewalks, patios, structures, and other such property
such that upon completion of all work. All property shall be restored to its original
condition or better as determined by the Engineer.
END OF SECTION
Fort Collins Utilities Master Specifications Earthwork
June 2012 02200 - 1
SECTION 02200
EARTHWORK
PART 1 - GENERAL
1.01 WORK INCLUDED
A. Extent of earthwork is indicated on the Contract Drawings and includes excavation
and backfill.
1.02 RELATED WORK
A. General Conditions and Division 1 - General Requirements
B. Section 02100 - Site Preparation
C. Section 02225 - Trenching, Bedding and Backfill
1.03 GENERAL EXCAVATION
A. The Contractor shall perform all excavation regardless of the type, nature, or
condition of material encountered, as specified, shown, or required in order to
accomplish the construction.
1.04 SUBMITTALS - Not applicable
1.05 JOB CONDITIONS
A. A geotechnical investigation and report has been performed for the Owner in order to
obtain relative data concerning the character of material in and upon which the
project is to be built. This report is available to the Contractor in the office of the
Engineer for information purposes only. The Contractor shall satisfy himself as to
the kind and type of soil to be encountered and any water conditions which might
affect the construction of the project.
B. The location of existing utilities is shown in an approximate way only and not all
utilities may be shown. The Contractor shall determine the exact location of all
existing utilities prior to commencing work. The Contractor shall be fully responsible
for any and all damages which might be occasioned by his failure to exactly locate
and preserve any and all utilities. If utilities are to remain in place, the Contractor
shall provide adequate means of support and protection during construction.
C. Should drawn or incorrectly drawn piping or other utilities be encountered during
excavation, the Contractor shall advise the Engineer within thirty (30) minutes of
encountering the utility. The Contractor shall cooperate the with Engineer and utility
companies in keeping respective services and facilities in operation to the
satisfaction of the respective owners. The owners reserve the right to perform any
and all work required should the Contractor fail to cooperate with the respective
companies, and backcharge the Contractor for any and all expenses.
Fort Collins Utilities Master Specifications Earthwork
June 2012 02200 - 2
D. The Contractor shall provide barricades and signs in accordance with the Uniform
Manual of Traffic Control Devices where applicable. The Contractor shall maintain
all devices in a working manner.
PART 2 - MATERIALS
2.01 SOIL MATERIALS
A. Soil material for backfill shall be coarse-grained soils free from debris, roots, organic
material, and non-mineral matter containing no particles larger than 4-inch size and
classified as either:
1. Sands with fines (SM, SC) and less than 25 percent of the soil particles
passing the No. 200 sieve, or
2. Clean sands (SW, SP)
3. Native soils as determined acceptable by the Soils Engineer.
PART 3 - EXECUTION
3.01 EARTHFILL CONSTRUCTION
A. The Contractor shall construct earthfills to lines and grades shown or specified. The
fill shall be placed in continuous horizontal layers not exceeding 8-inches in loose
thickness. Where hand operated compaction equipment is used, the layers shall not
exceed 6-inches in loose thickness.
B. The Contractor shall protect the fill against freezing when atmospheric temperature
is less than 35 deg. F. (1 deg. C).
3.02 COMPACTION
A. Compact soil to not less than the following percentages of maximum density
relationship determined in accordance with ASTM D 698. The Contractor shall meet
the minimum percentage density specified for each area classification as follows:
1. Foundations, paved areas, sidewalks and unpaved areas within rights-of-way
=/> 95%
2. Unpaved areas outside right-of-way =/>90%
B. Control moisture content within 2% of optimum moisture content as determined by
ASTM D 698. Where subgrade or a layer of soil material must be moisture
conditioned before compaction, uniformly apply water to surface of cut area
subgrade, or loosely placed layer of soil material, to prevent free water appearing on
surface during or subsequent to compaction operations.
1. Remove and replace, or scarify and air dry, soil material that is too wet to
permit compaction to specified density.
2. Soil material that has been removed because it is too wet to permit
compaction may be stockpiled or spread and allowed to dry. Assist drying by
Fort Collins Utilities Master Specifications Earthwork
June 2012 02200 - 3
discing, harrowing or pulverizing until moisture content is reduced to a
satisfactory value.
3.03 GRADING
A. The Contractor shall perform all grading to the lines and grades as shown on the
Drawings and/or established by the Engineer. Shape, trim, and finish slopes of
channels to conform to the lines, grades, and cross sections as shown or approved.
All slopes shall be free of all exposed roots and stones exceeding 3-inch diameter
which are loose and liable to fall.
B. Rounded surfaces shall be neatly and smoothly trimmed. Top soil shall be replaced
to a depth of 4-inches in areas to be seeded or sodded with grass and 12-inches in
cultivated areas.
3.04 SETTLEMENT
A. Where completed compacted areas are disturbed by subsequent construction
operations or adverse weather, the Contractor shall scarify the ground surface,
re-shape, and compact to required density prior to further construction.
B. Any settlement in backfill, fill, or in structures built over the backfill or fill, which may
occur within the 2 years guarantee period in the General Conditions will be
considered to be caused by improper compaction methods and shall be corrected at
no cost to the Owner. Any structure damaged by settlement shall be restored to their
original condition by the Contractor at no cost to the Owner.
3.05 DISPOSAL OF EXCESS EXCAVATION AND WASTE MATERIALS AND SPECIAL
REQUIREMENTS
A. The Contractor shall dispose of all excess excavated material not required for fill
on-site.
B. The Contractor shall remove and be responsible for legally disposing of excess fill
material not placed on-site, waste materials, trash and debris.
C. The Contractor shall conduct all site grading operations and other construction
activities to minimize erosion of site soil materials. He shall be responsible to
maintain streets daily removing any spillage of dirt, rocks or debris from equipment
entering or leaving the site.
END OF SECTION
Fort Collins Utilities Master Specifications Removal of Structures and Obstructions
June 2012 02220-1
SECTION 02220
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. This work consists of the removal and disposal of trees, slope and ditch protection,
abandoned utility services, curb, gutter, pipes, sidewalk, appurtenances, fences,
foundations, pavements, pavement markings, fill debris (i.e. concrete and trash) and
any other obstructions that are not designated or permitted to remain. It shall also
include salvaging, stockpiling and loading salvable materials, sandblasting, plugging
structures, cleaning culverts, and sawing and cutting to facilitate controlled breaking
and removal of concrete and asphalt to a neat line. Except in areas to be excavated,
the resulting trenches, holes, and pits shall be backfilled.
Materials removed and not designated to be salvaged or incorporated into the work
shall become the property of the CONTRACTOR.
1.02 RELATED SECTIONS
A. Section 02230 – Clearing and Grubbing
B. Section 02315 – Excavation and Embankment
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.01 CONSTRUCTION REQUIREMENTS
A. General: The CONTRACTOR shall raze, remove, and dispose of all structures and
obstructions which are identified on the project, except utilities, structures and
obstructions removed under other contractual agreements or as otherwise provided
for in the Contract Documents, and salvable material designed to remain the
property of the OWNER.
Prior to removing structures the CONTRACTOR is responsible for having all utilities
disconnected and for all expenses associated with disconnecting and abandoning
utility service lines. Payment for any utility disconnection shall be included in the unit
price for structure removal.
The CONTRACTOR and ENGINEER shall field measure and agree upon the
quantity to be removed before the work commences. Should the CONTRACTOR fail
to request the ENGINEER to measure any work, the CONTRACTOR will not be
compensated for materials that were not measured by the ENGINEER.
The accepted quantities will be paid for at the contract unit price. Saw cutting,
excavation, backfill, haul disposal, and stockpiling of materials will not be measured
and paid for separately. This cost shall be included in the unit price for each bid
item.
Fort Collins Utilities Master Specifications Removal of Structures and Obstructions
June 2012 02220-2
B. Salvable Material: All salvable material designated in the Contract or by the
ENGINEER to remain the property of the OWNER shall be removed without
damage, in sections or pieces which may be readily transported, and shall be
stockpiled by the CONTRACTOR at specified locations within the project limits. The
CONTRACTOR shall safeguard salvable materials and shall be responsible for the
expense of repairing or replacing damaged or missing material until it is incorporated
into the work, or is loaded onto the OWNER’s equipment by the CONTRACTOR.
C. Signs and Traffic Signals: Removal of signs shall include removal of posts, footings,
pedestals, sign panels, and brackets. Concrete adhering to salvable sign posts shall
be removed.
Removal of sign panel shall include removal of the panel and its attachment
hardware from the existing installation and adjusting the spacing of the remaining
panels.
The removal of traffic signal items shall include poles, mast arms, signal heads, span
wires, footings, all attachment hardware, and other incidental materials. Removal of
signal pole or pedestal pole shall include pole, span wire, cable, signal heads,
overhead sign support wire, footings, and pedestrian push buttons. Removal of
traffic signal controller and cabinet shall include removal of the footing and all
auxiliary equipment contained within the cabinet.
D. Pavements, Sidewalks, and Curbs: All pavements, sidewalks, structures, curbs,
gutters, etc., designated for removal, shall be disposed of off-site by the
CONTRACTOR at his expense. Sawing of concrete and asphalt shall be done to a
true line, with a vertical face, unless otherwise specified. The minimum depth of a
saw cut shall be 2 inches. For reinforced concrete, the minimum depth shall be 2
inches, or to the depth of the reinforcing steel, whichever occurs first. Sections of
concrete or asphalt which, due to the CONTRACTOR’S negligent operations, crack
or break beyond the limits of construction, shall be saw cut, removed and replaced at
the CONTRACTOR’S expense. The limit and responsibility of the repair will be
determined by the ENGINEER. All saw cutting associated with removal items shall
be considered incidental to the work and will not be measured or paid for separately
under this item.
E. Abandonment of Existing Sewer Facilities: All existing sewer facilities to be plugged
and abandoned in place are specifically shown on the Drawings. Unless otherwise
specified on the Drawings, the procedures and methods for the abandonment of said
facilities shall conform to the requirements set forth in the Contract Documents for
that specific item. Abandonment of existing sewer facilities shall be included in this
item of work unless otherwise provided for under other work items in the Contract
Documents.
END OF SECTION
Fort Collins Utilities Master Specifications Trenching, Bedding & Backfill
June 2012 02225 - 1
SECTION 02225
TRENCHING, BEDDING AND BACKFILL
PART 1 - GENERAL
1.01 WORK INCLUDED
A. Labor, equipment, and materials necessary for excavation and trenching for water,
sewer and stormwater conduits and appurtenances.
B. Provision of bedding and compacted fill over water, sewer and stormwater conduits
and appurtenances.
1.02 RELATED WORK
A. General Conditions and Division 1 - General Requirements
B. Section 02315 – Excavation and Embankment
1.03 REFERENCES
A. ASTM C136 - Sieve Analysis of Fine and Coarse Aggregates.
B. ASTM D698 or AASHTO T99 - Tests for Moisture-Density Relations of Soils and
Soil-Aggregate Mixture Using 5.5 lb (2.49 kg) Rammer and 12-inch (305mm) Drop
(Standard Proctor).
C. ASTM D2049 - Test for Relative Density for cohesionless soils.
D. Testing Agency: All soils testing during construction will be performed by a testing
laboratory selected and paid by the Owner.
E. Federal Register, Part II, Department of Labor, Occupational Safety and Health
Administration, 29 CFR Part 1926 Occupational Safety and Health Standards -
Excavations; Final Rule Date Tuesday October 31, 1989 latest revision thereto.
F. Excavations - U. S. Department of Labor Occupational Safety and Health
Administration 1990 (revised) OSHA 2226 latest revision thereto.
1.04 TESTING
A. In-place moisture density tests will be performed to ensure trench backfill complies
with specified requirements. The following minimum tests should be expected to be
performed:
1. Trench bedding - 1 per 200 feet
2. Backfill - 1 per 200 feet
B. Backfill compaction tests will be performed until compaction meets or exceeds
requirements. The cost of "passing" tests will be paid by the Owner. Costs
associated with tests failing to meet the minimum compaction requirements shall be
Fort Collins Utilities Master Specifications Trenching, Bedding & Backfill
June 2012 02225 - 2
paid by the Contractor. Pipe bedding shall be tested prior to placement of backfill.
Testing of all bedding and backfill material shall be done in compliance with OSHA -
Excavations.
1.05 SUBMITTALS
A. The Contractor shall cooperate with the geotechnical engineers in obtaining samples
of all bedding materials. The Contractor shall submit test certificates of all
stabilization material, bedding material, barrier material, and any imported or on-site
material proposed for use on this project.
1.06 PROTECTION
A. Sheeting and Shoring
The Contractor shall protect excavations by shoring, bracing, sheet piling,
underpinning, or other methods required to prevent any excessive widening or
sloughing of the trench which may be detrimental to human safety, to the pipe or
appurtenances being installed, or to existing facilities or structures. The latest
requirements of OSHA shall be complied with at all times including trenching and
confined space entry requirements.
The Contractor must provide protection for his workers, Owner, Engineer, testing
agencies and any other inspector/individual who requires access to the trench.
The safety of the workers shall be provided for as required by the most recent
standards adopted by the Colorado Occupational Safety and Health (COSH)
Standards Board as enforced by the Colorado Department of Labor.
The Contractor shall be responsible for underpinning adjacent structures which may
be damaged by excavation work.
B. Weather and Frost
The Contractor shall protect bottom of excavations and soil adjacent to and beneath
foundations from frost.
1. Do not place backfill, fill or embankment on frozen surfaces.
2. Do not place frozen materials, snow or ice in backfill, fill or embankments.
3. Do not deposit, tamp, roll or otherwise mechanically compact backfill in
water.
C. Drainage and Groundwater
The excavation shall be graded to prevent surface water run-off into trench or
excavation.
1. Maintain excavations and trench free from water during construction.
2. Remove water encountered in the trench to the extent necessary to provide a
firm subgrade, to permit joints to be made in the dry, and to prevent the
entrance of water into the pipeline.
Fort Collins Utilities Master Specifications Trenching, Bedding & Backfill
June 2012 02225 - 3
3. Divert surface runoff and use sumps, gravel blankets, well points, drain lines
or other means necessary to accomplish the above.
4. Maintain the excavation or trench free from water until the structure, or pipe
to be installed therein, is completed to the extent that no damage from
hydrostatic pressure, flotation, or other cause will result.
5. Water shall be prevented from entering into previously constructed pipe.
6. Unless approved by the OWNER the pipe under construction shall not be
used for dewatering.
D. Underground Facilities
The location of known existing underground utilities and obstructions are shown in
an approximate way and not all of them may be shown.
1. The Contractor shall notify each utility owner and request utilities be field
located a minimum of 48 hours prior to excavation.
2. Contractor shall expose and verify size, location and elevation of all utilities
and obstructions sufficiently in advance in order to permit changes in the
event of conflict. The Contractor shall be fully responsible for any and all
damages which might be occasioned by his work and failure to locate and
preserve any and all utilities and obstructions.
3. If Contractor elects to remove underground obstructions, such as sprinklers,
drainage culverts, catch basins or other structures, the following shall apply:
a.) Drainage culverts may be salvaged, stored and reused if approval is
obtained from the Utilities Department or property owner having
jurisdiction thereof.
b.) Replace all other underground obstructions with new materials.
c.) Restore to original conditions or better.
d.) Maintain the flow in field drains at the quantity, quality, and velocity
present prior to the temporary removal of the drain pipe.
PART 2 - MATERIALS
2.01 SUB-BEDDING: Materials shall consist of:
A. Uniformly graded rock ranging from 3/4-inch to 1-1/2-inch.
B. Sub-bedding shall be used to provide a firm foundation in soils which are judged by
the Engineer to be soft or unstable.
2.02 BEDDING AND PIPE ZONE MATERIALS:
A. Pipe shall be bedded in a uniformly graded material conforming to CDOT #67
granular bedding or Squeegee Sand, unless otherwise noted on the Drawings or as
approved by the ENGINEER.
B. Squeegee Sand shall meet the requirements as shown in the following table.
Squeegee Sand
Fort Collins Utilities Master Specifications Trenching, Bedding & Backfill
June 2012 02225 - 4
Sieve Size Total Percent Passing
by Weight
3/8-inch 100
No. 200 0 - 5
B. It will be the responsibility of the Contractor to locate material meeting the
Specifications, to test its ability to consolidate to at least 65% relative density, and to
secure approval of the Engineer before such material is delivered to the project.
Relative density shall be determined as stipulated in ASTM-Designation: D-2049.
2.03 BACKFILL
A. Backfill shall meet the following requirements:
Use only backfill for trenches which is free from boulders, large roots, other
vegetation or organic matter, and frozen material. No boulders greater than 3 inches
in diameter shall be allowed.
2.04 CUT-OFF WALLS
A. Clay or controlled low strength material backfill cut-off walls are acceptable.
1. Clay cut-off walls
a.) More than 50% shall pass a No. 200 Sieve. The plasticity index shall
be greater than 12.
2. Controlled low strength material backfill cut-off walls
a.) See Section 02321 for requirements.
2.05 PIPELINE MARKER OR DETECTION TAPE
A. Marker tape shall be 6” wide, minimum 0.04” thick polyethylene, metallic blue color,
with “Caution Buried Water Line” printed on the top face, as manufactured by Seton
or approved equal.
PART 3 - EXECUTION
3.01 GENERAL
A. The following procedures shall be followed by the Contractor in sequencing his work.
1. No more than 150 feet of trench shall be left open at any time. The entire
trench shall be backfilled upon conclusion of each day's work. The trench
shall not be backfilled until the pipe installation is reviewed by the Engineer.
2. Trench shall be backfilled within 50 feet of the pipe installation at all times.
3. Clean-up shall be maintained within 400 feet of the trench excavation.
B. Prior to placement in the trench, all pipe, fittings, and appurtenances shall be
cleaned and examined for defects by the Contractor. If found defective, the
Contractor shall reject the defective pipe, fitting, or appurtenance. The Contractor
shall advise the Engineer of all defective materials.
Fort Collins Utilities Master Specifications Trenching, Bedding & Backfill
June 2012 02225 - 5
All surplus excavation shall be placed, in an orderly manner. If material is stockpiled
on private property, written permission must be obtained from the property owner
and provided to the Engineer.
All sub-bedding, bedding, and pipe zone material shall be imported unless otherwise
designated by the Owner's geotechnical engineer.
Upon completion of the work, all plants, rubbish, unused materials, concrete forms
and other like material shall be removed from the jobsite. The site shall be left in a
state of order and cleanliness.
3.02 MAINTENANCE AND CORRECTION
A. Scarify surface, reshape and compact to required density completed or partially
completed areas of work disturbed by subsequent construction operations or by
adverse weather.
B. Maintain and correct backfill, fill and embankment settlement and make necessary
repairs to pavement, structures, seeding and sodding which may be damaged as a
result of settlement for the period specified in the Contract Documents.
C. Contractor may perform such maintenance and correction by subcontract.
3.03 OBSTRUCTIONS AND DISPOSAL OF WASTE MATERIAL
A. The Contractor shall remove obstructions that do not require replacement from within
the trench or adjacent areas such as tree roots, stumps, abandoned piling, buildings
and concrete structures, frozen material, logs, and debris of all types without
additional compensation. The Engineer may, if requested, make changes in the
trench alignment to avoid major obstructions, if such alignment changes can be
made within the work limits without adversely affecting the intended function of the
facility. Excavated materials unsuitable for backfill or not required for backfill shall be
disposed of in accordance with local regulations.
3.04 TRENCH EXCAVATION
A. All existing asphalt or concrete surfacing shall be saw cut vertically in a straight line,
and removed from the job site prior to starting the trench excavation. This material
shall not be used in any fill or backfill.
B. The trench shall be excavated so that a minimum clearance of six (6) inches is
maintained on each side of the pipe for proper placement and densification of the
bedding or backfill material. The maximum clearance measured at the spring line of
the pipe shall be eighteen (18) inches regardless of the type of pipe, type of soil,
depth of excavation or the method of densifying the bedding and backfill.
C. All excavations shall be made to the lines and grades as established by the Contract
Drawings. Pipe trenches shall be excavated to a minimum depth of six inches (6")
below the bottom of the pipe. Deviation from grades will be allowed only when
Fort Collins Utilities Master Specifications Trenching, Bedding & Backfill
June 2012 02225 - 6
approved by the Engineer. Over excavation shall be rectified to the satisfaction of
the Engineer at the expense of the Contractor.
D. Except as otherwise dictated by construction conditions, the excavation shall be of
such dimensions as to allow for the proper pipe installation and to permit the
construction of the necessary pipe connections. Care shall be taken to insure that
the excavation does not extend below established grades. If the excavation is made
below such grades, the excess excavation shall be filled in with sand or graded
gravel deposited in horizontal layers not more than six inches (6") in thickness after
being compacted and shall be moistened as required to within two percent (2%) of
the optimum moisture content required for compaction of that soil. After being
conditioned to have the required moisture content, the layers shall be compacted to
the required density.
E. The Contractor shall stockpile excavated materials in a safe manner. Stockpiles
shall be graded for proper drainage.
F. The Contractor shall place and grade the trench base to the proper grade ahead of
pipe laying. The invert of the trench shall be compacted to provide a firm unyielding
support along entire pipe length.
3.05 SURPLUS EXCAVATION MATERIAL
A. If surplus excavation is disposed of on private property, written permission shall be
obtained from the Owner and a copy given to the Engineer and the Contractor.
3.06 FOUNDATIONS ON UNSTABLE SOILS
A. If the bottom of the excavation is soft or unstable, and in the opinion of the Engineer,
cannot satisfactorily support the pipe or structure, a further depth and width shall be
excavated and refilled to six inches (6") below grade with rock uniformly graded
between 3/4 inch and 1 1/2 inch to provide a firm foundation for the pipe or
structure. From six inches (6") below grade to grade, the appropriate bedding
material shall be placed to provide support for the pipe or structure.
3.07 PIPE BEDDING
A. After completion of the trench excavation and proper preparation of the foundation,
six inches (6") of bedding material shall be placed on the trench bottom for support
under the pipe. Bell holes shall be dug deep enough to provide a minimum of two
inches (2") of clearance between the bell and the bedding material. All pipe shall be
installed in such a manner as to insure full support of the pipe barrel over its entire
length. After the pipe is adjusted for line and grade and the joint is made, the
bedding material shall be carefully placed and tamped under the haunches of the
pipe. For all types of pipe, the limits of bedding shall be as shown on the trench
section details on the drawings.
B. Bedding shall be compacted to 65% relative density in accordance with ASTM
D2049. Care shall be exercised to assure sufficient tamping under the pipe to
achieve uniform support. (See the Contract Drawings for a typical trench cross-
Fort Collins Utilities Master Specifications Trenching, Bedding & Backfill
June 2012 02225 - 7
section).
3.08 BACKFILL AND COMPACTION
A. Pipes:
1. The pipe trench shall be backfilled to the limits as shown on the Contract
Drawings. The backfill in all roadway rights-of-way and paved areas shall be
compacted by vibrating, tamping or a combination thereof to sixty-five
percent (65%) relative density for sand material as determined by the relative
density of cohesionless soils test, ASTM Standard Designation D2049 or to
95% of maximum density for cohesive soils as determined by ASTM
Standard Designation D698. Required compaction in all other areas will be
ninety percent (90%) ASTM D698 for cohesive soils or 65% relative density
for cohesionless soils, unless otherwise specified.
2. All backfill shall be brought up to equal height along each side of the pipe in
such a manner as to avoid displacement. Wet, soft or frozen material,
asphalt chunks or other deleterious substances shall not be used for backfill.
If the excavated material is not suitable for backfill, as determined by the
Engineer, suitable material shall be hauled in and utilized and the rejected
material hauled away and disposed of.
3. Backfilling shall be conducted at all times in a manner to prevent damage to
the pipe or its coating and shall be kept as close to the pipe laying operation
as practical.
4. Backfilling procedures shall conform to the additional requirements, if any, of
appropriate agencies or private right-of-way agreements.
B. Structures
1. Backfill, and fill within three feet (3') adjacent to all structures and for full
height of the walls, shall be selected non-swelling material. It shall be
relatively impervious, well graded, and free from stones larger than three
inches (3"). Material may be job excavated, but selectivity will be required as
determined by the Engineer. Stockpiled material, other than topsoil from the
excavation shall be used for backfilling unless an impervious structural
backfill is specified. The backfill material shall be free from rubbish, stone
larger than five inches (5") in diameter, clods and frozen lumps of soil. All
backfill around the structures shall be consolidated by mechanical tamping.
The material shall be placed in six inch (6") loose lifts within a range of two
percent (2%) above to two percent (2%) below the optimum moisture content
and compacted to ninety-five percent (95%) of maximum density for cohesive
soils as determined by ASTM Standard Designation D698 or to seventy
percent (70%) relative density for pervious material as determined by the
relative density of cohesionless soils test, ASTM Standard Designation
D2049.
2. Impervious structural backfill, where shown or specified, shall consist of
material having 100% finer than three inches (3") in diameter and a minimum
of twenty percent (20%) passing a #200 U.S. Standard sieve. The material
shall be placed in six inch (6") loose lifts within a range of two percent (2%)
above to two percent (2%) below the optimum moisture content and
compacted to ninety five percent (95%) of maximum density for cohesive soil
Fort Collins Utilities Master Specifications Trenching, Bedding & Backfill
June 2012 02225 - 8
as determined by ASTM Standard Designation D698.
3.09 SURFACE RESTORATION
A. Unsurfaced areas
All surface cuts shall be, as a minimum, restored to a condition equal to, or better
than, that prior to construction.
B. Surfaced areas
All surface cuts shall be, as a minimum, restored to a condition equal to, or better
than, that prior to construction. All gravel or paved streets shall be restored in
accordance with the regulation and requirements of the agency having control or
jurisdiction over the street, roadway or right-of-way.
C. Grassed or landscaped areas
In landscaped or agricultural areas, topsoil, to a depth of 12 inches, shall be
removed from the area of general disturbance and stockpiled. After installation of all
pipelines, appurtenances and structures and completion of all backfill and
compaction, the stockpiled topsoil shall be redistributed evenly over all disturbed
areas. Care should be taken to conform to the original ground contour or final
grading plans.
END OF SECTION
Fort Collins Utilities Master Specifications Clearing and Grubbing
June 2012 02230-1
SECTION 02230
CLEARING AND GRUBBING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. This work consists of clearing, grubbing, removing, and disposing of vegetation
and debris within the limits of the project site as shown on the Drawings and as
required by the Work. Vegetation and objects designated to remain shall be
preserved free from injury or defacement.
1.02 RELATED SECTIONS
A. Section 02315 - Excavation and Embankment
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.01 CONSTRUCTION REQUIREMENTS
A. The OWNER will designate all trees, shrubs, plants, and other objects to remain.
Any object that is designated to remain and is damaged shall be repaired or
replaced as directed by the OWNER, at the CONTRACTOR’s expense.
Clearing and grubbing shall extend to the toe of fill or the top of cut slopes,
unless otherwise designated. All surface objects, trees, stumps, roots, and other
protruding obstructions not designated to remain shall be cleared and grubbed,
including mowing, as required. Undisturbed stumps, roots, and nonperishable
solid objects located two feet or more below subgrade or embankment slope may
remain in place. In areas to be rounded at the tops of backslopes, stumps shall
be removed to at least two feet below the surface of the final slope line.
Except in areas to be excavated, all holes resulting from the removal of
obstructions shall be backfilled with suitable material and compacted in
accordance with Section 02315.
No material or debris shall be disposed of within the project limits.
All cleared timber shall be removed from the project and shall become the
property of the CONTRACTOR. Branches on trees or shrubs shall be removed
as directed. All trimming shall be done in accordance with good tree surgery
practices.
The CONTRACTOR shall scalp the areas within the excavation or embankment
grading limits. Scalping shall include the removal from the ground surface of
sawdust, and other vegetation matter.
END OF SECTION
FFoorrtt CCooll
lliinnss UUttii
lliittiieess MM
aasstteerr SSpp
eecciiffiiccaatt
iioonnss TTrr
eeee PPrroottee
ccttiioonn
JJuunnee 220011
22 0022223311--
11
SECTION 02231
SECTION TREE PROTECTION
PART 1 - GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and
Supplementary Conditions and Division 1 Specification Sections, apply to this
Section.
1.02 SUMMARY
A. This Section includes the protection and trimming of existing trees that interfere with,
or are affected by, execution of the Work, whether temporary or permanent
construction.
B. Related Sections include the following:
1. Division 1 Section "Summary" for limits placed on Contractor's use of the
site.
2. Division 1 Section "Temporary Facilities and Controls" for temporary tree
protection.
3. Division 2 Section "Site Clearing" for removal limits of trees, shrubs, and
other plantings affected by new construction.
4. Division 2 Section "Earthwork" for building and utility trench excavation,
backfilling, compacting and grading requirements, and soil materials.
1.03 DEFINITIONS
A. Tree Protection Zone: Area surrounding individual trees or groups of trees to remain
during construction, and defined by the drip line of individual trees or the perimeter
drip line of groups of trees, unless otherwise indicated.
1.04 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Tree Pruning Schedule: Written schedule from arborist detailing scope and extent of
pruning of trees to remain that interfere with or are affected by construction.
C. Qualification Data: For tree service firm and arborist.
1.05 QUALITY ASSURANCE
A. Tree Service Firm Qualifications: An experienced tree service firm that has
successfully completed tree protection and trimming work similar to that required for
this Project and that will assign an experienced, qualified arborist to Project site
during execution of tree protection and trimming.
B. Tree Pruning: Contact the City Foresters Office if tree pruning is required. City
Forester shall review the contractors request for tree pruning and provide direction.
FFoorrtt CCooll
lliinnss UUttii
lliittiieess MM
aasstteerr SSpp
eecciiffiiccaatt
iioonnss TTrr
eeee PPrroottee
ccttiioonn
JJuunnee 220011
22 0022223311--
22
C. Preconstruction Conference: Conduct conference at Project site to comply with
requirements in Section 01310 - Project Meetings
1. Before tree protection operations begin, meet with representatives of
authorities having jurisdiction, Owner, City Forester, Artist, consultants, and
other concerned entities to review tree protection and trimming procedures
and responsibilities.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Drainage Fill: Selected crushed stone, or crushed or uncrushed gravel, washed,
ASTM D 448, Size 24, with 90 to 100 percent passing a 2-1/2-inch sieve and not
more than 10 percent passing a 3/4-inch sieve.
B. Topsoil: Natural or cultivated surface-soil layer containing organic matter and sand,
silt, and clay particles; friable, pervious, and black or a darker shade of brown, gray,
or red than underlying subsoil; reasonably free of subsoil, clay lumps, gravel, and
other objects more than 1.5 inch in diameter; and free of weeds, roots, and toxic and
other nonsoil materials.
1. Obtain topsoil only from well-drained sites where topsoil is 4 inches deep or
more; do not obtain from bogs or marshes.
C. Filter Fabric: Manufacturer's standard, nonwoven, pervious, geotextile fabric of
polypropylene, nylon, or polyester fibers.
D. Temporary Fencing: Orange Snow Fence; a minimum of 48 inches high; with steel
‘T’posts; with tie wires, and other accessories for a complete fence system.
E. Organic Mulch: Shredded Cedar, free of deleterious materials.
PART 3 - EXECUTION
3.01 PREPARATION
A. Temporary Fencing: Install temporary fencing around tree protection zones to
protect remaining trees and vegetation from construction damage. Maintain
temporary fence and remove when construction is complete.
B. Protect tree root systems from damage caused by runoff or spillage of noxious
materials while mixing, placing, or storing construction materials. Protect root
systems from ponding, eroding, or excessive wetting caused by dewatering
operations.
C. Mulch areas inside tree protection zones and other areas indicated.
1. Apply 3-inch average thickness of organic mulch. Do not place mulch within
6 inches of tree trunks.
D. Do not store construction materials, debris, or excavated material inside tree
protection zones. Do not permit vehicles or foot traffic within tree protection zones;
prevent soil compaction over root systems.
E. Maintain tree protection zones free of weeds and trash.
F. Do not allow fires within tree protection zones.
FFoorrtt CCooll
lliinnss UUttii
lliittiieess MM
aasstteerr SSpp
eecciiffiiccaatt
iioonnss
T
Trreeee PPrroot
teeccttiioonn
JJuunnee 220011
22 0022223311--
33
3.02 EXCAVATION
A. Install shoring or other protective support systems to minimize sloping or benching of
excavations.
B. Do not excavate within tree protection zones, unless otherwise indicated.
C. Where excavation for new construction is required within tree protection zones, hand
clear and excavate to minimize damage to root systems. Use narrow-tine spading
forks and comb soil to expose roots.
1. Redirect roots in backfill areas where possible. If encountering large, main
lateral roots, expose roots beyond excavation limits as required to bend and
redirect them without breaking. If encountered immediately adjacent to
location of new construction and redirection is not practical, cut roots
approximately 3 inches back from new construction.
2. Do not allow exposed roots to dry out before placing permanent backfill.
Provide temporary earth cover or pack with peat moss and wrap with burlap.
Water and maintain in a moist condition. Temporarily support and protect
roots from damage until they are permanently relocated and covered with
soil.
D. Where utility trenches are required within tree protection zones, tunnel under or
around roots by drilling, auger boring, pipe jacking, or digging by hand.
1. Root Pruning: Do not cut main lateral roots or taproots; cut only smaller
roots that interfere with installation of utilities. Cut roots with sharp pruning
instruments; do not break or chop.
2. The installation of utilities, irrigation lines or any underground fixture requiring
excavation deeper than six (6) inches shall be accomplished by boring under
the root system of protected existing trees at a minimum depth of twenty-four
(24) inches. The auger distance is established from the face of the tree
(outer bark) and is scaled from tree diameter and breast height as described
in the chart below.
Tree Diameter at Breast Height (inches) Auger Distance From Face of Tree (feet)
0-2 1
3-4 2
5-9 5
10-14 10
15-19 12
Over 19 15
3.03 REGRADING
A. Grade Lowering: Where new finish grade is indicated below existing grade around
trees, slope grade beyond tree protection zones. Maintain existing grades within tree
protection zones.
FFoorrtt CCooll
lliinnss UUttii
lliittiieess MM
aasstteerr SSpp
eecciiffiiccaatt
iioonnss
T
Trreeee PPrroot
teeccttiioonn
JJuunnee 220011
22 0022223311--
44
B. Minor Fill: Where existing grade is 6 inches or less below elevation of finish grade,
fill with topsoil. Place topsoil in a single uncompacted layer and hand grade to
required finish elevations.
C. Moderate Fill: Where existing grade is more than 6 inches but less than 12 inches
below elevation of finish grade, place drainage fill, filter fabric, and topsoil on existing
grade as follows:
1. Carefully place drainage fill against tree trunk approximately 2 inches above
elevation of finish grade and extend not less than 18 inches from tree trunk
on all sides. For balance of area within drip-line perimeter, place drainage fill
up to 6 inches below elevation of grade.
2. Place filter fabric with edges overlapping 6 inches minimum.
3. Place fill layer of topsoil to finish grade. Do not compact drainage fill or
topsoil. Hand grade to required finish elevations.
3.04 TREE PRUNING
A. Prune trees to remain that are affected by temporary and permanent construction.
B. Prune trees to remain to compensate for root loss caused by damaging or cutting
root system. Provide subsequent maintenance during Contract period as
recommended by arborist.
C. Pruning Standards: Prune trees according to ANSI A300 (Part 1) as follows:
1. Type of Pruning: Cleaning, Thinning and Raising.
D. Cut branches with sharp pruning instruments; do not break or chop.
E. Chip removed tree branches and dispose of off-site.
3.05 TREE REPAIR AND REPLACEMENT
A. Violation of these specifications will lead to penalties based on the type of violation
and/or the resulting damages, and may be grounds for the termination of this
contract.
1. Penalties will be assessed based on the amount of damage done and the
total value of that tree, or group of trees, prior to the damage. Penalties for
damage would be based on the total value of the tree as determined by the
City Forestry Division staff and the severity of the damage as a proportion of
the total value of that tree. This could include up to the full value of the tree.
B. Promptly repair trees damaged by construction operations within 24 hours. Treat
damaged trunks, limbs, and roots according to City Forester’s instructions.
C. Remove and replace trees indicated to remain that die or are damaged during
construction operations that City Forester determines are incapable of restoring to
normal growth pattern.
1. Where practical, provide new trees of same size and species as those being
replaced; plant and maintain as specified in Division 2 Section "Exterior
Plants."
2. Provide new trees of 6-inch caliper size and of a species selected by
Architect when damaged trees more than 6 inches in caliper size, measured
FFoorrtt CCooll
lliinnss UUttii
lliittiieess MM
aasstteerr SSpp
eecciiffiiccaatt
iioonnss
T
Trreeee PPrroot
teeccttiioonn
JJuunnee 220011
22 0022223311--
55
12 inches above grade, are required to be replaced. Number of replacement
trees required to mitigate loss of larger trees will comply with City Code.
Plant and maintain new trees as specified in Division 2 Section "Exterior
Plants."
D. Aerate surface soil, compacted during construction, 10 feet beyond drip line and no
closer than 36 inches to tree trunk. Drill 2-inch- diameter holes a minimum of 12
inches deep at 24 inches o.c. Backfill holes with an equal mix of augered soil and
sand.
3.06 DISPOSAL OF WASTE MATERIALS
A. Burning is not permitted.
B. Disposal: Unless otherwise agreed to, remove excess excavated material and
displaced trees from Owner's property.
END OF SECTION
Fort Collins Utilities Master Specifications Topsoil
June 2012 02235-1
SECTION 02235
TOPSOIL
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. This work consists of stripping, salvaging and stockpiling topsoil, and excavating
suitable topsoil from stockpiles, contractor sources, available sources, or from
the approved natural ground cover to place on designated areas. It shall include
the placing of topsoil upon constructed cut and fill slopes after grading operations
are completed.
1.02 RELATED SECTIONS
A. Section 02230 – Clearing and Grubbing
B. Section 02315 – Excavation and Embankment
PART 2 - PRODUCTS
2.01 MATERIALS
A. Topsoil shall consist of loose friable loam free of subsoil, refuse, stumps, roots,
rocks, brush, weeds, heavy clay, hard clods, toxic substances, or other material
which would be detrimental to its use on the project. Topsoil shall consist of
natural on-site ground cover or hauled material from off-site sources.
Wetland topsoil material shall consist of moist organic soil, including any existing
wetland vegetation and seeds, to be excavated from areas as shown on the
drawings or as directed by the ENGINEER.
PART 3 - EXECUTION
3.01 CONSTRUCTION REQUIREMENTS
A. Remove sod and grass and brush before stripping topsoil.
B. Wetland Soil: The top 12”-18” of wetland soils, within the limits of the project
where indicated on the drawings, shall be salvaged prior to top soils striping and
beginning hauling, excavating, or fill operations by excavating and stockpiling the
materials at designated location in a manner that will minimize sediment damage,
and not obstruct natural drainage. Wetland soil may be less than 12” deep. Strip
wetland soil to whatever depths are encountered.
1. Remove subsoil and nonsoil material from wetland soils, including trash,
debris, weeds, roots, and other waste materials.
Fort Collins Utilities Master Specifications Topsoil
June 2012 02235-2
C. Topsoil: Generally, the top six inches (6”) of topsoil, within the limits of the
project shall be salvaged prior to beginning hauling, excavating, or fill operations
by excavating and stockpiling the material at designated locations in a manner
that will minimize sediment damage, and not obstruct natural drainage. Topsoil
may be less than six inches (6”) deep. Strip topsoil to whatever depths are
encountered, or a maximum of twelve inches (12”), in a manner to prevent
intermingling with underlying subsoil or other waste materials. Topsoil shall be
placed directly upon completed cut and fill slopes whenever conditions and the
progress of construction will permit.
1. Remove subsoil and nonsoil materials from topsoil, including trash,
debris, weeds, roots, and other waste materials.
D. No soil stockpile shall exceed ten (10) feet in height. Stockpile topsoil materials
away from edge of excavations without intermixing with subsoil. Grade and
shape stockpiles to drain surface water. Cover stockpiles to prevent windblown
dust. Do not stockpile topsoil within tree protection zones. Stockpile surplus
topsoil to allow for respreading deeper topsoil. All soil stockpiles shall be
protected from sediment transport by surface roughening, watering, and
perimeter silt fencing. Any soil stockpile remaining after 30 days shall be seeded
and mulched.
E. Topsoil shall be placed at locations and to the thickness provided in the Contract
Documents and shall be keyed to the underlying material by the use of harrows,
rollers, or other suitable equipment.
Water shall be applied to the topsoil as designated in the Contract, in a fine spray
by nozzles or spray bars so the topsoil areas will not be washed or eroded.
Salvaged topsoil exceeding the quantity required under the Contract shall be
disposed of at the CONTRACTOR’s expense.
END OF SECTION
Fort Collins Utilities Master Specifications Water Control and Dewatering
June 2012 02240-1
SECTION 02240
WATER CONTROL AND DEWATERING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. The work of this section consists of controlling groundwater, site drainage, and
storm flows during construction. The CONTRACTOR is cautioned that the work
involves construction in and around drainage channels, local streams or rivers,
and areas of local drainage. These areas are subject to frequent periodic
inundation.
1.02 RELATED SECTIONS
A. Section 02200 – Earthwork
B. Section 02225 - Trenching, Bedding and Backfill
C. Section 02315 – Excavation and Embankment
PART 2 - PRODUCTS
2.01 MATERIALS
A. On-site materials may be used within the limits of construction to construct
temporary dams and berms. The materials such as plastic sheeting, sand bags,
and storm sewer pipe may also be used if desired by the CONTRACTOR.
PART 3 - EXECUTION
3.01 CONSTRUCTION REQUIREMENTS
A. General: For all excavation, the CONTRACTOR shall provide suitable
equipment and labor to remove water, and he shall keep the excavation
dewatered so that construction can be carried on under dewatered conditions
where required by the Drawings and Specifications. Water control shall be
accomplished such that no damage is done to adjacent channel banks or
structures. The CONTRACTOR is responsible for investigating and familiarizing
himself with all site conditions that may affect the work including surface water,
level of groundwater and the time of year the work is to be done. All excavations
made as part of dewatering operations shall be backfilled with the same type
material as was removed and compacted to 95% of Maximum Standard Proctor
Density (ASTM D698) except where replacement by other materials and/or
methods are required.
The CONTRACTOR shall conduct his operation in such a manner that storm or
other waters may proceed uninterrupted along their existing drainage courses.
By submitting a bid, the CONTRACTOR acknowledges that he has investigated
Fort Collins Utilities Master Specifications Water Control and Dewatering
June 2012 02240-2
the risk arising from such waters and has prepared his bid accordingly, and
assumes all of said risk.
At no time during construction shall the CONTRACTOR affect existing surface or
subsurface drainage patterns of adjacent property. Any damage to adjacent
property resulting from the CONTRACTOR’s alteration of surface or subsurface
drainage patterns shall be repaired by the CONTRACTOR at no additional cost
to the OWNER.
CONTRACTOR shall remove all temporary water control facilities when they
are no longer needed or at the completion of the project.
Pumps and generators used for dewatering and water control shall be quiet
equipment enclosed in sound deadening devices.
B. Surface Water Control: Surface water control generally falls in to the
following categories:
1. Normal low flows along the channel;
2. Storm/flood flows along the channel;
3. Flows from existing storm drain pipelines; and,
4. Local surface inflows not conveyed by pipelines.
The CONTRACTOR shall coordinate, evaluate, design, construct, and
maintain temporary water conveyance systems. These systems shall not
worsen flooding, alter major flow paths, or worsen flow characteristics during
construction. The CONTRACTOR is responsible to ensure that any such
worsening of flooding does not occur. The CONTRACTOR is solely
responsible for determining the methods and adequacy of water control
measures.
