Loading...
HomeMy WebLinkAboutRFP - 8214 CM/GC FOR LINCOLN CORRIDOR PROPJECTRFP 8214 CM/GC Services for the Lincoln Corridor Project Page 1 of 20 REQUEST FOR PROPOSAL 8214 CM/GC SERVICES FOR THE LINCOLN CORRIDOR PROJECT The City of Fort Collins is requesting proposals from qualified Construction Managers/General Contractors (CM/GC) for construction expertise related to the construction of the Lincoln Corridor Project including the Poudre River Bridge. As part of the City’s commitment to Sustainable Purchasing, proposals submission via email is preferred. Proposals shall be submitted in a single Microsoft Word or PDF file under 20MB and e-mailed to: purchasing@fcgov.com. If electing to submit hard copy proposals instead, five (5) copies, will be received at the City of Fort Collins' Purchasing Division, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Proposals must be received before 3:00 p.m. (our clock), January 22, 2016 and referenced as Proposal No. 8214. If delivered, they are to be sent to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, the address is P.O. Box 580, Fort Collins, 80522-0580. Please note, additional time is required for bids mailed to the PO Box to be received at the Purchasing Office. The City encourages all Disadvantaged Business Enterprises (DBEs) to submit proposals in response to all requests for proposals. No individual or business will be discriminated against on the grounds of race, color, sex, or national origin. It is the City’s policy to create a level playing field on which DBEs can compete fairly and to ensure nondiscrimination in the award and administration of all contracts. A MANDATORY prebid meeting will be held at 10:00 AM on January 7, 2016 in the Community Room, located at 215 N Mason Street, Fort Collins. Questions concerning the scope of the bid should be directed to Brad Buckman, Project Manager, at (970) 416-4248 or bbuckman@fcgov.com. Questions regarding bid submittal or process should be directed to Elliot Dale, Buyer at (970) 221-6777 or edale@fcgov.com. All questions must be submitted in writing via email to Brad Buckman, with a copy to Elliot Dale, no later than 5:00 PM our clock on January 14, 2016. Questions received after this deadline will not be answered. A copy of the RFP may be obtained at www.rockymountainbidsystem.com. The City of Fort Collins is subject to public information laws, which permit access to most records and documents. Proprietary information in your response must be clearly identified and will be protected to the extent legally permissible. Proposals may not be marked ‘Proprietary’ in their entirety. All provisions of any contract resulting from this request for proposal will be public information. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 2 of 20 New Vendors: The City requires new vendors receiving awards from the City to fill out and submit an IRS form W-9 and to register for Direct Deposit (Electronic) payment. If needed, the W-9 form and the Vendor Direct Deposit Authorization Form can be found on the City’s Purchasing website at www.fcgov.com/purchasing under Vendor Reference Documents. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision- making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or sham proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in the current term or in any future terms. Sustainability: Consulting firms/teams participating in the proposal are to provide an overview of the organization’s philosophy and approach to Sustainability. In no more than two (2) pages please describe how your organization strives to be sustainable in the use of materials, equipment, vehicles, fuel, recycling, office practices, etc. The City of Fort Collins incorporates the Triple Bottom Line into our decision process by including economic (or financial), environmental, and social factors in our evaluation. The selected Service Provider shall be expected to sign the City’s standard Agreement without revision prior to commencing Services (see sample attached to this Proposal). Sincerely, Gerry S. Paul Purchasing Director RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 3 of 20 8214 CM/GC SERVICES FOR THE LINCOLN CORRIDOR PROJECT I. PROJECT SCOPE OF WORK AND REQUIREMENTS A. General Information The City of Fort Collins (City) is seeking qualification statements from qualified Construction Managers/General Contractors (CM/GC) to provide construction services related to the construction of the Lincoln Corridor Project in Fort Collins, Colorado, including construction of the Poudre River Bridge. The Lincoln Corridor Project is based on the concepts presented in the Lincoln Corridor Plan (May 2014 http://www.fcgov.com/planning/lincoln.php). The Lincoln Corridor Plan developed a vision and a preliminary multi-modal design for Lincoln Avenue between Jefferson Street and Lemay Avenue. The corridor is growing and already reflects an eclectic mix of existing uses, historic neighborhoods, retail, industrial, and natural areas - as well as a developing technology campus. In addition, this portion of Lincoln Avenue lacks basic infrastructure in many places and needs to be brought up to current City standards. The Plan seeks to provide an enhanced level of amenities that restores its importance as a primary entry to the heart of the City, as well as providing an important connection from Downtown to the east and northeast. The total estimated cost of the Lincoln Corridor Project is $19.3 million. Due to funding limitations, the first two segments from Lemay Avenue to the Lincoln Bridge are currently funded. The scope of the proposed improvements is based on the concepts approved in the Lincoln Corridor Plan with a reduced level of enhancement consistent with the “reduced plan” budget for the first two segments and accommodations to existing uses. These segments are 100% locally funded and includes right of way acquisition, professional services and construction. The Corridor is divided into the following 3 funding segments:  1st Street to Lemay Avenue - $6.5 Million Reduced Plan (Full Plan $8.0 Million)  Poudre River Bridge - $5.3 Million Reduced Plan (Full Plan $5.7 Million)  UPRR to Poudre River Bridge - $3.6 Million Reduced Plan (Full Plan $5.6 Million) B. Project Background The City entered into a contract with Interwest Consulting Group in September 2015 to provide the final engineering design for the Lincoln Corridor. The general timelines for design milestones are as follows: 30% Design Submittal December 2015 65% Design Submittal March 2016 90% Design Submittal May 2016 Construction NTP June/July 2016 Construction Complete 2017 (exact timeframe TBD) RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 4 of 20 DITESCO will be the owner’s representative and designated construction manager (CM) for the Lincoln Corridor Project and shall be responsible for the professional quality, technical accuracy, timely completion and the coordination of all services rendered by the CM/GC contractor, including but not limited to the full construction services related to the completion of the Lincoln Corridor project. DITESCO staff will participate in the RFP evaluation process. Material testing will be performed by CTL Thompson under separate contract. C. CM/GC Requirements The City expects the CM/GC Contractor to provide full construction services related to the completion of the Lincoln Corridor Project. These services are to include, but not be limited to the following:  Provide a designated representative to participate in the engineering design effort, which will begin between the 30% and 65% design submittals. At this time the CM/GC contract is expected to be awarded.  Provide construction services according to the Agreement and contract documents including self-performance of at least 20% of the physical work (including overhead, profit and materials).  Provide qualified full time site supervision and management of trade subcontractors to meet or exceed the defined project schedule.  Provide open procurement of subcontractors and suppliers that are not assigned by the City. Include City and/or CM team members in procurement process. A minimum of 3 quotes is required for the subcontractor procurement process.  Provide storm water management and BMP maintenance for the site complying with State and City regulations.  Provide construction delivery scheduling, meeting attendance and reporting according to contract document and federal or state requirements. This includes monthly reporting on DBE participation if applicable, progress reporting and subcontractor work participation.  Provide site security and protection during construction. Provide all site safety management and compliance with OSHA standards and criteria. Implement a site safety program that is reported on regularly.  Provide for quality control program that meets or exceeds minimum job/contract document and industry standards. Coordinate all quality control testing and inspections through the CM.  Provide subcontractor and/or DBE participation to meet set goals if applicable. Report in your proposal to the City how the remaining work will support this goal.  Meet all licensing requirements as set forth by the City of Fort Collins for both GC and subcontracted work. Provide work that complies with the Larimer County Urban Area Street Standards (LCUASS).  Provide services to manage participation in project close out process and needs during the project warranty period. D. Owner Expectations and Delivery Schedule RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 5 of 20 Partnering The City and CM expect a partnering relationship with the selected CM/GC. A formal Partnering Session will be held with the selected contractor, City of Fort Collins team members, contract Architects and Engineers (Interwest Consulting Group), and contract Construction Managers (DITESCO) as soon as the selection process is completed. The City expects an environment where trust and teamwork prevent disputes, foster a cooperative bond to everyone’s benefit, and facilitate the completion of a successful project. Traditional adversarial relationships between the project participants are not an acceptable way of doing business on this project. Key Staff The City expects the CM/GC to commit key staff members to manage the project through attendance of weekly project meetings; preparation of RFIs; management of subcontractors; management of schedule; management of quality and management of cost. Key staff members for this project are expected to include a project manager, superintendent and possibly a field engineer. Communication The City and CM expect open and honest communication related to project activities including subcontractor performance, cost control, schedule control, budget and quality issues as they may arise. The City expects communication to occur directly through the established chain of command which may involve working directly, receiving direction and coordinating with City assigned personnel or consultant/CM team staff. Contract Management The City expects the CM/GC to participate in contract management such that pay applications, work change directives, change orders, RFIs and other documents are managed timely and effectively to avoid delays in project delivery. The City expects the CM/GC to work with its representatives to gain approval and processing of these documents in a coordinated fashion. Performance Standard The City expects CM/GC performance to a standard that exceeds industry accepted parameters. The City expects a world class contractor and project. The City expects to pay fairly for all work performed and expects the CM/GC to be profitable. II. SUBMITTAL REQUIREMENTS CM/GC firms that have the requisite experience and qualifications are encouraged to submit proposals. General Company Information Name of firm, contact person for this proposal, title, phone number, fax number, street and mailing addresses, and previous names of firm in last 10 years; date firm was established. Describe how the firm is organized. Provide general contracting licenses held by firm. Profile Projects Provide a brief project description and history of projects, similar in scope to this project, completed in the last 5 years. Include the following information: 1. Project description that includes the project name, firms that comprised the design team, and site location. RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 6 of 20 2. Project history that includes the original schedule agreed upon at the time of signing the contract, the actual duration of construction, and any special characteristics of the project that affected delivery. 3. Type of project delivery model used. 4. Original contract cost. 5. Cost at completion and number of change orders. 6. Contractor, subcontractor or owner initiated claims and their resolution. 7. Original contract time and actual completion time. Provide a brief discussion of any unusual factors that affected the project delivery (e.g. owner initiated delays, additions to the work, etc.). Provide both an owner reference and consulting engineer/architect reference for cited projects. Company Resources Indicate the total number of personnel employed by the company and how many resources are in each category (e.g. Administration, Clerical, Estimating, Project Management, Project Coordinator, Project Engineer, Superintendent, Foreman, Carpenter, Laborer, etc.) Provide an organizational chart for the resources proposed to be used on this project. Indicate the office location this project will be managed through. Provide a full list of equipment on hand owned and managed by the firm. The City values a company’s investment in supporting the industry with apprenticeships, volunteer, or intern opportunities, the use of locally sourced materials and labor, and the ability to recycle materials from generated construction materials. Describe your previous experience emphasizing local labor and materials and utilizing pollution prevention techniques. Key Project Staffing Names and resumes of proposed key project staff, including proposed project manager and construction project superintendent. Include references from owners and consulting engineers for the last 3 projects for each assigned person. Detail the availability of proposed staff. (Note: key personnel must be committed to this project for its duration, unless excused by the Owner. This requirement is non-negotiable.) Project Budget and Cost Control 1. Describe your approach to developing a cost to complete this project. 2. Describe your approach to developing value engineering ideas through construction delivery to enhance the work product while potentially saving cost. 3. Describe how the delivery schedule outlined in Part I.D above affects your approach to pricing. 4. Describe your approach to be transparent or open book when developing a cost for this project in cooperation with the project team. Construction Sequencing and Scheduling Describe the scheduling software your firm typically uses for sequencing tasks and scheduling subcontractors, materials and equipment. The City will require that an industry recognized software is used to develop and manage the project schedule; fully base-lined, critical path shown and float managed. Describe the way in which your firm develops and maintains project schedules for projects of this size and nature. Describe your process and frequency for updating project schedules and how your firm works to overcome challenges RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 7 of 20 and works to maintain the original completion date. Submit an example of a project schedule for a similar size project. Method of Construction Submit a written narrative explaining your approach to completion of this project. There are several businesses and homeowners along the Corridor, therefore ensuring access at all times will be important, as well as being efficient and cost effective during construction. Quality Assurance/Quality Control Provide details on your firm’s quality control program. Explain how your team administers a quality control program during construction, how performance measures are documented and how quality issues are addressed. Provide examples of when your firm exceeded quality standards, gained industry recognition or received quality awards. Partnering Experience Describe at least 5 projects completed by your firm where partnering was formally implemented. Provide a listing of key staff who participated in these projects and their roles. Describe in detail what Partnering means to your firm and how it is integral to your business operations. Safety Record Provide the firm’s OSHA reportable accident rate and current workman’s compensation insurance multiplier for the last 3 years. Provide the OSHA reportable accident rate on projects managed by the proposed superintendent or project manager over the three year period. Provide a list of all projects in the last 5 years that have received an OSHA citation either to the GC or subcontractor on the jobsite and provide a narrative of the citations. Trade Subcontractors Provide a listing of trade subcontractors your firm has relationships with and are known to perform to critical schedules and timeframes. Explain your relationship with these firms, how long they have worked with you on projects, and how your subcontractor procurement process works. Give examples of situations where these firms have performed to tight timeframes and accelerated schedules. Financial Statement Provide a recent financial statement (audited if possible) including balance sheet and income statement showing: 1. Current assets 2. Other assets 3. Current liabilities 4. Other liabilities 5. Fixed assets and equipment 6. Banking Reference (Provide name, address and phone number) Bonding Company Reference Provide the name, address and phone number of the firm’s bonding agent. Provide a letter from the bonding agent indicating the firm’s bonding capacity is adequate to undertake this work. Insurance Company Provide the name, address and phone number of the firm’s insurance agent(s). Provide certificate of insurance outlining coverage and policy limits. Provide statements to answer RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 8 of 20 the following questions. (See also Insurance Requirements in Item V. Sample Agreement). 1. Does coverage meet minimum project requirements? 2. Does coverage include builder’s risk? 3. Can this coverage be extended for work on this project? 4. Can coverage be increased? 5. Can the City be listed as an additional insured? 6. Are there any current claims that will affect coverage limits available for this project? Services and Construction Agreements The CM/GC will be required to sign a Services Agreement (SA) for the pre-construction Work, similar to Exhibit A attached herein. The pre-construction services shall include (at minimum) review of designs for constructability, review of site layout and grading, estimating cost of different options, alternatives and components, providing opinions and recommendations on suitable methods and approaches to accomplish the work, offer value engineering suggestions to accomplish the desired objectives in the most cost effective manner possible, and provide the team with up to date on-going cost status of the current project design. The CM/GC will be required to sign a Construction Agreement for the construction Work. A template of the City’s Construction Agreement is available upon written request. The construction services shall include (at minimum) full time site supervision when trades are working, stormwater management and permitting of the project site, site protection and security during construction, procurement of all subcontractors and suppliers to complete construction, project sequencing and scheduling of manpower, materials and equipment, project safety enforcement, management of quality control, management of testing, management of surveying, and management of project close-out. The Work Order for construction services will be awarded at approximately 90% design completion based on the Contractor’s satisfactory performance under the pre-construction services Work Order. Any exceptions to the agreements must be stated with your submission of qualifications for this project. The City makes no guarantees it will change the agreements but may consider the exceptions. CM/GC Fees Provide a list of construction cost factors that are used to develop the cost of work. Provide the following. Work Order I (Pre-Construction) Services: 1. Cost estimate for pre-construction services (meetings, cost estimating, value engineering and related tasks), to include personnel hourly rates and estimated time per task. Work Order II (Construction) Services: 2. Overhead markup, expressed as a percentage. 3. Profit markup, expressed as a percentage. 4. Subcontractor markup, expressed as a percentage. 5. Permanent materials markup, expressed as a percentage. RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 9 of 20 6. Equipment markup, expressed as a percentage. 7. Labor markup (provide unburdened labor rates and markups), expressed as a percentage. 8. Change order markup for labor, materials, and subcontractors, expressed as a percentage. Describe in detail how your firm uses the markups and cost of work to develop the final project cost. The City anticipates working with the CM/GC to develop this cost for all known quantities of the project. For unknown circumstances, the City anticipates negotiating allowances to complete the work. The final cost plus allowances will encompass a final Guaranteed Maximum Price (GMP) for the project, and it is the City’s intent to have the final cost separated from the fee structure when developing the GMP. III. SELECTION PROCESS AND SCHEDULE Qualified CM/GC’s interested in the work described in this Request for Proposal should submit items contained in Part II of this request. The proposer’s authorized signature on the Proposal assures the team’s compliance with City of Fort Collins’ purchasing restrictions. A copy of the restrictions is available for review in the Purchasing Department or the City Clerk’s Office. The City reserves the right to reject any and all proposals and to waive any informalities and irregularities therein. RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 10 of 20 CM/GC Procurement Schedule EVENT DATE Issued for Advertisement Week of December 14, 2015 Mandatory Pre-Proposal Meeting January 7, 2016 @ 10:00 AM Final Questions January 14, 2016 by 5:00 PM Proposals Due January 22, 2016 by 3:00 PM Conduct Interviews Week of January 25, 2016 The City reserves the right to select the top ranked firm directly from proposal documents without a formal interview process. In the event it becomes necessary to revise any part of the RFP a written addendum will be issued. Each Proposal shall state it is valid for a period of not less than ninety (90) days from date of proposal submittal. Taxation The City is exempt from all state taxation including state sales and use taxes. IV. EVALUATION CRITERIA Contractor Qualification Review and Assessment CM/GC firms will be evaluated on the following qualification criteria. These criteria will be the basis for review of the written proposals, as well as for the oral interviews (if necessary) of the top ranked firms. The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average rating, and a 5 being an outstanding rating. Weighting factors for the criteria are listed adjacent to the qualification. Weighting Factor Qualification Standard 2.0 Scope of Proposal Does the proposal show an understanding of the project objective, methodology to be used in the completion of construction and the results that are desired from the project? 2.0 Assigned Project Team Does the proposed team have the necessary skills and experience to fulfill the requirements of the project, including CM/GC delivery? Is the key staff available to do the work? 1.0 Safety Record “OSHA Illness/Injury Rate”, “OSHA Lost Work Day Incidence Rate” and Workers Compensation Experience Modification Rate Insurance Multiplier. 3.0 Firm Experience Has the firm worked on projects similar in scope to this project? Has partnering been used on other projects? Does the firm have the experience necessary for this project? Does this contractor have previous CM/GC or alternate delivery experience? RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 11 of 20 2.0 Cost Are the cost factors presented in the proposal reflective of industry standards? Do they offer a reasonable way to approach development of the GMP? 2.0 Firm Capability Does the firm have experience, equipment, manpower and finances to complete the work? Has the firm shown an interest in the work and a commitment to the successful completion of the project? 2.0 Construction Performance Do the referenced projects reflect favorably in respect to completion within the contract schedule, cost and number of change orders and claims? 