Loading...
HomeMy WebLinkAboutBID - 8222 ASBESTOS ABATEMENT AT UTILITY SERVICES CENTERAddendum 1 - Page 1 of 13 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 8222: Asbestos Abatement at Utilties Service Center OPENING DATE: 3:00 PM (Our Clock) January 29, 2016 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Revised Bid Schedule Exhibit 2 – Questions & Answers Exhibit 3 – Updated Work Area Site Pan Please contact Elliot Dale, Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 1 - Page 2 of 13 EXHIBIT 1 – REVISED BID SCHEDULE REVISED BID SCHEDULE The bid schedule in this addendum (Addendum #1) is replacing the original RFP bid schedule. In addition to requesting a BASE BID for total ACM abatement, this revised bid schedule requests alternate pricing for ACM encapsulation in flooring adhesive ACMs identified as FTC06, MA14 & MA15. We are also requesting prices for Regulated Building Material (RBM) abatement. AWARD OF THE CONTRACT IS BASED ON THE BASE BID OR AT THE CITY’S SOLE OPTION IN THE EVENT THE CITY ELECTS TO INCLUDE ANY OF THE ALTERNATES LISTED BELOW TO THE LOWEST QUALIFIED RESPONSIVE AND RESPONSIBLE BIDDER BASED ON THE CUMULATIVE TOTAL OF THE BASE BID AND ALL SELECTED ALTERNATES. Addendum 1 - Page 3 of 13 WORK AREA 1 ID Description of ACM Phase # BASE BID Abatement Price ($) ALTERNATE Encapsulation Price ($) CK01 Caulking, light gray malleable on door frames and expansion joints. 1 $ N/A DS02 Duct sealant, brown/yellow, hard. 1 $ N/A DS03 Duct sealant, red pliable. 1 $ N/A PF01 Pipe fitting insulation, white canvas wrapped, hard packed. 1 $ N/A FDM02 Fire door material, associated with four hour rated door frame and door 1 $ N/A MA10 Miscellaneous adhesive, associated with fiberglass wall panel, tile pattern 1 $ N/A RG01 Rope gasket, associated with bell housing on drain pipes 1 $ N/A Phase 1 mobilization cost $ N/A WORK AREA 1: PHASE 1 SUBTOTAL $ N/A FTC06 Floor tile and associated mastic, 9"x9" tan with brown streaks. 2 $ $ MA14 Miscellaneous adhesive, black tar like associated with Building B, remnant under carpet adhesive, likely floor tile adhesive. 2 $ $ MA15 Miscellaneous adhesive, black tar like associated with Building A, remnant under carpet adhesive, likely floor tile adhesive. 2 $ $ Phase 2 mobilization cost $ N/A WORK AREA 1: PHASE 2 SUBTOTAL $ N/A WORK AREA 1 TOTAL (Sum of Phase 1 & 2 subtotals) $ N/A WORK AREA 1 DURATIONS Number of days to perform abatement of all materials in Work area 1; Phase 1 days Number of days to perform abatement of all materials in work Area 1; Phase 2 days Addendum 1 - Page 4 of 13 WORK AREA 2 ID Description of ACM Phase # BASE BID Abatement Price ($) ALTERNATE Encapsulation Price ($) CK01 Caulking, light gray malleable on door frames and expansion joints. 1 $ N/A DS02 Duct sealant, brown/yellow, hard. 1 $ N/A DS03 Duct sealant, red pliable. 1 $ N/A PF01 Pipe fitting insulation, white canvas wrapped, hard packed. 1 $ N/A FDM02 Fire door material, associated with four hour rated door frame and door 1 $ N/A MA10 Miscellaneous adhesive, associated with fiberglass wall panel, tile pattern 1 $ N/A RG01 Rope gasket, associated with bell housing on drain pipes 1 $ N/A Phase 1 mobilization cost $ N/A WORK AREA 2: PHASE 1 SUBTOTAL $ N/A FTC06 Floor tile and associated mastic, 9"x9" tan with brown streaks. 2 $ $ MA14 Miscellaneous adhesive, black tar like associated with Building B, remnant under carpet adhesive, likely floor tile adhesive. 2 $ $ MA15 Miscellaneous adhesive, black tar like associated with Building A, remnant under carpet adhesive, likely floor tile adhesive. 2 $ $ Phase 2 mobilization cost $ N/A WORK AREA 2: PHASE 2 SUBTOTAL $ N/A WORK AREA 2 TOTAL (Sum of Phase 1 & 2 subtotals) $ N/A WORK AREA 2 DURATIONS Number of days to perform abatement of all materials in Work Area 2; Phase 1 days Number of days to perform abatement of all materials in Work Area 2; Phase 2 days Addendum 1 - Page 5 of 13 WORK AREA 3 ID Description of ACM Phase # BASE BID Abatement Price ($) ALTERNATE Encapsulation Price ($) CK01 Caulking, light gray malleable on door frames and expansion joints. 1 $ N/A DS02 Duct sealant, brown/yellow, hard. 1 $ N/A DS03 Duct sealant, red pliable. 1 $ N/A PF01 Pipe fitting insulation, white canvas wrapped, hard packed. 