At a minimum, the CONTRACTOR will be responsible for diverting the
quantity of surface flow around the construction area so that the excavations
will remain free of surface water for the time it takes to install these materials,
and the time required for curing of any concrete or grout. The
CONTRACTOR is cautioned that the minimum quantity of water to be
diverted is for erosion control and construction purposes and not for general
protection of the construction-site. It shall be the CONTRACTOR's
responsibility to determine the quantity of water which shall be diverted to
protect his work from damage caused by storm water.
The CONTRACTOR shall, at all times, maintain a flow path for all channels.
Temporary structures such as berms, sandbags, pipeline diversions, etc.,
may be permitted for the control of channel flow, as long as such measures
are not a major obstruction to flood flows, do not worsen flooding, or alter
historic flow routes.
C. Groundwater Control: The CONTRACTOR shall install adequate measures to
maintain the level of groundwater below the foundation subgrade elevation
and maintain sufficient bearing capacity for all structures, pipelines,
Fort Collins Utilities Master Specifications Water Control and Dewatering
June 2012 02240-3
earthwork, and rock work. Such measures may include, but are not limited
to, installation of perimeter subdrains, pumping from drilled holes or by
pumping from sumps excavated below the subgrade elevation. The
foundation bearing surfaces are to be kept dewatered and stable until the
structures or other types of work are
complete and backfilled. Disturbance of foundation subgrade by
CONTRACTOR operations shall not be considered as originally unsuitable
foundation subgrade and shall be repaired at CONTRACTOR’s expense.
Any temporary dewatering trenches or well points shall be restored following
dewatering operations to reduce permeability in those areas as approved by
the ENGINEER.
END OF SECTION
SECTION 02315
WALL EXCAVATION AND SUPPORT
PART 1 - GENERAL
1.1 SCOPE
A. This section specifies the requirements for the excavation and installation of the arch walls.
B. This project is facilitated using the City of Fort Collins’ (Owner) Advanced Project Delivery
System (APDS). As such, the selected Contractor shall be involved throughout both the design
and construction phases of the work.
1.2 DEFINITIONS
A. Arch wall – the steel reinforced shotcrete wall constructed at both ends of the tunnel.
B. Temporary support – steel sheet piles installed prior to excavation and installation of the arch
wall.
C. Break-out – the region of the arch wall that the tunneling operation penetrates upon launching.
D. Launch side – the side of the embankment from which the tunneling operation begins.
E. Receiving side – the side of the embankment that the tunneling operation mines towards.
1.3 RELATED SECTIONS
A. Section 02410 – Tunnel Excavation and Grouting
B. Section 02415 – Installation of Steel Pipe Guide Rails
C. Section 02465 – Drilled Shafts
D. Section 03210 – Reinforcing Steel
E. Section 03220 – Welded Wire Fabric
F. Section 03360 – Shotcrete
G. Section 03350 – Concrete Finishing
1.4 SUBMITTALS
A. Preconstruction submittals:
1. Prior to any work commencing, submit a critical path schedule.
2. Manufacturer or supplier cut sheets or mix designs for materials or equipment to be used.
11/14/2014 02315 – Wall Excavation and Support
100% Submittal Page 1 of 4
3. Manufacturer verification that the hammer chosen for driving sheet piles is capable of
delivering the required energy.
4. Contractor qualifications, as specified.
B. Construction submittals:
1. Daily field reports noting at a minimum production rate, crew size, hours worked,
equipment used, and any safety related issues.
1.5 QUALITY STANDARDS
A. American Society for Testing Materials (ASTM)
1. ASTM A328 – Steel Sheet Piling
2. ASTM A588 – High-Strength Low-Alloy Structural Steel, up to 50 ksi Minimum Yield
Point, with Atmospheric Corrosion Resistance
3. ASTM A690 – High-Strength Low-Alloy Nickel, Copper, Phosphorous Steel H-Piles and
Sheet Piling with Atmospheric Corrosion Resistance for Use in Marine Environments
1.6 GENERAL
This specification is applicable for projects or work involving either inch-pound or SI units. Within
the text and accompanying tables, the inch-pound units are given preference.
1.7 CONTRACTOR QUALIFICATIONS
The work in this section shall be provided by a CONTRACTOR with experience as noted in
Section 03360 and Section 02465. In addition, installation of sheet piles shall be provided only by
a CONTRACTOR specializing in and possessing the experience, equipment, knowledge, and
skilled operators for installation of sheet piles. Such experience shall be a minimum of three years
of installing sheet piles.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Concrete – Concrete shall be in accordance with Section 03310.
B. Shotcrete – Shotcrete shall be in accordance with Section 03360.
C. Reinforcing Steel – Reinforcing steel shall be in accordance with Section 03210.
D. Welded Wire Fabric – Welded Wire Fabric shall be in accordance with Section 03220.
E. Drilled Shafts – Drilled Shafts shall be installed in accordance with Section 02465.
F. Sheet Piles – Sheet piles shall be PS (flat sheet) piling in accordance with ASTM A328 with
11/14/2014 02315 – Wall Excavation and Support
100% Submittal Page 2 of 4
grade as shown on the Drawings.
G. Sheet Pile Connections – Sheet pile connections shall be in accordance with ASTM A588 or
ASTM A690.
PART 3 - EXECUTION
3.1 GENERAL
A. Do not commence any work until:
1. Required submittals have been made and approved by the OWNER.
2. Survey control has been established at the site.
B. The general construction sequence for work shall be as follows for the arch wall on the launch
side:
1. Install drilled shafts and sheet piles as shown on Drawings and as specified.
2. Begin excavation and installation of arch wall from the top down in lifts as shown on the
Drawings and as specified herein.
3. Place tunneling shield in excavation against sheet piles at break-out location.
4. Cut through sheets and begin tunneling.
C. The general construction sequence for work shall be as follows for the arch wall on the
receiving side:
1. Install drilled shafts and sheet piles as shown on Drawings and as specified.
2. Excavate tunnel to the point where tunneling shield is in contact with sheet piles.
3. Cut through sheets and continue tunneling into existing embankment until end of tunnel is
at the location shown on the Drawings.
4. Begin excavation and installation of arch wall from the top down in lifts as shown on the
Drawings and as specified herein.
3.2 INSTALLATION OF SHEET PILES
A. Sheet piles shall be driven to the depths shown on the Drawings.
B. Sheet piles shall be assembled before driving and then driven as a continuous wall progressively
in stages to ensure the sheets are aligned correctly.
C. Sheet piles shall be driven to form a tight bulkhead.
D. A driving head shall be used. Any piling damaged during driving shall be removed and
replaced at CONTRACTOR’S expense.
11/14/2014 02315 – Wall Excavation and Support
100% Submittal Page 3 of 4
E. Sheet piles shall be driven such that they are within three (3) inches of the location shown on
the Drawings. Sheet piles shall not exceed two (2) percent from plumb.
3.3 PROTECTION OF ADJACENT WORK
CONTRACTOR shall be responsible for protecting all adjacent work, existing structures, vehicles,
equipment and utilities from damage caused by sheet pile or arch wall installation. Known utilities
are shown on the drawings; however, these locations should not be considered accurate. Additional
utilities may exist and the CONTRACTOR is solely responsible for identifying and protecting
utilities.
3.4 EXCAVATION AND CONSTRUCTION OF ARCH WALL
A. General:
1. Excavation for the arch wall shall not commence until after the sheet piles and drilled
shafts have been installed at that location.
2. Excavation and construction of the arch wall will proceed from the existing ground surface
down in lifts as shown on the Drawings and specified herein.
3. The maximum excavation lift height for the first lift shall be seven (7) feet. The maximum
excavation lift height for subsequent lifts shall be ten (10) feet.
B. Excavation and Construction Sequence:
1. Excavate the first lift as shown on the Drawings.
2. Place reinforcing steel as shown on the Drawings the full height of the lift.
3. Backfill in front of the reinforcing steel such that at least two rows of horizontal steel at the
bottom of the lift are covered using pea gravel or other material approved by the
ENGINEER.
4. Shotcrete all exposed surfaces of the lift. Shotcrete must be applied in at least two passes
per lift.
5. Allow shotcrete to obtain 75% of its 28-day strength before proceeding to the next lift.
C. The connection between the arch wall and the drilled shaft shall be completed with shotcrete as
shown on the Drawings.
END OF SECTION
11/14/2014 02315 – Wall Excavation and Support
100% Submittal Page 4 of 4
Fort Collins Utilities Master Specifications Controlled Low Strength Material Backfill
June 2012 02321-1
SECTION 02321
CONTROLLED LOW STRENGTH MATERIAL BACKFILL
(FLO-FILL)
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. The CONTRACTOR shall furnish and place controlled low strength material
(CLSM) backfill where shown in the Drawings.
1.02 RELATED WORK
A. Section 02240 - Water Control and Dewatering
B. Section 02225 - Trenching, Bedding and Backfill
1.03 REFERENCES
A. ASTM C 33 - Concrete Aggregates
B. ASTM C 94 - Specification for Ready-Mixed Concrete
C. ASTM C 143 - Test Method for Slump of Hydraulic Cement Concrete
D. ASTM C 150 - Portland Cement
E. ASTM C 494 - Chemical Admixtures for Concrete
F. ASTM C 618 - Fly Ash in Portland Cement Concrete
G. ASTM D 4832 - Standard Test Method for Preparation and Testing of Soil-
Cement Slurry Test Cylinders
H. ASTM PS 28 - Provisional Standard Test Method for Flow Consistency of
Controlled Low Strength Material
I. ASTM PS 29 - Provisional Standard Test Method for Unit Weight, Yield and Air
Content (Gravimetric) of Controlled Low Strength Material
J. ASTM PS 30 - Provisional Standard Practice for Sampling Freshly Mixed
Controlled Low Strength Material
K. ASTM PS 31 - Provisional Standard Test Method for Ball Drop on Controlled Low
Strength Material to Determine Suitability for Load Application
1.04 SUBMITTALS:
A. A minimum of two days prior to starting CLSM work, CLSM mix design shall be
submitted for review and approval. No changes shall be made in the amounts or
Fort Collins Utilities Master Specifications Controlled Low Strength Material Backfill
June 2012 02321-2
sources of the approved mix ingredients without the approval of the ENGINEER.
Product inspection and field testing of the approved mix may be made by, or on-
behalf of, the OWNER.
PART 2 - PRODUCTS
2.01 MATERIALS
2.02 General: The CLSM shall consist of a mixture of sand, coarse aggregate, cement and
water. Fly ash and approved admixtures may be used to obtain the required properties
of the mix. The mix shall have good workability and flowability with self-compacting and
self-leveling characteristics. Proportions of the mix shall be as given in the following
table:
CLSM Mix Proportions
B. Cement: All cement used shall be Type II Portland cement, which shall conform
to the requirements of ASTM C 150.
C. Fly Ash: Fly ash may be either Class C or Class F. The fly ash shall conform to
ASTM C 618.
D. Aggregates:
1. Fine Aggregate: All fine aggregate shall conform to the grading and
quality requirements of ASTM C 33.
2. Coarse Aggregate: Coarse aggregate shall conform to the grading and
quality requirements of ASTM C 33 for size No. 57 or No. 67.
E. Water: The batch mixing water and mixer washout water shall conform to the
requirements of ASTM C 94. The Water:Cement ratio shall be 5.6:1.
F. Admixtures: Chemical admixtures that do not contain calcium chloride and
conform to ASTM C 494 for concrete may be used in the CLSM mix. All
chemical admixtures shall be compatible with the cement and all other
admixtures in the batch.
G. CLSM Properties:
1. Strength: CLSM shall have a maximum 28 day compressive strength of
60 psi when molded and cured as in conformance with ASTM D 4832.
2. Air-Entrainment: All CLSM shall be air entrained to a total air content of 4
– 8 %.
Component Amount
Cement 42 lbs
Fine Aggregate 1,845 lbs
Coarse Aggregate 1,700 lbs
Water 235 lbs
Fort Collins Utilities Master Specifications Controlled Low Strength Material Backfill
June 2012 02321-3
3. Slump: The minimum slump shall be seven inches and the maximum
slump shall be nine inches as when tested in accordance with ASTM PS
28.
4. Aggregate: Fine aggregate shall be between 50% and 60% by volume of
the total aggregates in the CLSM mix.
5. Consistency: The consistency of the CLSM slurry shall be such that the
material flows easily into all openings and the area to be filled. When
trenches are on a steep slope, a stiffer mix of slurry may be required to
prevent CSLM from flowing down the trench. When a stiffer mix is used,
vibration shall be performed to ensure that the CLSM slurry completely
fills all spaces between the pipe and the lower portion of the trench.
PART 3 - EXECUTION
3.01 PLACEMENT
A. CLSM shall be used as an alternative to backfill, as directed by the ENGINEER,
but may not be used as a substitute for bedding material.
Rodding, mechanical vibration and compaction of CLSM shall be performed to
assist in consolidating the CLSM.
CLSM shall be placed as closely behind pipe laying operations as possible.
When required to prevent uplift, the CLSM shall be placed in two stages as
required, allowing sufficient time for the initial set of the first stage before the
remainder is placed. CLSM shall be deposited as nearly as practical in its final
position and in no way disturb the pipe trench or cause foreign material to
become mixed with the CLSM.
Soil backfill shall not be placed until the CLSM has reached the initial set. If
backfill is not to be placed over the CLSM within 8 hours, a 6-inch cover of moist
earth shall be placed over the CLSM surface.
If the air temperature is 50° F or less, the moist earth cover should be at least
18-inches thick. CLSM shall not be placed when the air temperature is below
40° F unless the air temperature is 35° F or more and the temperature is rising.
CLSM shall not be placed, if, in the judgment of the ENGINEER, weather
conditions are unsuitable.
CLSM shall not be placed when the trench bottom or walls are frozen or contain
frozen materials.
END OF SECTION
Fort Collins Utilities Master Specifications Erosion and Sediment Control
June 2012 02370-1
SECTION 02370
EROSION AND SEDIMENT CONTROL
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. This work shall consist of temporary measures needed to control erosion and
water pollution. These temporary measures shall include, but not be limited to,
berms, dikes, dams, sediment basins, fiber mats, netting, gravel, mulches,
grasses, slope drains and other erosion control devices or methods. These
temporary measures shall be installed at the locations where needed to control
erosion and water pollution during the construction of the project, and as directed
by the ENGINEER, and as shown on the Drawings.
B. The Erosion Control Plan, if presented in the Drawings, were reviewed and
approved by the OWNER and serves as a minimum for the requirements of
erosion control during construction. The CONTRACTOR has the ultimate
responsibility for providing adequate erosion control and water quality throughout
the duration of the project. Therefore, if the provided plan is not working
sufficiently to protect the project areas, then the CONTRACTOR shall provide
additional measures as required to obtain the required protection. The
CONTRACTOR shall include in his bid price for erosion control a minimum of all
items shown on the Erosion Control Plan and any additional items that may be
needed to control erosion and water pollution.
1.02 RELATED SECTIONS
A. Section 02240 – Water Control and Dewatering
1.03 SUBMITTALS
A. Construction schedule for Erosion Control per subsection 3.01
B. Sequencing Plan per subsection 3.12
PART 2 - PRODUCTS
2.01 MATERIALS
A. Materials may include hay bales, straw, fiber mats, fiber netting, wood cellulose,
fiber fabric, gravel and other suitable materials, and shall be reasonably clean,
free of deleterious materials, and certified weed free. All materials shall be
submitted for approval prior to installation.
B. Temporary grass cover (if required) shall be a quick growing species suitable to
the area, which will provide temporary cover and will not later compete with the
grasses sown for permanent cover. All grass seed shall be approved by the
ENGINEER prior to installation.
Fort Collins Utilities Master Specifications Erosion and Sediment Control
June 2012 02370-2
C. Fertilizer and soil conditioners shall be approved by the ENGINEER prior to
installation.
PART 3 - EXECUTION
3.01 CONSTRUCTION REQUIREMENTS
A. When so indicated in the Contract Documents, or when directed by the
ENGINEER, the CONTRACTOR shall prepare construction schedules for
accomplishing temporary erosion control work. These schedules shall be
applicable to clearing and grubbing, grading, structural work, construction, etc.
He shall also submit for acceptance his proposed method of erosion control on
haul roads and borrow pits and his plan for disposal of waste material. Work
shall not be started until the erosion control schedules and methods of operations
have been accepted.
B. The CONTRACTOR will be required to incorporate all permanent erosion control
features into the project at the earliest practicable time as outlined in his
accepted schedule. Temporary erosion control measures will then be used to
correct conditions that develop during construction.
C. The erosion control features installed by the CONTRACTOR shall be adequately
maintained by him until the project is accepted.
D. In the event of conflict between these requirements and erosion and pollution
control laws, rules, or regulations of other Federal, State or local agencies, the
more restrictive laws, rules, or regulations shall apply.
3.02 PERMITS AND COMPLIANCE
A. The CONTRACTOR must apply for and obtain a Construction Dewatering Permit
402 from the Colorado Department of Health. All costs for this permit shall be
the responsibility of the CONTRACTOR. This permit requires that specific actions
be performed at designated times. The CONTRACTOR is legally obligated to
comply with all terms and conditions of the permit including testing for effluent
limitations.
The CONTRACTOR shall allow the Colorado Department of Health or other
representatives to enter the site to test for compliance with the permit. Non
compliance with the permit can result in stoppage of all work.
In addition to permit requirements, the OWNER shall also monitor the
CONTRACTOR’s erosion control and work methods. If the overall function and
intent of erosion control is not being met, then the OWNER shall require the
CONTRACTOR to provide additional measures as required to obtain the desired
results. Costs for any additional erosion control measures shall be the
responsibility of the CONTRACTOR, since he has the ultimate responsibility for
providing adequate erosion control and water quality for the duration of the
project.
Fort Collins Utilities Master Specifications Erosion and Sediment Control
June 2012 02370-3
3.03 STABILIZATION OF DISTURBED AREAS
A. Temporary sediment control measures shall be established within 5 days from
time of exposure/disturbance. Permanent erosion protection measures shall be
established within 5 days after final grading of areas.
3.04 PROTECTION OF ADJACENT PROPERTIES
A. Properties adjacent to the site of a land disturbance shall be protected from
sediment deposition. In addition to the erosion control measures required on the
Drawings, perimeter controls may be required if damage to adjacent properties is
likely. Perimeter controls include, but are not limited to, a vegetated buffer strip
around the lower perimeter of the land disturbance, sediment barriers such as
straw bales and silt fences; sediment basins; or a combination of such measures.
Vegetated buffer strips may be used only where runoff in sheet flow is expected
and should be at least 20 feet in width.
3.05 TIMING AND STABILIZATION OF SEDMENT AND EROSION CONTROL MEASURES
A. Sediment barriers, perimeter dikes, and other measures intended to either trap
sediment or prevent runoff from flowing over disturbed areas must be
constructed as a first step in grading and be made functional before land
disturbance takes place. Earthen structures such as dams, dikes, and diversions
must be stabilized within 5 days of installation. Stormwater outlets must also be
stabilized prior to any upstream land disturbing activities.
3.06 STABILIZATION OF WATERWAYS AND OUTLETS
A. All on-site stormwater conveyance channels used by the CONTRACTOR for
temporary erosion control purposes shall be designed and constructed with
adequate capacity and protection to prevent erosion during storm and runoff
events. Stabilization adequate to prevent erosion shall also be provided at the
outlets of all pipes and channels.
3.07 STORM SEWER INLET PROTECTION
A. All storm sewer inlets which are made operable during construction or which
drain stormwater runoff from a construction site shall be protected from sediment
deposition by the use of filters.
3.08 WORKING IN OR CROSSING WATERCOURSES AND WETLANDS
A. Construction vehicles should be kept out of watercourses to the extent possible.
Where in-channel work is necessary, precautions must be taken to stabilize the
work area during construction to minimize erosion. The channel (including bed
and banks) must always be restabilized immediately after in-channel work is
completed.
B. Where a live (wet) watercourse must be crossed by construction vehicles during
construction, a Temporary Stream Crossing must be provided for this purpose.
Fort Collins Utilities Master Specifications Erosion and Sediment Control
June 2012 02370-4
3.09 CONSTRUCTION ACCESS ROUTES
A. Wherever construction vehicles enter or leave a construction site, a Stabilized
Construction Entrance is required. Where sediment is transported onto a public
road surface, the roads shall be cleaned thoroughly at the end of each day.
Sediment shall be removed from roads by shoveling or sweeping and be
transported to a sediment controlled disposal area. Street washing shall be
allowed only after sediment is removed in this manner.
3.10 DISPOSITION OF TEMPORARY MEASURES
A. All temporary erosion and sediment control measures shall be disposed of within
30 days after final site stabilization is achieved or after the temporary measures
are no longer needed as determined by the OWNER. Trapped sediment and
other disturbed soil areas resulting from the disposition of temporary measures
shall be permanently stabilized to prevent further erosion.
3.11 MAINTENANCE
A. All temporary and permanent erosion and sediment control practices must be
maintained and repaired as needed to assure continued performance of their
intended function.
3.12 SEQUENCING
A. The CONTRACTOR shall submit a sequencing plan for approval for erosion
control in conformance with his overall Construction Plan for approval by the
OWNER. Changes to the Erosion Control Sequencing Plan may be considered
by the OWNER only if presented in writing by the CONTRACTOR.
3.13 SUBSTANTIAL COMPLETION OF EROSION CONTROL MEASURES
A. At the time specified in the Contract Documents, and subject to compliance with
specified materials and installation requirements, the CONTRACTOR will receive
a Substantial Completion Certificate for temporary erosion control measures.
3.14 MAINTENANCE OF EROSION CONTROL MEASURES AFTER SUBSTANTIAL
COMPLETION
A. The CONTRACTOR will be responsible for maintaining temporary erosion control
measures as specified in the Drawings and Contract Documents until such time
as the disturbed drainage area has stabilized as determined by the ENGINEER
and the OWNER.
3.15 FINAL COMPLETION AND ACCEPTANCE OF EROSION CONTROL MEASURES
A. After the ENGINEER and OWNER have determined that the drainage area has
stabilized, the CONTRACTOR shall remove all remaining temporary erosion
Fort Collins Utilities Master Specifications Erosion and Sediment Control
June 2012 02370-5
control measures. Any damage to the site shall be repaired to the satisfaction of
the ENGINEER and at no cost to the OWNER.
END OF SECTION
Fort Collins Utilities Master Specifications Riprap, Bedding, and Features Boulders
June 2012 02375-1
SECTION 02375
RIPRAP, BEDDING, AND FEATURE BOULDERS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. The work of this section shall include excavation, grading and installation of all
riprap, bedding, and boulders placed at the locations shown on the Drawings.
The materials to be used for the construction of such structures shall be as
specified herein.
1.02 RELATED SECTIONS
A. Section 02240 – Water Control and Dewatering
B. Section 02315 – Excavation and Embankment
C. Section 02225 - Trenching, Bedding and Backfill
1.03 SUBMITTALS
A. The CONTRACTOR shall cooperate with the ENGINEER in obtaining and
providing samples of all specified materials. The CONTRACTOR shall submit
certified laboratory test certificates for all items required in this section.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Riprap used shall be the type designated on the Drawings and shall conform to
the following:
Riprap Designation
% Smaller Than
Given Size By Weight
Intermediate Rock
Dimension (Inches)
d50
*
(Inches)
Type VL
70 - 100
50 - 70
35 - 50
2 - 10
12
9
6
2
6
Type L
70 - 100
50 - 70
35 - 50
2 - 10
15
12
9
3
9
Type M
70 - 100
50 - 70
35 - 50
2 - 10
21
18
12
4
12
Fort Collins Utilities Master Specifications Riprap, Bedding, and Features Boulders
June 2012 02375-2
Type H
70 - 100
50 - 70
35 - 50
2 - 10
30
24
18
6
18
Type VH 70 - 100
50 - 70
35 - 50
2 - 10
42
33
24
9
24
* d50
= Mean Particle Size
1. The riprap designation and total thickness of riprap shall be as shown on
the Drawings. The maximum stone size shall not be larger than the
thickness of the riprap.
2. The specific gravity of the riprap shall be 2.5 or greater.
3. Neither width nor thickness of a single stone of riprap shall be less than
1/3 of its length.
4. Broken concrete or asphalt pavement shall not be acceptable for use in
the work. Rounded riprap (river rock) is not acceptable unless specifically
designated on the Drawings.
5. The color of the riprap shall be gray with gray/blue hues and approved by
the ENGINEER prior to delivery to the project site. Color shall be
consistent on the entire project and shall match the color of rock to be
used for all other portions of the work.
6. Minimum density for acceptable riprap shall be 165 pounds per cubic foot.
The specific gravity shall be according to the bulk-saturated, surface-dry
basis, AASHTO T85.
7. The riprap shall have a percentage loss of not more than 40 percent after
500 revolutions when tested in the Los Angeles machine in accordance
with AASHTO Test T96.
8. The riprap shall have a percentage loss of not more than 10 percent after
5 cycles when tested in accordance with AASHTO Test T104 for ledge
rock using sodium sulfate.
9. The riprap shall have a percentage loss of not more than 10 percent after
12 cycles of freezing and thawing when tested in accordance with
AASHTO Test T103 for ledge rock, procedure A.
10. Rock shall be free of calcite intrusions.
11. Each load of riprap shall be reasonably well graded from the smallest to
the largest size specified. Stones smaller than the 2-10 percent size will
not be permitted in an amount exceeding 10 percent by weight of each
load.
Control of gradation will be by visual inspection. However in the event the
ENGINEER determines the riprap to be unacceptable, the ENGINEER will pick 2
random truck loads to be dumped and checked for gradation. Mechanical
equipment and labor needed to assist in checking gradation shall be provided by
the CONTRACTOR at no additional cost.
B. Bedding:
Fort Collins Utilities Master Specifications Riprap, Bedding, and Features Boulders
June 2012 02375-3
1. Gradation for Granular Bedding
U.S. Standard Percent by Weight
Passing
Square Mesh Sieves
Sieve Size Type I Type II
3 Inch 90 - 100
1-½ Inch
¾ Inch 20 - 90
3/8 Inch 100
No. 4 95 - 100 0 - 20
No. 16 45 - 80
No. 50 10 - 30
No. 100 2 - 10
No. 200 0 - 2 0 - 3
Granular bedding designation and total thickness of bedding shall be as shown
on the Drawings. Granular bedding shall meet the same requirements for
specific gravity, absorption, abrasion, sodium sulfate soundness, and freeze-
thaw durability as required for riprap and specified above.
C. Geotextile Fabric:
Where soil conditions dictate, geotextile fabric shall be placed directly on
excavated slopes, channel beds, etc. prior to the placement of any riprap
bedding or riprap. The extent and location of geotextile placement will be shown
on the Drawings.
Geotextile fabric shall be Trevira S1135 or approved equal under all rock drop
structures and Trevira S1120 or approved equal under all riprap.
D. Feature Boulders:
Feature boulders shall meet the same material requirements as riprap unless
designated otherwise on the drawings. The shape of the boulders shall be as
designated on the Drawings. Feature Boulders shall have a minimum dimension
of 4 feet, or as shown on the Drawings.
PART 3 - EXECUTION
3.01 CONSTRUCTION REQUIREMENTS
A. Channel slopes, bottoms, or other areas that are to be protected with riprap shall
be free of brush, trees, stumps, and other objectionable material and be graded
to a smooth compacted surface. The CONTRACTOR shall excavate areas to
receive riprap to the subgrade for granular bedding. The subgrade for bedding
materials shall be stable. If unsuitable materials are encountered, they shall be
removed and replaced as Muck Excavation in accordance with Section 02315 of
the Specifications. Unsuitable materials shall be disposed of from the site by the
CONTRACTOR at his expense. After an acceptable subgrade for granular
bedding material is established, the bedding shall be immediately placed and
Fort Collins Utilities Master Specifications Riprap, Bedding, and Features Boulders
June 2012 02375-4
leveled to the subgrade elevation. Immediately following this, the riprap shall be
placed. If bedding material is disturbed for any reason, it shall be replaced and
graded at the CONTRACTOR’s expense. In-place bedding materials shall not be
contaminated with soils, debris or vegetation before the riprap is placed. If
contaminated, the bedding material shall be removed and replaced at the
CONTRACTOR’s expense.
3.02 PLACEMENT
A. Following acceptable placement of geotextile fabric, granular bedding, riprap
placement shall commence as follows:
1. Machine Placed Riprap: Riprap shall be placed on the prepared slope or
channel bottom areas in a manner which will produce a reasonably well-
graded mass of stone with the minimum practicable percentage of voids.
Riprap shall be machine placed, unless otherwise stipulated in the
Drawings or Specifications.
When riprap is placed on slopes, placement shall commence at the
bottom of the slopes working up the slope. Place the riprap in a stepped
fashion with the bottom of the uphill riprap below the top of the downhill
riprap by half of the height of the riprap minimum.
The entire mass of riprap shall be placed on either channel slopes or
bottoms so as to be in conformance with the required gradation mixtures
and to lines, grades, and thickness shown on the Drawings. Riprap shall
be placed to its full course thickness at one operation and in such a
manner as to avoid displacing the underlying bedding material. Placing of
riprap in layers, or by dumping into chutes, or by similar methods shall not
be permitted.
All material going into riprap protection for channel slopes or bottoms
shall be so placed and distributed that there will be no large
accumulations of either the larger or smaller sizes of stone. Some hand
placement may be required to achieve this distribution.
It is the intent of these Specifications to produce a fairly compact riprap
protection in which all sizes of material are placed in their proper
proportions. Unless otherwise authorized by the ENGINEER, the riprap
protection shall be placed in conjunction with the construction of
embankments or channel bottoms with only sufficient delay in
construction of the riprap protection, as may be necessary, to allow for
proper construction of the portion of the embankment and channel bottom
which is to be protected. The CONTRACTOR shall maintain the riprap
protection until accepted. Any material displaced for any reason shall be
replaced to the lines and grades shown on the Drawings at no additional
cost to the OWNER. If the bedding materials are removed or disturbed,
such material shall be replaced prior to replacing the displaced riprap.
2. Hand Placed Riprap: Hand placed riprap shall be performed during
machine placement of riprap and shall conform to all the requirements of
Section 02375 PART 2 above. Hand placed riprap shall also be required
when the depth of riprap is less than 2 times the nominal stone size, or
when required by the Drawings or Specifications.
Fort Collins Utilities Master Specifications Riprap, Bedding, and Features Boulders
June 2012 02375-5
After the riprap has been placed, hand placing or rearranging of individual
stones by mechanical equipment shall be required to the extent
necessary to secure a flat uniform surface and the specified depth of
riprap, to the lines and grades as shown on the Drawings.
3. Soil Replacement In and Over Riprap: Where riprap is designated to be
buried, place onsite excavated material that is free from trash and organic
matter in riprap voids by washing and rodding. Prevent excessive
washing of material into stream. When voids are filled and the surface
accepted by the ENGINEER, place a nominal 6 inches of soil over the
area, or as designated on the Drawings. Fine grade, seed, and mulch per
the Specifications.
4. Rejection of Work and Materials: The ENGINEER shall reject placed
riprap which does not conform to this Section and the CONTRACTOR
shall immediately remove and relay the riprap to conform with said
sections.
Riprap shall be rejected, which is either delivered to the job site or placed,
that does not conform to this Section. Rejected riprap shall be removed
from the project site by the CONTRACTOR and at his expense.
5. Feature Boulders, unless identified as energy dissipation boulders, serve
as an aesthetic function and as such shall be placed and rotated into final
position as directed by the ENGINEER in order to achieve the desired
result.
6. Geotextile fabric shall be installed according to the manufacturer’s
specifications. Material proposed for use shall be submitted and
approved by the ENGINEER prior to installation.
END OF SECTION
SECTION 02410
TUNNEL EXCAVATION AND GROUTING
PART 1 - GENERAL
1.1 SCOPE
A. This section presents requirements for excavating, furnishing and installing one 168-inch inside
diameter tunnel by trenchless construction methods. The tunnel work spans underneath one
railroad track maintained and operated by BNSF.
B. This project is facilitated using the City of Fort Collins’ (Owner) Alternative Project Delivery
System (APDS). As such, the selected Contractor shall be involved throughout both the design
and construction phases of the work.
1.2 RELATED SECTIONS
A. 02415 – Installation of Steel Pipe Guide Rails
B. 02470 – Geotechnical Instrumentation and Monitoring
1.3 REQUIREMENTS
A. Tunnel excavation shall be accomplished through the use of mechanical or hand mining
methods inside a steel shield at the leading edge of the initial support.
B. Initial support is required and shall be accomplished through the use of a steel pipe that is
jacked into position via a jacking frame at the portal.
C. Variable ground conditions are anticipated including the presence of debris including but not
limited to wooden timbers. The excavation and initial support system shall be capable of
excavating and supporting the ground in the anticipated ground conditions as well as advancing
the tunnel to completion as shown on the Contract Drawings.
D. Tunneling or jacking undertaken under the railroad shall not damage, impair, or interfere with
the operation of the facility.
E. The Contractor shall determine and be responsible for the following within the limits specified
and shown: 1) tunnel excavation means and methods; 2) Initial Support, and 3) means and
methods of ground control and groundwater control.
F. Contact Grouting shall be performed as specified herein.
1.4 GENERAL
A. This specification is applicable for projects or work involving either inch-pound or SI units.
Within the text and accompanying tables, the inch-pound units are given preference.
B. Tunneling/Trenchless shall be staged from the east portal of the proposed tunnel.
11/14/2014 02410 – Tunnel Excavation & Grouting
100% Submittal Page 1 of 11
C. All appropriate permits shall be acquired prior to the initiation of the work.
1.5 CONTRACTOR EXPERIENCE
A. Only the pre-qualified tunneling Contractor, who is a member of the APDS team, will be
allowed to perform the tunneling operations in these Contract Documents.
B. Supervision. Each jacking shift shall be supervised by at least one person with previous
experience of the work. Application for acceptance of named supervisors shall be made to the
Engineer prior to the commencement of work.
C. Operation. System operators shall be experienced personnel with prior knowledge and ability in
the proper operation of the systems being employed. Application for acceptance of named
operators shall be made to the Engineer prior to the commencement of work.
D. Contractor shall provide evidence of OSHA certification for site safety representative and
personnel responsible for air quality monitoring.
1.6 DEFINITIONS
A. One-Pass Tunneling System: A method of tunneling in which the Carrier Pipe is advanced
concurrently with tunnel excavation in a single operation, and serves as both initial ground
support and the final lining.
B. Jacked Tunneling System: A method of tunneling in which the tunnel is excavated and the pipe
is advanced by jacking concurrently with tunnel excavation to provide initial ground support for
the tunnel.
C. Initial Support: Ground support installed near the point of excavation and soon after excavation
for the purpose of stabilizing the opening and providing for worker safety. Initial Support shall
consist of steel casing pipe that is a Jacked Tunneling System. Initial Support may serve as the
final tunnel lining and product pipe.
D. Contact Grouting: Injection of Portland Cement-based grout between the outside of the Initial
Support and the ground.
E. Tunneling Shield: A metal canopy or ring housing tunnel excavation and muck removal
equipment that is pushed forward as the tunnel advances providing temporary ground control
and support at the face and tunnel perimeter during tunneling.
F. Mechanical Excavation: The use of a machine for excavation of the ground including but not
limited to a backhoe, digger arm, or roadheader.
G. Hand Excavation: The use of human labor for excavation of the ground including but not
limited to shovels, picks, pneumatic spades and other hand-held tools.
H. BNSF: Burlington Northern Santa Fe Railroad.
I. Face: The location where excavation takes place; the head of the tunnel excavation; typically
vertical or near vertical.
11/14/2014 02410 – Tunnel Excavation & Grouting
100% Submittal Page 2 of 11
J. Jacking Frame: A structural component, fitted with hydraulic cylinders, which is used to push
the shield and pipe string into the ground. The jacking frame serves to distribute the thrust load
to the pipe string and the reaction load to the portal wall or thrust wall.
K. Jacking Pipe: A specialty pipe that is engineered and manufactured with a smooth outer wall
and watertight joints. The pipe is specifically designed to be jacked through the ground and
may also serve as a product pipe.
L. Laser: An optical system projecting a beam onto a target to provide guidance reference during
the tunnel excavation.
M. Lubricant (Lubrication): A fluid, normally bentonite and/or polymers, used to reduce frictional
jacking loads on the jacking pipe and fill the annular space.
1.7 SUBMITTALS
A. Pre-Construction Submittals - Submit the following prior to commencement of Work:
1. Tunnel Shield
a. Tunnel Shield configuration(s) including drawings showing proposed overcut, brow
configuration, and stabilizing beams.
b. Tunnel Shield capabilities for dealing with anticipated ground conditions including
the use of breasting plates and/or tables.
c. Grade and alignment control system.
2. Pipe and Pipe Jacking
a. Proposed pipe materials, selected joint design, and wall thickness.
b. Pipe coupling method including method to maintain pipe segment alignment during
jacking if segments are welded after installation as discussed herein.
c. Plan of location of interjacks (if necessary) and design drawings of interjacks
d. Plan for removal of interjacks and closure of void between pipe segments.
e. Lubricating plan showing, mixture, pumping pressures, and volumes including
Frequency and location of lubrication ports in Tunnel Shield and pipes.
3. Jacking and Retrieval Areas for Tunneling
a. Jacking frame configuration including statement that jacking frame has the necessary
thrust capacity as specified herein.
b. Design of the connection for load transfer from the thrust block to main jacks.
4. Contingency Plans. Detailed contingency plans are required for the following:
11/14/2014 02410 – Tunnel Excavation & Grouting
100% Submittal Page 3 of 11
a. High jacking forces.
b. Damaged pipe.
c. Obstruction(s).
d. Settlement.
e. Loss of line or grade.
f. Major mechanical breakdown.
g. Stoppage of jacking.
h. Strong hydrocarbon smell in muck.
i. Damage to alignment laser.
5. Tunnel monitoring and controls including line and grade controls, surveying, and
procedures to measure the actual volume of muck removed per unit length of tunnel.
6. Description of the muck haul routes and disposal site with hours of haulage and frequency
of trucks.
7. Contractor’s tunnel safety and accident prevention program, code of safe practices, and
emergency plan. Submittal shall be for record purposes only.
B. Construction Submittals - Submit the following during construction:
1. Daily Logs. The Daily Logs shall be submitted within one working day for each day and
shall contain as a minimum the information specified in Part 3 - Execution.
2. Survey records of tunnel excavation and advancement including deviations from design
line and grade. Submit copies of the notes on a weekly basis of the indicating how the
position of face of the excavation, and the line and grade of the tunnel was determined.
3. Results of all material tests specified herein. Test results shall be submitted within one
week after completion of each test.
C. Post-Construction Submittals. Submit the following within one week of completion of the
tunnel drive:
4. Survey of the line and grade of the completed tunnel.
PART 2 - EQUIPMENT, PRODUCTS AND MATERIALS
2.1 MATERIALS
A. Jacking Pipe.
11/14/2014 02410 – Tunnel Excavation & Grouting
100% Submittal Page 4 of 11
1. Minimum steel pipe wall thickness shall be 1.25 inches.
2. Jacking Pipe shall be specifically designed by the pipe manufacturer and be in accordance
with the pipe manufacturer’s specifications and guidelines for jacked pipe. The pipe shall
have sufficient strength and wall thickness to prevent failure from the horizontal, vertical
and longitudinal loads applied to it during the installation and grouting operations. Pipe
shall be able to safely resist applied loads including ground, Cooper E80 loading,
surcharge, water, construction and machine loads taking into consideration non-uniform
loading, and stress concentrations. Include all loads and stresses caused by fabrication,
transportation, and construction operations including handling, erecting, jacking stresses,
and grouting pressures.
B. Pipe Joints.
1. Joints for Jacking Pipe shall be welded. Joints that allow offset or displacement of pipe
sections are not allowed. Jacking Pipe joints shall be specifically designed by the pipe
manufacturer and be in accordance with the pipe manufacturer’s specifications and
guidelines for jacked pipe. The joints shall carry the horizontal, vertical and longitudinal
loads applied to it.
2. The Contractor, at its option, may weld the pipe joints before or after pipe installation as
shown on the Drawings. If welding is performed after installation, a method shall be used
that maintains the pipe segments in proper alignment for continued jacking and installation.
C. Contact Grout. Grout for displacing bentonite and filling the void between the pipe and the soil
shall consist of Portland cement, water and fluidizers as required to produce a satisfactory
pumpable grout with a minimum 28-day compressive strength of at least 300 psi.
D. Annulus Lubrication. Lubrication in the annulus outside the Jacking Pipe shall be a mixture of
bentonite, water and additives, and shall be designed by the Contractor. The lubrication shall be
non-toxic and shall not release environmental contaminants into the ground or groundwater
either directly or from degradation over time.
2.2 EQUIPMENT
A. Tunnel Excavation Equipment. The Contractor shall design the tunnel excavation equipment
within the limits specified herein. The tunneling system must be capable of being operated in a
manner which prevents loss of ground during tunneling and shall be steerable and capable of
controlling the advance of the heading to maintain line and grade within the tolerances
specified. The tunnel excavation equipment shall be designed for excavating and installing pipe
through the geologic materials as described in the geotechnical information.
B. Jacking Equipment. The jacking system shall be capable of providing a sustainable jacking
force equal to the anticipated maximum jacking force plus 20% at a minimum. The jacking
hydraulic circuit shall be set to relieve pressure at the maximum safe working capacity of the
pipe as stipulated by the Contractor, or the design load for the jacking pit thrust block,
whichever is less. The jacking system shall exert a uniform load to the pipe ring and at a speed
commensurate with the speed of excavation advance.
C. Lubrication System. The Contractor shall utilize a lubrication system to lower the friction
developed on the sides of the pipe during jacking.
11/14/2014 02410 – Tunnel Excavation & Grouting
100% Submittal Page 5 of 11
D. Ancillary Equipment. The Contractor shall determine the equipment used for all ancillary work
including but not limited to muck removal, materials transfer and tunneling utilities.
E. Surveying. A laser, optical or other system shall be used to maintain line and grade at all times.
The base for the survey system shall be set such that it is isolated from the jacking frame and
other tunneling components that could move during the work.
PART 3 - EXECUTION
3.1 GENERAL
A. Do not begin tunneling until:
1. Required submittals have been made and approved by the Owner’s Representative.
2. Portal excavations, stabilization, and shoring have been satisfactorily completed.
3. All monitoring and instrumentation has been installed and initial measurements have been
obtained per Section 02470 Geotechnical Instrumentation and Monitoring.
4. Survey control has been established for the tunnel.
5. The steel guide rail pipes are backfill grouted and the backfill has reached a compressive
strength of at least 2000 psi.
B. The hours of work and permitted noise levels for this project shall be indicated on the
Drawings, the Special Provisions to this item or as directed by the Owner’s Representative.
C. The Contractor is solely responsible for the adequacy of the tunnel and support system, pipe
placement and the faithful execution of the work covered by the Contract.
D. Maintain clean working conditions at all times inside the tunnel and portals. All excavated soil,
slush, grout spills, ponded water, and any other material not required for tunneling shall be
removed from the excavation in a timely manner.
E. Perform all work in the presence of the Owner’s Representative, unless the Owner’s
Representative has granted prior approval in writing to perform such work in his absence.
Provide access for the Owner’s Representative. Access shall include use of transportation
facilities used by the Contractor’s personnel within the portals. Access shall be for, but not be
limited to: inspect and observe the work, perform independent line and grade surveys, geologic
mapping, monitoring of instrumentation, and for installation of additional instrumentation.
F. Perform all work in accordance with all current applicable regulations and codes of federal,
state, and local agencies. In the event of conflict, comply with the strictest or most restrictive
applicable requirements.
G. Verify of conditions prior to commencement of work including layout and field measurements
and notify the Owner’s Representative of discrepancies.
11/14/2014 02410 – Tunnel Excavation & Grouting
100% Submittal Page 6 of 11
3.2 MUCK HANDLING
A. A temporary stockpile is allowed within the limits of the Contractor's Staging Area. The
temporary stockpile shall be wetted frequently or covered to control dust.
B. The Contractor shall use the identified muck disposal site and shall be responsible for all
transportation and disposal costs of the muck.
C. Hauling and disposal of materials shall be in accordance with all Federal, State, and local laws,
regulations, and ordinances.
D. All roads used for hauling shall be kept free of debris and open for use by others. Spillage and
obstructions on the road resulting from hauling shall be immediately removed.
3.3 SAFETY AND UTILITIES
A. The Contractor shall have sole responsibility for the safety of the tunnel and of persons engaged
in the work. Perform all work in accordance with the current applicable regulations and codes
of the federal, state and local agencies. Comply with all applicable provisions of 29 CFR Part
1926, Subpart S, and Underground Construction by OSHA.
B. Methods of construction shall ensure the safety of the work, project participants, the public,
third parties, and adjacent property, whether public or private. The Contractor is solely and
completely responsible for maintaining safe working conditions at the site at all times.
C. Conduct all tunneling operations by methods and with equipment and provide sufficient
facilities which will positively control the work environment in accordance with local laws,
safety codes, regulations, and ordinances. Provide all instrumentation and monitor as necessary
to assure that safety requirements are achieved.
D. Design, install and operate tunneling support utilities as necessary for support of construction
and the safety of workers in accordance with project requirements and all Federal, State, and
local laws, regulations, and codes. Utilities shall include but not be limited to electrical,
lighting, telephone and communications, sanitary sewer, water supply, water discharge, and
ventilation.
E. All underground construction shall be performed in accordance with the applicable fire
prevention and control requirements of OSHA and local Fire Department ordinances.
3.4 SETTLEMENT AND GROUND MOVEMENT
F. Settlement at the ground surface shall not exceed the limits provided in Section 02470,
Geotechnical Instrumentation and Monitoring.
G. Ground Movement within the BNSF Right of Way shall be in accordance with the respective
permit and requirements.
H. In the event that the settlement criteria are exceeded, the Contractor shall immediately make
adjustments in work procedures and perform necessary ground improvements to reduce
settlement to within specified limits as provided for in the submitted Contingency Plan.
11/14/2014 02410 – Tunnel Excavation & Grouting
100% Submittal Page 7 of 11
I. The Contractor shall be responsible for and bear the cost for all damages to all facilities caused
by underground construction including but not limited to tunnels, portals, grouting and
associated phenomena including but not limited to settlement, heave, grout contamination and
hydrofracturing. The liability for damages shall include but not be limited to direct costs of
repair or replacement and loss of use.
J. In the event there are damages, the Contractor shall make financial reparations to the Owner and
the third party affected or shall repair all damage, at the option of the Owner and the third party.
Repairs by the Contractor shall be completed immediately if a third party or the Owner are
inconvenienced by the damage, and in no case later than thirty (30) days after the damage is
discovered.
3.5 EXISTING UTILITIES
A. The Contractor shall be responsible for protecting all existing surface structures and utilities
from disturbances caused by tunnel construction. Perform tunneling operations in a manner that
will limit loss of ground and limit settlement of the ground surface, structures, and utilities
above and adjacent to the tunnel. Perform tunneling operations in a manner that will limit loss
of ground and limit settlement of the ground surface, structures, and utilities above and adjacent
to the tunnel. Known utilities are shown on the Contract Drawings.
3.6 SURVEY
B. At completion of tunneling and installation of the Pipe survey the Pipe invert at points not
greater than 25 ft intervals.
3.7 TUNNELING - GENERAL
A. Tunneling shall be conducted to minimize movement of the ground in front of and surrounding
the tunnel and to control the loss of ground, surface settlement, and heave of the ground surface.
B. Support the ground to provide safety, prevent loss of ground, and to keep the perimeter and face
of the tunnel excavation stable.
C. Tunnels and portals shall be drained as necessary to obtain satisfactory working conditions.
Keep the tunnel floor free from standing water.
3.8 SHIELD TUNNELING
A. Limit over-excavation beyond the Shield to less than or equal to a 1.0 inch radius.
B. Support the ground to provide safety, prevent loss of ground, and to keep the perimeter and face
of the tunnel excavation stable.
C. Control the advance rate, volume of material excavated, and pressure applied to the tunnel face
to avoid over-excavation, loss of ground, and heave of the ground surface.
D. Carefully control and monitor volume of ground removed. Compare theoretical and actual
volumes of soil removed. Adjust advance rate and excavation rate to avoid over-excavation.
Investigate potential voids created by over-excavation.
11/14/2014 02410 – Tunnel Excavation & Grouting
100% Submittal Page 8 of 11
E. During shutdowns and other interruptions in tunnel excavation work in unstable ground provide
complete positive support for the face by positioning the Shield or breasting boards firmly
against the face.
3.9 JACKING
A. Each pipe section shall be jacked forward as the excavation progresses in such a way as to
provide complete and adequate support to the surrounding ground at all times.
B. Avoid damage to pipe sections and joints during jacking. In the event of damage to a pipe
section or pipe joint, the Contractor shall notify the Owner’s Representative within the day of
observation of the damage. The Contractor shall jack all damaged pipe sections completely
through the tunnel following tunnel excavation or make repairs to the pipe that are suitable to
the Owner’s Representative.
C. The Contractor shall limit the jacking force to stay at or below safe working limit of the Jacking
Pipe. The jacking loads shall be continuously monitored and recorded at the jacking frame.
D. Use even pressure to all jacks during operation. Provide a suitable jacking head and suitable
bracing between the jacks and the jacking head to apply uniform pressure around the ring of the
pipe or circumference of the box.
E. Steering corrections made to the tunnel alignment shall be carried out in such a manner that the
joint angle of any two adjacent pipes or segments does not exceed allowable limits. Avoid
excessive steering. If the tunnel is off of the design line and grade, but within the tolerance
criteria, make steering corrections slowly by aiming for the correct end point of the drive.
Steering corrections shall not exceed recommendations of the Pipe manufacturer.
3.10 TUNNEL GROUTING
A. The annular space around the installed pipes shall, as early as reasonably possible after
completion of each section of tunneling, (and all intermediate jacking stations for a pipe jacked
tunnel closed) be filled with an approved Contact Grout.
B. Grout Connections: The Contractor shall provide Grout/Lubrication ports within the pipe wall
as shown in the drawings. Threaded port grout port plugs shall be provided for all grout ports.
C. The pressure and the volume of grout shall be controlled by the Contractor to avoid pipe
damage and displacement of the pipe and soil. Grout pressure shall be controlled so as to avoid
deformation of the casing pipe and avoid movement of the surrounding ground.
D. In no case shall the grout pressure exceed 10 psi at the point of discharge at the grout port.
3.11 TOLERANCES
A. The Carrier Pipe shall have a horizontal alignment within 12 inches of the alignment shown on
the Contract Drawings. The Carrier Pipe alignment shall not change by more than one inch per
50 feet.
B. The inverts of the Carrier Pipes shall be within six inches of the elevations shown on the
Contract Drawings. The Carrier Pipe invert grade shall not change by more than one inch per
11/14/2014 02410 – Tunnel Excavation & Grouting
100% Submittal Page 9 of 11
50 feet.
C. Changes in Carrier Pipe alignment and grade shall be made gradually such that pipe joints are
mated within the pipe manufacturer’s specifications, fully functional and not compromised in
any way.
D. If the Carrier Pipe is off line and/or grade by more than the specified tolerances, the Contractor
or Subcontractor shall make adjustments, repairs and changes as necessary to achieve the
specified tolerances. Should the tunnel be outside the above tolerance requirements, then the
face of excavation or leading edge of the pipe, shall be returned to the plane line and/or grade at
a rate of not more than 1 inch per 25 feet of tunneling.
E. If the tunnel is sufficiently far off line and/or grade to require redesign of structures, acquisition
of easements, or backfilling and re-excavation, the Contractor shall be responsible for doing all
additional work and costs. If the Carrier Pipe is off line and/or grade by an amount that
requires, in the opinion of the Owner’s Representative, re-design of any structure, the
Contractor or subcontractor shall be responsible for all redesign costs.
3.12 DAILY LOGS
A. Maintain Daily Logs of the work. As a minimum the Daily Logs shall contain the following:
B. Station of the face of the excavation and advance for each shift and day.
C. Description of the ground conditions including type of soil or rock, groundwater conditions and
flow, and ground behavior.
D. Muck quantity measured with comparison against the theoretical muck quantity, and description
of the muck.
E. Work hours, equipment and crews in use with persons and craft designations.
F. Method of excavation.
G. Cutter head torque.
H. Any unusual conditions, breakdowns and delays.
I. Monitoring and control data including survey records, line and grade checks with deviations
from design, and jacking loads.
J. Jacking Pressures, start, stop, and maximum for each pipe. Including pressures for Intermediate
Jacking.
K. Steering, including position of steering jacks.
L. Installation time of each pipe with a respective pipe identification name/number.
M. When, where, and how much lubrication was injected.
11/14/2014 02410 – Tunnel Excavation & Grouting
100% Submittal Page 10 of 11
3.13 RESTORATION OF THE JACKING SLAB AREA AND RETRIEVAL AREA
A. Upon tunnel completion, the jacking slab, thrust block, and retrieval areas shall be backfilled
and/or removed and graded as shown on the drawings.
END OF SECTION
11/14/2014 02410 – Tunnel Excavation & Grouting
100% Submittal Page 11 of 11
SECTION 02415
INSTALLATION OF STEEL PIPE GUIDE RAILS
PART 1 - GENERAL
1.1 SCOPE
A. This section presents requirements for excavating, furnishing and installing two steel pipe guide
rails by trenchless construction methods. The guide rails will be to assist the installation of the
primary tunnel as specified in Section 02410 – Tunnel Excavation and Grouting. The tunnel
work spans underneath one railroad track maintained and operated by BNSF.
B. This project is facilitated using the City of Fort Collins’ (Owner) Alternative Project Delivery
System (APDS). As such, the selected Contractor shall be involved throughout both the design
and construction phases of the work.
1.2 RELATED SECTIONS
A. 02410 – Tunnel Excavation and Grouting
B. 02470 – Geotechnical Instrumentation and Monitoring
1.3 REQUIREMENTS
A. Tunnel excavation shall be accomplished through the use of guided auger boring or guided pipe
ramming at the Contractor’s option.
B. The guidance method for the installation of the Steel Guide Rails shall be by Pilot Tube as
specified herein.
C. Tunneling or jacking undertaken under the railroad shall not damage, impair, or interfere with
the operation of the facility.
D. The Contractor shall determine and be responsible for the following within the limits specified
and shown: 1) tunnel excavation means and methods; 2) Initial Support, and 3) means and
methods of ground control and groundwater control.
1.4 GENERAL
A. This specification is applicable for projects or work involving either inch-pound or SI units.
Within the text and accompanying tables, the inch-pound units are given preference.
B. Trenchless work shall be staged from the east portal of the proposed tunnel.
C. All appropriate permits shall be acquired prior to the initiation of the work.
1.5 CONTRACTOR EXPERIENCE
A. Only the pre-qualified tunneling Contractor or its subcontractor approved by the Owner’s
11/14/2014 02415 – Installation of Steel Pipe Guide Rails
100% Submittal Page 1 of 7
Representative, who is a member of the APDS team, will be allowed to perform the tunneling
and Pilot Tube operations in these Contract Documents.
B. Supervision. Each jacking shift, including Pilot Tube installation, shall be supervised by at least
one person with previous experience of the work. Application for acceptance of named
supervisors shall be made to the Engineer prior to the commencement of work.
C. Operation. System operators shall be experienced personnel with prior knowledge and ability in
the proper operation of the systems being employed. Application for acceptance of named
operators shall be made to the Engineer prior to the commencement of work.
D. Contractor shall provide evidence of OSHA certification for site safety representative and
personnel responsible for air quality monitoring.
1.6 DEFINITIONS
A. Pilot Tube: Small diameter pipe pushed and or drilled into ground with directional control and
tight tolerances used as a pilot hole for larger trenchless installations.
B. Pipe Ramming: The trenchless installation of a pipe by driving an open-ended Pipe using a
pneumatically powered percussive hammer with selective removal of soil from inside the Pipe.
C. Auger Boring: The trenchless installation of a pipe by rotating augers that excavate the ground
while simultaneously transporting muck to the rear of the pipe.
D. BNSF: Burlington Northern Santa Fe Railroad.
E. Jacking Pipe: A specialty pipe that is engineered and manufactured with a smooth outer wall
and watertight joints. The pipe is specifically designed to be jacked through the ground and
may also serve as a product pipe.
F. Laser: An optical system projecting a beam onto a target to provide guidance reference during
the tunnel excavation.
G. Lubricant (Lubrication): A fluid, normally bentonite and/or polymers, used to reduce frictional
jacking loads on the jacking pipe and fill the annular space.
1.7 SUBMITTALS
A. Pre-Construction Submittals - Submit the following prior to commencement of Work:
1. Working drawings and written procedures describing in detail the proposed method of
installation. This shall include, but is not limited to; size, capacity and set up requirements
of equipment; dewatering if applicable; method of fusion and type of equipment for joining
pipe; type of cutting tool head; and method of monitoring and controlling line and grade.
If the Contractor determines that modifications to the method and equipment as stated in
the submittal is necessary during construction, the Contractor shall submit a plan
describing such modifications, including the reasons for the modification.
2. Jacking frame configuration including statement that jacking frame has the necessary thrust
capacity as specified herein.
11/14/2014 02415 – Installation of Steel Pipe Guide Rails
100% Submittal Page 2 of 7
3. Tunnel monitoring and controls including line and grade controls, surveying, and
procedures to measure the actual volume of muck removed per unit length of tunnel.
B. Post-Construction Submittals. Submit the following within one week of completion of the
tunnel drives:
4. Survey of the line and grade of the completed guide rail tunnels.
PART 2 - EQUIPMENT, PRODUCTS AND MATERIALS
2.1 MATERIALS
A. Jacking or Ramming Pipe.
1. Jacking or Ramming Pipe shall be specifically designed by the pipe manufacturer and be in
accordance with the pipe manufacturer’s specifications and guidelines for jacked or
rammed pipe. The pipe shall have sufficient strength and wall thickness to prevent failure
from the horizontal, vertical and longitudinal loads applied to it during the installation and
grouting operations. Pipe shall be able to safely resist applied loads including ground,
Cooper E80 loading, surcharge, water, construction and machine loads taking into
consideration non-uniform loading, and stress concentrations. Include all loads and
stresses caused by fabrication, transportation, and construction operations including
handling, erecting, jacking stresses, and grouting pressures.
B. Pipe Joints.
1. Joints for Jacking Pipe may be welded or interlocking joints such as Permalok.
2. Joints for Pipe Ramming shall be welded.
3. Joints that allow offset or displacement of pipe sections are not allowed. Jacking Pipe
joints shall be flush on the exterior and specifically designed by the pipe manufacturer and
be in accordance with the pipe manufacturer’s specifications and guidelines for jacked
pipe. The joints shall carry the horizontal, vertical and longitudinal loads applied to it.
2.2 EQUIPMENT
A. Pilot Tube Equipment. The Contractor shall provide all necessary equipment to complete the
Pilot Tube installations. The guidance system shall be capable of maintaining line and grade of
the Pilot Tube within the limitations specified herein.
B. Jacking Equipment. The jacking system shall be capable of providing a sustainable jacking
force equal to the anticipated maximum jacking force plus 20% at a minimum. The jacking
hydraulic circuit shall be set to relieve pressure at the maximum safe working capacity of the
pipe as stipulated by the Contractor, or the design load for the jacking pit thrust block,
whichever is less. The jacking system shall exert a uniform load to the pipe ring and at a speed
commensurate with the speed of excavation advance.
C. Ramming Equipment. The Pneumatic pipe pusher/driving device shall be specifically designed
11/14/2014 02415 – Installation of Steel Pipe Guide Rails
100% Submittal Page 3 of 7
for installing pipe from a drive pit through the ground conditions present. The forces on the ram
shall be easily regulated down to the safe working load rating of the pipe.
D. Spoil Removing System. The system for removing spoils from inside the pipe shall be capable
of being operated in controlled manner such that the size of the plug can be controlled.
E. Ancillary Equipment. The Contractor shall determine the equipment used for all ancillary work
including but not limited to muck removal, materials transfer and tunneling utilities.
F. Surveying. A laser, optical or other system shall be used to maintain line and grade at all times.
The base for the survey system shall be set such that it is isolated from the jacking frame and
other tunneling components that could move during the work.
PART 3 - EXECUTION
3.1 GENERAL
A. Do not begin tunneling or Pilot Tube installation until:
1. Required submittals have been made and approved by the Owner’s Representative.
2. Portal excavations, stabilization, and shoring have been satisfactorily completed.
3. All monitoring and instrumentation has been installed and initial measurements have been
obtained per Section 02470 Geotechnical Instrumentation and Monitoring.
4. Survey control has been established for the tunnel.
B. The requirements specified in Section 02410 – Tunnel Excavation and Grouting Section 3.1
shall apply to this Section.
3.2 SETTLEMENT AND GROUND MOVEMENT
C. Settlement at the ground surface shall not exceed the limits provided in Section 02470,
Geotechnical Instrumentation and Monitoring.
D. Ground Movement within the BNSF Right of Way shall be in accordance with the respective
permit and requirements.
3.3 EXISTING UTILITIES
A. The Contractor shall be responsible for protecting all existing surface structures and utilities
from disturbances caused by tunnel construction. Perform tunneling operations in a manner that
will limit loss of ground and limit settlement of the ground surface, structures, and utilities
above and adjacent to the tunnel. Perform tunneling operations in a manner that will limit loss
of ground and limit settlement of the ground surface, structures, and utilities above and adjacent
to the tunnel. Known utilities are shown on the Contract Drawings.
3.4 PILOT TUBE INSTALLATION
11/14/2014 02415 – Installation of Steel Pipe Guide Rails
100% Submittal Page 4 of 7
A. There shall be a system to guide the pilot tube by controlling the orientation and inclination of
the steering head. The system and the steering head shall be such that if deviations are detected,
the operator can modify the direction of advance of the steering head and pilot tube. The
steering head shall have a slanted leading surface or other method of controlling the advance
direction.
B. A monitoring system shall be used and shall consist of an optical theodolite or laser based
instrument set on design line and grade, target, and camera or monitoring screen which gives
the operator continuous information on the location of the steering head. The monitoring
equipment shall be capable of continuously monitoring the following:
1. The jacking pressure and advancement of the head of the pilot tube.
2. Position and deviation of the head of the pilot tube.
3. Inclination and orientation of the steering head.
C. The angle of the slant on the steering head shall be chosen by the Contractor and shall be
capable of directional change.
D. The entry angle of the pilot hole and the boring process shall be straight and have a vertical and
horizontal tolerance of plus or minus 1 inch for the full length of the pilot run.
E. If adjustments are required to the bore alignment of the pilot tube, the Contractor shall notify
the Engineer for approval prior to making adjustments.
F. Each pipe section shall be jacked forward as the excavation progresses in such a way as to
provide complete and adequate support to the surrounding ground at all times.
G. The Contractor shall limit the advancing force to stay at or below safe working limit of the pilot
tube.
H. Steering corrections made to the pilot bore alignment shall be carried out in such a manner that
the joint angle of any two adjacent pipes or segments does not exceed allowable limits.
3.5 STEEL GUIDE RAIL PIPE INSTALLATION
A. General
4. Steel Guide Rail Pipe used for guide rails shall be minimum 12 inches inside diameter with
minimum 3/8 inch wall thickness with a yield tensile strength of at least 35,000 psi, and
ultimate tensile strength of at least 60,000 psi.
5. The Engineer shall be notified immediately if any obstruction is encountered that stops the
forward progress of drilling operations.
6. The type of dewatering method, if necessary, shall be at the option of the Contractor.
However, the dewatering of the site must meet all requirements of the general conditions,
special provisions, and specifications. If water is encountered, the Contractor must provide
a dewatering system of sufficient capacity to remove water, keeping any excavations free
11/14/2014 02415 – Installation of Steel Pipe Guide Rails
100% Submittal Page 5 of 7
of water until the backfill operation is in progress. Dewatering shall be performed in a
manner that removal of soil particles is held to a minimum.
7. The steel guide rail pipe being advanced into the tunnel shall be protected and supported so
that it moves freely and is not damaged by stones and debris on the ground during
installation.
B. Auger boring requirements
1. Augers shall be the full size of the Casing Pipe inside diameter to convey the excavated
material to the work pit through the Casing Pipe.
2. Avoid damage to pipe sections and joints during jacking. In the event of damage to a pipe
section or pipe joint, the Contractor shall notify the Engineer within the day of observation
of the damage. If the pipe cannot be repaired the Contractor shall jack all damaged pipe
sections completely through the tunnel following completion of tunnel excavation.
3. The Contractor shall limit the jacking force to stay at or below safe working limit of the
Jacking Pipe.
4. The jacking loads shall be continuously monitored and recorded at the jacking frame.
5. Steering corrections made to the tunnel alignment shall be carried out in such a manner that
the joint angle of any two adjacent pipes or segments does not exceed allowable limits.
6. Lubrication, if deemed necessary by the Contractor, shall be applied to the external surface
of the pipe to reduce skin friction, and the annular space created by the overcut shall be
filled with a lubricant suitable for the particular soil conditions to be tunneled.
7. If lubrication is used, the Contractor shall at all times monitor the volumes, pressures, and
location of lubricant pumping to ensure that the annulus around the pipe is completely
filled with lubricant.
C. Pipe ramming requirements
1. The proposed hammer shall have the necessary force to complete the drive with a
minimum safety factor of 1.5.
2. A cutting shoe shall be placed on the leading edge of the Casing Pipe. The diameter of the
cutting shoe shall be sufficiently larger than the casing pipe to allow for proper
advancement of the pipe.
3. The hammer frame shall be positioned to develop a uniform distribution of ramming forces
around the periphery of the pipe. Carefully set the pipe guard rails in the pit to ensure
correctness of the alignment. Wedge-shaped adapters shall be used to seat the hammer and
transfer the ramming forces to the Casing Pipe.
4. Each pipe section shall be rammed forward as the excavation progresses in such a way to
provide complete and adequate ground support at all times. Pipe ramming shall be
conducted to minimize ground movement in front of and surrounding the pipe and to
control the ground loss, surface settlement, and heave of the ground surface.
11/14/2014 02415 – Installation of Steel Pipe Guide Rails
100% Submittal Page 6 of 7
5. Control the advance, volume of material excavated, and size of the soil plug to result in a
stable ground at the leading edge of the pipe and to prevent the loss of ground and heave.
6. Prevent the soil within the plug from running or flowing and exposing the ground at the
leading edge of the pipe.
7. Monitor and control the control the volume of soil removed. Compare theoretical and
actual volumes of soil removed. Investigate potential voids created by over-excavation.
8. During shutdowns and other interruptions in ramming operations, provide means to
maintain the integrity of the soil plug.
9. The Contractor shall limit the driving forces to stay at or below safe working limit of the
Ramming Pipe.
10. The driving parameters including advance rate and blows per foot of advancement shall be
continuously monitored and recorded.
11. The Contractor shall determine the need for and if necessary shall design and implement a
lubrication system outside and/or inside the pipe.
3.6 GROUT BACKFILL FOR STEEL GUIDE RAILS
1. Steel pipe guide rails shall be backfilled with a sanded grout mix. Backfill grout must
obtain a minimum compressive strength of 2000 psi before any loading of the guide rail
pipe is applied.
END OF SECTION
11/14/2014 02415 – Installation of Steel Pipe Guide Rails
100% Submittal Page 7 of 7
SECTION 02465
DRILLED SHAFTS
PART 1 - GENERAL
1.1 SCOPE
A. This section specifies the requirements for installation of steel reinforced concrete drilled shafts.
B. This project is facilitated using the City of Fort Collins’ (Owner) Advanced Project Delivery
System (APDS). As such, the selected Contractor shall be involved throughout both the design
and construction phases of the work.
1.2 DEFINITIONS
A. Drilled shaft – an excavated shaft with steel reinforcing for the purpose of transferring
structural loads to soil or rock below the structure.
B. Socket – a shaft of equal or smaller diameter extended into the bearing material.
C. Bearing material – the bearing material for this project is the bedrock underlying the
embankment fill.
D. Cage – the steel reinforcement in the drilled shaft consisting of vertical steel reinforcing bars
and horizontal steel hoops.
1.3 RELATED SECTIONS
A. Section 02315 – Wall Excavation and Support
B. Section 03310 – Structural Concrete
C. Section 03210 – Reinforcing Steel
1.4 QUALITY STANDARDS
A. American Railway Engineering and Maintenance-of-Way Associates (AREMA)
1. AREMA Manual for Railway Engineering Chapter 8 Part 24 – Drilled Shaft Foundations
1.5 SUBMITTALS
A. Submit a record of each drilled shaft installation within 24 hours of drilled shaft installation.
Such record shall have, at a minimum:
1. Shaft location and designation
11/14/2014 02465 – Drilled Shafts
100% Submittal Page 1 of 4
2. Shaft diameter
3. Top and bottom elevations of shaft
4. Date of installation
5. Amount and mix design of concrete placed, in cubic yards
6. Depth of water in excavation at time of concrete and steel placement
7. Method of concrete placement
8. Drill log including soil stratum changes
B. Contractor’s qualifications, as specified
1.6 GENERAL
This specification is applicable for projects or work involving either inch-pound or SI units. Within
the text and accompanying tables, the inch-pound units are given preference.
1.7 CONTRACTOR EXPERIENCE
The work in this section shall be provided only by a CONTRACTOR specializing in and possessing
the experience, equipment, knowledge, and skilled operators for installing drilled shafts. This
experience shall be a minimum of three years of installing drilled shafts of similar dimension using
similar installation methods to those proposed.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Delivery, storage, and handling of concrete shall be in accordance with Section 03310.
B. Delivery, storage, and handling of reinforcement shall be in accordance with Section 03210.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Concrete – Concrete shall be in accordance with Section 03310.
B. Reinforcing Steel – Reinforcing steel shall be in accordance with Section 03210.
C. Cage – The cage shall be fabricated on site in accordance with Section 03210.
2.2 EQUIPMENT
Drilled shafts shall be excavated with a foundation drilling rig capable of drilling to the depths
shown on the Drawings or specified herein at the diameters shown on the Drawings or specified
herein.
11/14/2014 02465 – Drilled Shafts
100% Submittal Page 2 of 4
PART 3 - EXECUTION
3.1 GENERAL
A. Do not begin drilling until:
1. Required submittals have been made and approved by the OWNER.
2. Survey control has been established for the drilled shafts.
3.2 TOLERANCES
A. Drilled shafts shall be within three (3) inches of their location as shown on the Drawings.
B. Drilled shafts shall vary no more than one inch in ten feet.
C. Drilled shafts shall be extended to the depth shown on the Drawings or to a depth that will
achieve a ten (10) foot rock socket past where the ENGINEER determines competent bedrock
exists, whichever is greater.
3.3 PROTECTION OF ADJACENT WORK
CONTRACTOR shall be responsible for protecting all adjacent work, existing structures, vehicles,
equipment and utilities from damage caused by drilled shaft installation. Known utilities are shown
on the drawings; however, these locations should not be considered accurate. Additional utilities
may exist and the CONTRACTOR is solely responsible for identifying and protecting utilities.
3.4 EXCAVATION
A. Perform excavation for drilled shafts at locations shown on Drawings to dimensions and
elevations shown on Drawings or specified herein. Machine clean the bottom of the shafts of
loose material and debris. Shafts shall be observed by ENGINEER during excavation and prior
to placement of cage or concrete.
B. Do not excavate within three (3) shaft diameters of a shaft which is unfilled or has been
concreted within the previous 24 hours. The CONTRACTOR shall exercise caution around
shafts that are unfilled or have been concreted within the previous 72 hours.
3.5 DRILLED SHAFT CONSTRUCTION
A. Form rebar cage to maintain its shape and proportion throughout the placing of concrete. Block
reinforcement up off the bottom of the drilled shaft at least three (3) inches. Rebar cage shall be
kept from contacting with sides of shaft.
B. Place concrete in each shaft no later than eight (8) hours after completion of drilling. Concrete
placed through free fall shall fall directly to the base without contacting either the cage or the
sidewall of the shaft. Concrete shall not be placed through free fall if water is present at the
bottom of the shaft. Tremie pipe diameter shall be at least eight (8) times as large as the largest
concrete aggregate size.
11/14/2014 02465 – Drilled Shafts
100% Submittal Page 3 of 4
C. The top of drilled shafts shall be formed to prevent mushrooming and facilitate the connection
between the arch wall and the drilled shaft as shown on the Drawings.
END OF SECTION
11/14/2014 02465 – Drilled Shafts
100% Submittal Page 4 of 4
SECTION 02470
GEOTECHNICAL INSTRUMENTATION AND MONITORING
PART 1 - GENERAL
1.1 SCOPE
A. This section presents requirements for installation, monitoring, and removal of geotechnical
instrumentation for monitoring of ground movements within and around tunnel and portal
excavations, as well as movement of utilities and structures.
B. This project is facilitated using the City of Fort Collins’ (Owner) Alternative Project Delivery
System (APDS). As such, the selected Contractor shall be involved throughout both the design
and construction phases of the work.
C. The following instruments shall be installed, maintained, monitored and removed under this
section: surface survey points, extensometers.
1.2 RELATED SECTIONS
A. 02410 – Tunnel Excavation and Grouting
B. 02415 – Installation of Steel Pipe Guide Rails
1.3 REQUIREMENTS
A. The instrumentation and monitoring program shall be conducted under the control of the
Contractor’s Instrumentation Specialist. The Instrumentation Specialist shall be experienced in
furnishing, installing, calibrating and maintaining geotechnical instrumentation systems.
B. The Contractor shall develop a geotechnical instrumentation and monitoring program.
Minimum instrumentation and monitoring requirements are presented herein and on the
Contract Drawings. Conduct additional instrumentation and monitoring as necessary to control
the work, verify proper performance of the portals and excavations during construction, and to
ensure the safety of the work and personnel. The Contractor shall design, install and monitor
additional instrumentation as necessary.
C. Remove or abandon in place all instrumentation in accordance with applicable laws, regulations
and guidelines and restore the ground at the completion of the project. As a minimum,
instrumentation shall be demolished within five feet of the ground surface.
1.4 GENERAL
A. This specification is applicable for projects or work involving either inch-pound or SI units.
Within the text and accompanying tables, the inch-pound units are given preference.
B. All appropriate permits shall be acquired prior to the initiation of the work.
1.5 QUALIFICATIONS
11/14/2014 02470 – Geotechnical Instrumentation and Monitoring
100% Submittal Page 1 of 7
A. Instrumentation Specialist: The Instrumentation Specialist shall have at least three (3) years
experience in the installation and monitoring of ground movements for excavations and tunnels.
The Instrumentation Specialist shall have successfully completed a similar instrumentation
program for at least two (2) projects, and shall have been in charge of the instrumentation
program for at least one (1) job.
B. Surveyor: Surveying shall have previous similar experience surveying for the detection of
structural or surface deformations and shall be a licensed Professional Surveyor in the State of
Colorado.
1.6 SUBMITTALS
A. Preconstruction. Submit the following:
1. Qualifications for Instrumentation Specialist and Surveyor
2. Description of methods and materials for installing and protecting the instruments
3. For all instrumentation installed in borings, submit proposed schedule for installing
instruments, detailed step-by-step procedures for installation, and materials
B. Construction Submittals: Submit the following items within the time restrictions specified:
1. Installation Records. Within five days of installation of each instrument, submit drawings
showing the installed location, the instrument identification number, the instrument type,
the installation date and time, established elevations, initial elevations, offset and
stationing, initial coordinates, boring logs, and the anchor to tip elevation and instrument
length, when applicable. Also furnish details of installed instruments showing all
dimensions and materials used, a separate statement describing installation procedures for
each instrument, and as-built drawings of each instrument including depths, lengths,
elevations and dimensions of key elements.
2. Data. Provide results of initial locations and readings and monitoring for all instruments.
PART 2 - EQUIPMENT, PRODUCTS AND MATERIALS
2.1 GENERAL
A. Surface protection shall be flush with the ground surface in ballasted areas and other areas
where the instrument may be damaged or be an impediment to other activities. Roadway or
lock boxes shall be provided for Extensometers.
2.2 PRODUCTS
A. Surface Survey Points: Surface Survey Points shall conform to the drawings and to the
conditions at the ground surface. Surface Survey Points installed in railroad ties shall be pk
nails or other product that allows horizontal and vertical measurements to be obtained. Surface
Survey Points installed in soil areas shall be deep anchors as shown on the Contract Drawings.
Each Surface Survey Point shall have a tag or marking indicating the identification number,
11/14/2014 02470 – Geotechnical Instrumentation and Monitoring
100% Submittal Page 2 of 7
tunnel station and/or offset from centerline.
B. Extensometers: Fixed multiple point rod type extensometers in protective casings as shown on
the Contract Drawings. Extensometers shall have either hydraulic or groutable anchors as
recommended by the manufacturer for the ground conditions present. Anchor depths shall be as
shown on the Contract Drawings and the Instrumentation Schedule. The head shall be
mechanical and readable with a micrometer.
C. Survey Targets: Survey Targets shall be used to monitor the position of the Secant Pile walls at
each portal as shown in the Contract Drawings. Survey Targets shall be reflective prisms or
other material to allow for monitoring of the walls in X, Y, and Z directions.
PART 3 - EXECUTION
3.1 GENERAL
A. Instrumentation Installation: Instrumentation shall be installed at the locations shown on the
Drawings, or as directed or approved by the Owner’s Representative.
B. All instrumentation within 100 ft of the work to be performed shall be installed a minimum of
seven days prior to start of excavation.
C. Access: Provide and facilitate safe access to the instrumentation to the Owner’s Representative
including keys for lock boxes.
D. Existing Conditions: Locate conduits and underground utilities in all areas where subsurface
geotechnical instrumentation is to be drilled and installed. Subsurface geotechnical
instrumentation locations shall be modified, as approved by the Owner’s Representative, to
avoid interference with existing conduits, utilities, and foundation elements.
E. Identification: All instruments shall be clearly marked, labeled, and protected to avoid being
obstructed or otherwise damaged by construction operations or the general public. Both
protective housing and box or vault covers shall be marked.
F. Instrument Designation: A unique instrument identification number shall be assigned to each
instrument and each point. The instrument identification number shall be clearly marked on
each instrument in a nondestructive manner.
G. Surveying: Immediately following installation, the location of the top of all instruments shall
be surveyed to provide horizontal and vertical coordinates. Data shall be provided to the
Owner’s Representative. Re-surveying from control points shall be required monthly or more
frequently to address potential disturbance or resolve conflicting data.
H. Drilling from the Ground Surface: Instrumentation holes drilled from the ground surface shall
be subject to the same permitting and drilling requirements as those for geotechnical exploration
boreholes. Obtain necessary permits for each such instrument and conform to the permit
requirements during drilling, installation, monitoring, and abandonment.
3.2 QUALITY CONTROL
11/14/2014 02470 – Geotechnical Instrumentation and Monitoring
100% Submittal Page 3 of 7
A. Perform all work in the presence of the Owner’s Representative, unless the Owner’s
Representative has granted prior approval in writing to perform such work in his absence.
B. Perform all work in accordance with all current applicable regulations and codes of federal,
state, and local agencies. In the event of conflict, comply with the strictest or most restrictive
applicable requirements.
C. Installation:
1. A written notice shall be provided to the Owner’s Representative not less than 24 hours
before installing geotechnical instrumentation.
2. Contractor shall coordinate all work on BNSF ROW with BNSF. A minimum of five (5)
days of notice shall be provided to BNSF to supply necessary flagman.
3. Install all instruments within 3 ft of the horizontal location shown on the Drawings or as
approved or directed by the Owner’s Representative.
D. Methods of installing the instrumentation shall be such as to ensure the safety of the work,
project participants, the public, third parties, and adjacent property, whether public or private.
3.3 INSTALLATION
A. Surface Survey Points: Surface Survey Points shall be located as shown on the Contract
Drawings and the Instrumentation Schedule.
B. Extensometers:
1. Extensometers shall be installed at as close as practical to the locations and with anchor
point locations as shown on the Contract Drawings and the Instrumentation Schedule.
2. Conduct drilling operations using appropriate methods that are consistent with geologic
conditions presented. Provide drill casing if required to hold drill hole open. Drill hole or
inside of casing, if applicable, shall provide a clear opening as recommended by the
manufacturer. A log of the soils encountered during drilling shall be accurately
maintained, and a copy shall be provided to the Owner’s Representative.
3. Install extensometers and anchors in accordance with the manufacturer’s recommendations
and the approved Drawings. Treat the annulus between extensometer rod sheaths and the
ground in accordance with the manufacturer’s recommendations.
4. Grouting and filling shall be done with a grout tube inside the casing beginning at the
bottom and working up to assure complete backfilling.
5. Protection. Install protective housing consisting of flush-mounted roadway box or vault so
as not to obstruct vehicle or foot traffic with locking cap and padlock, and provide Owner’s
Representative with a copy of the keys.
C. Survey Targets: Survey Targets shall be located as shown on the Contract Drawings.
11/14/2014 02470 – Geotechnical Instrumentation and Monitoring
100% Submittal Page 4 of 7
3.4 MONITORING
A. Initial Readings: The Contractor shall take initial readings of all instruments to establish a
baseline and provide the Owner’s Representative with this data.
B. Frequency:
1. The Contractor shall read required instrumentation and provide the Owner’s Representative
with these data.
2. As a minimum, the Contractor shall follow the following schedule:
Instrument Type
Active Zone/Period(a,b)
Outside Active
Zone(d)
Surface Monitoring Points
Extensometers Daily Weekly/Monthly
Survey Targets
Notes:
a) Active zone/period for tunnels is within 25 ft of active excavation
or tunnel face.
b) Active zone/period for portals is between the beginning of portal excavation and two
weeks following the end of portal excavation.
c) Weekly until all movement outside the baseline fluctuations as measured prior to
construction stops and monthly thereafter.
3. The Contractor shall perform additional monitoring as necessary to control construction
and to ensure the safety of the work.
C. Reporting: The Contractor shall provide final data from readings of all instruments to the
Owner’s Representative within one working day of obtaining the information. Copies of field
instrumentation data shall be provided to the Owner’s Representative immediately after the data
are collected in the field. The data shall include, but are not limited to, the following:
1. A copy of the data sheets containing a cumulative history of readings, proximity of the
excavation to the instrument location itself at the time of each reading.
2. A copy of the plot of measured values versus time, including a time history of construction
activity likely to influence such readings.
D. Interpretation: The Contractor shall provide interpretations of monitoring data and submit them
to the Owner’s Representative along with the data. Data or interpretations shall not be
published or disclosed to other parties without advance written permission of the Owner’s
Representative. The Owner’s Representative may make his/her interpretations of the data
available to the Contractor.
3.5 MAINTENANCE
A. Damaged Installations: Protect the instruments from damage. Damaged installations shall be
replaced or repaired prior to continuing excavation.
11/14/2014 02470 – Geotechnical Instrumentation and Monitoring
100% Submittal Page 5 of 7
B. Maintenance: Maintain the instruments by draining water and flushing debris from under
protective covers and keeping covers locked and sealed at all times.
3.6 RESPONSE VALUES:
A. The Contractor shall abide by the following response values:
Instrument Threshold Value Shutdown Value
Surface
Monitoring Points
Rail Ties – 1/4 in. vertical per
every 15 linear feet
Soil – 1/2 in. vertical per every 15
linear feet
Rail Ties – 1/2 in. vertical per
every 15 linear feet
Soil – 1 in. vertical per every 15
linear feet
Extensometer Lowest point: 1 in. vertical
Intermediate point: 3/4 in. vertical
Highest point: 1/4 in. vertical.
Lowest point: 1-1/2in.vertical
Intermediate point: 1 in. vertical
Highest point: 1/2 inch vertical
Survey Targets 1 inch in any of X, Y, or Z
directions
2 inches in any of X, Y, or Z
directions
1. When a given response value is reached, the Contractor shall respond in accordance with
the following: Threshold Value: The Contractor shall:
a. Immediately notify the Owner’s Representative and the BNSF Flagman.
b. Meet with the Owner’s Representative and BNSF to: 1) review interpretation of the
data and results, 2) review the construction means and methods, and 3) determine
what changes, if any, shall be made to better control movement.
2. Shutdown Value: The Contractor shall:
a. Immediately notify the Owner’s Representative and the BNSF Flagman.
b. Stop all work immediately and meet with the Owner’s Representative to develop a
plan of action before work can be resumed. Development and implementation of
mitigation measures shall be the responsibility of the Contractor subject to approval of
the Engineer and BNSF. Mitigation measures to correct excessive movement of the
tracks include but are not limited to compaction grouting through the embankment
below the tracks to raise the grade or, if necessary, hiring of BNSF to regrade or
reballast the tracks affected at no cost to BNSF or the Owner.
3.7 FINAL DISPOSITION
A. Surface Survey Points: Remove all Surface Survey Points installed in soil and on rail ties.
B. Survey Targets: If the existence of Survey Targets will not impede installation of the final
facing of the portal wall, the Survey Targets may remain in place. Otherwise, remove all
Survey Targets from the face of the walls.
C. For all underground instrumentation and instrumentation installed in bore holes: 1) Remove
protective housings and caps, 2) restore surface to the conditions existing prior to installation of
the instruments, and 3) Drill out and grout, or backfill grout in accordance with permits, and
11/14/2014 02470 – Geotechnical Instrumentation and Monitoring
100% Submittal Page 6 of 7
environmental laws and regulations.
END OF SECTION
11/14/2014 02470 – Geotechnical Instrumentation and Monitoring
100% Submittal Page 7 of 7
Fort Collins Utilities Master Specifications Base Course
02530 - 1
June 2012
SECTION 02530
BASE COURSE
PART 1 - GENERAL
1.01 This section covers base course requirements under all asphalt roadways, concrete
sidewalk and curb and gutter replacement.
1.02 Related sections include:
A. Section 02200 – Earthwork
B. Section 02510 - Asphalt Paving
PART 2 - PRODUCTS
2.01 MATERIALS
The base course shall consist of a hard, durable, crushed rock or stone and filler and should
have a minimum C.B.R. value of 80. The composite base course material shall be free from
vegetable matter and lumps or balls of clays and shall meet the Colorado Department of
Highways Specification Class 6 Aggregate Base Course which follows:
Sieve Size % Passing
3/4" 100
#4 30 - 65
#3 25 - 55
#200 3 - 12
Liquid Limit - 30 Maximum
Plasticity Index - 6 Maximum
The base course material, when tested in accordance with AASHTO Standard Test
Designation T-96 (Los Angeles Abrasion Test), shall have a percentage of wear of not more
than forty percent (40%).
Of the material passing the No. 40 sieve, at least 35% by weight shall have one or more
broken faces.
PART 3 - EXECUTION
3.01 BASE COURSE UNDER PAVEMENT
A. The base course shall be placed on the subgrade within +/-2% of optimum moisture
and compacted to at least ninety-five percent (95%) of Standard Proctor Density.
The base course shall be shaped to grade so that proper drainage of the roads is
obtained.
Fort Collins Utilities Master Specifications Base Course
June 2012 02530 - 2
Base course shall be constructed in maximum four inch (4") lifts and compacted to
95% Standard Proctor Density minimum.
B. After final shaping, compaction and curing of the base course, the base course shall
be maintained smooth and moist until the bituminous prime coat is app-lied in
accordance with Paragraph 3.02 of Section 02510 of these specifications. The
finished base course shall be of proper grade and thickness. Deviations of more the
1/2 inch in ten feet measured with a ten foot straight-edge, shall be corrected prior
to the application of the prime coat.
END OF SECTION
Fort Collins Utilities Master Specifications Plastic Non-Pressure Pipe
June 2012 02622-1
SECTION 02622
PLASTIC NON-PRESSURE PIPE
PART 1 - GENERAL
1.01 DESCRIPTION
A.This section covers plastic non-pressure sanitary sewer pipe and fittings to be furnished
complete with all jointing materials.
1.02 SUBMITTALS
A. Certification: Submit manufacturer's certification that products meet requirements
of referenced specifications.
B. Shop Drawings: Submit Shop Drawings and data showing details of joints, gasket
material and pipe length.
1.03 PRODUCT DELIVERY
A. Do not damage the pipe by impact, bending, compression or abrasion during
handling and storage.
B. Store PVC sewer pipe on a flat surface which provides even support for the barrel
with bell ends overhanging.
C. Do not stack pipe higher than 5 feet.
D. Do not use pipe and fittings stored in direct sunlight for periods in excess of 18
months.
E. Use only nylon protected slings or hands to handle pipe. Do not use hooks or bare
cable.
PART 2 - PRODUCTS
2.01 POLYVINYL CHLORIDE (PVC) PIPE
A. Pipe and fittings:
1. 4" through 15", ASTM D3034, type PSM, SDR 35.
2. 18" through 27", ASTM F679 (T1).
3. All pipe shall have the A.S.T.M. Specification, nominal diameter, and name
or trade mark of the manufacturer imprinted on the outside of the pipe.
4. Fittings shall be of the same material and class as the pipe to which it is
attached.
5. Plugs: P.V.C., size shall be the same as for the pipe. Plugs shall be air
Fort Collins Utilities Master Specifications Plastic Non-Pressure Pipe
June 2012 02622-2
tight for testing of the lines.
B. Joints: ASTM F477 push-on. Joints: ASTM D3212, push-on with an O-ring rubber
gasket conforming to ASTM Designation D3034. Solvent cement joints are strictly
prohibited.
C. Pipe lengths: maximum pipe length shall be twenty (20) feet and no shorter than
twelve and one half (12 1/2) feet, except service tees and closure pieces.
D. Markings: All sizes of PVC pipe shall have the SDR rating, the A.S.T.M.
Specification, nominal diameter, and name or trademark of the manufacturer
imprinted on the outside of the pipe.
PART 3 - EXECUTION
3.01 INSPECTION
A. In addition to any deficiencies covered by ASTM D3034, PVC which has any of the
following visual defects will not be accepted.
1. Straight pipe, measured from the concave side, shall not deviate from
straight greater than 1/16 inch per foot of length.
2. Pipe which is sufficiently out-of-round to prohibit proper jointing.
3. Improperly formed bell and spigot ends.
4. Fractured, cracked, chipped, dented, abrasions or otherwise damaged
pipe.
5. Pipe that has been damaged during shipment or handling. Acceptance of
the pipe at point of delivery will not relieve the Contractor of full
responsibility for any defects in material of the completed pipeline.
B. Mark rejected pipe and remove from the site.
3.02 INSTALLATION
A. Install pipe in accordance with Section 02722, Wastewater Collection System.
B. Cutting the pipe.
1. Cut pipe square with saw or pipe cutter designed specifically for the
material.
2. Bevel the end in accordance with the manufacturer's recommendations.
3. Insert the spigot to the reference mark, according to manufacturer's
recommendations.
4. Do not disturb previously installed joints during jointing operations.
3.03 FIELD QUALITY CONTROL
A. Pipe Deflection Tests
1. Test each reach of sewer pipe between manholes for vertical ring
Fort Collins Utilities Master Specifications Plastic Non-Pressure Pipe
June 2012 02622-3
deflection after backfill has been completed.
2. Maximum allowable deflection is 5% of the base internal diameter.
3. Uncover all pipe sections exceeding the maximum allowable deflection and
replace the bedding and backfill to prevent excessive deflection.
4. Retest any repaired sections.
5. The maximum allowable deflection at the end of the Correction Period shall
be 7 1/2 % of the base internal diameter. Uncover and repair sections
exceeding the maximum allowable deflections.
a. Divert flows as necessary to perform test.
b. Perform tests in the presence of the Owner.
c. Log results of test by line reach between adjacent manholes.
i. Deliver 2 copies of logs to Owner at completion of all tests.
3. Mandrel outside diameters in inches are as follows:
7 1/2%
NOMINAL 5% DEFLECTION DEFLECTION
PIPE SIZE BASE I.D. MANDREL MANDREL
6 5.74 5.45 5.31
8 7.66 7.28 7.09
12 11.36 10.79 10.51
15 13.90 13.21 12.86
18 16.97 16.12 15.70
21 20.00 19.00 18.50
24 22.49 21.36 20.80
27 25.33 24.06 23.43
B. Leakage tests
Reference Section 02722, Wastewater Collection Systems.
END OF SECTION
Fort Collins Utilities Master Specifications Plastic Non-Pressure Pipe
June 2012 02622-4
THIS PAGE INTENTIONALLY LEFT BLANK.
Fort Collins Utilities Master Specifications Sidewalk, Curb, Gutter and Miscellaneous Concrete
June 2012 02770-1
SECTION 02770
SIDEWALK, CURB AND GUTTER, AND MISCELLANEOUS CONCRETE
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Concrete work shall consist of air entrained Portland Cement concrete
constructed on a prepared subgrade in accordance with these Specifications.
The completed work shall conform to the thicknesses and typical cross-sections
shown on the Drawings. The completed work shall conform to the lines and
grades shown on the Drawings or to those established by the ENGINEER at the
job site.
1.02 RELATED SECTIONS
A. Section 02240 – Water Control and Dewatering
B. Section 02315 – Excavation and Embankment
C. Section 03313 – Structural Concrete
1.03 SUBMITTALS
A. The CONTRACTOR shall cooperate with the ENGINEER in obtaining and
providing samples of all specified materials. The CONTRACTOR shall submit
certified laboratory test certificates for all items required in this section, including
a mix design for concrete.
1.04 PROJECT REQUIREMENTS
A. The CONTRACTOR shall submit batch tickets for each load of concrete. Tickets
shall show weight of all materials and additives used in each batch.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Concrete shall conform to the following requirements:
28-Day Field Compressive Strength 3500 psi
Cement/Fly Ash 600 lbs./cu. yd.
Max. Water/Cement Ratio 0.53
Air Content % Range 5-8
Maximum Slump 4"
Fine Aggregate (max. % of total Aggregate) 50%
This material shall consist of a mixture of coarse and fine aggregates, Portland
cement, water and other materials or admixtures as required. The type of cement
Fort Collins Utilities Master Specifications Sidewalk, Curb, Gutter and Miscellaneous Concrete
June 2012 02770-2
shall be Type I, II, or I/II unless sulfate conditions dictate otherwise. If sulfate
conditions exist, Type V cement shall be used.
B. Concrete Aggregates:
The grading and composition requirements for coarse and fine aggregates for
concrete shall conform to the following tables.
COARSE AGGREGATES FOR PORTLAND CEMENT CONCRETE
Sieve Size or Percent Passing or
Test Procedure Test Requirement
1 Inch 100
3/4 Inch 90-100
3⁄8 Inch 20-55
No. 4 0-10
No. 8 0-5
% Wear 45, Max.
Clay Lumps, Friable Particles, % 2.0, Max.
Coal & Lignites, % 0.5, Max.
Sodium Sulfate Soundness % 12, Max.
FINE AGGREGATES FOR PORTLAND CEMENT CONCRETE
Sieve Size or Percent Passing or
Test Procedure Test Requirement
3⁄8 Inch 100
No. 4 95 - 100
No. 16 45 - 80
No. 50 10 - 30
No. 100 2 - 10
No. 200 3, Max.
Friable Particles, % 1.0, Max.
Coal & Lignite, % 1.0, Max.
Deleterious Material (AASHTO T 112),% 3, Max.
Sand Equivalent (AASHTO T 176),% 80, Min.
Fineness Modules 2.50 - 3.50
Sodium Sulfate Soundness, % 20.0, Max.
C. Coarse Aggregate for Concrete:
Coarse aggregates shall conform to the requirements of AASHTO M 80, except
that the percentage of wear shall not exceed 45 when tested in accordance with
AASHTO T 96. Coarse aggregate shall conform to the grading in above table.
D. Fine Aggregate for Concrete:
Fort Collins Utilities Master Specifications Sidewalk, Curb, Gutter and Miscellaneous Concrete
June 2012 02770-3
Fine aggregates shall meet Colorado Department of Highways Section 703.01
requirements and gradation as shown above. Fine aggregate for concrete shall
conform to the requirements of AASHTO M 6. The amount of deleterious
substances removable by elutriation shall not exceed 3% by dry weight of fine
aggregate when tested in accordance with AASHTO T 11, unless otherwise
specified. The minimum Sand Equivalent, as tested in accordance with AASHTO
T 176 shall be 80, unless otherwise specified. The Fineness Modules shall not
be less than 2.50 nor greater than 3.50, unless otherwise approved.
E. Fly Ash and Water:
Upon approval based on a satisfactory trial mix, the CONTRACTOR shall have
the option of substituting approved fly ash for Portland cement, up to a maximum
of 20 percent by weight. The total weight of cement and fly ash shall not be less
than the specified mix design.
1. Fly ash for concrete shall conform to the requirements of ASTM C 618,
Class C or Class All chemical requirements of ASTM C 618 Table 1-A
shall apply with the exception of footnote A.
Class C fly ash will not be permitted where sulfate resistant cement is
required.
The CONTRACTOR shall submit certified laboratory test results for the fly
ash. Test results that do not meet the physical and chemical
requirements may result in the suspension of the use of fly ash until the
corrections necessary have been taken to insure that the material meets
the specifications.
2. Water used in mixing or curing shall be clean and free of oil, salt, acid,
alkali, sugar, vegetable, or other substance injurious to the finished
product. Water will be tested in accordance with, and shall meet the
suggested requirements of AASHTO T 26. Water known to be of potable
quality may be used without test. Where the source of water is relatively
shallow, the intake shall be so enclosed as to exclude silt, mud, grass, or
other foreign materials.
F. Concrete Curing Materials and Admixtures
1. Curing Materials: Curing Materials shall conform to the following
requirements as specified:
Burlap Cloth made from Jute or Kenaf: AASHTO M 182
Liquid Membrane-Forming Compounds Curing Concrete: ASTM C309
Type II, Class B.
Sheet Materials for Curing Concrete: AASHTO M 171
Straw shall not be used for curing unless approved by the ENGINEER.
2. Air-Entraining Admixture: Air-entraining admixtures shall conform to the
requirements of AASHTO M 154. Admixtures which have been frozen
will be rejected. No chloride containing additives shall be permitted.
3. Chemical Admixtures: Chemical admixtures for concrete shall conform to
the requirements of AASHTO M 194. Admixtures which have been
frozen will be rejected.
Fort Collins Utilities Master Specifications Sidewalk, Curb, Gutter and Miscellaneous Concrete
June 2012 02770-4
4. Joint Fillers: The joint fillers shall be silicon or asphalt based and shall be
submitted for approval as part of paragraph 1.03.
PART 3 - EXECUTION
3.01 SUBGRADE PREPARATION
A. The subgrade shall be excavated or filled to the required grades and lines. All
soft, yielding, or otherwise unsuitable material shall be removed and replaced
with suitable material with the ENGINEER’s approval. Filled sections shall be
compacted and compaction shall extend a minimum of six inches outside the
form lines.
The moisture content of the subgrade shall be brought within +/- 2% of optimum
moisture content and compacted to 95% of the maximum standard Proctor
density (ASTM D698) for subgrade materials classified as A-4 through A-7 or
95% of modified proctor density for materials classified as A-1 through A-3.
3.02 CONCRETE PLACEMENT
A. Concrete transported in truck mixers or truck agitators shall be delivered to the
site of the work and completely discharged within a period of ninety (90) minutes
after the cement comes in contact with the mixing water or with the combined
aggregates containing free moisture in excess of 2% by weight. The concrete
shall be placed either by an approved slip form/extrusion machine, by the formed
method, or by a combination of these methods. The subgrade shall be
conditioned to provide a uniformly moist surface when concrete is placed.
3.03 MACHINE PLACEMENT
A. The slip form/extrusion machine shall be so designed to place, spread,
consolidate, screed, and finish the concrete in one complete pass in such a
manner that a minimum of hand finishing will be necessary to provide a dense
and homogenous concrete section. The machine shall shape, vibrate, and/or
extrude the concrete for the full width and depth of the concrete section being
placed. It shall be operated with as nearly a continuous forward movement as
possible. All operations of mixing, delivery, and spreading concrete shall be so
coordinated as to provide uniform progress, with stopping and starting of the
machine held to a minimum.
3.04 FORMED METHOD
A. The vertical face of previously sawed and adjacent asphalt pavement may NOT
be used as a forming surface. The CONTRACTOR shall use forms on front and
back of all curb and gutter, sidewalks and crosspans.
The forms shall be of metal or other suitable material that is straight and free
from warp, having sufficient strength to resist the pressure of the concrete
without displacement and sufficient tightness to prevent the leakage of mortar.
Flexible or rigid forms of proper curvature may be used for curves having a
Fort Collins Utilities Master Specifications Sidewalk, Curb, Gutter and Miscellaneous Concrete
June 2012 02770-5
radius of 100 feet or less. Division plates shall be metal. Where directed by the
ENGINEER the CONTRACTOR shall use a thin metal back form to preserve
landscaping, sprinklers, etc. Form must be straight and rigid and must be
approved by the ENGINEER prior to use on project.
The front and back forms shall extend for the full depth of the concrete. All of the
forms shall be braced and staked so that they remain in both horizontal and
vertical alignment until their removal. No wooden stakes will be allowed. They
shall be cleaned and coated with an approved form-release agent before
concrete is placed against them. The concrete shall be deposited into the forms
without segregation and then it shall be tamped and spaded or mechanically
vibrated for thorough consolidation. Low roll or mountable curbs may be formed
without the use of a face form by using a straight edge and template to form the
curb face. When used, face forms shall be removed as soon as possible to
permit finishing. Front and back forms shall be removed without damage to the
concrete after it has set.
Should the removal of adjacent asphalt pavement be required beyond that shown
in the asphalt patch detail to properly correct failed concrete sections, the
CONTRACTOR shall remove and replace said asphalt pavement to such an
extent as to provide a smooth repair. The ENGINEER shall be notified prior to
commencing any additional asphalt removal.
3.05 FINISHING
A. The plastic concrete shall be finished smooth by means of a wood float and then
it shall be given final surface texture using a light broom or burlap drag.
Concrete that is adjacent to forms and formed joints shall be edged with a
suitable edging tool to the dimensions shown on the Drawings.
3.06 JOINTING
A. Contraction Joints: Transverse weakened-plane contraction joints shall be
constructed at right angles to the curb line at intervals not exceeding 10 feet for
curb and gutter or 5 feet for sidewalk. Joint depth shall average at least one-
fourth of the cross-section of the concrete.
Contraction joints may be sawed, hand-formed, or made by 1/8 inch thick division
plates in the form work. Sawing shall be done early after the concrete has set to
prevent the formation of uncontrolled cracking. The joints may be hand-formed
either by (1) using a narrow or triangular jointing tool or a thin metal blade to
impress a plane of weakness into the plastic concrete, or (2) inserting 1/8 inch
thick steel strips into the plastic concrete temporarily. Steel strips shall be
withdrawn before final finishing of the concrete. Where division plates are used
to make contraction joints, the plates shall be removed after the concrete has set
and while the forms are still in place.
B. Expansion Joints: Expansion joints shall be constructed at right angles to the
curb line at immovable structures and at points of curvature for short radius
curves. Filler material for expansion joints shall be silicon or asphalt based and
Fort Collins Utilities Master Specifications Sidewalk, Curb, Gutter and Miscellaneous Concrete
June 2012 02770-6
shall be submitted for approval according to Section 1.03 and shall be furnished
in a single 1/2 inch thick piece for the full depth and width of the joint.
Expansion joints in a slip formed curb or curb-and-gutter shall be constructed
with an appropriate hand tool by raking or sawing through partially set concrete
for the full depth and width of the section. The cut shall be only wide enough to
permit a snug fit for the joint filler. After the filler is placed, open areas adjacent
to the filler shall be filled with concrete and then troweled and edged. The
CONTRACTOR may choose to place the filler and pour the concrete around it.
Alternately, an expansion joint may be installed by removing a short section of
freshly extruded curb-and-gutter immediately, installing temporary holding forms,
placing the expansion joint filler, and replacing and reconsolidating the concrete
that was removed. Contaminated concrete shall be discarded.
Construction joints may be either butt or expansion-type joints. Curbs or
combined curbs and gutters constructed adjacent to existing concrete shall have
the same type of joints as in the existing concrete, with similar spacing; however,
contraction joint spacing shall not exceed 10 feet.
3.07 PROTECTION
A. The CONTRACTOR shall always have materials available to protect the surface
of the plastic concrete against rain. These materials shall consist of waterproof
paper or plastic sheeting. For slip form construction, materials such as wood
planks or forms to protect the edges shall also be required. Concrete damaged
by rain shall be required to be removed and replaced at the CONTRACTOR’s
expense.
Concrete being placed in cold weather during which the temperature may be
expected to drop below 35 degrees F., shall be suitably protected to keep the
concrete from freezing until it is at least 10 days old or as directed by the
ENGINEER. Concrete injured by frost action shall be required to be removed
and replaced at the CONTRACTOR’s expense.
The CONTRACTOR will be responsible for correcting any vandalism or
defacement (graffiti) that occurs on the concrete prior to final acceptance.
3.08 CURING
A. Concrete shall be cured for at least 7 days after placement to protect against loss
of moisture, rapid temperature change, and mechanical injury prior to any overlay
or reconstruction work. Moist burlap, waterproof paper, white polyethylene
sheeting, white liquid membrane compound, or a combination thereof may be
used as the curing material. Membrane curing shall not be permitted in
frost-affected areas when the concrete will be exposed to deicing chemicals
within 30 days after completion of the curing period.
3.09 BACKFILLING
Fort Collins Utilities Master Specifications Sidewalk, Curb, Gutter and Miscellaneous Concrete
June 2012 02770-7
A. The spaces in front and back of curbs shall be refilled with suitable material to
the required elevations after the concrete has set sufficiently. The fill material
shall be thoroughly tamped in layers.
3.10 TOLERANCE
A. Forms shall not deviate from true line by more than ¼-inch at any point.
B. Mixed concrete shall be not less than 50°F, nor more than 80°F at the time of
placing it in forms unless otherwise directed.
C. If air temperature is 35°F or less at the time o f placing, the ENGINEER will
require water and/or aggregate heated to not less than 70°F, or more than 150°F.
D. Finished joints shall not deviate more than ¼-inch in the horizontal alignment
from a straight line.
E. Any localized humps and or depressions greater than ¼-inch will require removal
and replacement of the work in question.
F. No ponding of water greater than 3/8-inch shall be allowed.
G. Combination curb, gutter and walk and/or vertical curb and gutter flowline depth
shall not vary from adopted standards by more than +1/2-inch, measured
vertically from the top of curb to the gutter invert.
H. Pedestrian walks shall have a minimum of 2.0% and a maximum of 2.5% slope
toward the roadway.
I. Contraction and construction joints shall be placed at the standard spacing of 10
feet in curb, gutter, sidewalks, crosspans, trickle channel, etc. A minimum
spacing of 5 feet will be allowed for repairs.
J. Heave or settlement of sidewalk, relative to separate curb pour, greater than ½-
inch shall be cause for corrective action.
K. At the time of final acceptance inspection, the repair of all cracks will be
completed.
1. Cracks that are less than ¼-inch wide, exhibit no horizontal or vertical
shifting, and do not meet the conditions in 2, 3, and 4 below may, at the
discretion of the OWNER, be sealed by routing approximately ¾-inch to
1-inch deep by ¼-inch wide and filling with Sikaflex 1-A or equivalent. If
the OWNER feels the cracks have compromised the service life of the
concrete, the CONTRACTOR shall remove and replace the cracked
concrete at his expense.
2. Any crack that extends through a joint shall require removal and
replacement of the entire cracked area.
3. Any longitudinal cracked section of concrete will require complete
removal and replacement of that section between joints.
Fort Collins Utilities Master Specifications Sidewalk, Curb, Gutter and Miscellaneous Concrete
June 2012 02770-8
4. Repair action for hairline cracks as determined in 1 above may be waived
at the discretion of the OWNER. For the purpose of this section, a
hairline crack is one that is reasonably immeasurable and without
separation as determined by the ENGINEER.
3.11 QUALITY CONTROL
A. Concrete testing and testing laboratory services required shall conform to the
following unless otherwise determined by the ENGINEER.
Procedures
Project Acceptance Test Project
Section / Type of Test Frequency Sampling Testing
GRADATION Sidewalks: 1/1000 sq yds CP 30 CP 31
or fraction thereof for
each size aggregate of
concrete placed
Curbing: 1/2000 lineal feet or
fraction thereof for each
size aggregate of concrete
placed
MOISTURE 1 per day and as often CP 30 CP 60
CONTENT as needed for quality
(FINE AGGREGATE) control
MOISTURE 1 per day min. where CP 30 CP 60
CONTENT moisture content is greater
(COARSE than +0.5% from SSD condition
AGGREGATE)
SLUMP The slump, air content and T 141 T 119
unit weight tests shall be
carried out on the first
truck of concrete for the
daily placement and there-
after in conformance with
the following table:
AIR CONTENT 1 set of tests for every T 141 T 152
1000 sy or fraction thereof T 199
of concrete placed
YIELD AND 1 test (min) for every T 141 T121
CEMENT day of concrete placement
Fort Collins Utilities Master Specifications Sidewalk, Curb, Gutter and Miscellaneous Concrete
June 2012 02770-9
COMPRESSIVE Sidewalks: 1 set (4) of T 141 T 22
cylinders per 1000 square yards T 23
or fraction thereof of
concrete placed per day
Curbing: 1 set (4) of
cylinders per 2000 lineal
feet or fraction thereof
of concrete placed per day
Point of Acceptance: Gradation - Stockpile, belt, or bin
Air Content - Mixer Discharge
Prior to backfilling and after forms are removed, honeycombed, defective or damaged
areas of concrete shall be repaired. Repairs shall be made within 7 days after the forms
are removed.
3.12 CLEAN-UP
A. The surface of the concrete shall be thoroughly cleaned upon completion of the
work and prior to the substantial completion walk through, and the site left in a
neat and orderly condition.
END OF SECTION
Fort Collins Utilities Master Specifications Wood Fences
June 2012 02832-1
SECTION 02832
WOOD FENCES
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. This item shall consist of furnishing and installing new fence and/or removing and
salvaging the existing fence and restoring the same in conformance with the lines
and grades and requirements shown on the Drawings. Wherever the materials
to be removed are not in good condition, as judged by the ENGINEER, or
wherever the CONTRACTOR has damaged the materials during the process of
removal, equal or better quality fencing materials than the existing will be
furnished and installed by the CONTRACTOR.
1.02 SUBMITTALS
A. Submit the manufacturer’s literature, color specification and two (2) twelve-inch
(12”) long samples of materials (posts, rails, pickets) with the specified finish.
B. Submit the manufacturer’s literature for gate hardware (latches, hinges, center
stops, gate opener etc.)
C. Shop drawings for repair or replacement fence(s)
1.03 QUALITY ASSURANCE
A. Reference Standards: Wood materials shall comply with standards and
specifications of the International Fence Industry Association.
B. Provide at least one person who shall be present at all times during execution of
this portion of the work and who shall be thoroughly familiar with the type of
materials being installed and the best methods for their installation and who shall
direct all work performed under this section.
1.04 GUARANTEE
A. Guarantee fence against defects for a period of two years from the date of
Substantial Completion.
B. This guarantee will not be enforced should damage occur due to vandalism,
improper maintenance by Owner, lawn mower damage by Owner, or other
circumstances beyond the control of the Contractor.
C. Replace or re-install fence when it is no longer in a satisfactory condition as
determined by the Owner’s Representative for the duration of the guarantee
period.
PART 2 - PRODUCTS
2.01 FENCING MATERIALS
Fort Collins Utilities Master Specifications Wood Fences
June 2012 02832-2
A. Posts and Rails: Pressure treated and dimensioned as required to provide the
configuration as detailed on the drawings.
B. Hardware: As shown on the drawings.
C. Nails: All nails used for construction shall be galvanized
D. Screws: All screws used for construction shall be zinc-coated wood screws.
E. Fence Posts: Wood posts shall conform to the details and dimensions indicated
on the plans. Wood posts shall be straight, sound, and seasoned with ends
sawed off square or as indicated. All knots shall be trimmed flush with the
surface. Wood posts shall be peeled and shall be treated with preservative in
accordance with AASHTO M 133 and AWPA C14.
F. All dimensional timber and lumber required for fences or gates shall be sound,
straight, and free from knots, splits, and shakes. It shall be of the species and
grades indicated on the plans or as specified.
G. Concrete posts shall be made of concrete of the class specified, and shall
contain steel reinforcement as shown on the plans or as specified.
H. Repair and replacement fence: Materials to match existing condition.
2.02 FINISH
A. Repair or Replacement Fence: Stain to match existing condition or as specified.
2.03 HARDWARE AND FASTNERS
A. Hardware and Fastener materials shall comply with standards and specifications
of the International Fence Industry Association.
PART 3 - EXECUTION
3.01 REMOVAL OF EXISTING FENCE
A. Rails, braces, posts, and the like shall be removed and disposed of or salvaged
by the CONTRACTOR to allow construction of the project as described on the
Drawings.
3.02 CONSTRUCTION OR REPLACEMENT OF FENCE
A. General Construction Requirements: The CONTRACTOR shall perform such
clearing and grubbing as may be necessary to construct or replace the fence to
the required grade and alignment as shown on the Drawings. At locations where
breaks in a run of fencing are required, appropriate adjustments in fence
alignment and/or post spacing shall be made to satisfy requirements or
conditions encountered.
Fort Collins Utilities Master Specifications Wood Fences
June 2012 02832-3
B. Posts and Rails: Posts shall be securely embedded into the ground to meet the
proper alignment and elevations. Posts shall be embedded in concrete as shown
on the Drawings. Posts and rails shall be held in proper positions by secure
bracing until such time as the concrete has set sufficiently to hold the posts.
Materials shall not be installed on posts, or stress placed on bracing until the
concrete has set sufficiently to withstand the stress. The complete fence shall be
plumb and in straight alignment as shown on the Drawings or as directed by the
ENGINEER.
3.03 LAYOUT
A. Contractor shall install fencing in the alignment shown on the drawings.
3.04 INSTALLATION OF FENCING AND OTHER MATERIALS
A. Workmanship: The completed fence shall be plumb, both in line and transverse
to the fence and straight. Details of construction not specified shall be performed
in keeping with good standard fencing practice.
B. Concrete: Set posts in concrete designed to have a minimum compressive
strength of 3,000 psi at 28 days. Slope top of footing from posts out to edge
approximately one (1) inch to match finish grade at edges. Provide smooth trowel
finish on top of footings. Allow post footings to cure at least seven (7) days before
rails, pickets and wire fabric are installed.
C. Line and Terminal Posts: Space line posts as required by length of rails and set
in concrete as detailed.
D. Rails: Set rails as nearly parallel to the finish grade as possible and at the
specified height of fence. In the case of sloping grades, the rails shall be sloped
uniformly parallel to the finish grade as nearly possible and in a manner to
prevent abrupt changes in elevation of the rails.
E. Pickets: Fasten pickets using zinc-coated wood screws. Picket screws shall be of
a length to provide a minimum one-inch penetration into the supporting member.
END OF SECTION
Fort Collins Utilities Master Specifications Ground Preparation For Seeding
June 2012 02921-1
SECTION 02921
GROUND PREPARATION FOR SEEDING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. This section covers soil preparation for areas to be reseeded.
B. This section addresses work within the limits of disturbance as shown on the
Drawings. However, if disturbance does occur outside of this designated area,
this section will also pertain to those areas, which have been disturbed.
1.02 RELATED SECTIONS
A. Section 02900 - Landscape Planting
B. Section 02950 – Planting, Soil Preparation and Finish Grading
1.03 INITIAL INSPECTION
The CONTRACTOR will inspect existing site conditions and note irregularities affecting
work of this section. Verify that grading operations have been satisfactorily completed
and that topsoil of adequate quantity and quality has been replaced in all areas as
specified. Verify that the area to be revegetated is protected from concentrated runoff
and sediment from adjacent areas. Note any previous treatments to the area such as
temporary seeding or mulching and discuss how these treatments will effect permanent
revegetation with the ENGINEER. Report all irregularities affecting work of this section
to the ENGINEER before beginning work. Beginning work of this section implies
acceptance of existing conditions.
1.04 CLEANING
Perform cleaning daily during installation of the work, and upon completion the work.
Remove and haul from the site all excess materials, debris, and equipment. Repair
damage resulting from ground preparation operations.
PART 2 - EXECUTION
2.01 GENERAL SOIL PREPARATION
A. Inspection: Examine the substrate in which the work is to be performed. Do not
proceed until unsatisfactory conditions have been corrected.
B. Grades: Grades have been established under work of another Section to within 1
inch, plus or minus, of required finished grades. Verify that grades are within 1
inch, plus or minus, of required finished grades. Notify the ENGINEER prior to
Fort Collins Utilities Master Specifications Ground Preparation For Seeding
June 2012 02921-2
commencing soil preparation work if existing grades are not satisfactory, or
assume responsibility for conditions as they exist.
C. Weed and Debris Removal: All ground areas to be planted shall be cleaned of
all weeds and debris prior to any soil preparation or grading work. Weeds and
debris shall be disposed of off the site.
D. Contaminated Soil: Do not perform any soil preparation work in areas where soil
is contaminated with cement, plaster, paint or other construction debris. Bring
such areas to the attention of the ENGINEER and do not proceed until the
contaminated soil is removed and replaced.
E. Moisture Content: Soil shall not be worked when moisture content is so great
that excessive compaction will occur, nor when it is so dry that dust will form in
the air or that clods will not break readily. Water shall be applied, if necessary,
to bring soil to an optimum moisture content for tilling and planting.
F. Ripping & Scarification: Rip, scarify, or otherwise loosen all areas to a depth of 6
inches, removing all obstructions encountered in excavating, such as loose rock,
construction debris, etc. Thoroughly till all areas which are to be seeded that
previously supported vehicular traffic to a depth of 12". Till all remaining areas to
a depth of 6". Channel bottom areas are to be ripped to a depth of at least 2 feet
on approximately 2- to 4-foot centers. Work the soil only when moisture
conditions are suitable. Remove rocks and other objects 3" or greater in any
dimension.
G. Soil Conditioning: After soil preparation has been completed and high and low
spots graded, add soil amendments as indicated above and rototill, making
repeated passes with the cultivator to the depth specified until the amendments
have been thoroughly mixed.
END OF SECTION
DIVISION 3
SECTION 03110 STRUCTURAL CAST-IN-PLACE CONCRETE FORMS
SECTION 03151 HYDROPHILIC RUBBER WATERSTOP
SECTION 03210 REINFORCING STEEL
SECTION 03220 WELDED WIRE FABRIC
SECTION 03240 FIBROUS CONCRETE REINFORCING
SECTION 03310 STRUCTURAL CONCRETE
SECTION 03320 CONSTRUCTION JOINTS
SECTION 03350 CONCRETE FINISHING
SECTION 03360 SHOTCRETE
SECTION 03390 CONCRETE CURING
SECTION 03615 GROUT
Fort Collins Utilities Master Specifications Structural Cast-In-Place Concrete Forms
June 2012 03110-1
SECTION 03110
STRUCTURAL CAST-IN-PLACE CONCRETE FORMS
PART 1 - GENERAL
1.01 SECTION INCLUDES
The CONTRACTOR shall supply all labor, tools, equipment and materials to set forms
for the proper placement of concrete for structures. It is the CONTRACTOR’s responsi-
bility to design and build adequate forms and to leave them in-place until the forms can
be safely removed. The CONTRACTOR is responsible for damage and injury caused
by removing forms carelessly or before the concrete has gained sufficient strength.
Means and methods of repair shall be reviewed by the ENGINEER prior to performing
the work.
1.02 RELATED SECTIONS
A. Section 03310 – Structural Concrete
B. Section 03320 – Construction Joints
C. Section 03350 - Concrete Finishing
D. Section 03615 - Grout
1.03 QUALITY STANDARDS
A. American Concrete Institute
1. ACI 318 - Building Code Requirements for Structural Concrete
2. ACI SP-4 - Formwork for Concrete
B. American Plywood Association
1. PS 1 - US Product Standard for Construction and Industrial Plywood
2. J20 - Grades and Specifications
3. V345 - Concrete Forming
1.04 SUBMITTALS
A. General
Design, placement and maintenance of formwork and form systems is the re-
sponsibility of the CONTRACTOR. Submittals other than listed herein are not
required nor will they be reviewed.
Fort Collins Utilities Master Specifications Structural Cast-In-Place Concrete Forms
June 2012 03110-2
B. Product Technical Data
1. Manufacturer and type of form materials
2. Manufacturer and type of form ties
3. Manufacturer and type of void form including compressive strength
4. Manufacturer of form release agent
C. Formwork Design
A copy of a transmittal letter from the designing engineer to the CONTRACTOR
indicating that the design of the formwork for the project was prepared by or un-
der his supervision. The letter shall be stamped with the seal of the designing
engineer and signed in accordance with the professional engineering registration
laws where the project is located. The designing engineer’s qualifications shall
be attached to the transmittal letter.
1.05 QUALITY ASSURANCE
Formwork, and if required shoring and reshoring, shall be designed by a Professional
Engineer licensed to practice in the state where the project is located and having a
minimum of five years’ experience in the design of concrete formwork or form systems.
PART 2 - PRODUCTS
2.01 GENERAL
For the purposes of this specification exposure shall be defined as a surface, interior or
exterior, of a structure that will be exposed to view during its use. For example, the inte-
rior wall of a buried water retaining structure is a surface exposed to view.
2.02 FORMS FOR SURFACES EXPOSED TO VIEW
A. Walls
1. APA B-B Plyform Class I, Exterior, PS-1-83. The plywood shall be mill
oiled and edge sealed.
2. Symons hand set steel-ply forms, or equal.
B. Beams
1. APA B-B Plyform Class I, Exterior, PS-1-83. The plywood shall be mill
oiled and edge sealed.
2. Symons hand set steel-ply forms, or equal.
Fort Collins Utilities Master Specifications Structural Cast-In-Place Concrete Forms
June 2012 03110-3
C. Sides of Column Footings
1. APA B-B Plyform Class I, Exterior, PS-1-83. The plywood shall be mill
oiled and edge sealed.
2. Symons hand set steel-ply forms, or equal.
3. Steel of sufficient thickness that the form will remain true to shape after
numerous repetitive uses.
D. Sides of Curved or Straight Continuous Wall Footings
1. APA High Density Overlay Plyform Class I Exterior.
2. APA B-B Plyform Class I, Exterior, PS-1-83.
For curved surfaces, plywood of sufficient thickness, free from knots and other
imperfections, which can be cut and bent and held in place accurately to the re-
quired curvature without splintering or splitting shall be used.
E. Floor and Roof Slabs
1. APA B-B Plyform Class I, Exterior, PS-1-83. The plywood shall be mill
oiled and edge sealed.
F. Columns
Regardless of materials of construction the forms shall be such to permit bracing
in two directions at half-height and full height at a minimum. Two braces at 90°
are required at half and full height.
1. Steel of sufficient thickness that the form will remain true to shape after
numerous repetitive uses.
2. Fiberglass of sufficient thickness that the form will remain true to shape.
G. Column Capitals
1. Steel, 16 gage or thicker, so that the form will remain true to shape after
numerous repetitive uses.
2.03 FORMS FOR SURFACES NOT EXPOSED TO VIEW
Wood or steel sufficiently tight to prevent mortar leakage.
2.04 ANCHORAGE IN SLABS FOR BRACES FOR WALL AND COLUMN FORMS
Braces shall be anchored to deadmen of sufficient size and weight to maintain the
proper wall/column alignment under all load conditions including wind.
Fort Collins Utilities Master Specifications Structural Cast-In-Place Concrete Forms
June 2012 03110-4
Wedge anchors of any type, inserts or concrete nails are specifically not permitted for
anchorage of wall or column braces in water retaining structures. Wedge anchors or
nails may be used in other structures when in the opinion of the ENGINEER the result-
ing concrete finish patch will be acceptable. The CONTRACTOR shall make a submittal
including information about the type of wedge anchor or nail and the means of patching
the surface for review and acceptance by the ENGINEER.
2.05 ANCHORAGE IN SLABS FOR UPTURNED COLUMN FOOTING FORMS
Braces shall be anchored to deadmen of sufficient size and weight to maintain the
proper wall/column configuration and diameter. Wedge anchors of any type, inserts or
concrete nails are specifically not permitted for anchorage of column footing forms.
2.06 FORM TIES
A. Water Retaining Structures and Below Grade Structures:
Symons, S-Panel Ties, or equal, with water seal and one-inch break back cones
on both tie ends, shall be used on all wall forms.
B. Structures without formliners:
Symons, S-Panel Ties, or equal, with one-inch break back cones on both tie
ends unless otherwise called out or shown in the Drawings or approved by the
ENGINEER, shall be used on all wall forms.
C. Structures with formliners:
Ellis Construction supplied heavy duty loop panel ties with 1” extension, 2” break
back minimum unless otherwise called out or shown in the Drawings or approved
by the ENGINEER, shall be used on all wall forms where formliner will be used.
C. Twisted Wire Ties:
Twisted wire ties with loops to hold forms in position are not permitted.
2.07 CHAMFER STRIP
Chamfer strips (3/4 inch) shall be placed in the corners of forms and at the tops of walls
or up-turned footings, to produce beveled edges on permanently exposed concrete sur-
faces. Interior angles of intersecting concrete surfaces and edges of construction joints
shall not be beveled unless otherwise indicated in the Drawings. The chamfer strip may
be made of wood or polyvinyl chloride (PVC).
2.08 STIFFBACKS
Stiffbacks for wall forms shall be constructed of lumber or Glulams, uniform in width and
thickness, free from knots and other surface defects. Only one joint is permitted in the
Fort Collins Utilities Master Specifications Structural Cast-In-Place Concrete Forms
June 2012 03110-5
board of a stiffback and joints shall be offset so as to not occur at the same point. Stiff-
backs shall extend to a point not less than six inches above the top of forms.
2.09 GANG WHALER PLATES FOR THE TOP OF CURVED WALLS
Gang whaler plates shall be constructed of plywood as described below cut to the radius
of the wall curve. The gang whaler plate shall be of sufficient depth to permit notching
for stiffbacks.
A. APA High Density Overlay Plyform Class I Exterior.
B. APA B-B Plyform Class I, Exterior, PS-1-83.
2.10 WEDGE INSERTS
When permitted by the ENGINEER at the tops of walls or columns, wedge inserts may
be used to support future formwork or catwalks. The inserts shall be Richmond Screw
Anchor, or equal.
2.11 FORM RELEASE AGENT
Magic Kote by Symons Corp. or equal.
PART 3 - EXECUTION
3.01 GENERAL
Forms shall be used, wherever necessary, to confine the concrete and shape it to the
specified lines and grades as shown on the Drawings. The CONTRACTOR shall set
and maintain concrete forms so as to ensure completed work is within all applicable tol-
erance limits. If a type of form does not, in the opinion of the ENGINEER, consistently
perform in an acceptable manner, the type of form shall be changed and the method of
erection shall be modified by the CONTRACTOR, subject to the review of the ENGI-
NEER.
Forms shall have sufficient strength to withstand the pressure resulting from placement
and vibration of concrete, and shall be maintained rigidly in position. The design of
formwork and placing rate of concrete with medium and high-range water reducing
agents shall be adjusted to compensate for the greater hydraulic pressures exerted on
the forms by concrete of high fluidity.
Forms shall be clean and free from mortar and other foreign material from previous use
prior to being placed.
The CONTRACTOR shall demonstrate that forms are vertical, proper alignment, grade
or radius when requested by the ENGINEER.
Fort Collins Utilities Master Specifications Structural Cast-In-Place Concrete Forms
June 2012 03110-6
3.02 FORM SURFACE TREATMENT
A. General
Prior to placing reinforcing steel coat the forms with a non-staining release agent
that will effectively prevent the absorption of moisture and prevent bond of the
concrete to the form. Contact with hardened concrete against which fresh con-
crete is to be placed is prohibited. All bond breaking materials or processes
shall be used only after acceptance by the ENGINEER. Care shall be taken in
applying form oil to avoid contact with reinforcement steel. Embedded material
which becomes coated with form oil shall be thoroughly cleaned or replaced at
the expense of the CONTRACTOR.
B. For Potable Water Facilities
Form release agents for potable water facilities, such as treated water storage
reservoirs or water treatment plants, shall be non-toxic 30 days after application.
3.03 TOLERANCES
Tolerances are defined as allowable variations from specified alignments, grades and
dimensions. Allowable variations from specified alignments, grades and dimensions are
prescribed in the following sub-section. Descriptions of these criteria can be found in
Part 2 of the ACI Manual of Concrete Practice 1995, Commentary of Standard Specifi-
cations for Tolerances for Concrete Construction and Materials (ACI 117-90).
A. Footings and Foundations
1. Drilled Piers
Vertical alignment ≤ 2 % of the shaft length
Lateral alignment ≤ 1/24 of shaft diameter, 3 inch maximum
Level alignment to cut-off elevation: +1 inch, -3 inch
2. Continuous Wall Footings (Circular and Non-circular)
Lateral alignment: ≤ 2% of the footing width, 2 inches maximum
Relative alignment: Variation ≤ 1 inch in 10 feet (variation between speci-
fied plane and as built surface)
Cross-sectional dimension:
Horizontal dimension: Variation +2 inch, -1/2 inch
Vertical dimension (thickness): Variation ± 1/2 inch
Fort Collins Utilities Master Specifications Structural Cast-In-Place Concrete Forms
June 2012 03110-7
Circular Wall Footing Only
Variation in Radius in any 20 feet of wall length: ≤ 1/2 inch
Variation in Radius in entire wall length: ≤ 1 inch
3. Column footings
Lateral alignment: Variation ≤ 2 inch
Level alignment: Variation from specified elevation +1/2 inch, - 2 inch
Relative alignment: Variation ≤ 1 inch in 10 feet (variation between speci-
fied plane and as built surface)
Cross-sectional dimension:
Horizontal dimension: Variation +2 inch, -1/2 inch
Vertical dimension (thickness): Variation ± 1/2 inch
B. Cast-in-Place Concrete for Buildings and other Structures
1. Member (such as a beam, column, wall, slab, or pier)
Vertical alignment:
Variation from specified plumb ≤ 3/8 inch (full height)
1/4 inch (one form section)
Lateral alignment:
Maximum in any bay: Variation ≤ 1/2 inch
Maximum in any 20 feet of length: Variation ≤ 1/2 inch
Maximum for entire wall length: Variation ≤ 1 inch
Floor and wall opening locations: Variation ≤ 1/2 inch
Sawcuts and joints: Variation ≤ 3/4 inch
Level alignment:
Top elevation of slabs: Variation ≤ 3/4 inch
Lintels, other lines exposed to view: Variation ≤ 3/4 inch
Cross sectional dimensions:
Fort Collins Utilities Master Specifications Structural Cast-In-Place Concrete Forms
June 2012 03110-8
Walls and slabs (thickness): Variation ±1/4 inch
Columns and Beams: Variation +1/2 inch, -1/4 inch
Size of wall and floor openings: Variation ± 1/4 inch
Relative alignment:
Offset between adjacent formwork: Variation ±1/4 inch
Variation in Specified Grade:
For any distance less than 10 feet: Variation ≤ 1/4 inch
For entire structure: Variation ± 1/2 inch
For manholes and outlet structures: Variation ≤ 1 inch
2. Stairways
Relative alignment:
Difference in height between adjacent risers: 1/8 inch
Difference in width between adjacent treads: 1/4 inch
3.04 PLUMB AND STRING LINES
Plumb and string lines shall be installed on wall and column forms before, and main-
tained, during concrete placement. There shall be sufficient number of plumb or string
lines in walls, for example at every other stiffback, properly installed to permit continu-
ous monitoring. During concrete placement, the CONTRACTOR shall continually moni-
tor plumb and string line positions and immediately correct deficiencies. The plumb and
string lines shall extend to a point at least six inches above the top of wall or column.
3.05 FORMWORK CAMBER
In order to maintain specified tolerances of joists, beams or slabs subject to dead load
deflection, the CONTRACTOR shall camber formwork to compensate for dead load de-
flection prior to hardening of the concrete.
3.06 GANG WHALER PLATES FOR CIRCULAR WALLS
The CONTRACTOR shall place a gang whaler plate cut to the curvature of the wall,
such as a circular reservoir wall, at the top of the wall forms. The gang whaler plate
shall be attached to the forms with a gang whaler rod at appropriately designed inter-
vals. The gang whaler plate may be notched to permit the stiffback to extend above the
top of the wall forms. The gang whaler plate shall be sufficiently stiff to maintain the re-
quired curvature.
Fort Collins Utilities Master Specifications Structural Cast-In-Place Concrete Forms
June 2012 03110-9
3.07 HAND SET MODULAR FORMS
Hand set modular forms, such as Symons hand set steel-ply forms, shall be placed with
no more than two intersecting joints occur at one level in the formwork above the bottom
modular form level. The following figure illustrates the required form pattern.
Figure 1
The above form configuration is one way recommended by Simons Corp. to eliminate
vertical, in plane, bending of the forming system. The CONTRACTOR may develop al-
ternate means of maintaining vertical alignment. Alternate form system configurations
require preparation by a licensed Professional Engineer in Colorado and submittal to the
ENGINEER for review and approval.
3.08 FORMWORK CLOSURE
Forms which will prohibit visual review of items such as reinforcing steel, waterstops and
bearing pads by the ENGINEER, shall not be placed until the ENGINEER has per-
formed a final review of the reinforcing steel.
The CONTRACTOR shall use compressed air from an air-compressor to blow-out con-
struction debris and dirt at the bottom of sections or members to be placed such as
walls, slabs, beams and columns, prior to placing forms or concrete. The CONTRAC-
TOR shall demonstrate to the ENGINEER that all debris, such as loose concrete parti-
cles, saw dust, loose tie wire, bar tags, tape, trash and dirt, have been thoroughly re-
moved.
3.09 HOT OR COLD WEATHER PLACEMENT AND STEEL FORMS
Prior to placing concrete when steel forms are used, the forms shall be heated when the
surface temperature of the form is below 40° F or cooled when the surface temperature
of the form is above 90° F. If water is used to cool forms where ponding of water may
Fort Collins Utilities Master Specifications Structural Cast-In-Place Concrete Forms
June 2012 03110-10
occur, i.e., at the bottom of a column, the water shall be permitted to drain prior to plac-
ing concrete.
3.10 REMOVAL OF FORMS
The forms for any portion of a structure shall not be removed until the concrete has
reach sufficient strength with a factor of safety of 2.0, to withstand applied loads such as
self weight and wind loads or withstand damage when the forms are removed.
For post-tensioned concrete slabs and beams, formwork shall not be removed until the
entire slab or member has been stressed and stressing records accepted.
3.11 RESHORES
When a reshore plan is to be performed, it shall comply with Section 1.04 of this Speci-
fication.
END OF SECTION
Fort Collins Utilities Master Specifications Hydrophilic Rubber Waterstop
June 2012 03151-1
SECTION 03151
HYDROPHILIC RUBBER WATERSTOP
PART 1 - GENERAL
1.01 SECTION INCUDES
The CONTRACTOR shall furnish and securely install expanding rubber waterstops
where shown or specified in the Drawings. The work includes cleaning of concrete
surfaces and installation of expanding rubber waterstop.
1.02 RELATED SECTIONS
A. Section 03310 - Structural Concrete
B. Section 03320 - Construction Joints
1.03 QUALITY STANDARDS
A. ASTM D 412 - Test Methods for Vulcanized Rubber and Thermoplastic Rubbers
and Thermoplastic Elastomers - Tension
B. ASTM D 395 - Test Methods for Rubber Property - Compression Set
C. ASTM D 2240 - Test Method for Rubber Property - Durometer Hardness
1.04 SUBMITTALS
A. Waterstop Product Data
B. Adhesive
1.05 QUALITY ASSURANCE
The components and installation procedures shall be in accordance with the
manufacturer's printed specifications and recommendations. Installation shall be
performed by skilled workers who are trained in procedures and methods required for
proper performance of the waterstop.
Materials approved for use are:
Adeka MC-2010M
Adeka KM-3030M
Adeka P201 (except in contact with potable water)
Adeka KC series of waterstops
Fort Collins Utilities Master Specifications Hydrophilic Rubber Waterstop
June 2012 03151-2
1.06 DELIVERY, STORAGE, AND HANDLING
Deliver the waterstop materials to the project site in the manufacturer's unpacked
containers with all labels intact and legible at time of use. Materials shall be stored in a
secure, indoor, dry area. Maintain the waterstops in a dry condition during delivery,
storage, handling, installation and concealment.
PART 2 - PRODUCTS
2.01 HYDROPHILIC RUBBER WATERSTOP
A. Rubber Waterstop:
The waterstop shall have the minimum performance standard of:
Property ASTM Standard Results
Tensile Strength D 412 0.98
(MPa)
Elongation D 412 550
Hardness (Hs) D 2240 30 Duro Type A
The time period to maximum volume expansion is 35 days.
B. Adhesive:
The adhesive shall be 3M-2141 as manufactured by the 3M Company, or Adeka
H-1000 Ultra Bond.
PART 3 - EXECUTION
3.01 GENERAL
Coordinate as required with other trades and Specification 03310, Structural Concrete,
to assure proper execution of the waterstop installation. Examine the concrete surface
and correct any surface imperfections which will prevent proper installation and
performance of the waterstop. The finished concrete surface, prior to surface
preparation, shall be equal to a steel trowel finish.
3.02 SURFACE PREPARATION
Concrete surfaces shall be clean and free of dirt, saw dust, laitance, grease, form oils,
form release agent, or other contamination to insure proper adhesion of the waterstop to
the concrete surface. Use a wire brush to lightly roughen the surface. Remove all
concrete dust with a soft brush.
Fort Collins Utilities Master Specifications Hydrophilic Rubber Waterstop
June 2012 03151-3
3.03 WATERSTOP PLACEMENT
Measure and cut an exact length of waterstop. Splices are not permitted in the
waterstop in vertical wall joints of structures. Splices in horizontal joints are acceptable,
however, only one splice is permitted in 25 feet. Splice of waterstops in horizontal joints
shall be made by butting and gluing the ends of the waterstop with an approved
adhesive.
Refer to the manufacturer’s recommendations for minimum clearance to a concrete
face. Unless a greater clearance is recommended by the manufacturer the minimum
clearance shall be two inches. Use the greater clearance if the recommended
clearance is more than two inches.
Using a brush, apply a uniform coat of adhesive to the concrete surface along the line of
placement. Apply a uniform coat of adhesive to the waterstop. Gaps in the glue
application shall not be permitted.
After the adhesive has dried to a tacky condition (about 15 minutes in the summer and
30 minutes in the winter), firmly press the waterstop to the concrete surface. When
installing the waterstop on curved surfaces such as pipes, temporary bands, i.e., wire or
rope, may be used to assist in securing the waterstop to the surface. Any temporary
means of securing the waterstop shall be removed prior to placing concrete or grout.
Concrete placement within 12 hours is required. The waterstop shall be protected from
water and from displacement prior to concrete placement. During concrete placement
the CONTRACTOR shall visually observe the waterstop to assure proper placement and
alignment.
END OF SECTION
Fort Collins Utilities Master Specifications Hydrophilic Rubber Waterstop
June 2012 03151-4
THIS PAGE INTENTIONALLY LEFT BLANK
Fort Collins Utilities Master Specifications Reinforcing Steel
June 2012 03210-1
SECTION 03210
REINFORCING STEEL
PART 1 - GENERAL
1.01 SECTION INCLUDES
This work shall consist of furnishing and placing reinforcing steel in accordance with
these Specifications and in conformity with the Drawings.
1.02 RELATED SECTIONS
A. Section 03310 – Structural Concrete
1.03 QUALITY STANDARDS
A. American Concrete Institute
1. ACI 318 - Building Code Requirements for Reinforced Concrete
2. ACI Detailing Manual - (SP-66)
3. ACI 117 - Standard Tolerance for Concrete Construction and Materials
B. American Society for Testing and Materials
1. ASTM A 615, A 616 including supplementary requirement S1, A 617, A
706
2. ASTM A 767, Zinc-coated (galvanized) reinforcing bars
3. ASTM A 775 Epoxy-coated reinforcing bars
C. Concrete Reinforcing Steel Institute (CRSI)
1. Manual of Standard Practice
2. Placing Reinforcing Bars
D. American Welding Society (AWS)
1. AWS D1.4 - Structural Welding Code - Reinforcing Steel
Fort Collins Utilities Master Specifications Reinforcing Steel
June 2012 03210-2
PART 2 - PRODUCTS
2.01 REINFORCING STEEL
A. Deformed Bars:
All bar steel reinforcement shall be of the deformed type, ASTM A 615,
(AASHTO M31) and grade (40 or 60) as specified in the Drawings.
B. Spirals:
Spirals, hot-rolled plain or deformed bars per ASTM A 615, Grade 60 or cold
drawn wire per ASTM A 82 as specified in the Drawings.
Spirals for columns shall have two “spacers” with a section modulus > 0.008in3 in
order to maintain the proper pitch and spacing.
C. Epoxy-Coated Reinforcing Bars:
Epoxy-coated reinforcing bars shall conform to ASTM A 775. When required,
damaged epoxy coating shall be repaired with patching material conforming to
ASTM A 775 in accordance with the material manufacturer's recommendations.
D. Zinc-coated (Galvanized Reinforcing Bars):
Zinc-coated reinforcing bars shall conform to ASTM A 767. When required,
damaged zinc coating shall be repaired with a zinc-rich formulation conforming to
ASTM A 767.
2.02 TIE WIRE
16 gauge wire ties, manufactured by American Wire Tie, Inc., or equal. When epoxy
coated reinforcing steel is shown in the Drawings, PVC coated wire ties shall be used.
The minimum PVC coating is 0.7 mils.
2.03 IDENTIFICATION
Bundles of reinforcing bars and wire spirals shall be tagged, with a metal tag, showing
specification, grade, size, quantity and suitable identification to permit checking, sorting
and placing. When bar marks are used to identify reinforcing bars in the Drawings, the
bar mark shall be shown on the tag. Tags shall be removed prior to concrete place-
ment.
Bundles of flat sheets and rolls of welded wire fabric shall be tagged similar to reinforc-
ing bars.
2.04 STORAGE AND PROTECTION
Reinforcing steel shall be stored off of the ground and protected from oil or other mate-
rials detrimental to the steel or bonding capability of the reinforcing bar. Epoxy-coated
reinforcing bars shall be stored on protective cribbing.
Fort Collins Utilities Master Specifications Reinforcing Steel
June 2012 03210-3
Rust, seams, surface irregularities, or mill scale, shall not be cause for rejection pro-
vided that the weight and height of deformations of a hand-wire-brushed test specimen
are not less than the applicable ASTM Specification.
When placed in the work, the reinforcing bars shall be free from dirt, loose mill scale,
paint, oil, loose rust or other foreign substance.
2.05 BAR SUPPORTS
A. General:
Bar supports and spacing shall be in accordance with the CRSI Manual of Stan-
dard Practice, Chapter 3, a maximum of four feet or as required by the Draw-
ings.
B. Floor Slabs:
Uncoated steel or non-metallic composite chairs shall be used unless otherwise
shown in the Drawings. If required by the ENGINEER, the chair shall be stapled
on a bearing pad to prevent chair displacement. The bearing pad shall be made
of exterior grade plywood and be approximately five inches square.
C. Soffits:
Steel wire bar supports in concrete areas where soffits are exposed to view or
are painted shall be Class 1 or Class 2, Types A or B: Class 3 is acceptable in
other areas.
D. Water and Wastewater Vaults, Tank and Basin Walls, and Roof Slabs:
Only plastic clip, non-metallic composite or 100% epoxy coated steel chair bar
and bolster supports are acceptable for use in walls and roof slabs. Supports
shall be securely stapled to formwork.
E. Columns:
Plastic "space wheels" manufactured by Aztec (Model DO 12/40), or equal, are
required.
F. Epoxy-Coated and Zinc-Coated Bar Supports:
Epoxy-coated reinforcing bars supported from formwork shall rest on coated wire
bar supports made of dielectric or other acceptable materials. Wire supports
shall be fully coated with dielectric material, compatible with concrete. Reinforc-
ing bars used as support bars shall be epoxy-coated. In walls reinforced with
epoxy-coated bars, spreader bars shall be epoxy coated. Proprietary combina-
tion bar clips and spreaders used in walls with epoxy-coated reinforcing shall be
made of corrosion-resistant material or coated with dielectric material.
Fort Collins Utilities Master Specifications Reinforcing Steel
June 2012 03210-4
PART 3 - EXECUTION
3.01 BAR LIST
Eight copies of a list of all reinforcing steel and bending diagrams shall be furnished to
the ENGINEER at the site of the work at least two weeks before the placing of reinforc-
ing steel is begun. The CONTRACTOR shall be responsible for the accuracy of the lists
and for furnishing and placing all reinforcing steel in accordance with the details shown
on the Drawings.
Bar lists and bending diagrams for structures, which are included in the Drawings, do
not have to be furnished by the CONTRACTOR. When bar lists and bending diagrams
are included in the Drawings, they are intended for estimating approximate quantities.
The CONTRACTOR shall verify the quantity, size and shape of the bar reinforcement
against those shown on the Drawings and make any necessary corrections before or-
dering.
3.02 FABRICATION
Fabrication tolerances for straight and bent bars shall be in accordance with the re-
quirements of Subsection 4.3, Tolerance, of the American Concrete Institute Standard
315 and the CRSI Manual of Standard Practice.
3.03 BENDING
All reinforcing bars shall be bent cold. Bars partially embedded in concrete shall not be
field bent except as shown on the Drawings or as permitted by the ENGINEER. Bars
shall not be bent or straightened in a manner that will injure the material.
3.04 SPIRALS
One and one-half finishing bends are required at the top and bottom of the spiral.
Spacers shall be provided in accordance with Chapter 5, Section 9 of the CRSI Manual
of Standard Practice. Welding as an aid to fabrication and/or installation is not permit-
ted.
3.05 PLACING AND FASTENING
The placing, fastening, splicing and supporting of reinforcing steel and wire mesh or bar
mat reinforcement shall be in accordance with the Drawings and the latest edition of
"CRSI Recommended Practice for Placing Reinforcing Bars". In case of discrepancy
between the Drawings and the CRSI publication stated above, the Drawings shall gov-
ern. Reinforcement shall be placed within the tolerances provided in ACI 117.
Steel reinforcement shall be accurately placed in the positions shown on the Drawings
and firmly held during the placing and setting of concrete by means of spacer strips,
stays, metal chairs or other approved devices or supports. Chair and bolster supports
for slabs and walls shall be spaced at a maximum of four foot centers unless otherwise
Fort Collins Utilities Master Specifications Reinforcing Steel
June 2012 03210-5
shown in the Drawings. Staples used to attach bar supports to wall and roof forms shall
have the staple "tails" clipped after form removal. For Columns, three wheels, spaced
120 degree apart, shall be placed every four feet of column height. The CONTRACTOR
may increase the column spiral pitch if a conflict occurs with the wheel. Pre-tied column
reinforcing steel lowered into column forms shall be lowered vertically to prevent dam-
age to the space wheels.
Bars shall be securely tied at 50% of all intersections except where spacing is less than
one foot in each direction, when alternate intersections shall be tied unless otherwise
called out in the Drawings or in applicable specifications. Tying of steel by spot welding
will not be permitted unless specifically authorized by the ENGINEER. The placing and
securing of the reinforcement in any unit or section shall be accepted by the ENGINEER
before any concrete is placed in any such unit or section.
Bundle bars shall be tied together at not more than 6-foot centers.
3.06 SPLICING
Bar steel reinforcement shall be furnished in the full lengths indicated on the Drawings.
Splicing of bars, except where shown on the Drawings, will not be permitted without the
written acceptance of the ENGINEER. Splices shall be staggered. In cases where per-
mission is granted to splice bars, other than those shown on the Drawings, the addi-
tional material required for the lap shall be furnished by the CONTRACTOR at his own
expense. The minimum distance between staggered splices for reinforcing bars shall
be the length required for a lapped splice in the bar. All splices shall be full contact
splices.
Splices will not be permitted at points where the section is not sufficient to provide a
minimum distance of two inches between the splice and the nearest adjacent bar or the
surface of the concrete.
Welding of reinforcement shall be done only if detailed on the Drawings or if authorized
by the ENGINEER in writing. Welding shall be done by a certified welder. The welding
shall conform to AWS D 12.1, Recommended Practices for Welding Reinforcing Steel,
Metal Inserts and Connections in Reinforced Concrete Construction, with the modifica-
tions and additions specified hereinafter. Where AWS D 2.0 Specifications for Welded
Highway and Railway Bridges is referenced, the reference shall be construed to be for
AWS D 1.1. Where the term AWS D1.1 is used it shall mean the American Welding
Society Structural Welding Code, D 1.1 as modified and amended by the AASHTO
Standard Specifications for Welding of Structural Steel Highway Bridges. After comple-
tion of welding, coating damage to coated reinforcing steel bars shall be repaired.
When required or permitted, a mechanical connection may be used to splice reinforcing
steel bars or as substitution for dowel bars. The mechanical connection shall be capa-
ble of developing a minimum of 125% of the yield strength of the reinforcing bar in both
tension and compression. All parts of mechanical connections used on coated bars, in-
cluding steel splice sleeves, bolts, and nuts shall be coated with the same material used
for repair of coating damage.
3.07 CUTTING
Fort Collins Utilities Master Specifications Reinforcing Steel
June 2012 03210-6
When coated reinforcing bars are cut in the field, the ends of the bars shall be coated
with the same material used for repair of coating damage. All rebar cut in the field shall
be cut with a cut-off saw, any other method must be approved by the ENGINEER.
END OF SECTION
Fort Collins Utilities Master Specifications Welded Wire Fabric
June 2012 03220-1
SECTION 03220
WELDED WIRE FABRIC
PART 1 - GENERAL
1.01 WORK INCLUDED
A. This work shall consist of furnishing and placing welded wire fabric in accordance
with these specifications and in conformity with the Contract Documents.
1.02 RELATED WORK
A. Section 03210 - Reinforcing Steel
B. Section 03310 - Structural Concrete
PART 2 - MATERIALS
Materials used in the work shall meet the requirements for the class of material named.
Welded wire fabric shall conform to the requirements of the following specifications:
Welded Steel Wire Fabric for Concrete Reinforcement -- AASHTO M55 (ASTM A185)
Welded Deformed Steel Wire Fabric for Concrete Reinforcement -- AASHTO M221
(ASTM A497)
PART 3 - EXECUTION
3.01 STORING AND SURFACE CONDITION OF REINFORCEMENT
Welded wire fabric shall be stored above the surface of the ground upon platforms, skids, or
other supports and shall be protected as far as practicable from mechanical injury and
surface deterioration caused by exposure to conditions producing rust. When placed in the
work, the wire fabric shall be free from dirt, detrimental rust, loose scale, paint, grease, oil, or
other foreign materials. The welded wire fabric shall be free from injurious defects such as
cracks and laminations. Rust, surface seams, surface irregularities or mill scale will not be
cause for rejection, provided the minimum dimensions, cross section area and tensile
properties of a hand wire brushed specimen meets the physical requirements for the size
and grade of steel specified.
3.02 PLACING AND FASTENING
The placing, fastening, splicing and supporting of the wire mesh shall be in accordance with
the plans and the latest edition of "CRSI Recommended Practice for Placing Reinforcing
Bars". In case of discrepancy between the plans and the CRSI publication stated above, the
plans shall govern.
The wire mesh shall be accurately placed in the positions shown on the plans and firmly held
during the placing and setting of concrete by means of spacer strips, stays, metal chairs or
Fort Collins Utilities Master Specifications Welded Wire Fabric
June 2012 03220-2
other approved devices or supports. When metal chairs are used, the part of the chair in
contact with the form and at least 1 inch from the form shall be hot dip galvanized or plastic
coated. Other coatings or treatments will be acceptable when specifically accepted by the
Engineer. Precast concrete bricks or other accepted bricks or blocking may be used in
structures to support reinforcement in slabs placed on grade; however, the bricks or blocking
shall not contact the reinforcement over a distance greater than the depth of a standard
concrete brick. The placing and securing of the wire mesh in any unit or section shall be
accepted by the Engineer a minimum of 24 hours before any concrete is placed in any such
unit or section.
At the time the concrete is placed, the wire fabric required shall be free from flaky rust, mud,
oil or other coatings that will destroy or reduce the bond.
3.03 SPLICING
Sheets of welded wire fabric reinforcement shall overlap each other sufficiently to maintain a
uniform strength and shall be securely fastened at the ends and edges. The edge lap shall
not be less than 1 mesh in width.
3.04 TIES, CHAIRS, SPACERS
The wire mesh shall be accurately placed and adequately supported by concrete, metal or
other approved spacers or ties and secured against displacement within the tolerance
permitted.
3.05 PLACEMENT
Unless otherwise specified by the Engineer, the wire fabric shall be placed in specified
positions within the following tolerances:
A. In slabs, all wire mesh shall be placed within, plus or minus, one-quarter inch of
specified location.
END OF SECTION
Fort Collins Utilities Master Specifications Fibrous Concrete Reinforcing
June 2012 03240-1
SECTION 03240
FIBROUS CONCRETE REINFORCING
PART 1 - GENERAL
1.01 Work Included
A. Fibrous concrete reinforcement
1.02 Related Sections:
A. Section 02750 –Concrete Paving
1.03 References
A. General: Sources listed by reference, including revisions by issuing authority,
form a part of this specification section to extent indicated. Standards listed are
identified by issuing authority, authority abbreviation, designation number, title, or
other designation established by issuing authority. Standards subsequently
referenced herein are referred to by issuing authority abbreviation and standard
designation.
B. American Concrete Institute:
1. ACI 211.1 – Standard Practices for Selecting Proportion for Normal,
Heavyweight and Mass Concrete.
2. ACI 318 – Building Code Requirements for Reinforced Concrete.
3. ACI 544.1R – State-of-the-Art Report of Fiber Reinforced Concrete.
4. ACI 544.2R – Measurement of Properties of Fiber Reinforced Concrete.
C. American Society for Testing and Materials:
1. ASTM C1399-98 – Test Method for Determining Average Residual
Strength of Fiber Reinforced Concrete.
2. ASTM C94 – Standard Specification for Ready-Mixed Concrete.
3. ASTM C1116 – Standard Specification for Fiber-Reinforced Concrete and
Shotcrete.
4. ASTM C1018 – Standard Test Method for Flexural Toughness and First
Crack Strength of Fiber-Reinforced Concrete (Using Beam with Third
Point Loading).
5. ASTM r119 – Standard Method of Fire Tests of Building Construction
Material.
D. American Society of Civil Engineers (ASCE)
1. ASCE 9 – Standard Practice for the Construction and Inspection of
Composite Slabs
E. Underwriters Laboratories
1. UL Fire Resistance Directory.
Fort Collins Utilities Master Specifications Fibrous Concrete Reinforcing
June 2012 03240-2
1.04 System Description
A. Performance Requirements: Provide fibrous concrete reinforcement which has
been manufactured and mixed with concrete to achieve performance criteria
stated by manufacturer without defects, damage or failure.
B. Fire Classifications: Provide fibrous concrete reinforcement with fire
classifications as follows:
1. Underwriters Laboratories (UL) Report File No. R8534-11
2. Southwest Certification Services (SWCS, Omega Point Laboratories, Inc.
#8662-1.
C. Submittals
1. General: Submit listed submittals in accordance with Conditions of the
Contract and Division 1 Submittal Procedures Sections. Printed data shall
state a minimum amount of fiber to be added to each type of concrete.
2. Product Data: Submit product data, including manufacturer’s product
specification sheet for each product specified.
a. Indicate proposed fibrous concrete reinforcement materials including
application rate per cubic foot.
b. Include manufacturer’s printed batching and mixing instructions.
3. Submit fiber reinforcement’s certification of performance meeting or
exceeding ASTM C1116.
4. Samples: Submit selection and verification samples.
5. Quality Assurance Submittal: Certificate prepared by the Concrete
Supplier stating approved fibrous concrete reinforcement materials, at the
minimum rate added to each batch of concrete delivered to the project
site. Each certificate shall be accompanied by one copy of each batch
delivery ticket indicating the trade name, manufacturer’s name and
amount per cubic yard, of fibrous concreter reinforcement material added
to each batch of concrete.
1.05 Quality Assurance
A. Regulatory Requirements: Comply with the following code requirements
applicable to project. Submit applicable National Evaluation Service Report
(NER) to document compliance with the following codes:
B. BOCA National Building Code
C. SBCCI Standard Building Code
D. ICBO Uniform Building Code and all supplements as adopted by the Council of
American Building Officials.
E. Local Building Codes and supplements as adopted by the governing agency.
1.06 Warranty
A. Project Warranty: Refer to the Conditions of the Contract for project warranty
provisions.
Fort Collins Utilities Master Specifications Fibrous Concrete Reinforcing
June 2012 03240-3
A. Manufacturer’s Warranty: Submit, for Owner’s Acceptance, manufacturer’s
standard warranty document executed by authorized company official.
Manufacturer’s warranty is in addition to and not a limitation of, other rights
Owner may have under the contract documents.
B. Warranty Period: One year commencing on Date of Substantial Completion.
PART 2 - PRODUCTS
2.01 Fibrous Reinforcing
A. Manufacturer: Fibermesh or approved equivalent.
1. Contact: 4019 Industry Drive, Chattanooga, TN 37416; Telephone
(800) 635-2308
2. Products: Fibermesh fibrous concrete reinforcement.
2.02 Materials
A. Fibrous Concrete Reinforcement: 100% virgin polypropylene, MD Graded, fibers
containing no reprocessed olefin materials and specially manufactured for use
as concrete secondary reinforcement
B. Physical Characteristics:
1. Specific Gravity: 0.91
2. Fiber Length: Multi-Design Gradation
2.03 Related Materials
A. Concrete: Refer to Section 02750 and Division 3 for related concrete
materials.
2.04 Mixes
A. Mixing: Mix materials in accordance with manufacturer’s instructions,
including product data and product technical bulletins
2.05 Source Quality
A. Obtain fibrous reinforcements from a single manufacturer.
PART 3 - EXECUTION
3.01 Manufacturer’s Instructions
A. Compliance: Comply with manufacturer’s product data including product
technical bulletins, product catalog installation instructions and product carton
instructions for installation.
3.02 Application
A. Fibrous Reinforcement: Add fibrous concrete reinforcement to concrete
materials at the time concrete is batched in amount in accord with approved
submittals for each type of concrete required.
Fort Collins Utilities Master Specifications Fibrous Concrete Reinforcing
June 2012 03240-4
B. Concrete Placing and Finishing: Refer to Section 02750 for placement and
finishing concrete materials.
END OF SECTION
Fort Collins Utilities Master Specifications Structural Concrete
June 2012 03310-1
SECTION 03310
STRUCTURAL CONCRETE
PART 1 - GENERAL
1.01 SECTION INCLUDES
The CONTRACTOR shall furnish all labor, tools and equipment for the construction of
reinforced cast-in-place concrete for buildings, valve and equipment vaults, water and
wastewater treatment and facilities and tanks, box culverts, inlets, headwalls, drop
structures, concrete encasement of sanitary sewers, equipment pads, manhole bases,
pole bases and thrust blocks as shown on the Drawings and herein specified.
This section includes basic finishing and curing methods, accessory control, and
expansion and contraction joint devices.
1.02 CONCRETE PRODUCER QUALIFICATIONS
The ready-mixed concrete supplier to the CONTRACTOR shall have the capability to
produce and deliver concrete, meeting the requirements of the Drawings and
Specifications. The supplier shall have a contingency plan for a back-up plant in the
event of a mechanical malfunction of one of the primary plant(s). This plan shall be
submitted in accordance with Section 01330.
1.03 RELATED SECTION
A. Section 03110 - Structural Cast-In-Place Concrete Forms
B. Section 03151 - Hydrophilic Rubber Waterstop
C. Section 03210 – Reinforcing Steel
D. Section 03320 - Construction Joints
E. Section 03350 - Concrete Finishing
F. Section 03390 - Concrete Curing
G. Section 07900 - Sealants
1.04 QUALITY STANDARDS
A. American Society for Testing Materials (ASTM)
1. ASTM C 33 - Concrete Aggregates
2. ASTM C 94 - Ready Mixed Concrete
3. ASTM C 150 - Portland Cement
4. ASTM C 260 - Air-entraining Admixtures for Concrete
Fort Collins Utilities Master Specifications Structural Concrete
June 2012 03310-2
5. ASTM C 494 - Chemical Admixtures for Concrete
6. ASTM C 618 - Fly Ash in Portland Cement Concrete
7. ASTM C 979 - Pigments for Colored Concrete
8. ANSI/ASTM D 994 - Preformed Expansion Joint Fillers
9. ASTM D 1751 - Preformed Non-Extruding and Resilient Expansion Joint
Fillers
10. ASTM D 3575 - Test Methods for Flexible Cellular Materials made from
Olefin Polymers
B. American Concrete Institute (ACI)
1. ACI 211 - Standard Practice for Selecting Proportions for Concrete
2. ACI 212 - Guide for Use of Concrete Admixtures
3. ACI 221 - Guide for Use of Normal Weight Aggregates
4. ACI 301 - Structural Concrete for Buildings
5. ACI 304 - Guide for Measuring, Mixing, Transporting and Placing
Concrete
6. ACI 305 - Hot Weather Concreting
7. ACI 306 - Cold Weather Concreting
8. ACI 309 - Standard Practice for Consolidating Concrete
9. ACI 318 - Building Code Requirements for Structural Concrete
10. ACI 503 - Use of Epoxy Compounds
11. ACI 504 - Guide to Joint Sealants
1.05 SUBMITTALS
A. Product Data:
1. Admixtures (such as air-entraining and water-reducing admixtures)
2. Fly Ash
3. Form Release Agents
4. Ready Mixed Concrete Mix Designs
5. Form Ties
6. Bonding Agents
7. Grouts
8. Vibrator Specifications
9. Ready-Mixed Concrete Plant Production Contingency Plan
1.06 QUALITY ASSURANCE
A. Acquire cement and aggregate from the same source for all work.
B. Conform to ACI 305 for hot weather concrete placement
C. Conform to ACI 306 for cold weather concrete placement
D. Conform to ACI 309 for concrete consolidation
1.07 CONTRACTOR ASSISTANCE
Fort Collins Utilities Master Specifications Structural Concrete
June 2012 03310-3
The CONTRACTOR shall assist the OWNER or his concrete testing consultant as
requested during the performance of quality control testing. When concrete is placed
using a concrete pumper, concrete for testing will be taken from the pumper discharge
hose.
1.08 DELIVERY, STORAGE,AND HANDLING
A. Ready-Mixed Concrete Delivery Ticket:
The ready-mixed concrete truck driver shall provide the batch ticket to the
ENGINEER at the time of concrete delivery. The ticket shall summarize the
following information legibly in an easily discernible table:
1. Weight in pounds of all materials, excepting the water reducing and air-
entraining agents which shall be in ounces.
2. Cubic yards batched
3. The ratio of water to cementitious (W / C) materials ratio
4. Temperature of the concrete at the time it was batched
5. Time of batching.
6. Free moisture in the fine and coarse aggregates in percent of weight of
aggregate.
7. Gallons of water that may be added at the site without exceeding the
permissible W / C ratio.
B. Delivery:
Delivery shall conform to the recommendations of ACI 304 as determined by the
ENGINEER.
PART 2 - PRODUCTS
2.01 CEMENT
Cement shall be Portland Cement Type II, unless otherwise indicated on the Drawings.
2.02 AGGREGATE
A. Fine Aggregate:
Fine aggregate shall consist of hard, strong, durable particles to the provisions of
ASTM C 33.
B. Coarse Aggregate:
Coarse aggregate shall conform to the provisions of ASTM C 33 except that all
aggregate shall be crushed aggregate. Screened aggregate is unacceptable.
2.03 WATER
Fort Collins Utilities Master Specifications Structural Concrete
June 2012 03310-4
Water shall be clean and free from injurious amounts of oils, acids, alkalis, salts, organic
materials, or other substances that may be deleterious to concrete or steel. Mixing
water for prestressed pretensioned and prestressed post-tensioned concrete or for
concrete which will contain aluminum embedments, shall not contain deleterious
amounts of chloride ion.
Unless otherwise permitted or specified in the Drawings, the concrete shall be
proportioned and produced to have a slump not to exceed four inches or less than two
and one-half inches. Concrete not consolidated by internal vibration shall be
proportioned to have a slump not to exceed five and one-half inches or less than four
inches. The slump shall be determined by the "Test for Slump of Portland Cement"
ASTM C 143.
2.04 ADMIXTURES
Admixtures to be used in concrete shall be subject to prior acceptance by the
ENGINEER. The admixture shall maintain the same composition and performance
throughout the work as the product used in the concrete proportions established in
accordance with ACI 211. Admixtures containing chloride ions shall not be used.
A. Air Entrainment:
An air-entraining agent shall be used in all concrete. The agent used shall
conform to ASTM C 260.
Unless otherwise shown in the Drawings, the amount of air entraining agent
used in each concrete mix shall be such as will effect the entrainment of the
percentage of air shown in the following tabulation in the concrete as discharged
from the mixer. This table is applicable for concrete strengths less than 5000
psi.
Table 1
Nominal
max.
aggregate
size, in.
Average air content, percent
Severe
exposure
Moderate
exposure
3/8 7 1/2 ± 1 ½ 6 ± 1 1/2
¾ 6 ± 1 ½ 5 ± 1 1/2
1 1/2 5 1/2 ± 1 ½ 4 1/2 ± 1 1/2
The level of exposure will be determined by the ENGINEER.
B. Water Reducing, Set-Controlling Admixture:
The CONTRACTOR shall use a “mid-range” water reducing, set controlling
admixture, Polyheed 997, or equal. The water-reducing admixture shall be used
Fort Collins Utilities Master Specifications Structural Concrete
June 2012 03310-5
in all concrete and shall conform to ASTM C 494, specifically Types A, B, C, D
and E.
C. Finely Divided Mineral Admixtures:
Mineral admixtures shall be limited to fly ash conforming to ASTM C 618, Class
C.
2.05 BATCHING
Measuring and batching of materials shall be done at a batching plant.
A. Portland Cement:
Either sacked or bulk cement may be used. No fraction of a sack of cement
shall be used in a batch of concrete unless the cement is weighed. Bulk cement
shall be weighed on scales separate and distinct from the aggregate hopper or
hoppers. Batching shall be such that the accuracy of batching shall be plus or
minus one percent of the required weight.
B. Water:
Unless water is to be weighed, the water-measuring equipment shall include an
auxiliary tank from which the measuring tank shall be filled. In lieu of the volume
method, the CONTRACTOR will be permitted to use a water-metering device.
C. Aggregates:
Aggregates shall be handled from stockpiles or other sources to the batching
plant in such a manner as to secure a uniform grading of the material.
Aggregates that have become segregated, or mixed with earth or foreign
material, shall not be used. Batching shall be so conducted as to result in the
weights of material required for each type aggregate within a tolerance of two
percent.
Free water contents of the coarse and fine aggregates shall be continuously
tested and concrete mixture adjusted for moisture conditions of the aggregate in
order to meet the designated water/cement ratio.
D. Fine Aggregate:
The proportion of fine aggregate shall be between 36 and 44 percent by volume
of the total aggregates in the concrete.
2.06 MIXING
Ready-mixed concrete shall be either “central mixed” or “shrink mixed” concrete as
defined in ASTM C 94. “Truck mixed” concrete as defined in ASTM C 94 shall not be
permitted. Mixing time shall be measured from the time water is added to the mix, or
cement contracts the aggregate. All concrete shall be homogeneous and thoroughly
Fort Collins Utilities Master Specifications Structural Concrete
June 2012 03310-6
mixed, and there shall be no lumps or evidence of undispersed cement. Mixers and
agitators, which have an accumulation of hard concrete or mortar, shall not be used.
Ready-mixed concrete shall be mixed and transported in accordance with ASTM C 94.
The temperature of mixed concrete, immediately before placing shall not be less than
50°F or more than 80°F for slabs larger than 10,000 square feet and not be less than
50°F or more than 85°F for walls. Aggregates and water shall be heated or cooled as
necessary to produce concrete within these temperature limits. Neither aggregates nor
mixing water shall be heated to exceed 150°F.
The time elapsing from the time water is added to the mix (or the cement comes in
contact with aggregate) until the concrete is deposited in place at the site of the work
shall not exceed 45 minutes when the concrete is hauled in non-agitating trucks, nor
more than 90 minutes when hauled in truck mixers or truck agitators.
The batch shall be so charged into the drum that a portion of the mixing water shall
enter in advance of the cement and aggregates. The flow of water shall be uniform and
all water shall be in the drum by the end of the first 1/4 of the specified mixing time.
Cement shall be charged into the mixer by means that will not result in loss of cement
due to the effect of wind, or in accumulation of cement on surfaces of hoppers or in
other conditions which reduce or vary the required quantity of cement in the concrete
mixture.
2.07 TRANSPORTING MIXED CONCRETE - MIXED CONCRETE OR TRUCK MIXERS
Transporting of mixed concrete shall conform to ASTM C 94.
Truck agitators shall be loaded not to exceed the manufacturer's guaranteed capacity.
They shall maintain the mixed concrete in a thoroughly mixed and uniform mass during
hauling.
No additional mixing water shall be incorporated into the concrete during hauling or after
arrival at the delivery point, unless approved. If additional water is to be incorporated
into the concrete at the site, the drum shall be revolved not less than 30 revolutions at
mixing speed after the water is added and before discharge is commenced. One
addition of water at the site to adjust mix workability is permitted but the maximum water
cement ratio shall not be exceeded.
The CONTRACTOR shall furnish a water-measuring device in good working condition,
mounted on each transit mix truck, for measuring the water added to the mix on the site.
All water tanks on transit mix trucks shall be filled prior to being batched and arrive at
the construction site 100% full.
Each load of ready mixed concrete delivered at the job shall be accompanied by the
ticket referencing design mix and showing volume of concrete, the weight of cement in
pounds, percent of free water in coarse and dry aggregates, and the total weight of all
ingredients in pounds. The ticket shall also show the time of day at which the materials
were batched and the reading of the revolution counter at the time the truck mixer is
charged. See Paragraph 1.08.
Fort Collins Utilities Master Specifications Structural Concrete
June 2012 03310-7
2.08 COMPRESSIVE STRENGTH
Concrete compressive strength requirements consist of a minimum strength that must
be obtained before various loads of stresses are applied to the concrete and, for
concrete designated by strength, a minimum strength at the age of 28 days. Unless
otherwise shown on the Drawings the 28-day compressive strength of structural
concrete shall be a minimum of 4,500 psi. Portland cement concrete pavement shall
have a 28-day compressive strength of structural concrete shall be a minimum of 3,750
psi and have a modulus of rupture of third point loading of 600 psi (CDOT Class P).
Non-structural concrete such as manhole bases, kickblocks, cut-off walls, equipment
pads, valve box collars, fence post foundations, pipe cradles, etc., shall have a minimum
28-day compressive strength of 3,000 psi.
The mix shall be designed for required strengths in accordance with ACI 301. The ratio
of water to the sum of concrete + pozzolan shall not exceed 0.41 by weight for durable,
watertight, concrete. The amount of fly ash in the mix shall be between 15 and 20
percent by weight of the total cementitious materials.
2.09 CONCRETE VIBRATORS
Concrete vibrators for consolidating concrete shall be 2 1/2 inch diameter "high cycle"
vibrators with a frequency under load of 8,000 - 10,400 vibrations per minute (vpm).
Concrete vibrators of lesser capacity are unacceptable for use in any part of the
construction. The CONTRACTOR shall have at least one standby concrete vibrator
ready for use for every two concrete vibrators in use during a concrete placement.
PART 3 - EXECUTION
3.01 PRIOR TO PLACEMENT
Prior to placing concrete the CONTRACTOR shall remove all debris and thoroughly
dampen the surfaces that will be in contact with the concrete to be placed.
The CONTRACTOR shall use compressed air from an air-compressor to blow-out
construction debris and dirt at the bottom of members to be placed such as walls,
beams and columns, prior to final placement of forms that will obscure any joint. The
CONTRACTOR shall demonstrate to the ENGINEER that all debris, such as concrete
particles, saw dust, loose tie wire, bar tags, tape, trash and dirt, have been thoroughly
removed.
No concrete shall be placed when form surfaces that will be in contact with the concrete,
reinforcement, embedded items or sub-base is less than 32°F. When the mean daily
outdoor temperature is less than 40°F, the temperature of the concrete shall be
maintained between 50°F and 70°F for the required curing period. When necessary,
arrangements for heating, covering, insulating, or housing the concrete work shall be
made in advance of placement and shall be adequate to maintain the required
temperature without injury due to concentration of heat. Combustion heaters shall not
be used during the first 24 hours unless precautions are taken to prevent exposure of
the concrete to exhaust gases which contain carbon dioxide.
Fort Collins Utilities Master Specifications Structural Concrete
June 2012 03310-8
Concrete shall not be placed against forms exposed to heating by the unless the
temperature of the forms is first cooled to ≤ 90°F.
3.02 PLACEMENT
Placement shall conform to ACI 301, Chapter 8 "Placing", ACI 304R, "Guide of
Measuring, Mixing, Transporting and Placing Concrete," ACI 306 "Recommended
Practice for Cold Weather Concreting", ACI 305 "Recommended Practice for Hot
Weather Concreting" and ACI 309, "Standard Practice for Consolidation of Concrete".
No concrete shall be placed until all formwork, reinforcement, installation of parts to be
embedded, bracing of forms, and preparation of surfaces involved in the placing have
been reviewed by the ENGINEER. No concrete shall be placed in water except with the
written permission of the ENGINEER. All surfaces of forms and embedded materials
that have become encrusted with dried mortar or grout from concrete previously placed
shall be cleaned of all such mortar or grout before the surrounding or adjacent concrete
is placed. Immediately before placing concrete, all surfaces upon or against which the
concrete is to be placed shall be free from standing water, mud, debris or loose
materials. The surfaces of absorptive materials against or upon which concrete is to be
placed shall be moistened thoroughly so that moisture will not be drawn from the freshly
placed concrete. The concrete shall be placed by equipment that will prevent
segregation or loss of ingredients. The stream of concrete shall not be allowed to
separate by permitting it to fall freely over rods, spacers or other embedded materials.
No wetting of concrete surfaces during slab finishing operations shall be permitted.
Further, no concrete finishing operation shall be permitted while there is water on the
surface of slabs and other flatwork.
Unless otherwise called out in these Specifications or shown in the Drawings, the
placement lift depth of concrete in walls shall be limited to two feet or less to minimize
surface defects such as air voids that can form on concrete surfaces. Lift depths will be
limited to one foot if, in the opinion of the ENGINEER, the quality of the finish is
unacceptable at the 2-foot lift depth.
3.03 CONSOLIDATION
All concrete shall be thoroughly consolidated with internal vibrators as recommended in
ACI 309 immediately after deposition. The concrete shall be thoroughly worked around
the reinforcing steel, around embedded items and into corners of forms. Vibration shall
be supplemented by spading, rodding or forking to eliminate all honeycomb and voids
around embedded items.
The vibrator shall be inserted vertically, allowing it to penetrate rapidly to the bottom of
the lift and at least six inches into the previous lift. The vibrator shall be held at the
bottom of lift for 5 to 15 seconds. The vibrator shall be pulled up at a rate of about three
inches per second.
