Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7491 BLOCK 32 CM/GC IMPROVEMENTS (15)Your Company Slogan Address: 700 Wood Street DATE: April 19, 2016 FOR: USC Remodel ITEM AMOUNT COR 001 (157,058.00) COR 002 - COR 003 4,905.00 COR 004 (3,130.00) COR 006 5,257.00 COR 007 2,756.00 COR 008 7,639.00 TOTAL $ (139,631.00) This attachment becomes part of the City Change Order Form Construction Change Order 001 USC IGMP to 100% CD FCGMP DESCRIPTION PR03 Lithonia Lighting PR02, PR05 Geothermal Trenching Piping PR05 Geothermal Piping Change FD - Fence work for Geothermal Scope ASI002 Change Hardware US23D to US4 Erosion Control at Fence Line