Address: 222 LaPorte Avenue, Fort Collins, CO. 80522 DATE: March 25, 2016
FOR: UAB Construction
ITEM AMOUNT
COR 050 (23,484.00)
COR 051 1,149.00
COR 054 RFI 77R Eliminate condensate pumps on first floor (6,323.00)
COR 056 PR 31R1 Add makeup air to pump room 109 6,910.00
COR 057 PR 40 P4 Light changes 0.00
COR 058 (214.00)
COR 059 3,490.00
COR 060 RFI 102 Add Baby changing stations to restrooms on first floor 759.00
COR 061 PR 36 DP Sensor on 3rd Floor (1,855.00)
COR 062 PR 37 ERV Exhaust Fan Revisions 0.00
COR 063 PR 38 Added Return Air Grille 0.00
COR 064R1 ASI 09 - Add access panels to ceilings 0.00
COR 066 7,494.00
COR 067 January Weather Conditions 9,071.00
COR 069 11,613.00
COR 070 RFI 69 - Anchor Bolt Correction detail - Using A/P Construction Contingency 0.00
COR 071R1 4,689.00
COR 072 RFI 57 Change Acrylic Panel thickness to 1/4" since 3/8" material discontinued (2,915.00)
COR 074R1 (3,183.00)
COR 075 49,830.00
COR 077 4,890.00
COR 078 (37,000.00)
TOTAL $ 24,921.00
This attachment becomes part of the City Change Order Form
PR 42 Add Egress doors to satisfy Safety, Security & Risk Management
FGMP Clarifications and Contract Terms & Conditions
Construction Change Order 004
ASI 07 Deleted the heap pumps serving Electrical rooms 124, 212, 312
DESCRIPTION
RFI 75 Added cercuitry for heat trace requirement
PR 35 Floor Flatness TM Reconciliation
PR 27, RFI 93, RFI 94 Added door strikes and change door swing
Expedite MDP Gear
PR 39 Create 3rd floor office in SE corner with ceiling
PR 33 Add transfer air z-ducts for return air to heat pumps
PR 44 Remove vapor barrier from roofing scope
February Weather Conditions
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 050 Date: 1/28/2016
To: Brian Hergott From: Kelly Sevier
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
ASI 07 Delete Electrical Room Heat Pumps, Modifications -$23,484 0
COR Reference Reason Required By Status
Design Change 2/4/2016 BIC - Owner
COR Notes
See below for costs to delete heat pumps at small electrical rooms, and make other mechanical and electrical modifications per ASI 07. Add
costs to provide high efficiency heat pumps were previously provided and approved under COR 14.
PCO Description Proposed Amount
Potential Change Order Details
066 - Delete WSHP 1-15, 2-15, and 3-17 serving the small electrical rooms, along -$21,680
with associated duct, piping, controls, etc. Revise EF-1, and airflow rates for
other heat pumps per ASI 07 and USE COR #013 dated 1/25/2016.
066 - Revise electrical circuits and panels per heat pump changes indicated in ASI -$744
07, per GE quote dated 1/19/2016.
066 - 0.65% Performance Bond -$146
066 - 1.00% General Liability Ins -$226
066 - 1.25% Subguard Insurance -$285
066 - 1.75% Fee -$404
Total for PCO 066 -$23,484
Approved By:
Signature
Printed Name
Date 2-5-16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 051 Date: 1/28/2016
To: Brian Hergott From: Kelly Sevier
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
RFI 075 - Heat Trace Requirements $1,149 0
COR Reference Reason Required By Status
Design Change 2/4/2016 BIC - Owner
COR Notes
See below for costs to add electrical circuitry for heat tape at piping to the cooling tower per RFI 75.
PCO Description Proposed Amount
Potential Change Order Details
067 - Provide circuitry for heat tape for piping to cooling tower per RFI 75 and GE $1,097
quote dated 1/20/2016.
067 - 0.65% Performance Bond $7
067 - 1.00% General Liability Ins $11
067 - 1.25% Subguard Insurance $14
067 - 1.75% Fee $20
Total for PCO 067 $1,149
Approved By:
Signature
Printed Name
Date 2-5-16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 054 Date: 3/8/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
RFI 077R Condensate Pumps on First Floor Elimination -$6,323 0
COR Reference Reason Required By Status
Field Condition 3/17/2016 BIC - Owner
COR Notes
See below for credit to delete level 1 condensate pumps and associated receptacles per RFI 77R .