Fort Collins Utilities Master Specifications Structural Concrete
June 2012 03310-9
The vibrator shall be inserted so that the fields of action overlap. The field of action is
approximately eight times the vibrator’s head diameter. Thus for a 2 1/2 inch diameter
vibrator, the spacing of each insertion will be approximately 20 inches.
Vibration shall be stopped when the concrete surface takes a sheen and large air
bubbles no longer escape.
Do not use a vibrator to move concrete horizontally.
3.04 OPENINGS AND INSERTS
Pipe sleeves, inserts for pipe connections, anchors and forms for pipe holes must be
accurately placed and securely fastened to the forms in such a manner that the placing
of concrete will not alter their alignment or location. In the event that openings are
inadvertently omitted or improperly placed, the ENGINEER may require the concrete to
be cored at the proper location. Filling of improperly placed openings shall be done with
expansive grout or dry pack or mortar applied with an accepted epoxy adhesive. The
surfaces of the opening shall be roughened prior to filling.
3.05 EMBEDDED ITEMS
At the time of concrete placement, embedded items should be clean and free from mud,
oil and other coatings that may adversely affect bonding capacity. Aluminum
embedments shall be coated with a bituminous material to prevent electrolytic action
between the embedded item and reinforcing steel that results in concrete deterioration.
Embedment items shall be accurately placed and securely fastened to the forms in such
a manner that the placing of concrete will not alter their alignment or location. Contact
between embedded items and reinforcing steel or tendon ducts is unacceptable and is
not permitted.
3.06 CONSTRUCTION JOINTS
The location of all construction joints will be subject to the acceptance of the
ENGINEER. The surface of all construction joints shall be thoroughly cleaned and all
laitance and standing water removed. Clean aggregate shall be exposed by abrasive
blast cleaning. Wire brushing and air water jets may be used while concrete is fresh
provided results are equal to abrasive blast cleaning. Construction joints shall be keyed
at right angle to the direction of shear. Except where otherwise shown on the Drawings,
keyways shall be at least 1-1/2" in depth over at least 25% of the area of the section.
3.07 EVAPORATIVE RETARDANT
The use of an evaporative retardant is required to assist in proper placement of
concrete. See Section 03390. When an evaporative retardant is used, it shall be
applied two times: after screeding and after the first floating operation. The retardant
should be applied at a rate of one gallon of sprayable solution per 200 - 400 square feet
by spraying with an industrial type sprayer. If the nozzle of the sprayer becomes
plugged, the CONTRACTOR shall clean, or replace, the nozzle. Under no
circumstances shall the retardant be used except by spraying a mist with a nozzle. The
retardant shall be applied in strict conformance with the manufacturer’s
Fort Collins Utilities Master Specifications Structural Concrete
June 2012 03310-10
recommendations and precautions. In no case shall the retardant be used as a finishing
agent. The use of an evaporative retardant requires review and approval by the
ENGINEER.
END OF SECTION
Fort Collins Utilities Master Specifications Construction Joints
June 2012 03320-1
SECTION 03320
CONSTRUCTION JOINTS
PART 1 - GENERAL
1.01 SECTION INCLUDES
The CONTRACTOR shall supply all labor, tools, equipment and material for the prepa-
ration of construction joints in concrete in accordance with these specifications and as
shown in the Drawings. This includes joints such as column-footing joints, wall con-
struction joints, column capital-slab joints, grout closures around pipe-slab penetrations
and footing-slab joints.
1.02 RELATED SECTIONS
A. Section 03110 - Structural Cast-In-Place Concrete Forms
B. Section 03151 - Hydrophilic Rubber Waterstop
C. Section 03210 - Reinforcing Steel
D. Section 03310 - Structural Concrete
E. Section 03615 - Grout
1.03 QUALITY STANDARDS
A. American Concrete Institute (ACI)
1. ACI 117 - Standard Tolerance for Concrete Construction and Materials
2. ACI 301 - Specifications for Structural Concrete for Buildings
3. ACI 302 - Guide for Concrete Floor and Slab Construction
4. ACI 318 - Building Code Requirements for Structural Concrete
1.04 CONSTRUCTION REVIEW
The ENGINEER shall review the preparation of all construction joints prior to concrete
and grout closure placements. It is the responsibility of the CONTRACTOR to notify
and provide a minimum of 24 hours notice to the ENGINEER of these activities. If joint
placement is performed without the ENGINEER’s presence, the work will be deemed
unacceptable and non-conforming to these specifications. If the ENGINEER determines
that construction review of a particular activity is unnecessary, he will provide written di-
rection to the CONTRACTOR to proceed with that particular activity without his con-
struction review.
Fort Collins Utilities Master Specifications Construction Joints
June 2012 03320-2
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.01 SURFACE PREPARATION
The surface of concrete construction joints shall be clean and all materials that inhibit
bond, such as curing compounds, laitance, saw dust, wood, dirt, polyethylene, pipe tape
coating and paper shall be removed. Concrete shall be roughened to produce a rough,
plus or minus 1/16 inch, surface texture. Concrete surfaces shall be wetted with clean
potable water and standing water removed immediately before new concrete or closure
grout is placed. Unless otherwise called out in the Drawings, a bonding agent shall be
used prior to placing the concrete or grout.
3.02 PIPE GROUT CLOSURE SECTIONS
A. Pipe Surface Preparation
Unless otherwise detailed in Drawings, all pipes penetrating concrete sections
such as wall and floor slabs shall have all coatings and other materials that can
inhibit bond completely removed from the portion of the pipe to be in contact with
the concrete or slab closure grout.
B. Ground Surface Preparation
The ground surface at joints such as pipe / slab closures shall be smooth and
properly graded and compacted. All debris such as Styrofoam, paper, polyeth-
ylene and wood shall be removed. The ground surface shall be dampened and
prepared to prevent the inclusion of dirt, pieces of aggregate or balls of soil in
the concrete or grout.
3.03 CONCRETE AND CLOSURE GROUT PLACEMENT
Mixing, surface preparation in addition to that prescribed above, placement, and curing
of grout at pipe closure joints shall be performed in strict accordance with Specification
Section 03615 and when a proprietary grout is specified, with the grout manufacturer’s
directions. Special care shall be taken to insure that the grout is thoroughly and prop-
erly consolidated at waterstops, pipe weep rings, and existing concrete surfaces. An
appropriate capacity vibrator shall be used when necessary or required by the manufac-
turer to properly consolidate the grout.
END OF SECTION
Fort Collins Utilities Master Specifications Concrete Finishing
June 2012 03350-1
SECTION 03350
CONCRETE FINISHING
PART 1 - GENERAL
1.01 SECTION INCLUDES
The CONTRACTOR shall supply all labor, tools, equipment and materials to finish
properly placed concrete for structures such as box culverts, vaults, foundations, bridge
sub- and super-structures, hydraulic and water retaining structures.
The means and methods of repair of improperly placed or finished concrete shall be
reviewed by the ENGINEER prior to performing the work. Regardless of prior approval
of the means and methods of concrete finish repair, no concrete finish shall be repaired
until the ENGINEER has reviewed the existing finish. This includes defects caused by
ineffective and improper vibration such as honeycomb, excessive air voids on formed
surfaces, placement “pour” lines (cold joints) and sand streaking. It also includes
defects caused by excessive form deflections, form damage or form failure.
Unless otherwise called out in the Drawings tie holes shall be finished as specified
herein.
1.02 RELATED SECTIONS
A. Section 03110 - Structural Cast-In-Place Concrete Forms
B. Section 03310 - Structural Concrete
C. Section 03615 - Grout
1.03 QUALITY STANDARDS
A. American Concrete Institute
1. ACI 116 - Cement and Concrete Terminology
2. ACI 121 - Quality Assurance Systems for Concrete Construction
3. ACI 301 - Specifications for Structural Concrete for Buildings
4. ACI SP-15 - ACI 301 Field Reference Manual
5. ACI 304 - Placing Concrete by Pumping Methods
6. ACI 309 - Identification and Control of Consolidation-Related Surface
Defects in Formed Concrete
7. ACI 311 - Guide for Inspection of Concrete
Fort Collins Utilities Master Specifications Concrete Finishing
June 2012 03350-2
B. American Society for Testing and Materials
1. ASTM STP 169C - Significance of Tests and Properties of Concrete and
Concrete-Making Materials
2. ASTM C 150 - Standard Specification for Portland Cement
3. ASTM C 33 - Concrete Aggregates
C. US Department of Interior - Bureau of Reclamation
1. M-47 Standard Specifications for Repair of Concrete
1.04 SUBMITTALS
A. General
Submittals shall be made in accordance with Section 01330.
B. Product Data
1. Grouts
2. Bonding agents
3. Means and methods of repairing defects unless otherwise called out
herein.
C. Equipment
1. Thermometers for measuring concrete surface temperature
D. Manufacturer’s safety data sheets
1.05 DELIVERY, STORAGE AND HANDLING
Deliver the materials to the project site in the manufacturer’s containers with all labels
intact and legible at the time of use. Materials shall be stored in a secure, indoor, dry
area. Maintain grouts and aggregates in a dry condition during delivery, storage, and
handling.
PART 2 - PRODUCTS
2.01 PREMIXED PRE-PACKAGED GROUTS
A. Master Builders EMACO R320
B. Master Builders EMACO S66-CR
Fort Collins Utilities Master Specifications Concrete Finishing
June 2012 03350-3
2.02 EPOXY BONDING AGENTS
A. Master Builders Concresive Liquid (LPL)
B. Master Builders Concresive Standard Liquid
2.03 CEMENT
ASTM C 150, Type 1
2.04 AGGREGATE
ASTM C 33, 100% passing the No. 30 mesh sieve
2.05 BOND COAT MORTAR
Mortar used to bond patching mortar shall be made of the same materials and of
approximately the same proportions as used for the concrete, except that the coarse
aggregate shall be omitted and the mortar shall consist of 1 part cement to not more
than 1 part sand by damp loose volume.
2.06 PATCHING MORTAR
Patching mixture shall be made of the same materials and of approximately the same
proportions as used for the concrete, except that the coarse aggregate shall be omitted
and the mortar shall consist of 1 part cement to not more than 2-1/2 parts sand by damp
loose volume. White Portland Cement shall be substituted for a part of the gray Portland
Cement on exposed concrete in order to produce a color matching the color of the
surrounding concrete, as determined by a trial patch. The quantity of mixing water shall
be no more than necessary for handling and placing. The patching mortar shall be
mixed in advance and allowed to stand with frequent manipulation with a trowel, without
addition of water, until it has reached the stiffest consistency that will permit placing.
2.07 WATER
Only clean potable water shall be used. A calibrated measuring device is required for
measuring the proper amount of water to be added to pre-packaged grouts and mortars.
PART 3 - EXECUTION
3.01 REPAIR OF SURFACE DEFECTS
Surface defects, unless otherwise specified by the Contract Documents, shall be
repaired immediately after form removal but not before review by the ENGINEER. The
surface temperature of the concrete shall be 50° F and rising. The CONTRACTOR
shall measure surface temperatures when requested by the ENGINEER. If necessary
the CONTRACTOR shall enclose and heat the area to be repaired to bring the surface
temperature of the concrete and air temperature to acceptable levels and to permit
proper curing.
Fort Collins Utilities Master Specifications Concrete Finishing
June 2012 03350-4
All honeycombed and other defective concrete shall be removed down to sound
concrete. If chipping is necessary, the edges shall be perpendicular to the surface or
slightly undercut. Feathered edges will not be permitted. The area to be patched and
an area at least six inches wide surrounding it shall be dampened to prevent absorption
of water from the patching mortar. A bonding grout shall be prepared, mixed to the
consistency of thick cream, and after surface water has evaporated from the area to be
patched, well brushed into the surface.
When the bond coat begins to lose the water sheen, the premixed patching mortar shall
be applied. The mortar shall be thoroughly consolidated into place and struck off so as
to leave the patch slightly higher than the surrounding surface. To permit initial
shrinkage, it shall be left undisturbed for at least one hour before being finally finished.
The patched area shall be kept damp for seven days. Metal tools shall not be used in
finishing a patch in a formed wall that will be exposed.
3.02 TIE HOLES
A. Water Retaining Structures and Below Grade Vaults with Breakback Cone Ties
Fill tie holes solid as specified in Section 03615.
B. Other Structures
After being cleaned and thoroughly dampened, fill tie holes solid as specified in
Section 03615.
3.03 PROPRIETARY MATERIALS
Certain types of defects may require the use proprietary compounds for adhesion or as
patching ingredients. The ENGINEER will review these defects and request means and
methods for these repairs from the CONTRACTOR.
In lieu of, or in addition to, the foregoing patching procedures using bond coat and
patching mortars, epoxy bonding agents and premixed pre-packaged grouts may be
used for repair of defective areas. Such compounds shall be used in accordance with
the manufacturer's written recommendations and directions. The ENGINEER shall
review and provide written acceptance of these procedures.
3.04 FINISHING OF FORMED AND UNFORMED SURFACES
Finishes shall be performed as called out in the Drawings and in referenced
Specifications.
A. Formed Surfaces
1. Smooth Form Finish
The form facing material shall produce a smooth, hard, uniform texture
on the concrete. The arrangement of the facing material shall be orderly
Fort Collins Utilities Master Specifications Concrete Finishing
June 2012 03350-5
and symmetrical, with the number of seams kept to the practical
minimum. Surface textures that result from forms with raised grain, torn
surfaces, worn edges, patches, dents, or other defects shall be ground
smooth or otherwise repaired.
a. Air Voids on Formed Surfaces
Air voids on formed surfaces deeper than 1/4 inch shall be filled
with patching mortar. The frequency and size of air voids shall
be equal to or better than shown in Figure 1. The total void area
is 1% of the surface area, or 0.36 sq. in. This 6-inch x 6-inch
Figure 1
Fort Collins Utilities Master Specifications Concrete Finishing
June 2012 03350-6
figure is the visual standard for acceptance of the finish that does
not require filling of air voids.
b. Tie Holes
Tie holes shall be filled as specified in section 03615.
c. Form Fins
Chip or rub-off form fins exceeding 1/16 inch in height.
d. Rock Pockets
Poorly consolidated concrete shall be removed to sound concrete
and the defect repaired. The ENGINEER shall outline the area to
be repaired.
2. As-Cast Finish
For as-cast concrete finish form materials shall produced a sound surface.
a. Air Voids
Fill air voids deeper than 1/4 inch. and larger than 0.50 sq. in.
The total area of acceptable air voids is 0.72 sq. in. in a 6 inch by
6-inch square.
b. Tie Holes
Tie holes shall be filled as specified in section 03615.
c. Form Fins
Chip or rub-off form fins exceeding 1/8 inch in height.
3. Rubbed Finish
Immediately after removing the forms, form ties shall be broken back a
minimum of 3/4 inch from the surface, honeycomb, voids and other
surface defects grouted. The surfaces shall then be thoroughly
dampened and rubbed with a No. 16 carborundum stone or equal
abrasive to create a uniform surface paste. The rubbing shall be
continued to remove all form marks and surface irregularities producing a
smooth, dense surface. After setting, the surface shall then be rubbed
with a No. 30 carborundum stone until the surface is smooth in texture
and uniform in color. Unless otherwise shown in the Drawings only
exposed surfaces shall have a rubbed finish.
4. Grout Finish
Fort Collins Utilities Master Specifications Concrete Finishing
June 2012 03350-7
Prepare surface as described in Rubbed Finishes above. Mix one part
Portland cement and one-half parts fine sand with sufficient water to
produce a grout with the consistency of thick paint. Wet surface of
concrete to prevent absorption of water from grout and apply grout
uniformly with brushes. Immediately after applying grout mix, scrub the
surface with a cork float or stone to coat surface and fill remaining air
voids and other remaining surface defects. Remove excess grout by
working the surface with rubber float. After the surface whitens from
drying, rub with clean burlap. Cure surface for a period of 72 hours
B. Unformed Surface
Unless otherwise shown in the Drawings unformed surfaces shall be finished as
follows.
1. Slabs
Screed with straightedge to remove low and high spots bringing the
surface to the required finish elevation of slope and float with a steel float
at least 3 feet in width. When the concrete has reached its initial set,
finish with a steel (power) trowel. Leave finish essentially free of trowel
marks, uniform in texture and appearance and plane to the correct
tolerance. Dusting the surface with dry cement, sand or sprinkling with
water is prohibited
Finishes that are exposed and subject to foot traffic shall receive a broom
finish with a texture of ± 1/16 inch.
2. Tops of Walls with Bearings
Strike smooth tops of walls and similar unformed surfaces that will have
bearings or bearing pads, and finish with a steel trowel.
3. Tops of Exposed Footings in Reservoirs
Strike smooth tops of footings and finish with a light broom providing a
texture of ± 1/16 inch.
4. Stairways and Sidewalks
Strike smooth tops of stairs and sidewalks and finish with a light broom
providing a texture of ± 1/16 inch.
5. Slabs with Waterproofing Membranes
Strike smooth and float finish.
6. Construction Joint Surfaces
Fort Collins Utilities Master Specifications Concrete Finishing
June 2012 03350-8
Surface shall be broom or raked finished. Surface shall be water or grit
blasted prior to placing additional concrete, such as columns on column
footings and column footings on reservoir slabs.
END OF SECTION
Fort Collins Utilities Master Specifications Concrete Finishing
June 2012 03350-9
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 03360
SHOTCRETE
PART 1 - GENERAL
1.1 SCOPE
A. This section specifies the requirements for materials, proportioning, and application of shotcrete
using either dry-mix or wet-mix process.
B. This project is facilitated using the City of Fort Collins’ (Owner) Advanced Project Delivery
System (APDS). As such, the selected Contractor shall be involved throughout both the design
and construction phases of the work.
1.2 DEFINITIONS
Shotcrete – Concrete pneumatically projected at high velocity onto a surface. Also known as
pneumatically applied concrete or gunite.
1.3 SHOTCRETE SUPPLIER QUALIFICATIONS
The shotcrete supplier to the CONTRACTOR shall have the capability to produce and deliver
shotcrete, meeting the requirements of the Drawings and Specifications. The supplier shall have a
contingency plan for a back-up plant in the event of a mechanical malfunction of one of the primary
plant(s) if a wet-mix process is used. This plan shall be submitted in accordance with Section
01330.
1.4 RELATED SECTIONS
A. Section 02315 – Wall Excavation and Support
B. Section 03220 – Welded Wire Fabric
C. Section 03210 – Reinforcing Steel
D. Section 03310 – Structural Concrete
E. Section 03320 – Construction Joints
F. Section 03350 – Concrete Finishing
1.5 QUALITY STANDARDS
A. American Society for Testing Materials (ASTM)
1. ASTM C 33 – Concrete Aggregates
2. ASTM A1064 – Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed,
11/14/2014 03360 – Shotcrete
100% Submittal Page 1 of 7
for Concrete (Replaces ASTM A185)
3. ASTM A615 – Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
4. ASTM C94 – Ready-Mixed Concrete
5. ASTM C150 – Portland Cement
6. ASTM C260 – Air-Entraining Admixtures for Concrete
7. ASTM C494 – Chemical Admixtures for Concrete
8. ASTM C685 – Concrete Made by Volumetric Batching and Continuous Mixing
B. American Concrete Institute (ACI)
1. ACI 304R – Guide for Measuring, Mixing, Transporting, and Placing Concrete
2. ACI 506R – Guide to Shotcrete Specification for Materials, Proportioning, and Application
of Shotcrete
3. ACI 318 – Building Code Requirements for Structural Concrete
1.6 SUBMITTALS
A. Product Data:
1. Admixtures (such as air-entraining and water-reducing admixtures)
2. Fly ash
3. Shotcrete Mix Design
4. Bonding Agents
5. Grouts
6. Aggregate gradation
B. Contractor’s qualifications, as specified
1.7 GENERAL
This specification is applicable for projects or work involving either inch-pound or SI units. Within
the text and accompanying tables, the inch-pound units are given preference.
1.8 CONTRACTOR EXPERIENCE
The work in this section shall be provided only by a CONTRACTOR specializing in and possessing
the experience, equipment, knowledge, and skilled operators for application of shotcrete. This
experience shall be a minimum of three years of placing shotcrete in vertical or near-vertical
11/14/2014 03360 – Shotcrete
100% Submittal Page 2 of 7
applications.
1.9 CONTRACTOR ASSISTANCE
The CONTRACTOR shall assist the OWNER or his concrete testing consultant as requested during
the performance of quality control testing.
1.10 TESTING
A. Preconstruction Testing:
1. CONTRACTOR shall design shotcrete mix to produce the compressive strengths indicated
on the drawings or in the specifications.
2. Two (2) test panels for the chosen mix shall be shot. Each test panel shall be 18 inches
square by 3 inches thick. Five cores shall be taken from each panel for compressive
strength testing in accordance with ACI 506R.
3. Each nozzleman the CONTRACTOR proposes to use for the application of shotcrete shall
be qualified by shooting one (1) test panel in the field whose compressive strength is
greater than or equal to the design strengths indicated on the drawings or in the
specifications.
B. Construction Testing:
1. One (1) test panel shall be made for each day’s work. Provide test panels to a testing
laboratory approved by the ENGINEER. Five cores shall be taken from each panel for
compressive strength testing in accordance with ASTM C42. One (1) sample shall be
tested at 7 days after application and three (3) samples shall be tested at 28 days after
application. The fifth sample shall be held in reserve.
1.11 DELIVERY, STORAGE, AND HANDLING
A. Properly deliver and handle materials to prevent contamination, segregation, or damage to
materials.
B. Store cement in weathertight enclosures to protect against dampness and contamination.
C. Prevent segregation and contamination of aggregates by proper arrangement and use of
stockpiles.
D. Store admixtures properly to prevent contamination, evaporation, freezing, or other damage.
E. If batched off site, provide batch ticket for each truck of shotcrete delivered summarizing, at a
minimum:
1. Weight in pounds of all materials, excepting the water reducing and air-entraining agents
which shall be in ounces
2. Cubic yards batched
11/14/2014 03360 – Shotcrete
100% Submittal Page 3 of 7
3. The ratio of water to cementitious (W / C) materials
4. Temperature of the shotcrete at the time it was batched
5. Time of batching
6. Free moisture in the aggregates in percent of weight of aggregate
7. Gallons of water that may be added at the site without exceeding the permissible W / C
ratio
F. Delivery shall conform to the recommendation of ACI 304 as determined by the ENGINEER.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Cement – Cement shall be Portland Cement Type I or II.
B. Aggregate – Aggregate shall be in accordance with ASTM C33 and the following limits:
Sieve Size Percent Passing
3/8-inch square 95 to 100
No. 4 80 to 100
No. 8 50 to 85
No. 16 25 to 60
No. 30 30 to 50
No. 50 10 to 30
No. 100 2 to 10
No. 200 0 to 4
C. Admixtures – Chemical and Air-entraining Admixtures shall be in accordance with ASTM
C494 and ASTM C260, respectively. All admixtures shall be subject to prior acceptance by the
ENGINEER. Admixtures containing chloride ions shall not be used.
D. Water – Water shall be fresh, clean, and potable.
E. Reinforcing Steel – Reinforcing Steel shall be in accordance with ASTM A615 and shall be
Grade 60 unless otherwise shown on the Drawings.
F. Welded Wire Mesh – Welded Wire Mesh shall be in accordance with ASTM A1064 (previously
ASTM A185).
2.2 EQUIPMENT
A. Dry mix process
1. Mixing equipment: mixers shall be of a type and size which is sufficient to continuously
supply all materials to the nozzle.
11/14/2014 03360 – Shotcrete
100% Submittal Page 4 of 7
2. Delivery equipment:
a. Gun and nozzle shall be a premixing type designed for material delivery and water
injection.
b. Air compressor and hoses shall be sized to provide, without interruption, steady
pressure and volume of air necessary for longest hose delivery in accordance with
ACI 506R.
c. Water supply shall be of adequate size to supply, without interruption, a continuous
amount of water at a steady pressure at least fifteen (15) pounds greater than the
highest air pressure.
B. Wet mix process
1. Mixing equipment: equipment for mixing shotcrete components shall comply with the
requirements of Section 03310.
2. Delivery equipment: The delivery equipment shall be able to deliver a uniform flow of
material, without interruption, without segregation or loss of the ingredients.
3. Air supply shall be in accordance with ACI 506R.
2.3 PROPORTIONING
Mix shall be designed by CONTRACTOR in accordance with ACI 506R and the strength
requirements shown on the Drawings or specified.
PART 3 - EXECUTION
3.1 GENERAL
A. Do not begin shotcrete placement until:
1. Required submittals have been made and approved by the OWNER.
2. Sheet piles have been installed per drawings and specifications.
3. Survey control has been established for the wall.
3.2 RESTRICTIONS ON PLACING SHOTCRETE
A. Shotcrete shall not be applied under strong wind conditions, as evidenced by the removal of a
considerable amount of cement and moisture from the shotcrete spray.
B. Shotcrete shall not be applied if the temperature approaches freezing temperatures and shotcrete
cannot be protected.
C. Shotcrete shall not be applied if rain occurs which would wash cement out of freshly placed
material.
11/14/2014 03360 – Shotcrete
100% Submittal Page 5 of 7
D. Shotcrete shall not be applied if the ENGINEER determines that adverse conditions for the
placement of shotcrete exist.
3.3 PROTECTION OF ADJACENT WORK
CONTRACTOR shall be responsible for protecting all adjacent work, existing structures, vehicles,
equipment and utilities from damage caused by shotcrete installation. Overshot shotcrete and
rebound shotcrete shall be removed before it adheres.
3.4 BATCHING AND MIXING
E. Mixing and placing of shotcrete shall conform to the requirements specified herein.
F. Mix proportions shall be controlled by weight batching or by volume batching meeting the
requirements of ASTM C 685.
G. Use batching and mixing equipment capable of proportioning and mixing all ingredients in
accordance with the requirements specified herein and at a rate that will provide adequate
production and with an accuracy that will ensure uniformity.
3.5 JOINTS
A. Contraction joints shall be provided in the locations shown on the drawings or, where not
shown, at approximately 15 ft spacing for vertical joints.
B. Construction joints shall be provided as placement of shotcrete stops at locations accepted by
the ENGINEER.
3.6 SHOOTING
A. Shoot in accordance with ACI 506R.
B. Do not work rebound into construction or salvage rebound for subsequent batching.
C. Construction joints shall be in accordance with ACI 506R. Thoroughly clean the joint and
adjacent shotcrete then wet surface before continuing placement of shotcrete.
D. Prevent dryout resulting in cracking and separation by keeping surfaces continuously moist for
seven (7) days after shotcreting.
3.7 CURING
Cure shotcrete in accordance with ACI 506R
3.8 HOT WEATHER AND COLD WEATHER SHOTCRETING
Shotcrete shall be applied in accordance with ACI 506R for adverse temperature conditions.
3.9 CLEAN-UP
11/14/2014 03360 – Shotcrete
100% Submittal Page 6 of 7
CONTRACTOR shall remove rebound material continuously.
END OF SECTION
11/14/2014 03360 – Shotcrete
100% Submittal Page 7 of 7
Fort Collins Utilities Master Specifications Concrete Curing
June 2012 03390-1
SECTION 03390
CONCRETE CURING
PART 1 - GENERAL
1.01 WORK INCLUDED
The CONTRACTOR shall furnish all labor, tools and equipment for curing plain,
reinforced and post-tensioned cast-in-place concrete.
1.02 RELATED WORK
A. Section 03310 – Structural Concrete
B. Section 03320 – Construction Joints
C. Section 03350 – Concrete Finishing
1.03 QUALITY STANDARDS
A. American Concrete Institute (ACI)
1. ACI 305 - Hot Weather Concreting
2. ACI 306 - Cold Weather Concreting
3. ACI 308 - Standard Practice for Curing Concrete
B. American Society for Testing Materials (ASTM)
1. ASTM C 171 – Sheet Materials for Curing Concrete
2. ASTM C 309 – Liquid Membrane-Forming Compounds for Curing
Concrete
3. ASTM D 2103 – Polyethylene Film and Sheeting
1.04 SUBMITTALS
Provide data on curing compounds sheet materials and methods of securing sheet
materials in place.
1.05 QUALITY CONTROL
Perform the work in accordance with this Specification and in accordance with applicable
ACI standards. When a conflict occurs between this Specification and ACI occurs, the
ACI standard shall control. The CONTRACTOR shall have a copy of the current
applicable ACI standards on site. All materials shall be used in accordance with the
manufacturer’s printed instructions, a copy of which shall be on site.
Fort Collins Utilities Master Specifications Concrete Curing
June 2012 03390-2
1.06 DELIVERY, STORAGE AND HANDLING
Deliver, store and handle products under the provisions of Section 01650.
Deliver curing materials in manufacturer’s original packaging including applicable
instructions and manufacturer’s safety data sheets (MSDS).
PART 2 - PRODUCTS
2.01 SHEET MATERIALS FOR CURING CONCRETE
White burlap-polyethylene sheeting weighing not less than 10 oz/linear yard, 40 inches
wide, impregnated on one side with white opaque polyethylene 0.004 inches thick as
specified in ASTM C 171 shall be used when called out in the Drawings or in other
applicable specifications. The polyethylene shall be securely bonded to the burlap so
that there will be no separation.
2.02 LIQUID MEMBRANE-FORMING COMPOUNDS FOR CURING CONCRETE
Liquid membrane-forming compounds for curing concrete shall and conform to ASTM C
309, Type 1-D with a red or white fugitive dye. Use a white dye unless otherwise
directed by the ENGINEER.
2.03 POLYETHYLENE FILM
Polyethylene film shall conform to ASTM D 2103. The film shall have a thickness of 6
mils and be a white opaque color.
2.04 LIQUID MEMBRANE FORMING COMPOUND AND EVAPORATIVE RETARDANT
APPLICATORS/ SPRAYERS
Membrane curing and evaporative retardant compounds shall be applied with a sprayer
manufactured by Allen Engineering, Inc., or equal, capable of maintaining a constant
pressure. (Allen Engineering, Inc., P.O. Box 819, Paragould, Arizona 74450, telephone
(800) 643-0095.) Unless otherwise accepted in writing by the ENGINEER, spraying
membrane curing compounds or evaporative retardants by other methods, such as hand
pressurized sprayers, is unacceptable.
2.05 EVAPORATIVE RETARDANT
Confilm manufactured by Master Builders, Inc. or approved equal.
2.06 WATER
Water shall only be used when prior approval is granted by the ENGINEER. Only water
that has been determined to be non-detrimental to concrete shall be used.
Fort Collins Utilities Master Specifications Concrete Curing
June 2012 03390-3
PART 3 - EXECUTION
3.01 GENERAL
Beginning immediately after placement, concrete shall be protected from premature
drying, excessively hot or cold temperatures, and mechanical injury, and shall be
maintained with minimal moisture loss at a relatively constant temperature for the period
necessary for hydration of the cement and hardening of the concrete in accordance with
ACI 308, "Standard Practice for Curing Concrete". The materials and method of curing
shall be subject to review and acceptance by the ENGINEER. Specific curing
requirements may be called out on the Drawings or other Technical Specifications.
Curing shall be continued for at least seven days. Alternatively, if tests are made of
cylinders kept adjacent to the structure and cured by the same methods, moisture
retention measures may be terminated when the average compressive strength has
reached 70% of the specified concrete strength.
When a spray applied membrane-curing compound is used, it shall be applied in two
coats with the second coat applied at right angles to the first coat.
3.02 EVAPORATIVE RETARDANT
An evaporative retardant shall be used during concrete placement for water retaining
structure floor and roof slabs and other slabs larger than 2,500 square feet in size. The
retardant shall be sprayed using a power sprayer at a rate of 10 gallons per 2,000
square feet after screeding and repeated after the first floating operation. The
evaporative retardant shall not be applied during the final steel troweling operations or
after the water sheen has disappeared from the concrete surface.
3.03 SLABS
For concrete surfaces not in contact with forms, a procedure determined by the
ENGINEER shall be applied immediately after completion of placement and finishing.
3.04 WALLS AND COLUMNS
Moisture loss from surfaces placed against wooden or metal forms exposed to heating
by the sun shall be minimized by keeping the forms wet until they can be safely
removed. After form removal, the concrete shall be cured until the end of the curing time
by one of the previously described curing methods. Concrete shall not be placed
against forms that have been exposed to air below freezing temperatures until the forms
have been heated so that the surface temperature of the form is ≥ 40° F.
The top of walls and columns not covered by forms shall be cured using a membrane-
curing compound conforming to ASTM C 309 immediately after placement
3.05 OTHER SURFACES
Unless otherwise shown in the Drawings all other surfaces shall be cured using two
applications of a membrane-curing compound conforming to ASTM C 309. The second
application shall be applied at 90° to the first application.
Fort Collins Utilities Master Specifications Concrete Curing
June 2012 03390-4
3.06 COLD WEATHER
Curing during cold weather conditions shall include the above methods except for water
cure unless measures are taken to prevent freezing of the water.
3.07 HOT WEATHER
If the rate of evaporation approaches 0.2 lb/ft2/hr, as estimated by ACI 305, precautions
against plastic shrinkage cracking are required. The CONTRACTOR shall have a
recording thermometer, hygrometer and wind gage on site seven days prior to first
concrete placement. When necessary, provision for windbreaks, shading, fog spraying,
sprinkling, ponding, or wet covering with a light colored material shall be made in
advance of placement, and such protective measures shall be taken as quickly as
concrete hardening and finishing operations will allow. Precautions against plastic
shrinkage cracks may be required in conditions other than what is normally considered
hot weather conditions.
3.08 RATE OF TEMPERATURE CHANGE
Changes in temperature of the air immediately adjacent to the concrete during and
immediately following the curing period shall be kept as uniform as possible and shall
not exceed 5° F in any one hour or 50° F in any 24-hour period.
3.09 PROTECTION FROM MECHANICAL INJURY
During the curing period, the concrete shall be protected from damaging mechanical
disturbances, such as load stresses, heavy shock, and excessive vibration. All finished
concrete surfaces shall be protected from damage by construction equipment, materials,
or methods, by application of curing procedures, and by rain or running water. Self-
supporting structures shall not be loaded in such a way as to overstress the concrete.
END OF SECTION
Fort Collins Utilities Master Specifications Grout
June 2012 03615-1
SECTION 03615
GROUT
PART 1 - GENERAL
1.01 SECTION INCLUDES
The Contractor shall furnish all labor, tools and equipment for the placement of grout in
tie holes and other locations as shown on the Drawings and specified herein.
This section includes basic mixing, application, and curing methods for grout.
Contractor shall have a printed set of manufacturer’s recommendations for product use
on site for review during preparation, mixing and application of grouts.
1.02 RELATED SECTIONS
A. Section 03110 - Structural Cast-In-Place Concrete Forms
B. Section 03310 - Structural Concrete
C. Section 03320 - Construction Joints
D. Section 03350 - Concrete Finishing
E. Section 03390 - Concrete Curing
1.03 QUALITY STANDARDS
A. ASTM C 78 - Test Method for Flexural Strength of Concrete (Using Simple Beam
with Third-Point Loading
B. ASTM C 109 - Test Method for Compressive Strength of Hydraulic Cement Mor-
tars - Modified
C. ASTM C 469 - Test Method for Static Modulus of Elasticity and Poisson’s Ratio
of Concrete in Compression
D. ASTM C 666 - Test Method for Resistance of Concrete to Rapid Freezing and
Thawing
E. ASTM C 882 - Test Method for Bond Strength of Epoxy Resin Systems used
with Concrete - Modified
F. ASTM C 1012 - Test Method for Length Change of Hydraulic Cement Mortars
Exposed to Sulfate Solution - Modified
G. ASTM C 1202 - Electrical Indication of Resistance to Chloride Ion Penetration
Fort Collins Utilities Master Specifications Grout
June 2012 03615-2
1.04 SUBMITTALS
A. Grout
B. Bonding Agent
C. Curing Compound
1.05 QUALITY ASSURANCE
A. Field Tests
1. When the Owner is to perform grout testing, the Contractor shall assist
the Owner or his concrete testing consultant as requested during the per-
formance of quality control testing.
2. When prescribed in the Drawings or by these Specifications, length
change test specimens will be taken during construction from the first
placement of each type of mortar, and at intervals thereafter as selected
by the Engineer to insure continued compliance with these specifications.
Unless otherwise specified on the Drawings or Specifications the testing
will be performed by the Owner or testing representative.
3. When required length change tests and fabrication of specimens for ce-
ment based mortar will be performed as specified in ASTM C 1012 at in-
tervals during construction as selected by the Engineer. A set of three
specimens will be made for testing at 7 and 28 days.
4. All mortar, already placed, that fails to meet the requirements of this
Specification, is subject to removal and replacement at the cost of the
Contractor.
5. Unless otherwise specified in the Drawings or Specifications, the cost of
all laboratory tests on grout will be borne by the Owner, but the Contrac-
tor shall assist the Engineer in obtaining specimens for testing. However,
the Contractor shall be charged for the cost of any additional tests and
investigation on work performed which does not meet the Specifications.
B. Construction Tolerances
Construction tolerances shall be as specified in the Section 03110 except as
modified herein and elsewhere in the Contract Documents.
1.06 ACCEPTABLE MANUFACTURERS/PRODUCTS
Master Builders Technologies
EMACO R320 - Polymer-Modified Vertical/Overhead Patching Mortar
Fort Collins Utilities Master Specifications Grout
June 2012 03615-3
MB 429, Masterkure CR, Masterkure 200W or Masterkure 100W - curing com-
pounds
1.07 DELIVERY, STORAGE AND HANDLING
Cement based mortar shall be delivered and stored in manufacturer’s packaging until it
is ready to be mixed and placed. Mortar bags shall be stored off the ground and pro-
tected from water and all other substances that will penetrate packaging.
PART 2 - PRODUCTS
2.01 MORTAR FOR TIE HOLES
EMACO R320 or approved equal.
2.02 BONDING ADHESIVES
Concresive Liquid LPL, Concresive Standard Liquid or approved equal.
2.03 WATER
Only clean potable water shall be used. A calibrated measuring device is required for
measuring the proper amount of water to be added to grouts and mortars.
2.04 CURING COMPOUND
MB 429, Masterkure 100W, Masterkure 200Wor approved equal.
2.05 (EXPOSED) REINFORCING STEEL COATING
EMACO P22 or approved equal.
PART 3 - EXECUTION
3.01 GENERAL
These grouts contain admixtures that increase grout strength and workability. The
strength and performance of the grout is dependent on proper surface preparation,
grout mixing and curing. The Contractor shall be required to use a calibrated measuring
device to add clean potable water to the grout mix. Water added to a grout mix without
a calibrated device is cause for grout rejection, removal and re-placement.
Curing is critical to prevent shrinkage cracks that can develop with grouts containing
some admixtures. Curing shall begin immediately after placement.
All mixing, surface preparation, handling, placing, consolidation, and other means of
execution for pre-packaged mortars shall be done according to the instructions and rec-
ommendations of the manufacturer and this Specification. In the event that a conflict
occurs between this Specification and manufacturer’s instructions, the manufacturer’s
instructions shall prevail in all cases.
Fort Collins Utilities Master Specifications Grout
June 2012 03615-4
3.02 GROUT FOR TIE HOLES
A. Preparation:
Thoroughly clean the roughened surface and any exposed reinforcement of rust,
dirt, loose chips, and dust. Maintain substrate in a saturated, surface-dry condi-
tion.
Where applicable, exposed reinforcing steel shall be coated with EMACO P22
reinforcing steel bar protection coating prior to patching.
B. Mixing:
Comply with mortar manufacturer’s recommendations for water quantity. Me-
chanically mix with a slow speed drill (400 to 600 RPM) and Jiffler-type paddle.
Pour approximately 90% of the mix water into the mixing container; then add the
bagged material while continuing to mix. Add remaining water as needed. Mix
time shall not exceed 5 minutes.
C. Application:
Apply bonding adhesive such as Concresive Liquid LPL or Concresive Standard
Liquid.
Place and finish with trowel or screed. In hot, windy, or dry conditions, where
rapid surface evaporation may occur, use Confilm Evaporation Reducer.
D. Curing:
Apply Masterkure 200 W curing compound in accordance with label instructions.
END OF SECTION
Fossil Creek / BNSF Pedestrian Tunnel Appendix A
June 2016 Page-1 Technical Specifications
APPENDIX A
CTL Thompson
GEOTECHNICAL INVESTIGATION
PEDESTRIAN TRAIL UNDERPASS
FOSSIL CREEK TRAIL AT BNSF UNDERPASS
FORT COLLINS, COLORADO
CITY OF FORT COLLINS
Project No. FC06103‐125
May 28, 2013
(Revised October 17, 2013)
BRIERLEY ASSOCIATES
BASIS OF DESIGN REPORT
FOSSIL CREEK PEDESTRIAN TUNNEL FORT COLLINS, COLORADO
November 14, 2014
CONSTRUCTION AND MAINTENANCE AGREEMENT FOR PEDESTRIAN/BIKE UNDERPASS
Between BNSF RAILWAY COMPANY and THE CITY OF FORT COLLINS, COLORADO
February 19, 2016
BASIS OF DESIGN REPORT
FOSSIL CREEK PEDESTRIAN TUNNEL
FORT COLLINS, COLORADO
NOVEMBER 14, 2014
November 14, 2014
File Number: 113245-000
Stantec, Inc.
2659 East Harmony Road, Suite
Fort Collins, Colorado 80528
Attention: Don Silar, PE
Senior Project Manager
Basis of Design Report
Fossil Creek Pedestrian Tunnel
Fort Collins, Colorado
Mr. Silar:
Submitted herewith is the Basis of Design Report for the Fossil Creek Pedestrian Tunnel
project. This study was conducted in general accordance with the contract between Brierley
Associates (Brierley) and Stantec dated March 24, 2013. The enclosed Basis of Design Report
contains a summary of project characteristics and proposed construction, the results of
Brierley’s subsurface investigation, engineering interpretation and design basis for proposed
critical site components, and recommendations and an overview of the proposed construction of
this project. The report was written primarily to provide additional understanding of the project
and to explain how the proposed site features were determined from a design perspective.
If you have any questions regarding the content of this report, please contact the undersigned.