1 $ N/A FDM02 Fire door material, associated with four hour rated door frame and door 1 $ N/A MA10 Miscellaneous adhesive, associated with fiberglass wall panel, tile pattern 1 $ N/A RG01 Rope gasket, associated with bell housing on drain pipes 1 $ N/A Phase 1 mobilization cost $ N/A WORK AREA 3: PHASE 1 SUBTOTAL $ N/A FTC06 Floor tile and associated mastic, 9"x9" tan with brown streaks. 2 $ $ MA14 Miscellaneous adhesive, black tar like associated with Building B, remnant under carpet adhesive, likely floor tile adhesive. 2 $ $ MA15 Miscellaneous adhesive, black tar like associated with Building A, remnant under carpet adhesive, likely floor tile adhesive. 2 $ $ Phase 2 mobilization cost $ N/A WORK AREA 3: PHASE 2 SUBTOTAL $ N/A WORK AREA 3 TOTAL (Sum of Phase 1 & 2 subtotals) $ N/A WORK AREA 3 DURATIONS Number of days to perform abatement of all materials in Work Area 3; Phase 1 days Number of days to perform abatement of all materials in Work Area 3; Phase 2 days Addendum 1 - Page 6 of 13 WORK AREA 4 ID Description of ACM Phase # BASE BID Abatement Price ($) ALTERNATE Encapsulation Price ($) CK01 Caulking, light gray malleable on door frames and expansion joints. 1 $ N/A DS02 Duct sealant, brown/yellow, hard. 1 $ N/A DS03 Duct sealant, red pliable. 1 $ N/A PF01 Pipe fitting insulation, white canvas wrapped, hard packed. 1 $ N/A FDM02 Fire door material, associated with four hour rated door frame and door 1 $ N/A MA10 Miscellaneous adhesive, associated with fiberglass wall panel, tile pattern 1 $ N/A RG01 Rope gasket, associated with bell housing on drain pipes 1 $ N/A Phase 1 mobilization cost $ N/A WORK AREA 4: PHASE 1 SUBTOTAL $ N/A FTC06 Floor tile and associated mastic, 9"x9" tan with brown streaks. 2 $ $ MA14 Miscellaneous adhesive, black tar like associated with Building B, remnant under carpet adhesive, likely floor tile adhesive. 2 $ $ MA15 Miscellaneous adhesive, black tar like associated with Building A, remnant under carpet adhesive, likely floor tile adhesive. 2 $ $ Phase 2 mobilization cost $ N/A WORK AREA 4: PHASE 2 SUBTOTAL $ N/A WORK AREA 4 TOTAL (Sum of Phase 1 & 2 subtotals) $ N/A WORK AREA 4 DURATIONS Number of days to perform abatement of all materials in Work Area 4; Phase 1 days Number of days to perform abatement of all materials in Work Area 4; Phase 2 days Addendum 1 - Page 7 of 13 WORK AREA 5 ID Description of ACM Phase # BASE BID Abatement Price ($) ALTERNATE Encapsulation Price ($) CK01 Caulking, light gray malleable on door frames and expansion joints. 1 $ N/A DS02 Duct sealant, brown/yellow, hard. 1 $ N/A DS03 Duct sealant, red pliable. 1 $ N/A PF01 Pipe fitting insulation, white canvas wrapped, hard packed. 1 $ N/A FDM02 Fire door material, associated with four hour rated door frame and door 1 $ N/A MA10 Miscellaneous adhesive, associated with fiberglass wall panel, tile pattern 1 $ N/A RG01 Rope gasket, associated with bell housing on drain pipes 1 $ N/A Phase 1 mobilization cost $ N/A WORK AREA 5: PHASE 1 SUBTOTAL $ N/A FTC06 Floor tile and associated mastic, 9"x9" tan with brown streaks. 2 $ $ MA14 Miscellaneous adhesive, black tar like associated with Building B, remnant under carpet adhesive, likely floor tile adhesive. 2 $ $ MA15 Miscellaneous adhesive, black tar like associated with Building A, remnant under carpet adhesive, likely floor tile adhesive. 2 $ $ Phase 2 mobilization cost $ N/A WORK AREA 5: PHASE 2 SUBTOTAL $ N/A WORK AREA 5 TOTAL (Sum of Phase 1 & 2 subtotals) $ N/A WORK AREA 5 DURATIONS Number of days to perform abatement of all materials in Work Area 5; Phase 1 days Number of days to perform abatement of all materials in Work Area 5; Phase 2 days Addendum 1 - Page 8 of 13 Regulated Building Material (RBM) Abatement RBM Name Approximate Quantity Abatement Unit Cost Abatement Price Total ($) Emergency lighting 12 $ $ Exit lighting 36 $ $ Fluorescent lamps*** 2,400 $ / 100 $ Mercury gauges/Switches 2 $ $ Polychlorinated biphenyl containing light ballasts*** 1,100 $ / 100 $ Smoke detectors 22 $ $ RBM Total $ ***Shall be priced per 100 units Addendum 1 - Page 9 of 13 BASE BID Work Area 1 TOTAL $ Work Area 2 TOTAL $ Work Area 3 TOTAL $ Work Area 4 TOTAL $ Work Area 5 TOTAL $ RBM TOTAL $ TOTAL BASE BID In words: FIRM NAME_____________________________________________________ Are you a Corporation, Partnership, DBA, LLC, or PC SIGNATURE_____________________________________________________ ADDRESS______________________________________________________ _____________________________________________________ PHONE #______________________________________________________ E-MAIL ADDRESS_______________________________________________ Based on final design plans and subsequent ACM disturbances, the City reserves the right to select as many, or as few, ACMs to be abated in each work area. The City also reserves the right to award on factors other than lowest bid, such as work area durations and prior experience. AWARD OF THE CONTRACT IS BASED ON THE BASE BID OR AT THE CITY’S SOLE OPTION IN THE EVENT THE CITY ELECTS TO INCLUDE ANY OF THE ALTERNATES LISTED ABOVE TO THE LOWEST QUALIFIED RESPONSIVE AND RESPONSIBLE BIDDER BASED ON THE CUMULATIVE TOTAL OF THE BASE BID AND ALL SELECTED ALTERNATES. Addendum 1 - Page 10 of 13 EXHIBIT 2 – QUESTIONS & ANSWERS 1. Have you considered encapsulating ACM flooring mastic as opposed to abatement? a. The City will revise the bid schedule to include encapsulation as an alternate. In addition to requesting a BASE BID for total ACM abatement, this revised bid schedule requests alternate pricing for ACM encapsulation in flooring adhesive ACMs identified as FTC06, MA14 and MA15. 2. In areas where replacing lights, does GAC also abate mercury containing bulbs and ballasts? a. Yes, the City is requesting pricing for these and other Regulated Building Material (RBM) abatement such as emergency lighting, exit lighting, mercury gauges/switches, and smoke detectors. Please see the Building Inspection Report and revised bid schedule. 3. Is the February 10 start date firm? Mobilizing February 10 will not work because of the need to apply for permit from the State which takes 10 business days or 2 weeks minimum. a. Upon execution of contract, successful GAC shall apply for permit from the State. Phase 1 Notice to Proceed will be negotiated but will be no less than 15 days in order to provide time for permit. Phases 2 through 5 Notice to Proceed will remain 10 days. 4. Who will be performing demolition of non-ACM materials in order to access ACM materials a. The General Contractor will perform demolition to provide access to ACM materials for GAC. 5. Is the GAC responsible to demolish all material systems that contain ACM? a. Any building material that has been identified as ACM or is in contact with ACM and which may be subject to sanding, cutting, grinding or abrading during the remodel process must be removed by the GAC. For example, the duct sealant identified as ACM must be removed as well as the duct to sufficient margins to ensure any and all ACM has been abated. In another scenario, the GAC shall remove carpet and/or any other flooring that is in contact with or covering the ACM flooring mastic. 6. Can we have the drawings? a. No, due to security concerns we cannot share the building plans. 7. Who is performing 3rd party observation, etc.? a. LT Environmental 8. Will they provide a Project Manager that will be on site full-time? a. The scope of work for the third party firm to provide inspection, oversight, and visual and air clearances is not fully identified at this time and subject to change. 9. How should the duration be bid? Addendum 1 - Page 11 of 13 a. Bid longest duration for full abatement of all ACM materials. 10. Will be plumbing be shut-off and drained? There is a concern of pipes freezing during the abatement process. a. The City has not established its approach to avoiding frozen pipes. As necessary, the City and General Contractor will provide temporary heating to prevent pipes from freezing. 11. Did Walsh do destructive investigation? a. Walsh performed a comprehensive semi-destructive asbestos inspection and quantification of all accessible building materials suspected to contain asbestos found to be present in the building. 12. We noticed the windows are not operational in many areas. Can we remove window for ventilation? a. Windows can be removed for ventilation. The GAC must coordinate with General Contractor when removing windows in order to secure and protect exterior openings that were created during the abatement process. 