2.0 Method of Construction Does the written project approach reflect a good balance between construction efficiency and access to businesses during construction? Does the method of construction and project approach reflect innovation and potential for significant cost savings measures? Reference evaluation process (top rated firm) After the interviews (if necessary) have been conducted, the evaluation committee will select the top rated firm and the Project Manager will check references for overall performance, timetable, completeness, budget and job knowledge of selected project/references. A satisfactory/unsatisfactory rating shall be given to each reference contacted. If references check out for the top firm, then the City of Fort Collins will work to negotiate a contract for CM/GC services with the top firm. If the top firm references do not check out, then the selection committee will look to the second ranked firm and check their references. QUALIFICATION STANDARD Overall Performance Would you hire this Contractor again? Timetable Was the original Scope of Work completed within the specified time? Were interim deadlines met in a timely manner? Completeness Was the Contractor responsive to client needs; did they anticipate problems? Were problems solved quickly and effectively? Budget Was the original Scope of Work completed within the project budget? Job Knowledge Did Contractor personnel exhibit the knowledge and skills necessary for the efficient completion of the scope or work? RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 12 of 20 V. SAMPLE AGREEMENT PROFESSIONAL SERVICES AGREEMENT WORK ORDER TYPE THIS AGREEMENT made and entered into the day and year set forth below by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and , hereinafter referred to as "Professional". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Scope of Services. The Professional agrees to provide services in accordance with any project Work Orders for , issued by the City. A blank sample of a work order is attached hereto as Exhibit "A", consisting of ( ) pages and is incorporated herein by this reference. A general scope of services is attached hereto as Exhibit “B", consisting of ( ) pages and is incorporated herein by this reference. The City reserves the right to independently bid any project rather than issuing a Work Order to the Professional for the same pursuant to this Agreement. Irrespective of references in Exhibit A to certain named third parties, Professional shall be solely responsible for performance of all duties hereunder. 2. The Work Schedule. The services to be performed pursuant to this Agreement shall be performed in accordance with the Work Schedule stated on each Work Order. 3. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated as specified on each Work Order. Time is of the essence. Any extensions of any time limit must be agreed upon in writing by the parties hereto. 4. Contract Period. This Agreement shall commence , 20 , and shall continue in full force and effect until , 20 , unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional one year periods not to exceed ( ) additional one year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties. Written notice of renewal shall be provided to the Professional and mailed no later than thirty (30) days prior to contract end. 5. Early Termination by City/Notice. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Professional. Such notice shall be delivered at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this agreement shall be effective when mailed, postage prepaid and sent to the following address: RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 13 of 20 Professional: City: Copy to: Attn: City of Fort Collins Attn: PO Box 580 Fort Collins, CO 80522 City of Fort Collins Attn: Purchasing Dept. PO Box 580 Fort Collins, CO 80522 In the event of any such early termination by the City, the Professional shall be paid for services rendered prior to the date of termination subject only to the satisfactory performance of the Professional's obligations under this Agreement. Such payment shall be the Professional's sole right and remedy for such termination. 6. Design, Project Insurance and Insurance Responsibility. The Professional shall be responsible for the professional quality, technical accuracy, timely completion and the coordination of all services rendered by the Professional, including but not limited to designs, plans, reports, specifications, and drawings and shall, without additional compensation, promptly remedy and correct any errors, omissions, or other deficiencies. The Professional shall indemnify, save and hold harmless the City its officers and employees, in accordance with Colorado law, from all damages whatsoever claimed by third parties against the City and for the City's costs and reasonable attorney’s fees arising directly or indirectly out of the Professional's negligent performance of any of the services furnished under this Agreement. The Professional shall maintain insurance in accordance with Exhibit , consisting of one (1) page, attached hereto and incorporated herein. 7. Compensation. In consideration of services to be performed pursuant to this Agreement, the City agrees to pay Professional on a time and reimbursable direct cost basis designated in Exhibit "B", consisting of ( ) page(s), attached hereto and incorporated herein by this reference. At the election of the City, each Work Order may contain a maximum fee, which shall be negotiated by the parties hereto for each such Work Order. Monthly partial payments based upon the Professional's billings and itemized statements are permissible. The amounts of all such partial payments shall be based upon the Professional's City-verified progress in completing the services to be performed pursuant to the Work Order and upon approval of the Professional's direct reimbursable expenses. Final payment shall be made following acceptance of the work by the City. Upon final payment, all designs, plans, reports, specifications, drawings, and other services rendered by the Professional shall become the sole property of the City. 8. City Representative. The City will designate, prior to commencement of work, its project representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the project. All requests for contract interpretations, change orders, and other clarification or instruction shall be directed to the City Representative. 9. Project Drawings. Upon conclusion of the project and before final payment, the Professional shall provide the City with reproducible drawings of the project containing accurate information on the project as constructed. Drawings shall be of archival, RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 14 of 20 prepared on stable mylar base material using a non-fading process to provide for long storage and high quality reproduction. "CD" disc of the as-built drawings shall also be submitted to the owner in and AutoCAD version no older then the established city standard. 10. Monthly Report. Commencing thirty (30) days after Notice to Proceed is given on any Work Order and every thirty days thereafter, Professional is required to provide the City Representative with a written report of the status of the work with respect to the Work Order, Work Schedule and other material information. Failure to provide any required monthly report may, at the option of the City, suspend the processing of any partial payment request. 11. Independent Contractor. The services to be performed by Professional are those of an independent contractor and not of an employee of the City of Fort Collins. The City shall not be responsible for withholding any portion of Professional's compensation hereunder for the payment of FICA, Workers' Compensation, other taxes or benefits or for any other purpose. 12. Subcontractors. Professional may not subcontract any of the Work set forth in the Exhibit A, Statement of Work without the prior written consent of the city, which shall not be unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent of the City), then the following provisions shall apply: (a) the subcontractor must be a reputable, qualified firm with an established record of successful performance in its respective trade performing identical or substantially similar work, (b) the subcontractor will be required to comply with all applicable terms of this Agreement, (c) the subcontract will not create any contractual relationship between any such subcontractor and the City, nor will it obligate the City to pay or see to the payment of any subcontractor, and (d) the work of the subcontractor will be subject to inspection by the City to the same extent as the work of the Professional. 13. Personal Services. It is understood that the City enters into this Agreement based on the special abilities of the Professional and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Professional shall neither assign any responsibilities nor delegate any duties arising under this Agreement without the prior written consent of the City. 14. Acceptance Not Waiver. The City's approval of drawings, designs, plans, specifications, reports, and incidental work or materials furnished hereunder shall not in any way relieve the Professional of responsibility for the quality or technical accuracy of the work. The City's approval or acceptance of, or payment for, any of the services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement. 15. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 15 of 20 according to the terms of this Agreement, such party may be declared in default. 16. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non- defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees and costs incurred because of the default. 17. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire Agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 18. Law/Severability. The laws of the State of Colorado shall govern the construction, interpretation, execution and enforcement of this Agreement. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. 19. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et. seq., Professional represents and agrees that: a. As of the date of this Agreement: 1. Professional does not knowingly employ or contract with an illegal alien who will perform work under this Agreement; and 2. Professional will participate in either the e-Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the “e-Verify Program”) or the Department Program (the “Department Program”), an employment verification program established pursuant to Section 8-17.5- 102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement. b. Professional shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement. c. Professional is prohibited from using the e-Verify Program or Department Program procedures to undertake pre-employment screening of job applicants while this Agreement is being performed. d. If Professional obtains actual knowledge that a subcontractor performing work under RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 16 of 20 this Agreement knowingly employs or contracts with an illegal alien, Professional shall: 1. Notify such subcontractor and the City within three days that Professional has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and 2. Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien; except that Professional shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. e. Professional shall comply with any reasonable request by the Colorado Department of Labor and Employment (the “Department”) made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. f. If Professional violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, Professional shall be liable for actual and consequential damages to the City arising out of Professional’s violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Professional violates this provision of this Agreement and the City terminates the Agreement for such breach. 20. Special Provisions. Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit " " - Confidentiality, consisting of one (1) pages, attached hereto and incorporated herein by this reference. RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 17 of 20 THE CITY OF FORT COLLINS, COLORADO By: Gerry Paul Purchasing Director DATE: ATTEST: City Clerk APPROVED AS TO FORM: Assistant City Attorney PROFESSIONAL'S NAME By: Printed: Title: CORPORATE PRESIDENT OR VICE PRESIDENT Date: RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 18 of 20 EXHIBIT A WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND DATED: Work Order Number: Purchase Order Number: Project Title: Commencement Date: Completion Date: Maximum Fee: (time and reimbursable direct costs): Project Description: Scope of Services: Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this Work Order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of ___ (_) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. PROFESSIONAL By:_______________________________ Date:_____________________________ CITY OF FORT COLLINS By:_________________________________ Project Manager Date: ______________________________ By: _______________________________ Gerry Paul Purchasing Director (over $60,000.00) Date: ____________________________ RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 19 of 20 EXHIBIT INSURANCE REQUIREMENTS 1. The Professional will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Professional shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: “The insurance evidenced by this Certificate will not reduce coverage or limits and will not be cancelled, except after thirty (30) days written notice has been received by the City of Fort Collins.” In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Professional, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Professional under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Professional 's general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Professional shall maintain during the life of this Agreement for all of the Professional's employees engaged in work performed under this Agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Professional shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Professional shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. C. Errors & Omissions. The Professional shall maintain errors and omissions insurance in the amount of $1,000,000. RFP 8214 CM/GC Services for the Lincoln Corridor Project Page 20 of 20 EXHIBIT CONFIDENTIALITY IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the “City”) pursuant to this Agreement (the “Agreement”), the Professional hereby acknowledges that it has been informed that the City has established policies and procedures with regard to the handling of confidential information and other sensitive materials. In consideration of access to certain information, data and material (hereinafter individually and collectively, regardless of nature, referred to as “information”) that are the property of and/or relate to the City or its employees, customers or suppliers, which access is related to the performance of services that the Professional has agreed to perform, the Professional hereby acknowledges and agrees as follows: That information that has or will come into its possession or knowledge in connection with the performance of services for the City may be confidential and/or proprietary. The Professional agrees to treat as confidential (a) all information that is owned by the City, or that relates to the business of the City, or that is used by the City in carrying on business, and (b) all information that is proprietary to a third party (including but not limited to customers and suppliers of the City). The Professional shall not disclose any such information to any person not having a legitimate need-to-know for purposes authorized by the City. Further, the Professional shall not use such information to obtain any economic or other benefit for itself, or any third party, except as specifically authorized by the City. The foregoing to the contrary notwithstanding, the Professional understands that it shall have no obligation under this Agreement with respect to information and material that (a) becomes generally known to the public by publication or some means other than a breach of duty of this Agreement, or (b) is required by law, regulation or court order to be disclosed, provided that the request for such disclosure is proper and the disclosure does not exceed that which is required. In the event of any disclosure under (b) above, the Professional shall furnish a copy of this Agreement to anyone to whom it is required to make such disclosure and shall promptly advise the City in writing of each such disclosure. In the event that the Professional ceases to perform services for the City, or the City so requests for any reason, the Professional shall promptly return to the City any and all information described hereinabove, including all copies, notes and/or summaries (handwritten or mechanically produced) thereof, in its possession or control or as to which it otherwise has access. The Professional understands and agrees that the City’s remedies at law for a breach of the Professional’s obligations under this Confidentiality Agreement may be inadequate and that the City shall, in the event of any such breach, be entitled to seek equitable relief (including without limitation preliminary and permanent injunctive relief and specific performance) in addition to all other remedies provided hereunder or available at law. INDEX OF SHEETS E. LINCOLN AVENUE AND S. LEMAY AVENUE IMPROVEMENTS FROM LINCOLN BRIDGE TO LEMAY AVENUE FORT COLLINS, COLORADO DECEMBER 2015 BENCHMARKS: BENCHMARK 1: CITY OF FORT COLLINS BM# 3-00, ON A PARAPET WALL AT THE NORTHWEST END OF THE LINCOLN AVE BRIDGE NEAR THE NORTHEAST CORNER OF LINCOLN AVE AND WILLOW ST. ELEV-4964.15 (NGVD 29 UNADJUSTED) BENCHMARK 2: NATIONAL GEODETIC SURVEY #R 402, IN FORT COLLINS AT THE JUNCTION OF 9TH STREET AND LINCOLN AVE IN THE EAST EDGE OF THE CONCRETE FOOTING FOR HIGHLINE TOWER NUMBER 29, 156.8 FT NORTH OF THE CENTERLINE OF THE AVENUE, 73.2 FT WEST OF THE CENTERLINE OF THE STREET, AND 0.7 FT WEST OF THE EAST EDGE OF THE FOOTING. ELEV=4939.03 (NGVD 29 UNADJUSTED) VICINITY MAP APPROX. 