Sincerely,
BRIERLEY ASSOCIATES
Robin Dornfest Nathan Soule, PE
Central Region Manager Associate
Lance Heyer, EI
Geotechnical Engineer
2629 Redwing Road, Ste. 150, Fort Collins, CO 80526 | 970.237.4988 | www.BrierleyAssociates.com
Stantec
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page ii of i
TABLE OF CONTENTS
1 INTRODUCTION .......................................................................................................................... 1
2 PROJECT CHARACTERISTICS ................................................................................................. 2
2.1 Site Description and Project History ...................................................................................... 2
2.2 Proposed Construction.......................................................................................................... 2
3 FIELD INVESTIGATION AND LABORATORY TESTING ........................................................... 3
3.1 Field Investigation ................................................................................................................. 3
3.2 Laboratory Testing ................................................................................................................ 4
3.3 General Summary of Subsurface Conditions ........................................................................ 5
3.3.1 Embankment Fill (CL, SC) ............................................................................................. 5
3.3.2 Fine Alluvium (CL) ......................................................................................................... 5
3.3.3 Coarse Alluvium (SM, SC, SP, GP, GC) ........................................................................ 5
3.3.4 Sandstone Bedrock........................................................................................................ 6
3.3.5 Groundwater .................................................................................................................. 6
4 DESIGN BASIS ........................................................................................................................... 6
4.1 Geotechnical Design Parameters .......................................................................................... 6
4.2 Load Configuration ................................................................................................................ 7
4.2.1 ZSTRESS Vertical Stress Loading ................................................................................. 7
4.2.2 Sheet Piling Loading ...................................................................................................... 7
4.2.3 Drilled Shaft Loading ...................................................................................................... 8
4.2.4 Arch Wall Loading .......................................................................................................... 8
4.2.5 Pipe Tunnel Loading ...................................................................................................... 9
4.3 Geotechnical and Structural Modeling ................................................................................... 9
4.3.1 Sheet Pile Modeling ....................................................................................................... 9
4.3.2 Drilled Shaft Modeling .................................................................................................... 9
4.3.3 Arch Wall Modeling ...................................................................................................... 10
4.4 Design Basis ....................................................................................................................... 11
4.4.1 Sheet Piling ................................................................................................................. 11
4.4.2 Drilled Shafts ............................................................................................................... 11
4.4.3 Arch Walls ................................................................................................................... 11
4.4.4 Thrust Block ................................................................................................................. 12
4.4.5 Pipe Segment Tunnel .................................................................................................. 12
5 CONSTRUCTION CONSIDERATIONS ..................................................................................... 12
5.1 Construction Sequence ....................................................................................................... 12
5.2 Sheet Pile Installation ......................................................................................................... 13
5.3 Drilled Shaft Construction ................................................................................................... 13
5.4 Arch Wall Construction........................................................................................................ 13
5.5 Jacking Pit and Thrust Block Construction .......................................................................... 13
5.6 Tunnel Jacking and Installation ........................................................................................... 14
TABLES –
Table 1 – Summary of Laboratory Testing
FIGURES –
Figure 1 – Site and Boring Location Map
APPENDICIES –
APPENDIX A – Test Boring Key & Test Boring Logs (Brierley)
APPENDIX B – Geotechnical Laboratory Testing
Stantec
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 1 of 15
1 INTRODUCTION
Brierley Associates (Brierley) was contracted by Stantec, Inc. (Stantec), the prime engineer for
the project, to direct and lead a geotechnical investigation and provide geotechnical and
structural design for the Fossil Creek Pedestrian Tunnel (FCPT). The project owner is the City
of Fort Collins Parks (City). Proposed construction will take place on land owned by the City
and within the Burlington Northern Santa Fe (BNSF) right of way.
The project is located approximately a 1-mile northwest of the intersection of College Avenue
(Highway 287) and Trilby Road in Fort Collins, Colorado. The project includes the construction
of a 14-ft diameter pedestrian tunnel through a BNSF railroad embankment and under a single
active BNSF track. The tunnel will function to convey foot, bicycle, and equestrian traffic under
railroad embankment for the larger Fossil Creek Trail.
The purposes of this study were to: 1) conduct a subsurface investigation and determine the
general subsurface conditions within, adjacent to, and under the tunnel alignment by drilling
borings through the proposed tunnel cross section and near critical site features; 2) conduct a
geotechnical laboratory program to appropriately determine the geotechnical engineering
characteristics of soils and bedrock at the site; and 3) provide geotechnical and structural
design for the sheet piles, drilled shafts, arch walls, jacking pit and thrust block, and tunnel.
In preparing this report, Brierley has relied on:
The American Railway Engineering and Maintenance-of-Way Association (AREMA)
Manual for Railway Engineering Chapter 8 (2012);
2006 and 2009 International Building Code, Section 1613;
1997 Uniform Building Code, Volume 2, Structural Engineering Division, Chapter 16,
Division IV-V, 1997;
American Concrete Institute (ACI) 318-11 Building Code Requirements for Structural
Concrete and Commentary (2008);
American Institute of Steel Construction (AISC) Steel Construction Manual, 13th ed
(2005);
Geotechnical Engineering Circular No. 4, Ground Anchors and Anchored Systems,
FHWA Publication No. FHWA-IF-99-015;
Mechanics of Materials, Roy R. Craig, 2011;
NAVFAC DM-7.1 & DM-7.2. Foundations and Earth Structures. Department of the Navy,
Naval Facilities Engineering Command, May 1982.
Peck, R. (1969), Deep excavation and tunneling in soft ground;
Young, W. C., and Budynas, R. G., (2002). Roark's Formulas for Stress And Strain.
McGraw-Hill, New York, NY;
ASTM International - Standards ASTM International - Standards Worldwide, May 2013.
<http://www.astm.org/Standard/index.sht;
Safety and Health Topics | Trenching and Excavation, Occupational Safety and Health
Administration – Home; May 2013. <http://www.osha.gov/SLTC/trenchingexca;
AECOM’s 60% design submittal package to BNSF;
Final Design for Fossil Creek / BNSF Pedestrian Tunnel (Fort Collins, Colorado), April
2014, 95 % Plan Drawing Package, Stantec;
Fossil Creek Underpass Design Calculations (Fort Collins, Colorado), Marh 27, 2014,
Brierley Associates;
Stantec, Inc.
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 2 of 15
Geologic Map of the Boulder, Fort Collins, Greeley Area, USGS Miscellaneous
Investigation Series Map I-855-G , Colton 1978;
Survey of the site and each boring location after drilling conducted by Stantec;
Other in-house geologic information and experience with similar projects; and
Discussions and meetings with Stantec, the City, and the selected Contractors Garney
and BTrenchless (BT) regarding project characteristics and proposed methods of
construction.
2 PROJECT CHARACTERISTICS
The proposed FCPT site is located in Fort Collins, Colorado as shown on Figure 1. The
following sections include a brief site description and summary of the proposed construction
activities for the FCPT.
2.1 Site Description and Project History
The FCPT site is located approximately 200 feet south of Fossil Creek. The railroad
embankment in the vicinity of the proposed underpass extends approximately 30 feet above
surrounding grades. The embankment side slopes range from approximately 2H:1V
(horizontal:vertical) to 2.5H:1V. In general, the site slopes generally downward toward Fossil
Creek. An approximate 10 foot tall swale parallels the railroad tracks and is located 120 feet to
the east of the track centerline.
2.2 Proposed Construction
The project includes the design and construction of a 14-foot inner-diameter pedestrian tunnel
under a single, active BNSF railway line. Five key site components or features encapsulate the
proposed construction of the FCPT: driven sheet piles, drilled shafts, arch walls, thrust block
and mud mat, and the steel pipe tunnel. For additional information related to FCPT construction
and orientation of specific design components, the reader is referred to the construction
drawings.
Driven sheet piles will form the general shape of the arch wall. The selected shape of the driven
sheets is a P27.5 flat, interlocking shape. Sheets will not be driven within 5 feet of the proposed
drilled shaft locations. Sheet orientation and verticality will be critical to the construction
process, as the arch walls will be constructed directly against sheet piling, as discussed.
A total of 6 drilled shafts will be constructed at the site. A single drilled shaft will be located at
each of the four corners of the two arch walls, and two drilled shafts will provide additional
resistance to the trust block during tunnel jacking. All six drilled shafts will be identical in
construction. Each drilled shaft will be 48 inches in diameter and contain a W36x260 section for
reinforcement. Concrete with a minimum compressive strength of 4000 psi will be tremied from
the base of the shafts to the required elevations. Calculations determined drilled shafts must
penetrate competent bedrock by a minimum of 10 feet, and the maximum stick-up of the shaft
above competent bedrock is 8 feet.
The two shotcrete arch walls will be constructed in top-down sequence. Both the launch side
and receiving side arch walls will be constructed prior to launching the tunnel. The arch walls
will both be approximately semicircular with a radius of approximately 25 feet. The top of wall
profile will slope downward toward the top of the drilled shafts at the terminus of each wall. At
each corner location the arch wall will socket 6 inches into the drilled shaft and the socket will
Stantec, Inc.
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 3 of 15
extend a minimum of 5 feet vertically. The tunnel cross section, including expected overcut, will
be blocked out on the launch and receiving side arch walls during construction. Four lifts will be
utilized to construct both arch walls. The excavation of each lift will generally follow the
proposed top of wall profile and extend a maximum of 7 feet, vertically, into the embankment.
Excavated embankment includes material between the existing downstream surface of the
embankments and sheet pile faces. Structurally, each wall will be formed of shotcrete with a
minimum thickness of 12 inches utilizing double mats for reinforcement with lift heights
extending 5 feet.
The thrust block and mud mat (temporary concrete slab) will be constructed on the east side of
the railroad embankment in order to provide jacking resistance for advancing the tunnel casing
pipe and to provide an adequate working surface, respectively. The thrust block will overlap the
previously constructed drilled shafts by 1 foot and extend 13.5 by 5 feet in cross section
perpendicular to the tunnel alignment. The thrust block will have a minimum thickness of 3 feet.
A 1-inch thick, 5 by 8 foot road plate will be fixed to the trust block, between the jacking frame
and the thrust block. The mud mat will be a 6-inch thick, unreinforced working slab, extending
18.5 feet wide by 34 feet between the thrust block and constructed arch wall. The thrust block
system described above will be partially removed after tunneling is complete.
Tunnel construction will progress by jacking 14-foot diameter steel pipe segments using a
jacking frame provided by the tunneling Contractor for the project, BT Construction, Inc. (BTC).
The thickness of the pipe segments will be 1.25 inches. A shield will be welded onto the front of
the first pipe segment and material within the tunnel horizon will be mined and removed from the
tunnel cross section as the tunnel is jacked through the BNSF embankment. Segments will be
partially or completely welded to previously installed segments prior to jacking. After all 7 pipe
segments have been jacked the appropriate distance, fully penetrating welds will be completed
and contact grout will be pumped through previously installed grout ports in each tunnel
segment.
Two tunnel guiderails, installed by guided auger bores, will be constructed prior to tunnel jacking
and will allow for tight tolerances on the larger tunnel’s line and grade. The center of the two
guided auger bores will be located approximately 65 inches apart, or approximately 21 degrees
from vertical as measured from the tunnel center. The two sheet piles within each of the launch
and receiving auger bore profiles will be driven above the auger bore alignment, creating room
for each auger bore. The guided auger bores will be 12 inches in diameter, and steel casing
pipe will be installed following the guided auger bore machine. Upon exiting the receiving side
arch wall, both guide bores will be grouted.
3 FIELD INVESTIGATION AND LABORATORY TESTING
Brierley conducted an investigation, including laboratory testing, to investigate the general
subsurface conditions at the FCPT site. The following sections include details relating to our
subsurface investigation and subsequent laboratory investigation.
3.1 Field Investigation
The subsurface investigation and laboratory testing were used to characterize the subsurface
conditions, determine the quality of foundation materials, and determine the feasibility of the site
to construct structures proposed for the FCPT. The results of our field investigation and
geotechnical testing are discussed below. CTL Thompson, Inc. (CTL) performed an initial
Stantec, Inc.
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 4 of 15
subsurface investigation at the direction of AECOM for a 45% level design, and submitted
associated drawings and calculations on October 31, 2013. CTL also conducted a second
subsurface investigation with oversight from Brierley adequate for final design of the FCTP. The
initial subsurface investigation was preformed prior to selection of the final tunnel alignment and
key design components, prior to Brierley’s involvement with the project. The following sections
summarize the subsurface investigation, laboratory testing, and subsurface conditions of the
site.
Prior to Brierley involvement in the FCPT project, CTL drilled three (3) borings (BH-1, BH-2, and
BH-3) in September 2013, to classify the subsurface conditions on the east side of the
embankment and through the embankment and obtain intact samples for laboratory testing.
CTL, directed by Brierley, drilled seven (7) additional borings (BH-4 through BH-10) on
November 25, 2013 and January 8, 2014 to investigate general subsurface conditions on the
west and east sides of the embankment and through the embankment and to obtain samples to
aid in the determination of engineering properties through geotechnical laboratory testing.
Borings were located in the general vicinity of site features as understood at the time of each
investigation, as presented in Figure 1. Boring locations were selected to provide an accurate
representation of subsurface materials adjacent to and under or overlying critical proposed site
features. Drilling for all borings was subcontracted by CTL and Precision Sampling.
The ten (10) total exploratory borings were drilled to depths ranging from 34 to 43 ft below the
existing ground surface. Borings were logged based on the materials geologic and USCS
classifications. A summary of the subsurface conditions based on the field investigation and
tested laboratory samples is provided below. Complete boring logs are included as Appendix A.
Modified California barrel (2-inch inside diameter) samples were collected from borings,
generally at 5-ft intervals. The modified California barrel sampler is used to obtain relatively
intact cohesive soil samples well suited for geotechnical testing. Modified California Barrel
samples were obtained from each boring in a general accordance with Standard Penetration
Test Procedures (ASTM D 1586). The penetration values, reported on the boring logs, indicate
the number of blows required for a 140-lb hammer falling 30 inches, to induce 12 inches of
sampler penetration. The blow counts indicated on the subsurface exploration logs are not
factored for the modified California barrel sampler and indicate the field measured value.
Descriptions and visual classifications of soils and bedrock and samples were recorded on test
boring reports during drilling. Geologic soil descriptions are preceded by USCS soil
classifications, which are in accordance with the ASTM D 2487 or ASTM D 2488, more
commonly known as the Unified Soil Classification System (USCS). The completed test boring
reports are provided as Appendix A. Sampling information, other pertinent field data and
observations, and laboratory testing data are also included on the reports. The subsurface
conditions revealed by the field investigation are discussed further in the following sections.
3.2 Laboratory Testing
To aid in classifying the soils and bedrock and to determine general engineering characteristics,
selected laboratory tests, as presented in the following table, were performed on representative
samples collected during our subsurface investigation. Material classifications presented on the
test boring reports were amended as necessary to reflect laboratory test data. The results of
Stantec, Inc.
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 5 of 15
the laboratory testing are summarized in Attachment 2. All laboratory analyses were performed
by CTL.
Laboratory Tests
Parameter Method Reference
Atterberg Limits ASTM D4318
Direct Shear ASTM D3080
Grain Size Distribution ASTM D422
In Place Density and Moisture ASTM D6938
Minus #200 Wash ASTM D6913
Unconfined Compressive Strength ASTM D2166
Water Soluble Sulfates ASTM D1580
3.3 General Summary of Subsurface Conditions
The materials encountered during drilling included embankment fill, fine and coarse alluvium,
and sandstone bedrock of the Richard Sandstone member of the Pierre Shale formation.
A more detailed description of the subsurface conditions encountered during our field
investigations are presented as Appendix A. A general description of the predominant materials
encountered is presented below.
3.3.1 Embankment Fill (CL, SC)
Embankment fill, used to form the BNSF railroad embankments, composed primarily of sandy
lean clay (CL) and clayey sand (SC) was encountered in borings BH-1, BH-2, BH-9 and BH-10.
In addition to sandy lean clay and clayey sand, minor amounts of coal and brick were also
encountered. The embankment fill thickness ranged from 21 to 29 ft. As encountered during
the subsurface investigation, embankment fill was moist to wet and medium stiff to very stiff in
consistency, lose to medium dense in density with standard penetration test values ranging from
6 to 29 blows per foot (bpf).
3.3.2 Fine Alluvium (CL)
Fine alluvium, consisting primarily of sandy lean clay (CL), was encountered in borings BH-1,
BH-2, and BH-3 and borings BH-6 through BH-10. Native sandy lean clay (CL) was
encountered at depths ranging from 23 to 29 ft below the ground surface (bgs) in borings drilled
from the top of the railroad embankment including BH-1, BH-2, BA-9, and BA-10. In borings
drilled adjacent to the railroad embankments including borings BH-3 and BA-6 through BA-8,
native sandy lean clay was encountered at depths ranging from 0 to 4 ft bgs. The sandy lean
clay layer thickness ranged from 2 to 6 ft. As encountered during the subsurface investigation,
the lean clay ncluded fine to medium sand, was stiff to very stiff in consistency, with standard
penetration test values ranging from 9 to 42 blows per foot (bpf).
3.3.3 Coarse Alluvium (SM, SC, SP, GP, GC)
Coarse alluvium composed primarily of poorly-graded sand (SM, SC, SP) with silt and clay and
poorly-graded gravel (GP, GC) with silt and clay was encountered in all borings. Two primary
layers of coarse alluvium were encountered during the investigation: a silty or clayey sand layer
encountered at depths ranging from 0 to 13 feet bgs and a poorly graded sand or poorly graded
gravel with clay layer encountered at depths ranging from 9 to 36 feet bgs. The upper layer was
moist, loose to medium dense with standard penetration test values ranging from 6 to 21 bpf
Stantec, Inc.
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 6 of 15
and the lower layer was dry to moist, medium dense to very dense, with standard penetration
test values ranging from 21 bpf to 50 per 10 in.
3.3.4 Sandstone Bedrock
Sandstone bedrock (BR) of the Richards Sandstone member of the Pierre Shale formation was
encountered in all borings except BH-2 from depths ranging from 6 to 36 ft bgs and extended to
the maximum depth of investigation. The bedrock was dry to moist with standard penetration
test values ranging from 17 bpf to 50 blows per 2 inches. The field hardness or resistance to
abrasion for this bedrock was very soft to soft.
3.3.5 Groundwater
Groundwater was encountered in borings BH-3 and BH-5 through BH-8 at depths below the top
of boring ranging from 5 to 21 ft. In general groundwater flows from northeast to southwest
across the site or slopes away from Fossil Creek. Fluctuations in the groundwater level will
occur due to variations in the Fossil Creek water elevation, rainfall, temperature, site
development and other factors not evident at the time readings were recorded. A
comprehensive groundwater evaluation is outside of the scope of this study. Groundwater is
not anticipated to affect wall or tunneling construction.
4 BASIS OF DESIGN
As mentioned previously, five major design components were considered in designing
structures associated with the construction of the FCPT: sheet pile walls, drilled shafts, arch
walls, thrust block and mud mat, and the pipe tunnel itself. Sections below include geotechnical
design parameters, load configuration, geotechnical and structural modeling performed to
design, and the design basis considered for each design component. A comprehensive list of
specific design values for each component are not presented below; however, the calculation
package, submitted in tandem with this report, covers the numerical determination of each
individual design item discussed in the following sections. The purpose of the following is to
outline the design procedure utilized, and provide background information related to the
determination of appropriate stresses and deflections and subsequent geometry of specific
design components presented on the drawings (Final Design for Fossil Creek / BNSF
Pedestrian Tunnel, 2014) and in the calculation package (Fossil Creek Underpass Design
Calculations, 2014), presented in tandem with this report.
4.1 Geotechnical Design Parameters
Based on our subsurface investigation, and experience with similar materials and projects, the
following table presents geotechnical parameters of embankment materials utilized in designing
critical site components:
Stantec, Inc.
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 7 of 15
Geotechnical Design Parameters
Parameter Abbreviation Selected Value
State Parameters
Unit Weight γt 110 pcf
Internal Friction Angle Φ 28 deg
Short Term Cohesion ctemp 600 psf
Interfacial Friction δ 19 deg
Earth Pressure Coefficients
Active Earth Pressure Ka 0.32
At-Rest Earth Pressure K0 0.53
Passive Earth Pressure Kp 2.77
Utilization of the design parameters presented is explained further in the following sections, and
is presented in the calculation package, presented in addition to the Basis of Design Report.
The sole designed site feature located within foundation materials, below the existing
embankment elevation, include the drilled shafts. As discussed in Section 4.3.2, drilled shafts
were designed using LPile software. Specific geotechnical design parameters for drilled shafts
will be discussed in Section 4.3.2.
4.2 Load Configuration
Varying load configurations were utilized in the calculations of the various design components of
the FCPT. The following sections include a summary of how assumed loading configurations
were determined in calculating the various site components.
4.2.1 ZSTRESS Vertical Stress Loading
The software program ZSTRESS 2.0 was used to calculate the additional vertical stresses
applied adjacent to sheet piles and arch walls, and vertically to pipe tunnel segments due to
Cooper E-80 live load, track and ballast weight, and the embankment slope up and away from
the top of the sheet pile and shotcrete walls. ZSTRESS calculates increase in soil stress due to
external, applied loading, using both the Boussinesq and Westergaard methods. For the
designs considered, the average of the Boussinesq and Westergaard methods were used.
AREMA provides two alternative loading configurations for live load resulting from a single track.
The first option considers a uniform, vertically applied pressure of 8,000 pounds per linear foot.
The second option considers applying the maximum axle loads from engine cars at the
appropriate intervals as point loads. The second option was determined to be more
conservative producing a higher stress increase, and therefore was used throughout design.
A complete survey of the site has been completed by Stantec; therefore appropriate
embankment and ballast loadings were utilized to determine appropriate stress increases for
design in conjunction with the at-rest earth pressure, as described.
4.2.2 Sheet Piling Loading
The function of the sheet piles is to resist the temporary horizontal load resulting from railroad
embankment excavation during a construction lift, prior to the installation of arch wall
reinforcement and shotcrete. Similar to arch walls, the sheet piles are assumed to act as a
braced excavation in soft to medium clay (NAVFAC, 1982), as shown below.
Stantec, Inc.
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 8 of 15
Pressure Distribution for Braced Load in Internally Braced Flexible Walls (NAVFAC, 1982)
The first excavated lift was assumed to have a horizontal pressure distribution acting against the
restraining sheet piles defined by a section free to deflect at the top, and restrained at the base,
similar to a cantilever wall. Subsequent lifts were assumed to contain a horizontal pressure
distribution acting against the restraining sheet piles defined by a section restrained at the top
and base of the excavation, due to the previously installed shotcrete from previous lifts. In
addition, the moment distribution for the sheet pile span over the blocked out tunnel opening in
the receiving arch wall during construction was determined. Horizontal pressure distributions
acting on individual sheet pile lifts were determined by hand calculation and used to determine
the required sheet pile section modulus. In addition horizontal pressure distributions for sheet
piles utilized active earth pressures due to the empirical formulation utilized in determining sheet
pile size and embedment.
4.2.3 Drilled Shaft Loading
Two locations or scenarios were considered for drilled shafts: at the corner of the arch walls and
integral with the thrust block. For the four (4) drilled shafts restraining the arch walls, applied
loadings were determined upon the completion of arch wall modeling. The horizontal force
acting on the fixed connection nodes, simulating the arch wall socket into the drilled shaft, was
extracted after running the model. It was determined the total horizontal load acting over the 5-
ft socket was 350 kips per shaft. Arch wall base friction against the subgrade was considered in
the horizontal load determination. For the two drilled shafts resisting jacking forces applied to
the thrust block, the maximum jacking force of 600 tons, less the friction between the base of
the thrust block and the excavated ground surface and the passive resistance due to backfilled
material behind the thrust block and thrust block drilled shafts.
4.2.4 Arch Wall Loading
Brierley determined the horizontal pressure distribution acting on the arch walls will behave
similarly to a braced excavation in a soft to medium clay (NAVFAC, 1982), due to the presence
and location of the drilled shafts, the geometry of the arch walls, and the limited deflection
calculated post construction. The drilled shaft will act similarly to a strut, specifically for the first
Stantec, Inc.
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 9 of 15
lift, or upper portions of the arch wall. The load configuration selected for the arch walls is
identical to the NAVFAC load configuration presented previously and selected for the sheet
piles, based on anticipated restraint from the drilled shafts. The horizontal pressure was
determined utilizing passive earth pressures, due to the limited deflection expected, discussed
in Section 4.3.2.
Arch wall loading values were determined using hand calculations. Due to the limited expected
deflection, as discussed, the at-rest earth pressure coefficient of 0.53 for embankment material
was utilized in converting vertical stresses to the horizontal stresses. Upon determining the
horizontal stresses acting upon the arch wall at varying depths, loads were applied to RISA 3D
structural modeling software, as discussed in Section 4.3.3.
4.2.5 Pipe Tunnel Loading
The effective vertical pressure of the overlying embankment, in addition to the vertical load from
the overlying railroad was utilized to determine the appropriate long term required design pipe
thickness. In addition, the maximum horizontal jacking force of 600 tons was utilized to
determine the appropriate pipe thickness to resist buckling during installation.
4.3 Geotechnical and Structural Modeling
Modeling software including BeamBoy, LPile, and RISA 3D were utilized to determine loadings
and structural capacities of sheet piles, drilled shafts, and arch walls, respectively. The
following sections present a summary of the utilized design software, in addition to the required
inputs and outputs utilized to designed aforementioned site features.
4.3.1 Sheet Pile Modeling
BeamBoy was utilized to determine basic stresses, moments and deflections for sheet piles
utilized in this study. Two cases were analyzed in BeamBoy: a horizontal pressure distribution
from retained embankments and associated railroad loads acting over a maximum 7 foot depth
of excavation with boundary conditions including one fixed end and one free end, and a
horizontal pressure distribution from retained embankments and associated railroad loads
acting over a maximum 8 foot depth of excavation with boundary conditions including two
pinned ends. BeamBoy utilized simplified beam theory to determine stresses and deflections
along a beam segment, given the inputs discussed previously. Once maximum stresses were
determined, an appropriate sheet pile size was selected for proposed use as temporary
retention.
4.3.2 Drilled Shaft Modeling
Drilled shafts were modeled using LPile software. LPile contains coding designed to give the
user the capability to solve problems related to the selection of different types of piles for
varying purposes. Of primary importance to the majority of pile designs is determining whether
the applied loads will compromise the pile structurally and/or whether deflections due to applied
loads are acceptable. Pile integrity and deflection for both drilled shaft scenarios were
determined for this study.
Soils were modeled utilizing the p-y curve method within LPile. The parameters p and y are
used to describe a specific soil or rock response, p, to a specific pile deflection, y. Numerous
factors, including pile geometry, soil properties, and the type of loading govern the behavior of
each type of soil reaction. Based on the subsurface investigation and the available soil and
Stantec, Inc.
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 10 of 15
bedrock profiles within LPile, the alluvial and sandstone bedrock layers were modeled utilizing
appropriate p-y curves. The following table presents the selected p-y curves and specific inputs
utilized for soil layer parameters. Inputs parameters were consistent with depth.
LPile Soil and Rock Modeling Parameters
Soil Type Selected p-y Curve Unit Weight
(pcf)
Undrained
Cohesion (psf)
Friction
Angle (deg)
p-y Modulus
(pci)
Strain
Factor
Alluvium Silt (Cemented c-phi
Soil) 110 200 28 300 0.007
Soil Type Selected p-y Curve Unit Weight
(pcf)
Young’s
Modulus (psi)
Compressive
Strength (psi) RQD (%)
Strain
Factor
Sandstone
Bedrock Weak Rock (Reese) 135 29000 400 60 0.0005
In addition to soil and bedrock input parameters loading values, drilled shaft geometry and
structural parameters of the drilled shafts were also determined and utilized in the modeling
effort. The geometry and quantity of reinforcement included in each drilled shaft was modified
until deflections and structural capacities were within allowable ranges for scenarios considered.
Horizontal loads were applied uniformly over the entire 5-ft arc wall socket length. The drilled
shafts were considered free to rotate and deflect; in other words an unrestrained pile cap.
4.3.3 Arch Wall Modeling
RISA 3D modeling software was utilized to determine appropriate stresses and deflection
values specifically pertaining to the two arch walls utilized at the ends of the tunnel alignment.
RISA 3D is a structural modeling tool, designed to accelerate the time required to perform
structural analysis on complicated systems involving various components, geometries,
boundary conditions, and loading scenarios. Structural members can be defined using a variety
of predefined shape and strength parameters. In defining the two arch walls, plates were
utilized. Plates effectively divide a more complicated area into a series of smaller, uniform
pieces, allowing the user to define boundary conditions to each connecting plate corner and
apply a load to the surface of the plate. The modeling scenario considered utilized smaller
plates immediately around the tunnel horizon in order to more accurately define the tunnel cross
section geometry. Plates consider stresses in two directions, in this case the vertical plane,
perpendicular to anticipated embankment loads.
Load values, or horizontal stresses as described previously, were assigned to individual plates,
calculated depending on the individual plate vertical location below the intersection of the top of
the wall and the embankment. In addition anticipated railroad loads were also applied to
individual plate areas. It is important to note, the lateral distance of plates away from the
railroad tracks due to the arching wall geometry was not accounted for in the design process,
which is a conservative assumption. Instead, the relative lateral distance from the railroad
tracks remained constant throughout the design process as the most critical (closest) distance
for the entirety of both walls. Loads were applied perpendicular to plate surfaces.
Three sets and types of boundary conditions were utilized in the modeling scenario. A fixed
connection (complete joint restraint with zero degrees of freedom) was applied to joints
simulating the two arch wall sockets into the drilled shafts. The second boundary condition
Stantec, Inc.
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 11 of 15
segments. Node boundary conditions between plates other than those described were
considered free to rotate and deflect in all directions.
Plate forces and moments based on the input parameters described were determined in the two
directions perpendicular to each plate. Vertical and horizontal (based on plate orientations)
moments and forces were captured and used to determine the appropriate arch wall thickness
and horizontal and vertical reinforcement needed to appropriately support the wall.
4.4 Design Basis
Inputs and modeling scenarios described in the previous sections of this report provide a design
basis for the design components considered. Upon determining the critical stresses
encountered, the determination of appropriate structural capacities was determined for sheet
piles, drilled shafts, arch walls, thrust block and for the pipe segment tunnel. The following
sections include descriptions of how the critical stresses were integrated into design calculations
to determine appropriate designs for critical site infrastructure.
4.4.1 Sheet Piling
Based on the maximum calculated moment of 6.7 kip feet per foot, an appropriate section
modulus for the individual sheet piles was determined as 3.03 cubic inches. Therefore, a PS
27.5 sheet pile was selected. A flat sheet pile was utilized for design due to the sequence of
constructing the arch walls directly against the outer face of the exposed sheet piles after
excavation, as discussed in greater detail in Section 5.1.
4.4.2 Drilled Shafts
Calculations to determine appropriate drilled shaft diameter, embedment, and reinforcement
necessary to restrain the applied loads are integral within LPile design software. Shaft
specifications were determined based on the anticipated horizontal forces on the socketed
portion of the arch wall into the drilled shaft from the arch wall modeling scenario and the
maximum potential jacking force from the Contractor specified jacking frame. All six drilled
shafts will be 4 feet in diameter, extend a minimum of 10 feet into competent bedrock, and
contain a W36x260 section aligned with the strong axis parallel to the applied load. Equivalent
shaft geometries, reinforcement, and embedment depths were deemed appropriate for both
modeling scenarios despite the varying loading characteristics. Deflection controlled pile
specifications in both cases, and it was appropriate to assume a much larger deflection for the
temporary thrust block drilled shafts in comparison to drilled shafts restraining the arch wall from
lateral movement. The maximum deflection at the top of the shaft was determined as 0.30 and
1.34 inches for the arch wall and thrust block scenarios, respectively. Based on the drilled shaft
length of 10 feet, 0.30 inches at the top of the shaft correlates to negligible deflection.
4.4.3 Arch Walls
Arch walls were designed utilizing AREAMA Chapter 8, Manual for Railway Engineering.
Appropriate wall thickness, and horizontal and vertical steel values were determined based on
the maximum stresses and moment values determined from RISA 3D modeling. A minimum
wall thickness of 12 inches with two layers of reinforcement is sufficient to resist the anticipated
loading scenario. The reinforcement layers will include number 7 bars, both directions, spaced
at 8 inches horizontally and 12 inches vertically, placed 2 inches from the inner and outer faces,
respectively. Horizontal reinforcement overlap minimum is 48 in. and vertical reinforcement is
not necessary to overlap, although overlap can be accommodated between lifts as determined
Stantec, Inc.
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 12 of 15
for convenience by the Contractor. The tunnel cross section will not include reinforcement
before or after construction, as discussed in Section 5.1, and additional reinforcement around
the tunnel cross section and in the drilled shaft socket is not necessary as the critical stresses
and moments do not occur in these locations.
4.4.4 Thrust Block
The thrust block was designed to resist shear, flexure, and crushing caused by the jacking
frame reaction during pipe segment installation. American Concrete Institute (2008) Building
Code Requirements for Structural Concrete and Commentary design guidelines were utilized to
determine the necessary thickness and reinforcement necessary to resist the maximum jacking
loads possible from the jacking frame. Similar to the drilled shafts utilized to restrain the load
applied by the jacking frame, the thrust block was designed for the maximum jacking force of
600 tons. As discussed with the tunneling Contractor, BT, during design meetings, a 1 in. thick
road plate will be attached to the front of the trust block and aid in distributing the jacking load
evenly across the face of the thrust block. Based on thrust block calculations (Fossil Creek
Underpass Design Calculations, 2014) the thrust block will be a minimum of 3 ft thick and
include #6 vertical and #7 horizontal reinforcing bars spaced at 12 in. on center. In addition, the
thrust block and drilled shafts should overlap by approximately 1 ft.
4.4.5 Pipe Segment Tunnel
Pipe tunnel segments were designed to resist bucking due to the overburden embankment and
railroad loadings, typical handling loads, thin column buckling during installation and jacking,
circumferential buckling, and axial compression. In addition the expected required jacking loads
necessary to install pipe segments were also determined. The American Water Works
Association (AWWA, 2004) M11 Manual for Buried Pipe Installation, Deep Excavation and
Tunneling in Soft Ground (Peck, 1969), and Roark's Formulas for Stress And Strain (Young and
Budynas, 2001) were utilized to determine appropriate tunnel wall thicknesses and associated
expected jacking loads. Based on design calculations, necessary tunnel pipe segment
thicknesses is 1.25 in. and the expected jacking force necessary to install the 70 foot long
tunnel is approximately 380 tons.
5 CONSTRUCTION CONSIDERATIONS
The following sections present the assumed construction process, as described on the
construction drawings (Final Design for Fossil Creek / BNSF Pedestrian Tunnel, 2014). The
following sequence of construction was assumed in sizing and calculating the stability of site
infrastructure presented throughout Section 4.
5.1 Construction Sequence
In general the construction sequence will progress as follows: sheet pile installation, drilled shaft
construction, arch wall construction, jacking pit and thrust block construction, and finally tunnel
jacking and associated tunnel installation. The following sections provide descriptions of the
chronological construction process for each of the major design components mentioned. For a
more detailed depiction of the construction sequence, the reader is directed to the drawing
package, submitted in tandem with this report (Final Design for Fossil Creek / BNSF Pedestrian
Tunnel, 2014).
Stantec, Inc.
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 13 of 15
5.2 Sheet Pile Installation
The first significant component constructed will be the sheet pile arch. It is assumed sheet pile
orientations are within tolerances presented on the drawings. The arch wall will be constructed
directly against driven sheet piles, and structural modeling of the arch wall assumed geometry
presented on the construction drawings (Final Design for Fossil Creek / BNSF Pedestrian
Tunnel, 2014). Sheet piles will be driven to a minimum depth equal to the base of the arch wall,
as presented on the drawings. It was assumed that piles will not be driven within 6 in. of the
outer edge of the drilled shafts. In addition, two sets of sheets, or a total of four sheets, are
assumed to be driven to a lesser depth in comparison to all other sheets to create room from
the guided auger bore guide rails, which will aid in guiding the tunnel segments during
installation.
5.3 Drilled Shaft Construction
Calculations determined drilled shafts will be 48 in. in diameter, and penetrate a minimum of 10
feet into competent sandstone bedrock. After the completion of drilling, the W36x260
reinforcing section will be lowered into place and the base of the drilled shaft will be smoothed
and free of cuttings. The reinforcing section is assumed to be oriented in the center of the
drilled shaft with the strong access parallel to the proposed arch wall socket. In addition, it is
assumed that the 5 foot long arch wall socket will be blocked out prior to connecting the walls to
the shafts. Prior to arch wall socket connection into the drilled shaft, concrete forming the drilled
shaft will cure for a minimum of 3 days. Concrete compressive strength should be determined
in order to assure conformance with construction drawings.
5.4 Arch Wall Construction
Arch walls will be constructed in a series of four lifts, utilizing sheet piles for temporary
embankment support. Initially, a maximum 7 foot deep excavation of embankment material,
between the sheets and current embankment face, will be excavated, exposing the external
sheet pile face. In general, the excavation will follow the general slope of the embankment,
exposing 5 to 7 feet of sheet pile for the entire arched concept, as presented on the construction
drawings. Upon excavation, horizontal and vertical reinforcement will be hung at a 2 in.
distance away from the face of the sheets. After placing reinforcement, a minimum 6 in. thick
layer of shotcrete will be sprayed onto the face of the sheet piles, and cover the reinforcing bars.
Due to potential irregularities in the idealized arch shape presented in the construction drawings
as a result of sheet pile geometry, it is likely the first lift will extend more than 6 inches in
several, if not the majority of locations along the wall. Upon completion of the first application of
shotcrete, a second set of horizontal and vertical reinforcing bars will be hung a minimum of 4
in. away from the initial face of shotcrete. After placing the second set of reinforcement, a
minimum 6 in. layer of shotcrete will be sprayed onto the face of the first layer of shotcrete. The
shotcrete will extend a minimum of 2 in. over the reinforcement. The first lift will be socketed
into the drilled shaft by approximately 6 in over the entire length of the first lift, as presented on
the construction drawings. After completion of the first lift, subsequent lifts will be constructed in
an identical manner. The slope and geometry of each lift will change as the arch wall works
deeper into the subsurface. After completion, the arch wall will extend a minimum of 5 feet
above and below the projected tunnel horizon.
5.5 Jacking Pit and Thrust Block Construction
Two drilled shafts will be placed at 5.5 ft spacing center to center, as described in Section 5.3.
Material will be excavated as necessary to provide room for the construction of a working slab
Stantec, Inc.
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 14 of 15
and the thrust block. The minimum 6 in. thick unreinforced concrete working slab will be initially
poured within the jacking pit to provide a sufficient working area and track placement area
during construction. The thrust block will be completed after the working slab. The
reinforcement will be placed approximately 2 inches from the edge of the drilled shaft. The
thrust block, once poured, will encapsulate a minimum of 12 inches of the drilled shafts, as
presented on the construction drawings. The final dimensions of the thrust block will be 13 ft x 3
ft thick by 5 ft in height. The thrust block will be placed approximately 34 feet away from the
central edge of the arch wall. After completion of the thrust block, the backside, or non-jacking
side, of the block should be backfilled with adequately compacted material to provide passive
resistance during jacking.
5.6 Tunnel Jacking and Installation
Tunnel segments will be advanced using a specialty jacking frame selected by BTC, capable of
exerting 600 tons of jacking force. Prior to jacking, a specialty tunneling shield will be welded
onto the first segment of pipe used to control embankment materials during the jacking and
mucking process. Subsequent 10 foot pipe segments will be welded as required by the
construction documents to previous pipe segments previously jacked within the embankment
prior to initiating jacking loads on the recently attached segment. Embankment material within
the shield during jacking will be excavated using a modified digger arm. In addition, during
jacking, lubrication ports will be utilized throughout the installation process to reduce side friction
between the outside of pipe segments and the surrounding embankment surface. A total of
seven segments will be jacked through the embankment, forming the 70-ft long tunnel. After the
tunnel has reached the eastern arch wall, and the shield has been fully jacked through the
blocked out opening in the arch wall, the shield will be removed, and previously utilized
lubrication ports will be utilized as grout ports to fill any potential void space between the outer
edge of the tunnel and the surrounding embankment. The maximum grouting pressure
assumed is 10 psi.
6 CONCLUSIONS AND CONSTRUCTION OBSERVATIONS
Variations in subsurface conditions are likely to be encountered during construction at the site.
To permit correlation between the investigation data and the conditions encountered during
construction, and to provide conformance with the plans and specifications, we recommend
Brierley is retained to provide observations of the construction effort and coordinate construction
in the field with the Contractor and Owner.
7 LIMITATIONS
Boundaries between soil and bedrock types presented in our test boring logs are approximate
and transitions between materials types may be gradual.
Our test boring logs and related information depict subsurface conditions only at the test boring
locations and at the time of our subsurface investigation. Lateral variations in subsurface
conditions not identified during our subsurface investigation are likely. Subsurface conditions,
especially soil consistencies and groundwater levels may change with time.
This report has been prepared for Stantec for specific application to the Fossil Creek Pedestrian
Tunnel as understood by our firm at this time, in accordance with generally accepted
geotechnical engineering and engineering geologic practices common to the local area. No
other warranty, express or implied, is made. In the event that changes in the nature, design or
Stantec, Inc.
Fossil Creek Pedestrian Tunnel
November 14, 2014
Page 15 of 15
location of the planned project are made, the conclusions and recommendations presented in
this report should not be considered valid, unless the changes are reviewed by Brierley and the
recommendations presented in this report are revised or verified in writing.
Our analyses and recommendations are based on our experience with similar projects and
subsurface conditions. The nature and extent of variations between test borings may not be
evident until excavation and/or construction. If differing conditions from those anticipated based
on our subsurface investigation(s) are encountered, Brierley reserves the right to modify our
recommendations presented herein to provide more feasible geotechnical engineering
parameters and construction means and methods.
Brierley’s recommendations presented in this report are for the proposed construction as
understood by us at the time of issuing this report. Test borings performed at the locations of
the planned construction are intended for informational use only.
The scope of Brierley Associates services does not include an environmental assessment and
does not provide an evaluation of the presence or absence of hazardous or toxic materials in
the soil, bedrock, groundwater, or surface water within or beyond the project boundaries. Any
statements in this report or on the test boring reports regarding odors or other unusual
conditions observed are strictly for the information of our client. If not already conducted, we
recommend an environmental assessment of the site be conducted by a qualified professional
prior to initiation of any excavation and/or construction at the site.
Stantec
Fossil Creek Pedestrian Tunnel
November 14, 2014
TABLES
PROJECT NAME: FOSSIL CREEK PEDESTRIAN TUNNEL (FCPT)
PROJECT NUMBER: 113245-000
Boring No. or
Test Pit No.
Depth
(feet)
Sample Moisture
(%)
Dry Density
(%)
Gravel (%) Sand (%)
Fines
Content
(%)
LL (%) PI (%)
FRICTION ANGLE
(Φ)
COHESION (psf)
BH-1 9-10 23.3 95 86.0 1690 CL SANDY LEAN CLAY (CL), FILL
BH-1 12-13 22.7 98 84.0 45 30 CL SANDY LEAN CLAY (CL), FILL
BH-1 14-15 20.2 104 75.4 3010 0.38 CL SANDY LEAN CLAY (CL), FILL
BH-1 17-18 22.1 97 4.0 14.0 82.0 CL SANDY LEAN CLAY (CL), FILL
BH-1 29-30 12.5 103 2770 CL SANDY LEAN CLAY (CL)
BH-2 9-10 22.5 97 0.0 8.0 92.0 CL SANDY LEAN CLAY (CL), FILL
BH-2 12-13 20.5 103 2920 0.52 CL SANDY LEAN CLAY (CL), FILL
BH-2 14-15 21.8 101 84.0 50 33 CL SANDY LEAN CLAY (CL), FILL
BH-2 17-18 19.7 104 3540 0.50 CL SANDY LEAN CLAY (CL), FILL
BH-2 22-23 17.2 90 0.0 43.0 57.0 CL SANDY LEAN CLAY (CL)
BH-2 24-25 15.2 112 42.0 3980 0.07 CL SANDY LEAN CLAY (CL)
BH-3 4-5 11.5 120 54.0 43 28 CL SANDY LEAN CLAY (CL)
BH-3 9-10 22.2 101 1150 CL SANDY LEAN CLAY (CL)
BH-3 14-15 15.1 116 12150 BR SANDSTONE BEDROCK (BR)
BH-3 19-20 13.6 48.0 BR SANDSTONE BEDROCK (BR)
BH-4 7-8 6.8 109.0 3100.0 BR SANDSTONE BEDROCK (BR)
BH-4 14-15 11.8 106.0 32.0 BR SANDSTONE BEDROCK (BR)
BH-5 2-3 10.8 108.0 30.0 320.0 SM SILTY SAND (SM)
BH-5 4-5 7.1 106.0 0.0 52.0 48.0 33.0 19.0 16300.0 SC CLAYEY SAND (SC)
BH-5 7-8 7.9 108.0 0.0 60.0 40.0 29.0 12.0 SC CLAYEY SAND (SC)
BH-5 14-15 4.9 121.0 15.0 BR SANDSTONE BEDROCK (BR)
BH-6 2-3 10.8 108.0 0.0 30.0 70.0 39.0 25.0
BH-6 4-5 15.5 116.0 22.0 1440.0 SM SILTY SAND (SM)
BH-7 2-3 11.2 104.0 0.0 18.0 82.0 46.0 32.0 14600.0 SM SILTY SAND (SM)
BH-7 7-8 14.0 118.0 36.0 BR SANDSTONE BEDROCK (BR)
BH-8 4-5 13.5 114.0 79.0 47.0 35.0 CL SANDY LEAN CLAY (CL)
BH-8 7-8 20.1 105.0 30.0 40.0 BR SANDSTONE BEDROCK (BR)
BH-8 14-15 11.5 120.0 55.0 40.0 18.0
BH-9 17-18 20.0 102.0 87.0 44.0 26.0 CL SANDY LEAN CLAY (CL)
BH-9 22-23 16.7 102.0 65.0 36.0 19.0 2900.0 SC CLAYEY SAND (SC)
BH-9 27-28 17.0 107.0 58.0 37.0 23.0 CL SANDY LEAN CLAY (CL)
BH-10 5-6 18.7 98.0 83.0 50.0 35.0 3900.0 CL SANDY LEAN CLAY (CL)
BH-10 15-16 14.7 112.0 46.0 31.0 17.0 3700.0 SC CLAYEY SAND (SC)
BH-10 35-36 19.9 99.0 0.0 47.0 53.0 GP POORLY-GRADED GRAVEL (GP)
1
Residual values are reported at approximatley 20 percent strain for all samples tested
2
Brierley Associates's USCS designation for bedrock is BR
UNCONFINED
COMPRESSIVE
STRENGTH (psf)
Table 1
Stantec
Fossil Creek Pedestrian Tunnel
November 14, 2014
FIGURES
Stantec
Fossil Creek Pedestrian Tunnel
November 14, 2014
APPENDIX A
Test Boring Key
&
Test Boring Logs
0
5
10
15
20
25
4960
4955
4950
4945
4940
4935
C-1
4.0-5
8
C-2
7.0-8
8
C-3
9.0-10
8
C-4
14.0-15
5
C-5
19.0-20
4
C-6
24.0-25
2
4
5
10
16
10
34
50/5"
50/4"
50/2"
Medium dense, red-brown to brown, SILTY SAND (SM), poorly-
graded, trace medium sand, mostly fine sand, little silt, no odor,
moist
-COARSE ALLUVIUM-
7 ft.