13. Is the caulking around windows hot? a. Refer to Building Inspection report. 14. What criteria is the City leaning towards to evaluate the bids? a. The primary consideration will be the lowest cost responsive and responsible vendor based on the cumulative total of the base bid and alternatives selected at the City’s sole discretion. The City will also take into consideration qualifications, references and ability to meet the contract requirements. 15. At the job walk it was mentioned that the only portions of the project may be awarded. Can contractors assume that all asbestos in a particular work area ID will be awarded or will work area IDs be broken down to smaller quantities? a. Work area IDs may be broken down to smaller quantities. 16. Will LT Environmental be providing daily oversight for the duration of the contract? a. See response to Question 8. 17. Can the city provide construction drawings to assist in the bidding process? a. See response to Question 6. 18. Is this project subject to prevailing wages? a. No. 19. On the bid form per the work area ID there is two categories for MA14. Should one of these work area ID’s be MA15? It states on the bid form under description of ACM and in the Summary of Asbestos Containing Materials (ACM)- Sorted by Material Type and ID that MA15 is associated with Building A. Addendum 1 - Page 12 of 13 a. Yes, the ACM associated with Building A is MA15. This has been corrected in the revised bid schedule. 20. Are the rope gaskets considered friable? What type of containment needed for removal? a. Yes the rope gaskets are friable. Removal must be conducted in accordance with applicable State and Federal requirements for asbestos abatement. All identified regulated building materials which will be impacted during renovation or demolition activities contracted shall be removed and disposed of by properly trained and qualified personnel in order to comply with all current EPA, DOT, and OSHA regulations for waste transportation and disposal, as well as worker protection requirements. 21. Is the wall adhesive associated with wall paper or paneling adhesive? Is it friable? What type of containment is needed? a. MA10 is considered non-friable Category II and is associated with fiberglass wall panel, tile pattern. Removal must be conducted in accordance with applicable State and Federal requirements for asbestos abatement. All identified regulated building materials which will be impacted during renovation or demolition activities contracted shall be removed and disposed of by properly trained and qualified personnel in order to comply with all current EPA, DOT, and OSHA regulations for waste transportation and disposal, as well as worker protection requirements. 22. Will General Contractor remove non-ACM interior walls before exterior wall work to be done? a. The General Contractor will perform demolition of non-ACM to provide access to ACM materials for GAC. GAC will need to coordinate with General Contractor on scheduling. 23. Is the caulking on walls, windows, and doors friable? What type of containment needed? a. Caulking is considered Non-friable Category II. Removal must be conducted in accordance with applicable State and Federal requirements for asbestos abatement. All identified regulated building materials which will be impacted during renovation or demolition activities contracted shall be removed and disposed of by properly trained and qualified personnel in order to comply with all current EPA, DOT, and OSHA regulations for waste transportation and disposal, as well as worker protection requirements. 24. Will GAC need to remove all ductwork or just ACM seam sealer? a. Any building material that has been identified as ACM or is in contact with ACM and which may be subject to sanding, cutting, grinding or abrading during the remodel process must be removed by the GAC. For example, the duct sealant identified as ACM must be removed as well as the duct to sufficient margins to ensure any and all ACM has been abated. 25. Who will be abating trace ACMs? a. To be determined and answered in a future addendum in the event that the City elects to add this effort to the scope of this bid. Addendum 1 - Page 13 of 13 EXHIBIT 3 – UPDATED WORK AREA SITE PLAN