1"=800' ABBREVIATION LIST ABC AGGREGATE BASE COURSE AD ALGEBRAIC DIFFERENCE AE ACCESS EASEMENT ARV AIR RELEASE VALVE ASSY ASSEMBLY BOV BLOW OFF VALVE C&G CURB AND GUTTER CL CENTERLINE CMP CORRUGATED METAL PIPE DE DRAINAGE EASEMENT EL ELEVATION ES EMERGENCY SPILLWAY EOP EDGE OF PAVEMENT EX EXISTING FES FLARED END SECTION FL FLOWLINE GB GRADE BREAK GV GATE VALVE HMA HOT MIX ASPHALT HP HIGH POINT FH FIRE HYDRANT I.E. IRRIGATION EASEMENT INV INVERT IRR IRRIGATION LF LINEAR FEET LP LOW POINT LT LEFT MH MANHOLE MTS MOISTURE TREATED SUBGRADE PE PEDESTRIAN EASEMENT PC POINT OF CURVATURE PCC POINT OF COMPOUND CURVATURE PCC PORTLAND CEMENT CONCRETE PCR POINT OF CURB RETURN PI POINT OF INTERSECTION PRC POINT OF REVERSE CURVATURE PT POINT OF TANGENCY PVC POLYVINYL CHLORIDE 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 3/$16 I N T E R W E S T C O N S U L T I N G G R O U P NOT FOR CONSTRUCTION 74 2 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 3/$16 I N T E R W E S T C O N S U L T I N G G R O U P NOT FOR CONSTRUCTION 74 3 E. LINCOLN TYPICAL SECTION LINCOLN BRIDGE TO 1st STREET NTS E. LINCOLN TYPICAL SECTION 1st STREET TO 3rd STREET NTS E. LINCOLN TYPICAL SECTION 3rd STREET TO LEMAY NTS 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION 74 4 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 5+70 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 SCALE: 1" = 30' 30 15 30 60 MATCH LINE STA 11+70 MATCH LINE STA 5+70 PROPOSED CONCRETE PAVEMENT PROPOSED ASPHALT PAVEMENT PROPOSED CONCRETE SIDEWALK 3/$16 NOT FOR CONSTRUCTION 74 5 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 18+00 MATCH LINE STA 11+70 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St MATCH LINE STA 24+00 MATCH LINE STA 18+00 0 SCALE: 1" = 30' 30 15 30 60 3/$16 NOT FOR CONSTRUCTION PROPOSED CONCRETE PAVEMENT PROPOSED ASPHALT PAVEMENT PROPOSED CONCRETE SIDEWALK 74 6 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 30+00 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St MATCH LINE STA 24+00 MATCH LINE STA 36+00 MATCH LINE STA 30+00 0 SCALE: 1" = 30' 30 15 30 60 3/$16 NOT FOR CONSTRUCTION PROPOSED CONCRETE PAVEMENT PROPOSED ASPHALT PAVEMENT PROPOSED CONCRETE SIDEWALK 74 7 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 36+00 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 SCALE: 1" = 30' 30 15 30 60 3/$16 NOT FOR CONSTRUCTION PROPOSED CONCRETE PAVEMENT PROPOSED ASPHALT PAVEMENT PROPOSED CONCRETE SIDEWALK 74 8 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 SCALE: 1" = 30' 30 15 30 60 3/$16 NOT FOR CONSTRUCTION PROPOSED CONCRETE PAVEMENT PROPOSED ASPHALT PAVEMENT PROPOSED CONCRETE SIDEWALK MATCH LINE STA 36+50 MATCH LINE STA 36+50 74 9 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 5+70 MATCH LINE STA 11+70 MATCH LINE STA 5+70 74 10 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 18+00 MATCH LINE STA 11+70 MATCH LINE STA 24+00 MATCH LINE STA 18+00 74 11 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 30+00 MATCH LINE STA 24+00 MATCH LINE STA 36+00 MATCH LINE STA 30+00 74 12 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 36+00 SEE SHEET 14 SEE SHEET 14 74 13 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P CONTINUATION LINE STA 36+50 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 CONTINUATION LINE STA 36+50 CONTINUATION SHEET 13 74 14 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 5+70 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 11+70 MATCH LINE STA 5+70 74 15 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 18+00 3/$16 NOT FOR CONSTRUCTION MATCH LINE STA 11+70 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 24+00 MATCH LINE STA 18+00 74 16 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 30+00 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 24+00 MATCH LINE STA 36+00 MATCH LINE STA 30+00 74 17 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 36+00 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 74 18 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 5+70 CENTERLINE PROFILE 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 5+70 74 19 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 11+70 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St CENTERLINE PROFILE 3/$16 NOT FOR CONSTRUCTION MATCH LINE STA 5+70 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 11+70 MATCH LINE STA 5+70 74 20 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 18+00 3/$16 NOT FOR CONSTRUCTION MATCH LINE STA 11+70 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 CENTERLINE PROFILE MATCH LINE STA 18+00 MATCH LINE STA 11+70 74 21 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 24+00 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 18+00 CENTERLINE PROFILE MATCH LINE STA 24+00 MATCH LINE STA 18+00 74 22 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 30+00 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 24+00 CENTERLINE PROFILE MATCH LINE STA 30+00 MATCH LINE STA 24+00 74 23 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 36+00 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 30+00 CENTERLINE PROFILE MATCH LINE STA 36+00 MATCH LINE STA 30+00 74 24 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 36+00 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 CENTERLINE PROFILE MATCH LINE STA 36+00 74 25 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P CONTINUATION LINE STA 36+50 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 74 26 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P CONTINUATION LINE STA 36+50 3/$16 NOT FOR CONSTRUCTION E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 74 27 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 3/$16 NOT FOR CONSTRUCTION 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 74 28 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION 0 SCALE: 1" = 30' 30 15 30 60 74 29 MATCH LINE STA 5+70 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 SCALE: 1" = 30' 30 15 30 60 MATCH LINE STA 11+70 MATCH LINE STA 5+70 3/$16 NOT FOR CONSTRUCTION NOTES: 1. DIMENSIONS SHOWN ARE FROM CENTER OF STRIPE TO CENTER OF STRIPE, CURB FACE, OR CENTER OF DOUBLE STRIPE. 2. SIGNAGE IS NOT SHOWN IN 30% PLAN SET. 3. LINEAR PAVEMENT STRIPING SHALL BE LATEX PAINT. PAVEMENT MARKINGS (TEXT LEGENDS, CROSSWALK MARKINGS, YIELD LINES, ARROWS) SHALL BE EPOXY PAINT. 4. ALL SIGNING AND STRIPING SHALL BE PER 2009 MUTCD AND COLORADO SUPPLEMENT. 5. ALL CONFLICTING STRIPING SHALL BE REMOVED. 74 30 MATCH LINE STA 18+00 MATCH LINE STA 11+70 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St MATCH LINE STA 24+00 MATCH LINE STA 18+00 0 SCALE: 1" = 30' 30 15 30 60 3/$16 NOT FOR CONSTRUCTION NOTES: 1. DIMENSIONS SHOWN ARE FROM CENTER OF STRIPE TO CENTER OF STRIPE, CURB FACE, OR CENTER OF DOUBLE STRIPE. 2. SIGNAGE IS NOT SHOWN IN 30% PLAN SET. 3. LINEAR PAVEMENT STRIPING SHALL BE LATEX PAINT. PAVEMENT MARKINGS (TEXT LEGENDS, CROSSWALK MARKINGS, YIELD LINES, ARROWS) SHALL BE EPOXY PAINT. 4. ALL SIGNING AND STRIPING SHALL BE PER 2009 MUTCD AND COLORADO SUPPLEMENT. 5. ALL CONFLICTING STRIPING SHALL BE REMOVED. 74 31 MATCH LINE STA 30+00 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St MATCH LINE STA 24+00 MATCH LINE STA 36+00 MATCH LINE STA 30+00 0 SCALE: 1" = 30' 30 15 30 60 3/$16 NOT FOR CONSTRUCTION NOTES: 1. DIMENSIONS SHOWN ARE FROM CENTER OF STRIPE TO CENTER OF STRIPE, CURB FACE, OR CENTER OF DOUBLE STRIPE. 2. SIGNAGE IS NOT SHOWN IN 30% PLAN SET. 3. LINEAR PAVEMENT STRIPING SHALL BE LATEX PAINT. PAVEMENT MARKINGS (TEXT LEGENDS, CROSSWALK MARKINGS, YIELD LINES, ARROWS) SHALL BE EPOXY PAINT. 4. ALL SIGNING AND STRIPING SHALL BE PER 2009 MUTCD AND COLORADO SUPPLEMENT. 5. ALL CONFLICTING STRIPING SHALL BE REMOVED. 74 32 MATCH LINE STA 36+00 0 SCALE: 1" = 30' 30 15 30 60 NOTES: 1. DIMENSIONS SHOWN ARE FROM CENTER OF STRIPE TO CENTER OF STRIPE, CURB FACE, OR CENTER OF DOUBLE STRIPE. 2. SIGNAGE IS NOT SHOWN IN 30% PLAN SET. 3. LINEAR PAVEMENT STRIPING SHALL BE LATEX PAINT. PAVEMENT MARKINGS (TEXT LEGENDS, CROSSWALK MARKINGS, YIELD LINES, ARROWS) SHALL BE EPOXY PAINT. 4. ALL SIGNING AND STRIPING SHALL BE PER 2009 MUTCD AND COLORADO SUPPLEMENT. 5. ALL CONFLICTING STRIPING SHALL BE REMOVED. 