PCO Description Proposed Amount
Potential Change Order Details
072 - Delete all first floor condensate pumps per RFI 77R and USE COR #009 -$4,161
REVISED 2/16/2016
072 - Delete wiring and receptacles on first floor designated for condensate -$1,877
pumps, mark circuits as spares per RFI 77R and GE proposal Revised
2/16/2016
072 - 0.65% Performance Bond -$39
072 - 1.00% General Liability Ins -$61
072 - 1.25% Subguard Insurance -$77
072 - 1.75% Fee -$109
Total for PCO 072 -$6,323
Approved By:
Signature
Printed Name
Date 3/15/16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 056 Date: 3/8/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
PR 031 Pump Room Makeup Air- REVISED 3 2 2016 $6,910 0
COR Reference Reason Required By Status
M101 - PR031 Design Change 3/11/2016 BIC - Owner
COR Notes
M-101 Added outside air duct to pump room 109
Duct insulation
Louver, damper, grille
Balance
Controls - Damper interlocked with EF-4
See below for costs to add outside air duct and motorized damper to Pump Room 109 per PR 31.
PCO Description Proposed Amount
Potential Change Order Details
077 - Add outside air duct, motorized damper, and associated insulation, $6,598
balancing, low voltage wiring and controls per PR 031and USE COR #012
REVISED 2 29 2016 -Re-Routed
077 - 0.65% Performance Bond $43
077 - 1.00% General Liability Ins $66
077 - 1.25% Subguard Insurance $84
077 - 1.75% Fee $119
Total for PCO 077 $6,910
Approved By:
Signature
Printed Name
Date
Brian Hergott - Project Manager
3-8-16
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 057 Date: 2/16/2016
To: Brian Hergott From: Kelly Sevier
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
PR 040 P4 Lights $0 0
COR Reference Reason Required By Status
Field Condition 2/23/2016 BIC - Owner
COR Notes
Gregory Electric has verified that there is no cost change to switch P4 fixtures to 19" models per PR 40. In order to avoid delaying fixture
production, Gregory would like to maintain the original quantity of P4 fixtures, and will turn over the (1) P4 fixture that was deleted as extra
Owner's stock. Please advise as soon as possible to avoid any schedule delays.
PCO Description Proposed Amount
Potential Change Order Details
088 - Provide 19" fixtures ILO specified 28" fixtures for all P4 lights. Modify layout $0
and elevation per PR 40, and GE email dated 2/10/2016. Turn over (1)
deleted P4 fixture as Owner Stock - NO COST.
Total for PCO 088 $0
Approved By:
Signature
Printed Name
Date 2-16-16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 058 Date: 2/17/2016
To: Brian Hergott From: Kelly Sevier
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
PR 035 Floor Flatness - T&M Reconciliation -$214 0
COR Reference Reason Required By Status
Owner Change 2/24/2016 BIC - Owner
COR Notes
This COR will credit back the difference between the NTE price of COR #49 and the revised finishing costs from Three Brothers Concrete for
the polished concrete area on level 1.
PCO Description Proposed Amount
Potential Change Order Details
089 - Increase FF from 25 to 35 at polished concrete area on Level 1 SOG per PR $1,228
35 and 3 Brothers Quote #4811 revised 2/12/2016.
089 - Polish concrete as included in base bid. FF changes from 25 to 35 on east $0
half of Level 1 SOG - No Cost from Concrete Floor Systems
089 - Credit $1,500 T&M NTE approved in COR #49 and included in OCO #003. -$1,500
089 - 0.65% Performance Bond $8
089 - 1.00% General Liability Ins $12
089 - 1.25% Subguard Insurance $16
089 - 1.75% Fee $22
Total for PCO 089 -$214
Approved By:
Signature
Printed Name
Date 2/23/16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 059 Date: 2/26/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
PR 027, RFI 093, RFI 094 Added Door Strikes and Change of Door Swing $3,490 0
COR Reference Reason Required By Status
PR 027 Design Change 3/2/2016 BIC - Owner
COR Notes
Change Swing on 124, 212, 312 per PR 27.
Add Elec. Strike and Card readers to 112 and 131B per PR27 and RFI 93
Add Elec. Strike and Card Reader to 125 Per RFI # 94
PCO Description Proposed Amount
Potential Change Order Details
076 - Colorado Door Ways Proposal # 05 Dated 1 26 2016 for PR 27 RFI 93 RFI $3,332
94 Add Closer, Add Card Readers to 112, 215, 131B
076 - 0.65% Performance Bond $22
076 - 1.00% General Liability Ins $34
076 - 1.25% Subguard Insurance $42
076 - 1.75% Fee $60
Total for PCO 076 $3,490
Approved By:
Signature
Printed Name
Date 3/3/16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 060 Date: 2/26/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
RFI # 102 Added Baby Changers $759 0
COR Reference Reason Required By Status
Contingency 3/2/2016 BIC - Owner
COR Notes
Per RFI 102 Baby Changing Stations need to be wall mounted in restrooms 118 and 120.