Very soft, yellow-brown to tan, completely to highly weathered,
SANDSTONE BEDROCK (BR), fine to medium grained, weakly
cemented, calcareous
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above, except very soft to soft, increasing cementation
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above, except completely to highly weathered, planar
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above, except light olive gray, soft, little silt
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
TEST BORING REPORT Boring No. BH-4
Project: Fossil Creek Underpass File No. 113245-000
Start: 11/25/2013
Client: Stantec Finish:
30
35
40
45
50
55
60
4930
4925
4920
4915
4910
4905
C-7
29.0-30
2
C-8
34.0-35
1
50/2"
50/1"
As above, except increasing cementation
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
35 ft.
TEST BORING REPORT Boring No. BH-4
Project: Fossil Creek Underpass File No. 113245-000
Start: 11/25/2013
Client: Stantec Finish:
11/25/2013
Drilling Contractor: Custom Auger/Precision Driller: Steve
Casing Sampler Barrel Drilling Equipment and Procedures BA Rep.: Lance Heyer
Elevation: 4960.48
Type None California
Rig Make & Model: CME 45
Drill Method: Solid-Stem Auger Datum:
Inside Diameter (in.) 3 in 2 in Hoist/Hammer: Hydraulic/Automatic Location:
Hammer Weight (lb.) 140 lbs Bit Type: Cutting Head Fort Collins, Colorado
Hammer Fall (in.) 30 in Casing: Solid-Stem
Water Level Data Sample Identification Notes
Water
Level
Date
mm/dd/yy Time
Elapsed
Time
Bottom
of Casing
Bottom
of Hole
Depth to
Water
Northing: 102494.32
C California Barrel Easting: 193312.03
11/25/13 9:30 N/A N/A 35 N/A CS Continuous Sampler R Core
S Split Spoon B Bulk
G Geoprobe T Thin Wall Tube
Depth (ft.)
Elevation (ft.)
0
5
10
15
20
25
4965
4960
4955
4950
4945
4940
C-1
2.0-3
8
C-2
4.0-5
8
C-3
7.0-8
8
C-4
9.0-10
8
C-5
14.0-15
5
C-6
19.0-20
3
C-7
24.0-25
2
3
3
5
9
6
6
4
5
14/6""
36/2"
50/3"
50/2"
Loose, red-brown to brown, SILTY SAND (SM), poorly-graded,
mostly fine to medium sand, little silt, trace clay, no odor, moist
-COARSE ALLUVIUM-
As above, except medium dense, increasing clay content
-COARSE ALLUVIUM-
As above, except very weak cementation, calcareous, gypsum
fragments in sampler
-COARSE ALLUVIUM-
As above, except loose, little gravel, very weak cementation,
increasing calcareousness and gypsum fragments in sampler
-COARSE ALLUVIUM-
13 ft.
Very soft, yellow-brown, completely to highly weathered,
SANDSTONE BEDROCK (BR), fine to medium grained, planar, no
odor, moist, very weakly cemented
30
35
40
45
50
55
60
4935
4930
4925
4920
4915
4910
C-8
29.0-30
2
50/2" As above, except fine grained, decreasing cementation
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
Hard, cemented layer, drilling progress slowed significantly
Drilling refusal, sample not collected at 34 ft
34 ft.
TEST BORING REPORT Boring No. BH-5
Project: Fossil Creek Underpass File No. 113245-000
Start: 11/25/2013
Client: Stantec Finish:
11/25/2013
Drilling Contractor: Custom Auger/Precision Driller: Steve
Casing Sampler Barrel Drilling Equipment and Procedures BA Rep.: Lance Heyer
Elevation: 4966.47
Type None California
Rig Make & Model: CME 45
Drill Method: Solid-Stem Auger Datum:
Inside Diameter (in.) 3 in 2 in Hoist/Hammer: Hydraulic/Automatic Location:
Hammer Weight (lb.) 140 lbs Bit Type: Cutting Head Fort Collins, Colorado
Hammer Fall (in.) 30 in Casing: Solid-Stem
Water Level Data Sample Identification Notes
Water
Level
Date
mm/dd/yy Time
Elapsed
Time
Bottom
of Casing
Bottom
of Hole
Depth to
Water
Northing: 102484.92
C California Barrel Easting: 193362.74
11/25/13 10:30 N/A N/A 35 21 CS Continuous Sampler R Core
S Split Spoon B Bulk
G Geoprobe T Thin Wall Tube
Depth (ft.)
Elevation (ft.)
ID
Depth (ft.)
Rec.(in. or %)/RQD(%)
Blows/6 in.
Water Level
0
5
10
15
20
25
4955
4950
4945
4940
4935
4930
C-1
2.0-3
8
C-2
4.0-5
8
C-3
7.0-8
8
C-4
9.0-10
8
C-5
14.0-15
5
C-6
19.0-20
3
C-7
24.0-25
2
6
7
4
5
7
10
50/8"
50/5"
50/3"
50/2"
Medium dense, red-brown to brown, SILTY SAND (SM), poorly-
graded, mostly fine to medium sand, trace fines, moist, mild organic
odor, roots in sampler
-COARSE ALLUVIUM-
3 ft.
Stiff, dark brown, LEAN CLAY (CL) with sand, fine sand, trace silt,
moist, no odor, moderate plasticity
-FINE ALLUVIUM-
6 ft.
Soft, completely weathered, yellow-brown, SANDSTONE BEDROCK
(BR), fine to medium grained, planar, weak cementation
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above, except blocky to planar, increasing cementation
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above, except light olive gray, FeOX staining
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above, except no FeOX staining
30
35
40
45
50
55
60
4925
4920
4915
4910
4905
4900
C-8
29.0-30
2
C-9
34.0-35
2
50/2"
50/2"
As above
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
35 ft.
TEST BORING REPORT Boring No. BH-6
Project: Fossil Creek Underpass File No. 113245-000
Start: 11/25/2013
Client: Stantec Finish:
11/25/2013
Drilling Contractor: Custom Auger/Precision Driller: Steve
Casing Sampler Barrel Drilling Equipment and Procedures BA Rep.: Lance Heyer
Elevation: 4957.53
Type None California
Rig Make & Model: CME 45
Drill Method: Solid-Stem Auger Datum:
Inside Diameter (in.) 3 in 2 in Hoist/Hammer: Hydraulic/Automatic Location:
Hammer Weight (lb.) 140 lbs Bit Type: Cutting Head Fort Collins, Colorado
Hammer Fall (in.) 30 in Casing: Solid-Stem
Water Level Data Sample Identification Notes
Water
Level
Date
mm/dd/yy Time
Elapsed
Time
Bottom
of Casing
Bottom
of Hole
Depth to
Water
Northing: 102554.142
C California Barrel Easting: 193347.371
11/25/13 11:30 N/A N/A 35 17 CS Continuous Sampler R Core
S Split Spoon B Bulk
G Geoprobe T Thin Wall Tube
Depth (ft.)
Elevation (ft.)
0
5
10
15
20
25
4960
4955
4950
4945
4940
4935
C-1
2.0-3
8
C-2
4.0-5
8
C-3
7.0-8
8
C-4
9.0-10
8
C-5
14.0-15
6
C-6
19.0-20
3
C-7
24.0-25
2
10
11
8
12
8
9
8
25
50/6"
50/3"
50/2"
Medium dense, red-brown to brown, SILTY SAND (SM), poorly-
graded, mostly fine to medium sand, little silt, moist, no odor,
calcareous
-COARSE ALLUVIUM-
3 ft.
Stiff, dark brown, LEAN CLAY (CL) with sand, fine to medium sand,
moist, no odor, moderate plasticity
-FINE ALLUVIUM-
5 ft.
Medium dense, yellow-brown to brown, SILTY SAND (SM), poorly-
graded, mostly fine to medium sand, little silt, moist, no odor
-COARSE ALLUVIUM-
7 ft.
Very soft, yellow-brown, completely weathered, SANDSTONE
BEDROCK (BR), fine to medium grained, planar, no odor, moist,
very weakly cemented
30
35
40
45
50
55
60
4930
4925
4920
4915
4910
4905
C-8
29.0-30
3
C-9
34.0-35
2
50/3"
50/2"
As above
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
35 ft.
TEST BORING REPORT Boring No. BH-7
Project: Fossil Creek Underpass File No. 113245-000
Start: 11/25/2013
Client: Stantec Finish:
11/25/2013
Drilling Contractor: Custom Auger/Precision Driller: Steve
Casing Sampler Barrel Drilling Equipment and Procedures BA Rep.: Lance Heyer
Elevation: 4960.79
Type None California
Rig Make & Model: CME 45
Drill Method: Solid-Stem Auger Datum:
Inside Diameter (in.) 3 in 2 in Hoist/Hammer: Hydraulic/Automatic Location:
Hammer Weight (lb.) 140 lbs Bit Type: Cutting Head Fort Collins, Colorado
Hammer Fall (in.) 30 in Casing: Solid-Stem
Water Level Data Sample Identification Notes
Water
Level
Date
mm/dd/yy Time
Elapsed
Time
Bottom
of Casing
Bottom
of Hole
Depth to
Water
Northing: 102554.135
C California Barrel Easting: 193189.76
11/25/13 13:00 N/A N/A 35 17 CS Continuous Sampler R Core
S Split Spoon B Bulk
G Geoprobe T Thin Wall Tube
Depth (ft.)
Elevation (ft.)
0
5
10
15
20
25
4955
4950
4945
4940
4935
4930
C-1
2.0-3
8
C-2
4.0-5
8
C-3
7.0-8
8
C-4
9.0-10
8
C-5
14.0-15
6
C-6
19.0-20
3
C-7
24.0-25
2
5
16
5
11
4
5
15
13
50/6"
50/3"
50/2"
Medium dense, yellow-brown to brown, SILTY SAND (SM), poorly-
graded, mostly fine to medium sand, moist, no odor, very weakly
cemented
-COARSE ALLUVIUM-
4 ft.
Stiff, brown to red, LEAN CLAY (CL) with sand, little fine sand, moist,
no odor, calcareous, moderate to high plasticity
-FINE ALLUVIUM-
As above, except wet, trace gravel
-FINE ALLUVIUM-
9 ft.
Medium dense, yellow-brown to red-brown, POORLY-GRADED
SAND (SP), mostly medium to coarse sand, trace fines, wet, no odor
-COARSE ALLUVIUM-
11 ft.
Very soft, yellow-brown, completely weathered, SANDSTONE
30
35
40
45
50
55
60
4925
4920
4915
4910
4905
4900
C-9
34.0-35
3
50/3" 34 ft.
Very soft, Denver blue, highly weathered, CLAYSTONE BEDROCK
(BR), fine grained, blocky, no odor, moist, high plasticity
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
35 ft.
TEST BORING REPORT Boring No. BH-8
Project: Fossil Creek Underpass File No. 113245-000
Start: 11/25/2013
Client: Stantec Finish:
11/25/2013
Drilling Contractor: Custom Auger/Precision Driller: Steve
Casing Sampler Barrel Drilling Equipment and Procedures BA Rep.: Lance Heyer
Elevation: 4959.22
Type None California
Rig Make & Model: CME 45
Drill Method: Solid-Stem Auger Datum:
Inside Diameter (in.) 3 in 2 in Hoist/Hammer: Hydraulic/Automatic Location:
Hammer Weight (lb.) 140 lbs Bit Type: Cutting Head Fort Collins, Colorado
Hammer Fall (in.) 30 in Casing: Solid-Stem
Water Level Data Sample Identification Notes
Water
Level
Date
mm/dd/yy Time
Elapsed
Time
Bottom
of Casing
Bottom
of Hole
Depth to
Water
Northing: 102591.861
C California Barrel Easting: 193210.03
11/25/13 13:00 N/A N/A 35 9 CS Continuous Sampler R Core
S Split Spoon B Bulk
G Geoprobe T Thin Wall Tube
Depth (ft.)
Elevation (ft.)
ID
Depth (ft.)
Rec.(in. or %)/RQD(%)
Blows/6 in.
Water Level
0
5
10
15
20
25
4985
4980
4975
4970
4965
4960
R-1
0.5-3
15"
R-2
3.0-7
39"
C-3
7.0-8
12"
R-4
8.0-12
39
C-5
12.0-13
12
C-7
17.0-18
12
R-8
18.0-22
36
C-9
22.0-23
12
R-10
23.0-27
41
C-11
27.0-28
12
R-12
3
4
3
4
4
9
5
7
7
8
Rail road ballast
0.5 ft.
Medium stiff, yellow to red brown, LEAN CLAY (CL) with sand, little
fine sand, no odor, moist, medium plasticity, little claystone
fragments
-EMBANKMENT FILL-
3 ft.
30
35
40
45
50
55
60
4955
4950
4945
4940
4935
4930
28.0-32
32
C-13
32.0-33
8
R-14
33.0-37
24
C-15
37.0-38
10
R-16
38.0-42
39
C-17
42.0-43
6
24
26
50/10"
50/6"
Stiff, yellow brown, sandy LEAN CLAY (CL), little fine sand, no odor,
moist, medium plasticity-FINE ALLUVIUM-
32 ft.
Very dense, yellow brown, CLAYEY SAND (SC), mostly fine to
coarse sand, little clay, no odor, moist
-COARSE ALLUVIUM-
As above, CLAYEY SAND (SC)
34 ft.
34' - Dense to very dense, gray to red to brown, poorly graded
GRAVEL (GP) with sand and clay, no odor, dry
-COARSE ALLUVIUM-
36 ft.
36' - Very soft, yellow-brown, completely weathered, SANDSTONE
BEDROCK (BR), fine to medium grained, planar, no odor, moist,
very weakly cemented
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above, SANDSTONE BEDROCK (BR)
43 ft.
TEST BORING REPORT Boring No. BH-9
Project: Fossil Creek Underpass File No. 113245-000
Start: 1/7/2013
Client: Stantec Finish:
1/7/2014
Drilling Contractor: Custom Auger/Precision Driller: Todd
Casing Sampler Barrel Drilling Equipment and Procedures BA Rep.: Lance Heyer
Elevation: 4987.77
0
5
10
15
20
25
4985
4980
4975
4970
4965
4960
R-1
0.5-5
14"
C-2
5.0-6
12"
R-3
6.0-10
19"
C-4
10.0-11
12"
R-5
11.0-15
22"
C-6
15.0-16
12"
R-7
16.0-20
18"
C-8
20.0-21
12"
R-9
21.0-25
30"
C-10
25.0-26
12"
R-11
26.0-30
32"
4
2
4
7
4
7
5
7
4
5
Rail road ballast
0.5 ft.
Stiff, dark brown, sandy LEAN CLAY (CL), some fine to medium
sand, no odor, moist, medium plasticity
-EMBANKMENT FILL-
30
35
40
45
50
55
60
4955
4950
4945
4940
4935
4930
C-12
30.0-31
12"
R-13
31.0-35
48"
C-14
35.0-36
12"
R-15
36.0-40
32"
C-16
40.0-41
7"
R-16
41.0-43
12"
5
7
9
11
50/7"
Stiff, yellow to red brown, sandy LEAN CLAY (CL), some fine to
medium sand, no odor, moist, calcarious in tip of sampler
-FINE ALLUVIUM-
As above, sandy LEAN CLAY (CL)
As above, sandy LEAN CLAY (CL)
35 ft.
Medium dense, dark brown to red to gray, CLAYEY GRAVEL (GC),
poorly graded, angular, little to some clay, trace silt, no odor, moist -
COARSE ALLUVIUM-
36 ft.
Very soft, yellow-brown, completely weathered, SANDSTONE
BEDROCK (BR), fine to medium grained, planar, no odor, moist,
very weakly cemented
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above, SANDSTONE BEDROCK (BR)
As above, SANDSTONE BEDROCK (BR)
43 ft.
TEST BORING REPORT Boring No. BH-10
Project: Fossil Creek Underpass File No. 113245-000
Start: 1/8/2014
Client: Stantec Finish:
1/8/2014
Drilling Contractor: Custom Auger/Precision Driller: Todd
Casing Sampler Barrel Drilling Equipment and Procedures BA Rep.: Lance Heyer
Stantec
Fossil Creek Pedestrian Tunnel
November 14, 2014
APPENDIX B
Geotechnical Laboratory Testing
CONSTRUCTION AND MAINTENANCE AGREEMENT FOR
PEDESTRIAN/BIKE UNDERPASS
This Agreement made and entered into in duplicate as of the If!:. day of ih rtk')tv
2016 by and between the BNSF RAILWAY COMPANY, a Delaware C~
hereinafter called "Railroad" or "BNSF", and THE CITY OF FORT COLLINS,
COLORADO, hereinafter called "City".
WHEREAS, the Railroad owns and operates a line of railroad in and through the
City of Fort Collins;
WHEREAS, the City proposes to construct and maintain an underpass structure
and related work to carry a multi-use, pedestrian/bike trail for recreational use by the public
without charge (hereinafter "the Project") under the Railroad's track at Line Segment 476,
Mile Post 68.78, located on the Powder River Division, Front Range Subdivision
(hereinafter "the Premises"), approximately halfway between the major cross streets of
Harmony Road (National Crossing ID No. 244620N, BNSF MP 69.78) and West Trilby
Road (National Crossing ID No. 244618M, BNSF MP 67.68) in the City of Fort Collins,
Larimer County, Colorado, as shown on Exhibit A, attached hereto and made a part hereof;
WHEREAS, in connection with the Project, it will be necessary for the City to
perform certain work on, under and in proximity to the Railroad right-of-way and tracks;
WHEREAS, the City will be tunneling under the Railroad's track and shoring the
track to place a single cell, 14' diameter pipe culvert structure which will require Railroad
flaggers, an onsite Railroad inspector/representative, and stand-by track equipment to
address potential track alignment faults resulting from the tunneling and installation of the
pipe culvert structure as part of the Project costs;
WHEREAS, the City is willing to undertake the Project with its Contractor at the
expense of the City, and Railroad is willing to consent to the construction of the
Improvements upon the terms and conditions herein stated and not otherwise; and
WHEREAS, the parties desire to set forth in this instrument an agreement relating
to the construction, ownership, operation, use, maintenance, repair and replacement of the
Pedestrian/Bike Underpass, upon the terms and conditions herein stated and payment of
any Railroad charges made necessary in connection therewith;
NOW, THEREFORE, in consideration of the premises and the mutual dependent
promises hereinafter contained, the parties agree as follows:
ARTICLE I - DEFINITIONS
The term "Pedestrian/Bike Underpass" as used in this Agreement, refers to the
pipe culvert structure that will constitute the floor, walls and ceiling of the
pedestrian/bike path that will pass under the BNSF track and the pedestrian/bike path
itself along with all associated improvements and appurtenances as shown on the plans
1
Elevation: 4988.14
Type Hollow-
Stem California Continuous
Rig Make & Model: CME 45
Drill Method: Hollow-Stem Auger Datum:
Inside Diameter (in.) 4.5 in 2 in 3 in Hoist/Hammer: Hydraulic/Automatic Location:
Hammer Weight (lb.) 140 lbs Bit Type: Cutting Head Fort Collins, Colorado
Hammer Fall (in.) 30 in Casing: Hollow-Stem
Water Level Data Sample Identification Notes
Water
Level
Date
mm/dd/yy Time
Elapsed
Time
Bottom
of Casing
Bottom
of Hole
Depth to
Water
Northing: 102484.8
C California Barrel Easting: 193247.64
1/7/14 13:00 N/A N/A 43 N/A CS Continuous Sampler R Core
S Split Spoon B Bulk
G Geoprobe T Thin Wall Tube
Depth (ft.)
Elevation (ft.)
ID
Depth (ft.)
Rec.(in. or %)/RQD(%)
Blows/6 in.
Water Level
Stratigraphy
Soil: Density/consistency, color, GROUP NAME, max. particle size,
structure, odor, moisture,optional descriptions, geologic interpretation
Rock: Hardness, weathering, color, LITHOLOGY, texture,
joint spacing, drilling rate (min./ft.)
Visual-Manual Identification and Description
Well Diagram
Laboratory Results
Moisture (%)
Gravel (%)
Sand (%)
Fines (%)
LL (%)
PI (%)
UCS (ksf)
Swell/Collapse (%)
Swell Pressure (ksf)
Sheet No. 2 of 2
Medium stiff, red to dark brown, LEAN CLAY (CL) with sand, little
fine sand, trace silt, no odor, moist, medium plasticity
As above, LEAN CLAY (CL) with sand
As above, LEAN CLAY (CL) with sand
11 ft.
Medium dense, yellow brown, CLAYEY SAND (SC), poorly graded,
mostly fine to medium sand, trace to little silt, no odor, moist
-EMBANKMENT FILL-
12 ft.
1 foot thick COAL layer
13 ft.
Medium dense, yellow brown, CLAYEY SAND (SC), poorly graded,
mostly fine to medium sand, trace to little silt, no odor, moist
-EMBANKMENT FILL-
16 ft.
Stiff, yellow to red brown, sandy LEAN CLAY (CL), some fine sand,
no odor, moist, medium plasticity, trace COAL fragments
-EMBANKMENT FILL-
As above, sandy LEAN CLAY (CL)
21 ft.
Loose to medium dense, CLAYEY SAND (SC), poorly graded,
mostly fine sand, some clay, no odor, moist, medium plasticity
-EMBANKMENT FILL-
As above, CLAYEY SAND (SC)
26 ft.
Stiff, yellow to red brown, sandy LEAN CLAY (CL), some fine to
medium sand, no odor, moist, calcarious in tip of sampler
-EMBANKMENT FILL-
TEST BORING REPORT Boring No. BH-10
Project: Fossil Creek Underpass File No. 113245-000
Start: 1/8/2014
Client: Stantec Finish:
1/8/2014
Drilling Contractor: Custom Auger/Precision Driller: Todd
Casing Sampler Barrel Drilling Equipment and Procedures BA Rep.: Lance Heyer
Elevation: 4988.14
Type Hollow-
Stem California Continuous
Rig Make & Model: CME 45
Drill Method: Hollow-Stem Auger Datum:
Inside Diameter (in.) 4.5 in 2 in 3 in Hoist/Hammer: Hydraulic/Automatic Location:
Hammer Weight (lb.) 140 lbs Bit Type: Cutting Head Fort Collins, Colorado
Hammer Fall (in.) 30 in Casing: Hollow-Stem
Water Level Data Sample Identification Notes
Water
Level
Date
mm/dd/yy Time
Elapsed
Time
Bottom
of Casing
Bottom
of Hole
Depth to
Water
Northing: 102484.8
C California Barrel Easting: 193247.64
1/7/14 13:00 N/A N/A 43 N/A CS Continuous Sampler R Core
S Split Spoon B Bulk
G Geoprobe T Thin Wall Tube
Maximum particle size is determined by direct observation within the limitations of the sampler.
Boring No: BH-10
NOTE: Soil and rock identification based on visual-manual methods of the USCS as practiced by Brierley Associates.
Depth (ft.)
Elevation (ft.)
ID
Depth (ft.)
Rec.(in. or %)/RQD(%)
Blows/6 in.
Water Level
Stratigraphy
Soil: Density/consistency, color, GROUP NAME, max. particle size,
structure, odor, moisture,optional descriptions, geologic interpretation
Rock: Hardness, weathering, color, LITHOLOGY, texture,
joint spacing, drilling rate (min./ft.)
Visual-Manual Identification and Description
Well Diagram
Laboratory Results
Moisture (%)
Gravel (%)
Sand (%)
Fines (%)
LL (%)
PI (%)
UCS (ksf)
Swell/Collapse (%)
Swell Pressure (ksf)
Sheet No. 1 of 2
Type Hollow-
Stem California Continuous
Rig Make & Model: CME 45
Drill Method: Hollow-Stem Auger Datum:
Inside Diameter (in.) 4.5 in 2 in 3 in Hoist/Hammer: Hydraulic/Automatic Location:
Hammer Weight (lb.) 140 lbs Bit Type: Cutting Head Fort Collins, Colorado
Hammer Fall (in.) 30 in Casing: Hollow-Stem
Water Level Data Sample Identification Notes
Water
Level
Date
mm/dd/yy Time
Elapsed
Time
Bottom
of Casing
Bottom
of Hole
Depth to
Water
Northing: 102506.88
C California Barrel Easting: 192320.16
1/7/14 13:00 N/A N/A 43 N/A CS Continuous Sampler R Core
S Split Spoon B Bulk
G Geoprobe T Thin Wall Tube
Depth (ft.)
Elevation (ft.)
ID
Depth (ft.)
Rec.(in. or %)/RQD(%)
Blows/6 in.
Water Level
Stratigraphy
Soil: Density/consistency, color, GROUP NAME, max. particle size,
structure, odor, moisture,optional descriptions, geologic interpretation
Rock: Hardness, weathering, color, LITHOLOGY, texture,
joint spacing, drilling rate (min./ft.)
Visual-Manual Identification and Description
Well Diagram
Laboratory Results
Moisture (%)
Gravel (%)
Sand (%)
Fines (%)
LL (%)
PI (%)
UCS (ksf)
Swell/Collapse (%)
Swell Pressure (ksf)
Sheet No. 2 of 2
As above, LEAN CLAY (CL) with sand
1 foot thick COAL layer
4 ft.
As above, LEAN CLAY (CL) with sand
Medium stiff, yellow to red brown, LEAN CLAY (CL), trace to little
fine sand, no odor, wet, medium to high plasticity, trace to little COAL
fragments
-EMBANKMENT FILL-
As above except, stiff, red brown, LEAN CLAY (CL)
As above, LEAN CLAY (CL)
As above excepth, LEAN CLAY (CL), brick in tip of sampler
18 ft.
0.5 foot thick COAL layer
18.5 ft.
0.5 foot thick BRICK layer
19 ft.
Medium dense, red brown, CLAYEY SAND (SC), mostly fine sand,
trace medium sand, little fines, no odor, moist, low to medium
plasticity
-EMBANKMENT FILL-
As above, CLAYEY SAND (SC)
As above, CLAYEY SAND (SC)
28 ft.
TEST BORING REPORT Boring No. BH-9
Project: Fossil Creek Underpass File No. 113245-000
Start: 1/7/2013
Client: Stantec Finish:
1/7/2014
Drilling Contractor: Custom Auger/Precision Driller: Todd
Casing Sampler Barrel Drilling Equipment and Procedures BA Rep.: Lance Heyer
Elevation: 4987.77
Type Hollow-
Stem California Continuous
Rig Make & Model: CME 45
Drill Method: Hollow-Stem Auger Datum:
Inside Diameter (in.) 4.5 in 2 in 3 in Hoist/Hammer: Hydraulic/Automatic Location:
Hammer Weight (lb.) 140 lbs Bit Type: Cutting Head Fort Collins, Colorado
Hammer Fall (in.) 30 in Casing: Hollow-Stem
Water Level Data Sample Identification Notes
Water
Level
Date
mm/dd/yy Time
Elapsed
Time
Bottom
of Casing
Bottom
of Hole
Depth to
Water
Northing: 102506.88
C California Barrel Easting: 192320.16
1/7/14 13:00 N/A N/A 43 N/A CS Continuous Sampler R Core
S Split Spoon B Bulk
G Geoprobe T Thin Wall Tube
Maximum particle size is determined by direct observation within the limitations of the sampler.
Boring No: BH-9
NOTE: Soil and rock identification based on visual-manual methods of the USCS as practiced by Brierley Associates.
Depth (ft.)
Elevation (ft.)
ID
Depth (ft.)
Rec.(in. or %)/RQD(%)
Blows/6 in.
Water Level
Stratigraphy
Soil: Density/consistency, color, GROUP NAME, max. particle size,
structure, odor, moisture,optional descriptions, geologic interpretation
Rock: Hardness, weathering, color, LITHOLOGY, texture,
joint spacing, drilling rate (min./ft.)
Visual-Manual Identification and Description
Well Diagram
Laboratory Results
Moisture (%)
Gravel (%)
Sand (%)
Fines (%)
LL (%)
PI (%)
UCS (ksf)
Swell/Collapse (%)
Swell Pressure (ksf)
Sheet No. 1 of 2
Stratigraphy
Soil: Density/consistency, color, GROUP NAME, max. particle size,
structure, odor, moisture,optional descriptions, geologic interpretation
Rock: Hardness, weathering, color, LITHOLOGY, texture,
joint spacing, drilling rate (min./ft.)
Visual-Manual Identification and Description
Well Diagram
Laboratory Results
Moisture (%)
Gravel (%)
Sand (%)
Fines (%)
LL (%)
PI (%)
UCS (ksf)
Swell/Collapse (%)
Swell Pressure (ksf)
Sheet No. 2 of 2
BEDROCK (BR), fine to medium grained, planar, no odor, moist,
very weakly cemented
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above, except soft, light olive gray, highly weathered, increasing
cementation
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
TEST BORING REPORT Boring No. BH-8
Project: Fossil Creek Underpass File No. 113245-000
Start: 11/25/2013
Client: Stantec Finish:
11/25/2013
Drilling Contractor: Custom Auger/Precision Driller: Steve
Casing Sampler Barrel Drilling Equipment and Procedures BA Rep.: Lance Heyer
Elevation: 4959.22
Type None California
Rig Make & Model: CME 45
Drill Method: Solid-Stem Auger Datum:
Inside Diameter (in.) 3 in 2 in Hoist/Hammer: Hydraulic/Automatic Location:
Hammer Weight (lb.) 140 lbs Bit Type: Cutting Head Fort Collins, Colorado
Hammer Fall (in.) 30 in Casing: Solid-Stem
Water Level Data Sample Identification Notes
Water
Level
Date
mm/dd/yy Time
Elapsed
Time
Bottom
of Casing
Bottom
of Hole
Depth to
Water
Northing: 102591.861
C California Barrel Easting: 193210.03
11/25/13 13:00 N/A N/A 35 9 CS Continuous Sampler R Core
S Split Spoon B Bulk
G Geoprobe T Thin Wall Tube
Maximum particle size is determined by direct observation within the limitations of the sampler.
Boring No: BH-8
NOTE: Soil and rock identification based on visual-manual methods of the USCS as practiced by Brierley Associates.
Depth (ft.)
Elevation (ft.)
ID
Depth (ft.)
Rec.(in. or %)/RQD(%)
Blows/6 in.
Water Level
Stratigraphy
Soil: Density/consistency, color, GROUP NAME, max. particle size,
structure, odor, moisture,optional descriptions, geologic interpretation
Rock: Hardness, weathering, color, LITHOLOGY, texture,
joint spacing, drilling rate (min./ft.)
Visual-Manual Identification and Description
Well Diagram
Laboratory Results
Moisture (%)
Gravel (%)
Sand (%)
Fines (%)
LL (%)
PI (%)
UCS (ksf)
Swell/Collapse (%)
Swell Pressure (ksf)
Sheet No. 1 of 2
ID
Depth (ft.)
Rec.(in. or %)/RQD(%)
Blows/6 in.
Water Level
Stratigraphy
Soil: Density/consistency, color, GROUP NAME, max. particle size,
structure, odor, moisture,optional descriptions, geologic interpretation
Rock: Hardness, weathering, color, LITHOLOGY, texture,
joint spacing, drilling rate (min./ft.)
Visual-Manual Identification and Description
Well Diagram
Laboratory Results
Moisture (%)
Gravel (%)
Sand (%)
Fines (%)
LL (%)
PI (%)
UCS (ksf)
Swell/Collapse (%)
Swell Pressure (ksf)
Sheet No. 2 of 2
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above, except light olive gray, soft
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
TEST BORING REPORT Boring No. BH-7
Project: Fossil Creek Underpass File No. 113245-000
Start: 11/25/2013
Client: Stantec Finish:
11/25/2013
Drilling Contractor: Custom Auger/Precision Driller: Steve
Casing Sampler Barrel Drilling Equipment and Procedures BA Rep.: Lance Heyer
Elevation: 4960.79
Type None California
Rig Make & Model: CME 45
Drill Method: Solid-Stem Auger Datum:
Inside Diameter (in.) 3 in 2 in Hoist/Hammer: Hydraulic/Automatic Location:
Hammer Weight (lb.) 140 lbs Bit Type: Cutting Head Fort Collins, Colorado
Hammer Fall (in.) 30 in Casing: Solid-Stem
Water Level Data Sample Identification Notes
Water
Level
Date
mm/dd/yy Time
Elapsed
Time
Bottom
of Casing
Bottom
of Hole
Depth to
Water
Northing: 102554.135
C California Barrel Easting: 193189.76
11/25/13 13:00 N/A N/A 35 17 CS Continuous Sampler R Core
S Split Spoon B Bulk
G Geoprobe T Thin Wall Tube
Maximum particle size is determined by direct observation within the limitations of the sampler.
Boring No: BH-7
NOTE: Soil and rock identification based on visual-manual methods of the USCS as practiced by Brierley Associates.
Depth (ft.)
Elevation (ft.)
ID
Depth (ft.)
Rec.(in. or %)/RQD(%)
Blows/6 in.
Water Level
Stratigraphy
Soil: Density/consistency, color, GROUP NAME, max. particle size,
structure, odor, moisture,optional descriptions, geologic interpretation
Rock: Hardness, weathering, color, LITHOLOGY, texture,
joint spacing, drilling rate (min./ft.)
Visual-Manual Identification and Description
Well Diagram
Laboratory Results
Moisture (%)
Gravel (%)
Sand (%)
Fines (%)
LL (%)
PI (%)
UCS (ksf)
Swell/Collapse (%)
Swell Pressure (ksf)
Sheet No. 1 of 2
ID
Depth (ft.)
Rec.(in. or %)/RQD(%)
Blows/6 in.
Water Level
Stratigraphy
Soil: Density/consistency, color, GROUP NAME, max. particle size,
structure, odor, moisture,optional descriptions, geologic interpretation
Rock: Hardness, weathering, color, LITHOLOGY, texture,
joint spacing, drilling rate (min./ft.)
Visual-Manual Identification and Description
Well Diagram
Laboratory Results
Moisture (%)
Gravel (%)
Sand (%)
Fines (%)
LL (%)
PI (%)
UCS (ksf)
Swell/Collapse (%)
Swell Pressure (ksf)
Sheet No. 2 of 2
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
TEST BORING REPORT Boring No. BH-6
Project: Fossil Creek Underpass File No. 113245-000
Start: 11/25/2013
Client: Stantec Finish:
11/25/2013
Drilling Contractor: Custom Auger/Precision Driller: Steve
Casing Sampler Barrel Drilling Equipment and Procedures BA Rep.: Lance Heyer
Elevation: 4957.53
Type None California
Rig Make & Model: CME 45
Drill Method: Solid-Stem Auger Datum:
Inside Diameter (in.) 3 in 2 in Hoist/Hammer: Hydraulic/Automatic Location:
Hammer Weight (lb.) 140 lbs Bit Type: Cutting Head Fort Collins, Colorado
Hammer Fall (in.) 30 in Casing: Solid-Stem
Water Level Data Sample Identification Notes
Water
Level
Date
mm/dd/yy Time
Elapsed
Time
Bottom
of Casing
Bottom
of Hole
Depth to
Water
Northing: 102554.142
C California Barrel Easting: 193347.371
11/25/13 11:30 N/A N/A 35 17 CS Continuous Sampler R Core
S Split Spoon B Bulk
G Geoprobe T Thin Wall Tube
Maximum particle size is determined by direct observation within the limitations of the sampler.
Boring No: BH-6
NOTE: Soil and rock identification based on visual-manual methods of the USCS as practiced by Brierley Associates.
Depth (ft.)
Elevation (ft.)
ID
Depth (ft.)
Rec.(in. or %)/RQD(%)
Blows/6 in.
Water Level
Stratigraphy
Soil: Density/consistency, color, GROUP NAME, max. particle size,
structure, odor, moisture,optional descriptions, geologic interpretation
Rock: Hardness, weathering, color, LITHOLOGY, texture,
joint spacing, drilling rate (min./ft.)
Visual-Manual Identification and Description
Well Diagram
Laboratory Results
Moisture (%)
Gravel (%)
Sand (%)
Fines (%)
LL (%)
PI (%)
UCS (ksf)
Swell/Collapse (%)
Swell Pressure (ksf)
Sheet No. 1 of 2
Stratigraphy
Soil: Density/consistency, color, GROUP NAME, max. particle size,
structure, odor, moisture,optional descriptions, geologic interpretation
Rock: Hardness, weathering, color, LITHOLOGY, texture,
joint spacing, drilling rate (min./ft.)
Visual-Manual Identification and Description
Well Diagram
Laboratory Results
Moisture (%)
Gravel (%)
Sand (%)
Fines (%)
LL (%)
PI (%)
UCS (ksf)
Swell/Collapse (%)
Swell Pressure (ksf)
Sheet No. 2 of 2
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above, except highly weathered, increasing cementation,
increasing relative density
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
As above, except soft, light olive gray, soft
-PIERRE SHALE, RICHARDS SANDSTONE MEMBER-
TEST BORING REPORT Boring No. BH-5
Project: Fossil Creek Underpass File No. 113245-000
Start: 11/25/2013
Client: Stantec Finish:
11/25/2013
Drilling Contractor: Custom Auger/Precision Driller: Steve
Casing Sampler Barrel Drilling Equipment and Procedures BA Rep.: Lance Heyer
Elevation: 4966.47
Type None California
Rig Make & Model: CME 45
Drill Method: Solid-Stem Auger Datum:
Inside Diameter (in.) 3 in 2 in Hoist/Hammer: Hydraulic/Automatic Location:
Hammer Weight (lb.) 140 lbs Bit Type: Cutting Head Fort Collins, Colorado
Hammer Fall (in.) 30 in Casing: Solid-Stem
Water Level Data Sample Identification Notes
Water
Level
Date
mm/dd/yy Time
Elapsed
Time
Bottom
of Casing
Bottom
of Hole
Depth to
Water
Northing: 102484.92
C California Barrel Easting: 193362.74
11/25/13 10:30 N/A N/A 35 21 CS Continuous Sampler R Core
S Split Spoon B Bulk
G Geoprobe T Thin Wall Tube
Maximum particle size is determined by direct observation within the limitations of the sampler.
Boring No: BH-5
NOTE: Soil and rock identification based on visual-manual methods of the USCS as practiced by Brierley Associates.
Depth (ft.)
Elevation (ft.)
ID
Depth (ft.)
Rec.(in. or %)/RQD(%)
Blows/6 in.
Water Level
Stratigraphy
Soil: Density/consistency, color, GROUP NAME, max. particle size,
structure, odor, moisture,optional descriptions, geologic interpretation
Rock: Hardness, weathering, color, LITHOLOGY, texture,
joint spacing, drilling rate (min./ft.)
Visual-Manual Identification and Description
Well Diagram
Laboratory Results
Moisture (%)
Gravel (%)
Sand (%)
Fines (%)
LL (%)
PI (%)
UCS (ksf)
Swell/Collapse (%)
Swell Pressure (ksf)
Sheet No. 1 of 2
ID
Depth (ft.)
Rec.(in. or %)/RQD(%)
Blows/6 in.
Water Level
Stratigraphy
Soil: Density/consistency, color, GROUP NAME, max. particle size,
structure, odor, moisture,optional descriptions, geologic interpretation
Rock: Hardness, weathering, color, LITHOLOGY, texture,
joint spacing, drilling rate (min./ft.)
Visual-Manual Identification and Description
Well Diagram
Laboratory Results
Moisture (%)
Gravel (%)
Sand (%)
Fines (%)
LL (%)
PI (%)
UCS (ksf)
Swell/Collapse (%)
Swell Pressure (ksf)
Sheet No. 2 of 2
11/25/2013
Drilling Contractor: Custom Auger/Precision Driller: Steve
Casing Sampler Barrel Drilling Equipment and Procedures BA Rep.: Lance Heyer
Elevation: 4960.48
Type None California
Rig Make & Model: CME 45
Drill Method: Solid-Stem Auger Datum:
Inside Diameter (in.) 3 in 2 in Hoist/Hammer: Hydraulic/Automatic Location:
Hammer Weight (lb.) 140 lbs Bit Type: Cutting Head Fort Collins, Colorado
Hammer Fall (in.) 30 in Casing: Solid-Stem
Water Level Data Sample Identification Notes
Water
Level
Date
mm/dd/yy Time
Elapsed
Time
Bottom
of Casing
Bottom
of Hole
Depth to
Water
Northing: 102494.32
C California Barrel Easting: 193312.03
11/25/13 9:30 N/A N/A 35 N/A CS Continuous Sampler R Core
S Split Spoon B Bulk
G Geoprobe T Thin Wall Tube
Maximum particle size is determined by direct observation within the limitations of the sampler.
Boring No: BH-4
NOTE: Soil and rock identification based on visual-manual methods of the USCS as practiced by Brierley Associates.
Depth (ft.)
Elevation (ft.)
ID
Depth (ft.)
Rec.(in. or %)/RQD(%)
Blows/6 in.
Water Level
Stratigraphy
Soil: Density/consistency, color, GROUP NAME, max. particle size,
structure, odor, moisture,optional descriptions, geologic interpretation
Rock: Hardness, weathering, color, LITHOLOGY, texture,
joint spacing, drilling rate (min./ft.)
Visual-Manual Identification and Description
Well Diagram
Laboratory Results
Moisture (%)
Gravel (%)
Sand (%)
Fines (%)
LL (%)
PI (%)
UCS (ksf)
Swell/Collapse (%)
Swell Pressure (ksf)
Sheet No. 1 of 2
Summary of Geotechnical Laboratory Testing Results
SAMPLE LOCATION IN-PLACE STATES ATTERBERG LIMITS DIRECT SHEAR1
WATER SOLUABLE USCS2 SOIL OR ROCK DESCRIPTION2
SULFATES (%)
GRAIN SIZE DISTRIBUTION
utilized was a spring in the vertical direction for the base arch wall plate joints in direct contact
with the subsurface. The vertical spring simulates the subgrade stiffness expected. Boundary
conditions around the tunnel segment in immediate contact with the arch wall were not
considered and joints were treated as free due to not fully integrating the wall and tunnel