74 33 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 SCALE: 1" = 30' 30 15 30 60 3/$16 NOT FOR CONSTRUCTION MATCH LINE STA 36+50 MATCH LINE STA 36+50 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 74 34 74 35 74 36 74 37 74 38 74 39 74 40 74 41 74 42 74 43 74 44 74 45 74 46 74 47 74 48 74 49 74 50 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION 1603 Oakridge Drive Fort Collins, CO 80525 (970) 223-7577 fax (970) 223-1827 Landscape Architecture Urban Design Graphic Design 74 51 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION EAST LINCOLN AVENUE S. LEMAY AVE. RIVERSIDE AVE. 1ST ST. 2ND ST. 3RD ST. WILLOW ST. POUDRE RIVER JEFFERSON ST. 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' n/a 30 15 30 60 MATCHLINE, SEE SHEET IR 2.2 1603 Oakridge Drive Fort Collins, CO 80525 (970) 223-7577 fax (970) 223-1827 Landscape Architecture Urban Design Graphic Design 74 52 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION EAST LINCOLN AVENUE S. LEMAY AVE. RIVERSIDE AVE. 1ST ST. 2ND ST. 3RD ST. WILLOW ST. POUDRE RIVER JEFFERSON ST. 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' n/a 30 15 30 60 MATCHLINE, SEE SHEET IR 2.1 1603 Oakridge Drive Fort Collins, CO 80525 (970) 223-7577 fax (970) 223-1827 Landscape Architecture Urban Design Graphic Design MATCHLINE, SEE SHEET IR 2.3 74 53 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION EAST LINCOLN AVENUE S. LEMAY AVE. RIVERSIDE AVE. 1ST ST. 2ND ST. 3RD ST. WILLOW ST. POUDRE RIVER JEFFERSON ST. 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' n/a 30 15 30 60 MATCHLINE, SEE SHEET IR 2.2 1603 Oakridge Drive Fort Collins, CO 80525 (970) 223-7577 fax (970) 223-1827 Landscape Architecture Urban Design Graphic Design MATCHLINE, SEE SHEET IR 2.4 74 54 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION EAST LINCOLN AVENUE S. LEMAY AVE. RIVERSIDE AVE. 1ST ST. 2ND ST. 3RD ST. WILLOW ST. POUDRE RIVER JEFFERSON ST. 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' n/a 30 15 30 60 MATCHLINE, SEE SHEET IR 2.3 1603 Oakridge Drive Fort Collins, CO 80525 (970) 223-7577 fax (970) 223-1827 Landscape Architecture Urban Design Graphic Design MATCHLINE, SEE SHEET IR 2.5 74 55 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION EAST LINCOLN AVENUE S. LEMAY AVE. RIVERSIDE AVE. 1ST ST. 2ND ST. 3RD ST. WILLOW ST. POUDRE RIVER JEFFERSON ST. 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' n/a 30 15 30 60 MATCHLINE, SEE SHEET IR 2.4 1603 Oakridge Drive Fort Collins, CO 80525 (970) 223-7577 fax (970) 223-1827 Landscape Architecture Urban Design Graphic Design MATCHLINE, SEE SHEET IR 2.6 74 56 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION EAST LINCOLN AVENUE S. LEMAY AVE. RIVERSIDE AVE. 1ST ST. 2ND ST. 3RD ST. WILLOW ST. POUDRE RIVER JEFFERSON ST. 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' n/a 30 15 30 60 MATCHLINE, SEE SHEET IR 2.5 1603 Oakridge Drive Fort Collins, CO 80525 (970) 223-7577 fax (970) 223-1827 Landscape Architecture Urban Design Graphic Design MATCHLINE, SEE SHEET IR 2.7 74 57 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION EAST LINCOLN AVENUE S. LEMAY AVE. RIVERSIDE AVE. 1ST ST. 2ND ST. 3RD ST. WILLOW ST. POUDRE RIVER JEFFERSON ST. 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' n/a 30 15 30 60 MATCHLINE, SEE SHEET IR 2.6 1603 Oakridge Drive Fort Collins, CO 80525 (970) 223-7577 fax (970) 223-1827 Landscape Architecture Urban Design Graphic Design MATCHLINE, SEE SHEET IR 2.8 74 58 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION EAST LINCOLN AVENUE S. LEMAY AVE. RIVERSIDE AVE. 1ST ST. 2ND ST. 3RD ST. WILLOW ST. POUDRE RIVER JEFFERSON ST. 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' n/a 30 15 30 60 MATCHLINE, SEE SHEET IR 2.7 1603 Oakridge Drive Fort Collins, CO 80525 (970) 223-7577 fax (970) 223-1827 Landscape Architecture Urban Design Graphic Design 74 59 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 3/$16 NOT FOR CONSTRUCTION 1603 Oakridge Drive Fort Collins, CO 80525 (970) 223-7577 fax (970) 223-1827 Landscape Architecture Urban Design Graphic Design 74 60 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 30% PLANS NOT FOR CONSTRUCTION PULL BOX SCHEDULE A 12"X12"X12" B 12"X16"X18" C 13"X24"X18" D 17"X30"X18" E 24"X30"X18" F 16"X16"X18" ELECTRICAL PLANS 74 61 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 11+70 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St ELECTRICAL ENLARGED BRIDGE PLAN MATCH LINE STA 5+70 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 30% PLANS NOT FOR CONSTRUCTION ELECTRICAL BRIDGE PLAN 0 HORIZONTAL SCALE: 1" = 20' 20 10 20 40 ELECTRICAL PLANS 74 62 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 18+00 MATCH LINE STA 11+70 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 30% PLANS NOT FOR CONSTRUCTION ELECTRICAL PLANS 74 63 B B B B B B B B B B T B B B B 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 24+00 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 18+00 30% PLANS NOT FOR CONSTRUCTION ELECTRICAL PLANS 74 64 T E 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 30+00 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 24+00 30% PLANS NOT FOR CONSTRUCTION ELECTRICAL PLANS 74 65 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 36+00 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 MATCH LINE STA 30+00 30% PLANS NOT FOR CONSTRUCTION ELECTRICAL PLANS 74 66 B B B B B B B B B B 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P MATCH LINE STA 36+00 E Lincoln Ave S Lemay Ave River Riverside Ave 1st St 2nd St 3rd St Willow St Poudre Jefferson St 0 HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 30' 6' 30 15 30 60 30% PLANS NOT FOR CONSTRUCTION ELECTRICAL PLANS 74 67 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 30% PLANS NOT FOR CONSTRUCTION ELECTRICAL DETAILS 74 68 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 30% PLANS NOT FOR CONSTRUCTION BRANCH CIRCUIT DESCRIPTION PROJECT LINCOLN AVENUE CORRIDOR PANEL: NEW P1 BRANCH CIRCUIT DESCRIPTION 240/120 VOLT BUS: 100A CU 3 PHASE 3 W MAIN: 100A MAIN LUGS ONLY LOCATION: - Fault Current Rating: 10,000 FED FROM: #NAME? NOTES: MOUNTING: SURFACE LOAD FOR CKTS 4 AND 6 ARE A SUM OF CKTS 17-32 ID BREAKER DESCRIPTION V - A CIRCUIT PHASE CIRCUIT V - A DESCRIPTION BREAKER ID UNSWITCHED CIRCUITS BY PNL MFG + 100/2 MAIN 0 1 A 2 150 CONTROLLER 20 + BY PNL MFG BY PNL MFG + | 0 3 B 4 0 SWITCHED LOAD CENTER 60/2 + BY PNL MFG BY PNL MFG + 20/2 SPD 0 5 A 6 0 LOAD FOR CKTS 17-32 | + BY PNL MFG BY PNL MFG + | 0 7 B 8 0 SPARE 60/2 L G 20 LANDSCAPING CONTROL 0 9 A 10 0 | L + ---- SPACE 0 11 B 12 0 SPACE ---- + + ---- SPACE 0 13 A 14 0 SPACE ---- + + ---- SPACE 0 15 B 16 0 SPACE ---- + CIRCUITS BELOW ARE SWITCHED BY PHOTOCELL MOUNTED ON THE POWER PEDESTAL CABINET X 20 BLOCK XXXX RECEPTS 0 17 A 18 0 BLOCK XXXX RECEPTS 20 X X 20 BLOCK XXXX RECEPTS 0 19 B 20 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 21 A 22 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 23 B 24 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 25 A 26 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 27 B 28 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 29 A 30 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 31 B 32 0 BLOCK XXXX RECEPTS 20 + CONNECTED LOAD (Downstream Loads Included) TOTALS LOAD SUMMARY Phase A 150 CATEGORY CONNECTED FACTOR CALCULATED V - A AMPS Phase B 0 LIGHTING 0 125% 0 0.0 GENERAL RECEPTACLE 0 100% 0 0.0 REMAINING GENERAL REC. 0 50% 0 0.0 ABCDDDEEE = A-B-C-DDD-EEE DEDICATED RECEPTACLE 0 100% 0 0.0 1 DIGIT CONDUCTOR METAL (A FOR ALUMINUM AND C FOR COPPER) MOTOR 0 100% 0 0.0 # PARALLEL RUNS B - LARGEST MOTOR 0 125% 0 0.0 # NON-GROUND CONDUCTORS (INCLUDE POWER AND NEUTRALS) + MISCELANEOUS 150 100% 150 0.6 3 DIGIT SIZING OF NON-GROUNDED CONDUCTORS KITCHEN 0 65% 0 0.0 3 DIGIT SIZING OF GROUND ELECTRIC HEAT 0 125% 0 0.0 Total Demand: 150 1 BRANCH CIRCUIT DESCRIPTION PROJECT LINCOLN AVENUE CORRIDOR PANEL: NEW P2 BRANCH CIRCUIT DESCRIPTION 240/120 VOLT BUS: 100A CU 3 PHASE 3 W MAIN: 100A MAIN LUGS ONLY LOCATION: - Fault Current Rating: 10,000 FED FROM: #NAME? NOTES: MOUNTING: SURFACE LOAD FOR CKTS 4 AND 6 ARE A SUM OF CKTS 17-32 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 30% PLANS NOT FOR CONSTRUCTION ELECTRICAL DETAILS 74 70 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 30% PLANS NOT FOR CONSTRUCTION LUMINAIRE SCHEDULE TYPE LAMPS DESCRIPTION FINISH MOUNTING MANUFACTURER AND PRODUCT # AA 32 LED, 3000K LED. 4000K LAMP COLOR. INTEGRAL TWISTLOCK RECEPTACLE IN LUMINAIRE HOUSING. BRONZE. SEE NOTE 1 SEE PEDESTRIAN LIGHT POLE DETAIL ARCHITECTURAL AREA LIGHTING #UCM-STR-H3-T3-32LED-3K-450-RAL-FTG-FLD-MO D: SPECIAL MOUNTING AA2 32 LED, 3000K SAME AS AA EXCEPT DUAL HEAD BRONZE. SEE NOTE 1 SEE PEDESTRIAN LIGHT POLE DETAIL ARCHITECTURAL AREA LIGHTING #UCM-STR-H3-T3-32LED-3K-450-RAL-FTG-FLD-MO D: SPECIAL MOUNTING AA-ALT 42 LED ASSEMBLY, 4000K LED. 4000K LAMP COLOR. INTEGRAL TWISTLOCK