Loading...
HomeMy WebLinkAboutPrebid - BID - 8222 ASBESTOS ABATEMENT AT UTILITY SERVICES CENTER1/19/2016 1 BID #8222 ASBESTOS ABATEMENT AT UTILITIES SERVICES CENTER Pre-Bid Meeting January 14, 2016 Agenda • Introductions • Bid Schedule & Requirements • Building & Project Background • Remodel Scope of Work • Remodel Phasing & Schedule • ACM Floor Plans • Break • Building Walk: Areas A – F • Break • Recap & Summary of Expectations • Questions 1/19/2016 2 Introductions • Chad Mapp, Facilities Project Manager • DeEtta Carr, Utilities Project Coordinator • Elliot Dale, Purchasing Buyer • Matt Zoccali, Environmental Regulatory Affairs • Dennis Dutton, Utilities HVAC Maintenance Coordinator • Joe Dunlap, Adolfson & Peterson Construction • Matt Swope, Adolfson & Peterson Construction Bid Schedule & Requirements • Bid Solicitation January 4, 2016 • Pre-Bid Meeting January 14, 2016 • Questions Due January 18, 2016 by 5:00 PM • Answers January 22, 2016 • Bids Opening January 29, 2016 at 3:00 PM • Bid Award & NTP February 1, 2016* • Start Phase 1 February 10, 2016 *Pending reference checks, etc. 1/19/2016 3 Building Background Project Background & Goals Building Issues 1. Leaky - thermal comfort issues 2. HVAC equipment at end of life 3. Energy hog 4. Space issues Project Goals 1. Improved facilities for L&P Crews 2. Optimize & integrate space 3. Reduce energy & water use 4. Enhance indoor environmental quality 1/19/2016 4 Remodel Scope of Work • Replace HVAC System • Lake source geo-exchange heat pump system • Major envelope sealing & insulation • New Windows • Architectural Renovations • Space for L&P crews: workstations, locker rooms • Lobby Remodel Remodel Phasing & Schedule 1/19/2016 5 Remodel Phase in ITB ACM Floor Plan Sections 1/19/2016 6 ACM Floor Plan – Section 1 ACM Floor Plan – Section 2 1/19/2016 7 ACM Floor Plan – Section 3 Building Walk • Confirm Badging Requirements • Short Break – 10 min • Walk the Building: Areas A – F • Approximately 10 to 30 mins per area • Short Break • Meet back in Poudre Room for questions 1/19/2016 8 Questions & Clarifications 1. The legend does not correspond to the floor plan on Section 3 ACM Floor Plan. a. See Appendix C - ACM sorted by Location 2. Phasing in Invitation to Bid has Phase 4 and Phase 5 reversed. a. Phase 4 is South area offices b. Phase 5 is East area including locker room 3. Other: