Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9163085 (2)May 9, 2016 Dear Bruce, Thank you for the opportunity to provide you with a quotation for a Lester Uni-Frame Embedded building. For your review, please see the enclosed proposal, which is based on our understanding of your building requirements up to this point. As you review it, please be assured that we understand new building projects always come with many decisions and a fair amount of stress! Our goal is to help make those decisions easier and reduce your stress with what we feel is our industry’s most responsive and collaborative buying experience. Some other important factors set us apart and help us offer long-term customer satisfaction. For instance, the renowned quality and engineering standards of Lester buildings means you get the most value from your investment. In fact, with a solid reputation going back to 1947, Lester Buildings feature: • Unmatched design flexibility to meet your unique needs • Fast, cost-effective construction • Strong, straight and true structures, with excellent curb appeal • An industry-leading Lifetime Structural Design warranty Of course, we do our own part by providing full-service project planning and construction services. We do so with one goal in mind: to complete your project just as you envisioned it, in the agreed-upon time frame. Our team here at Rite Hand Construction Inc. stands ready to work with you and we look forward to your comments and questions. Thanks again and, as always, feel free to contact me anytime at 970-397-9058 or dickschantz@msn.com. Respectfully Submitted, Rite Hand Construction Inc. www.ritehandconstruction.com Agreement Building Location Rite Hand Construction Inc. proposes to deliver, furnish and erect to industry standards the described building to the following location: Lester Building Systems, 135 8th Street, Greeley, CO 80634. Building Description Lester Structural System: Uni-Frame Embedded (2) Width: 12'-0" Length: 12'-0" Clear Height: 12'-0" Building Code: IBC-2015 End Use: Personal Use - Other Personal Use Risk Class: General Use Ground Snow Load (psf): 35.7 UniForm Roof Snow Load (psf): 30 Roof Dead Load (psf): 4 Ceiling Dead Load (psf): 5 This Warranty allows for a properly designed Snow Retention Trim to be installed on this building. Design Wind Speed (mph): 115 Allowable Warranted Wind Speed (mph): 90.9 Exposure Category: C Basic Construction Specifications Lester Uni-Frame Embedded System: See Drawings. Roof and Roof Accessories Material: Uni-Rib 29ga - G60 SMP Insulation: None Sheathing: None Fasteners: Colored Screws Roof Slope: 3 / 12 Overhangs: S1: 0'-0"; S2: 0'-0"; E1: 0'-0"; E2: 0'-0" Annex or Dormers: None Additional: Exterior Walls EW1 EW2 SW1 SW2 Panel Material: Uni-Rib 29ga - G60 SMP Panel Material: Uni-Rib 29ga - G60 SMP Panel Material: Uni-Rib 29ga - G60 SMP Panel Material: Uni-Rib 29ga - G60 SMP Fasteners: Colored Screws Fasteners: Colored Screws Fasteners: Colored Screws Fasteners: Colored Screws Sheathing: None Sheathing: None Sheathing: None Sheathing: None Insulation: None Insulation: None Insulation: None Insulation: None Wainscot Material: None Wainscot Material: None Wainscot Material: None Wainscot Material: None Wainscot Insulation: None Wainscot Insulation: None Wainscot Insulation: None Wainscot Insulation: None Gable Material: None Gable Material: None Eave Material: None Eave Material: None Additional: Interior Walls/Partition Wall/Ceiling EW1 EW2 SW1 Additional Material: None Material: None Material: None Insulation: None Insulation: None Insulation: None SW2 Ceiling Partition Wall Material: None Material: None Material: None Insulation: None Insulation: None Additional: Exterior and interior finishes, require “surface mounted” electrical and plumbing fixtures and connections. Any holes cut into the final finish material will require a labor and material surcharge. Consult your salesperson for an estimate. Porches Refer to floor plan and or elevation drawings for additional information. ID Width Height Slope Drop Roof Finish Eave Finish Over Hang Angle Block Y Br. Gutter D.S. Additional: Openings Schedule Refer to floor plan and or elevation drawings, AJ Door and Windows Product Bulletin, and Openings Schedule Report for additional information. ID Quantity Type / Model / Size A 1 Clear Opening - Sidewall / 12' Wide x 12' High Clear Opening Additional: Accessory Schedule Refer to Accessory Product Bulletins for additional information. ID Quantity Type / Model / Size A 1 Ridgecap - Metal / Ridgecap - Metal / Ridgecap - Solid Additional: Additional Accessories Gutters: S1: None S2: None Downspouts: S1: 0 S2: 0 Snow Retention Trim: S1: No S2: No Additional: Concrete Specifications Additional: Building Color Schedule Roof Colors Wall Colors Opening & Trim Colors Additional: Inclusions/Exclusions Item Includes Excludes Site preparation X Fill and preparation needed for concrete grade heights X Lester building material package X Labor X Delivery X Insulation X General liability and workmans’ comp. X Signed engineered drawings X Gutters and Downspouts X Local building permits (Excludes Fee’s) X Concrete and placement of concrete X Jobsite electricity X Final exterior landscaping - grading X Electrical hook-up of overhead doors X Interior finishing X Dumpster X Complete construction project debris removal X State Tax Only X Exclusions Note All items not specifically listed above or noted elsewhere are excluded from this proposal. The investment proposal assumes building site is prepared and level, with no underground obstructions, has easy and obtainable Tractor/Trailer access and has no other features that can inhibit efficient construction performance. Any delays or additional costs resulting from owner(s) or owner(s) agents negligence to or failure to comply with any part of this contract, or have not completed site preparation prior to start of construction will be charged extra material and labor according to Change Order Procedures and Schedules. Total Building Investment $12,378.74 Total Price for (2) 12x12x12 Structures Payment Terms: • 20% (Down Payment) of materials due upon signing of contract • 40% (Delivery Payment) due upon delivery of materials • 20% (Truss Payment) due upon completion of truss installation • 20% (Final Payment) due upon building completion. Terms: • Owner is responsible for full payment of material at the time of unloading. • Payment terms of materials must be paid before construction begins • Some material such as insulation, interior liner, garage doors may not be onsite at the time of erection, and may be delivered at a later date. Items not delivered will billed according to site delivery. • Regal Red, Metallic Champagne, Metallic Copper Color is only available in 26 Gauge and is not quoted in proposal Notes: RHC will provide the best price possible for the items below and may be provided locally if included in the above proposal. • Garage Doors in proposal are white only; other color options may be subject to price change. • Insulation • Interior Liner Authorized this ________ day of _________________________, 20____ By (Buyer Signature) __________________________________________ Printed Name: _______________________________________________ By (Dick Schantz) ____________________________________________ Printed Name: _______________________________________________