RECEPTACLE IN LUMINAIRE HOUSING. BRONZE SEE PEDESTRIAN LIGHT POLE DETAIL VISIONAIRE LIGHTING #ODN-2-L-T5-42LC-3-4L-UNV-AML-BZ-C6/H1-VA106- S-S1-4-BZ AA2-ALT 42 LED ASSEMBLY, 4000K SAME AS AA-ALTERATIVE EXCEPT DUAL HEAD BRONZE SEE PEDESTRIAN LIGHT POLE DETAIL VISIONAIRE LIGHTING #ODN-2-L-T5-42LC-3-4L-UNV-AML-BZ-C6/H1-VA106- S-D2-4-BZ POLE - ROUND NON TAPERED STEEL POLE. ASTM A500 GRADE 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 30% PLANS NOT FOR CONSTRUCTION ELECTRICAL DETAILS 74 72 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P 30% PLANS NOT FOR CONSTRUCTION ELECTRICAL DETAILS 74 73 ELECTRICAL DETAILS 74 74 B TUBING WITH MINIMUM YIELD STRENGTH OF 46,000 PSI. SHAFT IS FURNISHED WITH GROUND LUG INSIDE POLE, OPPOSITE HAND HOLE OPENING. CENTER LINE OF HAND HOLE IS 12" FROM BASE PLATE. BRONZE POLE VISIONAIRE LIGHTING #RNTS-4R-7-XX'-9BC-343-T4R-BZ-RBC WW 10.5 LED 10.5 LED STEP LIGHT FOR WET LOCATIONS LIGHT BRONZE PAINT SMOOTH RECESSED WINONA # STEP13-WL-12LONG-LST2A-(COLOR TEMPERATURE)-MVOLT-LBPS WW2 50W LED SURFACE MOUNT ROUGH SERVICE LUMINAIRE WITH LED LAMPING, DIE CAST ROUND HOUSING AND POLYCARBONATE LENS. BRONZE SURFACE LITHONIA # VGR5C-50LED-120-DNAT-LPI NOTE: 1. RAL #7047 OR #7035. MANUFACTURER TO SUBMIT 6"X6" MINIMUM PHYSICAL SAMPLE OF POWERCOAT COLORS #7047 AND #7035 FOR OWNER'S REPRESENTATIVE TO REVIEW. SELECT AND APPROVE PRIOR TO POWERCOATING FIXTURES. ELECTRICAL DETAILS 74 71 ID BREAKER DESCRIPTION V - A CIRCUIT PHASE CIRCUIT V - A DESCRIPTION BREAKER ID UNSWITCHED CIRCUITS BY PNL MFG + 100/2 MAIN 0 1 A 2 150 CONTROLLER 20 + BY PNL MFG BY PNL MFG + | 0 3 B 4 0 SWITCHED LOAD CENTER 60/2 + BY PNL MFG BY PNL MFG + 20/2 SPD 0 5 A 6 0 LOAD FOR CKTS 17-32 | + BY PNL MFG BY PNL MFG + | 0 7 B 8 0 SPARE 60/2 L G 20 LANDSCAPING CONTROL 0 9 A 10 0 | L + ---- SPACE 0 11 B 12 0 SPACE ---- + + ---- SPACE 0 13 A 14 0 SPACE ---- + + ---- SPACE 0 15 B 16 0 SPACE ---- + CIRCUITS BELOW ARE SWITCHED BY PHOTOCELL MOUNTED ON THE POWER PEDESTAL CABINET X 20 BLOCK XXXX RECEPTS 0 17 A 18 0 BLOCK XXXX RECEPTS 20 X X 20 BLOCK XXXX RECEPTS 0 19 B 20 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 21 A 22 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 23 B 24 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 25 A 26 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 27 B 28 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 29 A 30 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 31 B 32 0 BLOCK XXXX RECEPTS 20 + CONNECTED LOAD (Downstream Loads Included) TOTALS LOAD SUMMARY Phase A 150 CATEGORY CONNECTED FACTOR CALCULATED V - A AMPS Phase B 0 LIGHTING 0 125% 0 0.0 GENERAL RECEPTACLE 0 100% 0 0.0 REMAINING GENERAL REC. 0 50% 0 0.0 ABCDDDEEE = A-B-C-DDD-EEE DEDICATED RECEPTACLE 0 100% 0 0.0 1 DIGIT CONDUCTOR METAL (A FOR ALUMINUM AND C FOR COPPER) MOTOR 0 100% 0 0.0 # PARALLEL RUNS B - LARGEST MOTOR 0 125% 0 0.0 # NON-GROUND CONDUCTORS (INCLUDE POWER AND NEUTRALS) + MISCELANEOUS 150 100% 150 0.6 3 DIGIT SIZING OF NON-GROUNDED CONDUCTORS KITCHEN 0 65% 0 0.0 3 DIGIT SIZING OF GROUND ELECTRIC HEAT 0 125% 0 0.0 Total Demand: 150 1 BRANCH CIRCUIT DESCRIPTION PROJECT LINCOLN AVENUE CORRIDOR PANEL: NEW P3 BRANCH CIRCUIT DESCRIPTION 240/120 VOLT BUS: 100A CU 3 PHASE 3 W MAIN: 100A MAIN LUGS ONLY LOCATION: - Fault Current Rating: 10,000 FED FROM: #NAME? NOTES: MOUNTING: SURFACE LOAD FOR CKTS 4 AND 6 ARE A SUM OF CKTS 17-32 ID BREAKER DESCRIPTION V - A CIRCUIT PHASE CIRCUIT V - A DESCRIPTION BREAKER ID UNSWITCHED CIRCUITS BY PNL MFG + 100/2 MAIN 0 1 A 2 150 CONTROLLER 20 + BY PNL MFG BY PNL MFG + | 0 3 B 4 0 SWITCHED LOAD CENTER 60/2 + BY PNL MFG BY PNL MFG + 20/2 SPD 0 5 A 6 0 LOAD FOR CKTS 17-32 | + BY PNL MFG BY PNL MFG + | 0 7 B 8 0 SPARE 60/2 L G 20 LANDSCAPING CONTROL 0 9 A 10 0 | L + ---- SPACE 0 11 B 12 0 SPACE ---- + + ---- SPACE 0 13 A 14 0 SPACE ---- + + ---- SPACE 0 15 B 16 0 SPACE ---- + CIRCUITS BELOW ARE SWITCHED BY PHOTOCELL MOUNTED ON THE POWER PEDESTAL CABINET X 20 BLOCK XXXX RECEPTS 0 17 A 18 0 BLOCK XXXX RECEPTS 20 X X 20 BLOCK XXXX RECEPTS 0 19 B 20 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 21 A 22 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 23 B 24 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 25 A 26 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 27 B 28 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 29 A 30 0 BLOCK XXXX RECEPTS 20 + X 20 BLOCK XXXX RECEPTS 0 31 B 32 0 BLOCK XXXX RECEPTS 20 + CONNECTED LOAD (Downstream Loads Included) TOTALS LOAD SUMMARY Phase A 150 CATEGORY CONNECTED FACTOR CALCULATED V - A AMPS Phase B 0 LIGHTING 0 125% 0 0.0 GENERAL RECEPTACLE 0 100% 0 0.0 REMAINING GENERAL REC. 0 50% 0 0.0 ABCDDDEEE = A-B-C-DDD-EEE DEDICATED RECEPTACLE 0 100% 0 0.0 1 DIGIT CONDUCTOR METAL (A FOR ALUMINUM AND C FOR COPPER) MOTOR 0 100% 0 0.0 # PARALLEL RUNS B - LARGEST MOTOR 0 125% 0 0.0 # NON-GROUND CONDUCTORS (INCLUDE POWER AND NEUTRALS) + MISCELANEOUS 150 100% 150 0.6 3 DIGIT SIZING OF NON-GROUNDED CONDUCTORS KITCHEN 0 65% 0 0.0 3 DIGIT SIZING OF GROUND ELECTRIC HEAT 0 125% 0 0.0 Total Demand: 150 1 INTERWEST - Lincoln Corridor PANEL CONDUIT AND FEEDER SCHEDULE POWER CONDUCTORS GROUND CONDUCTOR CONDUIT SECTION # RUNS # CONDUCTOR SIZE (AWG/KCMIL) METAL INSUL. MAX 1WAY LENGTH L (FT) %VD # CONDUCTOR SIZE (AWG/KCMIL) METAL INSUL. MIN SIZE (INCHES) TYPE L (FT) NOTES A 1 3 3/0 AL XHHW ##### 1 1 AL XHHW 2 PVC -5 - B 1 1 6 AL XHHW ##### - - 1 PVC -5 - NOTES: 1. ALL MEASUREMENTS ARE APPROXIMATE, CONTRACTOR TO CONFIRM LENGTHS IN FIELD 2. # RUNS SIGNIFIES THE NUMBER OF PARALLEL RUNS OF CONDUIT AND CONDUCTORS PER SECTION 3. CONDUITS AND CABLES TO BE PERMANENTLY LABELED PER EQUIPMENT LABELING SCHEDULE 4. CONDUCTOR SIZE BASED UPON LENGTH OF RUN 5. CONTRACTOR TO PROVIDE A SINGLE CONDUIT TO EACH POLE CONTAINING BOTH A AND B TRAIN POWER CONDUCTORS FOR THE CONTROL PANEL DISCONNECTS, PROVIDE JBOX OR LT FOR CONNECTION TO AS NECESSARY. CONDUCTOR SIZE SHOWN TAKES REQUIRED DERATING INTO ACCOUNT. 6. VOLTAGE DROP SHOWN ABOVE IS FROM GENERATOR TO THE CONTROL PANEL DISCONNECTS AT THE INDIVIDUAL QUAD POLES. 7. CONDUCTOR SIZING PER 'X' USED ABOVE PER EACH POLE. 8. SIZING PER TAP RULE 9. LFMC = LIQUID TIGHT FLEXIBLE METAL CONDUIT ELECTRICAL DETAILS 74 69 RCP REINFORCED CONCRETE PIPE RD ROOF DRAIN RT RIGHT SAN SANITARY SEWER STA STATION SDMH STORM DRAIN MANHOLE TB THRUST BLOCK TOF TOP OF FOUNDATION TYP TYPICAL UE UTILITY EASEMENT VCP VITRIFIED CLAY PIPE VPC VERTICAL POINT OF CURVATURE VPI VERTICAL POINT OF INTERSECTION VPT VERTICAL POINT OF TANGENCY TOW TOP OF WALL BOW BOTTOM OF WALL CONTACTS: CITY OF FORT COLLINS ENGINEERING ERIKA KEETON 970.221.6521 BRAD BUCKMAN 970.416.4248 STORMWATER / WATER / WASTEWATER HEATHER MCDOWELL 970.224.6065 LIGHT & POWER JANET MCTAGUE 970.224.6154 TRAFFIC JOE OLSEN 970.221.6062 BRITNEY SORENSEN 970.416.2268 TRANSFORT TIMOTHY WILDER 970.416.2113 INTERWEST CONSULTING GROUP BOB ALMIRALL 970.460.8487 CENTURY LINK BILL JOHNSON 970.490.7501 XCEL ENERGY STEPHANIE RICH 970.493.2044 COMCAST DENNIS GREENWALT 970.484.7166 ELCO WATER DISTRICT RANDY SIDDENS 970.493.2044 Sheet No. Description Of Sheets PROPOSED STREET LIGHT PROPOSED STORM SEWER & MANHOLE EXISTING SANITARY SEWER MAIN PROPOSED TELEPHONE LINE EXISTING GAS EXISTING STORM SEWER EXISTING WATER MAIN EXISTING MANHOLE PROPOSED STORM INLET LEGEND PROPOSED CONCRETE PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING UTILITY POLE EXISTING GUY WIRE PROPOSED GAS EXISTING ELECTRIC LINE PROPOSED ELECTRIC LINE EXISTING TELEPHONE LINE EXISTING FIRE HYDRANT PROPOSED FIRE HYDRANT EXISTING WATER VALVE PROPOSED SANITARY SEWER & MANHOLE PROPOSED WATER LINE & VALVE EXISTING CONCRETE EXISTING FLOWLINE, CURB & GUTTER PROPOSED FLOWLINE, CURB & GUTTER PROPOSED FENCE EXISTING OVERHEAD UTILITY EXISTING STORM SEWER INLET PROPOSED UTILITY POLE EXISTING STREET LIGHT EXISTING FIBER OPTIC LINE EXISTING OVERHEAD ELECTRIC LINE EXISTING OVERHEAD TELEPHONE LINE PROPOSED OVERHEAD ELECTRIC LINE PROPOSED FIBER OPTIC LINE PROPOSED OVERHEAD TELEPHONE LINE EXISTING FENCE PROPOSED OVERHEAD UTILITY EXISTING CABLE TV PROPOSED CABLE TV EXISTING CONIFEROUS TREE EXISTING DECIDUOUS TREE EXISTING TRAFFIC SIGNAL S LEMAY AVE E LINCOLN AVE E MULBERRY ST RIVERSIDE AVE MULBERRY WATER RECLAMATION FACILITY S COLLEGE AVE SITE E VINE DR PROPOSED TRAFFIC SIGNAL COVER SHEET GENERAL NOTES TYPICAL SECTIONS HORIZONTAL CONTROL PLAN DEMOLITION PLAN - PAVEMENT DEMOLITION PLAN - UTILITIES FLOWLINE PLAN & PROFILE EXISTING TRAIL PLAN & PROFILE IN-SITU STORM OUTFALL STRIPING PLAN SITE PLAN LANDSCAPE PLAN IRRIGATION PLAN ELECTRICAL PLAN 1 2 - 3 4 5 - 9 10 - 14 15 - 18 19 - 27 28 29 30 - 34 35 - 42 43 - 50 51-60 61 - 74 3/$16 NOT FOR CONSTRUCTION 74 1