PCO Description Proposed Amount
Potential Change Order Details
091 - ABS Cost to install Specified Baby Changer per RFI 102 and ABS COR $600
4560 Dated 2 16 2016 - Includes Installation of Items - Excludes Hand
Dryers
091 - AP Backing Charges to Add Wall Mounted Baby Changers per RFI # 102 $124
091 - 0.65% Performance Bond $5
091 - 1.00% General Liability Ins $7
091 - 1.25% Subguard Insurance $9
091 - 1.75% Fee $13
Total for PCO 091 $759
Approved By:
Signature
Printed Name
Date 3/3/16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 061 Date: 2/26/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
PR 036 DP Sensor on Level 3 -$1,855 0
COR Reference Reason Required By Status
M 103 Design Change 3/2/2016 BIC - Owner
COR Notes
Mechanical
Revise Sheet M-103 as follows:
• Remove secondary condenser water loop differential pressure
sensor on Level 3.
PCO Description Proposed Amount
Potential Change Order Details
092 - USE Engineering COR # 19 dated 2/19/2016 3rd Floor DP Removal - PR -$1,771
036 DP Sensor on Level 3 - Removed secondary condenser water Loop
differential pressure sensor on Level 3
092 - Gregory Electric No Cost per Email for PR036 DP Sensor on Level 3 $0
092 - 0.65% Performance Bond -$12
092 - 1.00% General Liability Ins -$18
092 - 1.25% Subguard Insurance -$23
092 - 1.75% Fee -$32
Total for PCO 092 -$1,855
Approved By:
Signature
Printed Name
Date 3-8-16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 062 Date: 2/26/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
PR 37 ERV Exhaust Fan $0 0
COR Reference Reason Required By Status
M502 Design Change 3/2/2016 BIC - Owner
COR Notes
Revise Sheet M-502 as follow:
• Add recirculation damper to control schematic and points list
• Revise sequence of operation for exhaust fan tracking to be a
percentage offset from the supply fan.
Revise sequence of operation for heat wheel frost protection per
manufacturer’s recommendations.
PCO Description Proposed Amount
Potential Change Order Details
093 - Gregory Electric No Cost per Email for PR 037 ERV Exhaust Fan $0
093 - USE NO Cost Email for PR 037 for the ERV Exhaust Fan $0
Total for PCO 093 $0
Approved By:
Signature
Printed Name
Date
3-8-16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 063 Date: 2/26/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
PR 038 Added RA Grille $0 0
COR Reference Reason Required By Status
m101 Design Change 3/2/2016 BIC - Owner
COR Notes
Revise Sheet M-101 as follow:
• Add return air grille with damper to main return air duct fro Level 1 return
air.
PCO Description Proposed Amount
Potential Change Order Details
094 - Gregory Electric NO Cost per Email PR 038 Added RA Grille Dated 2 19 $0
2016
094 - USE No Cost Email Per PR 038 Added RA Grille Dated 2/16/2016 $0
Total for PCO 094 $0
Approved By:
Signature
Printed Name
Date 3/3/16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 064 Date: 2/26/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
ASI 009 Added Access Panels in Hard Lid -REVISED $0 0
COR Reference Reason Required By Status
M101 M102 M103 Design Change 3/16/2016 BIC - Owner
COR Notes
NO Cost to Add Access Panels to Hard Lid per ASI 009
• Add General Notes regarding provision for access panels to maintain accessibility to mechanical
equipment above hard ceilings.
PCO Description Proposed Amount
Potential Change Order Details
090 - REVISED NO COST PER EMAIL DATED 3 16 2016 US Engineering No $0
cost to add Access Panels in Hard Lids per ASI 0009 (M101, M102, M103)
090 - Frame rough openings for access panels added per ASI 009 - Holsinger $0
Drywall NO Cost Per Email dated 2/26/2016
Total for PCO 090 $0
Approved By:
Signature
Printed Name
Date 3-24-16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 066 Date: 2/29/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
Cost to Quick Ship Switch Gear in 8 Weeks- Expedite Shipping Costs $7,494 0
COR Reference Reason Required By Status
Email dated 2 16 2016 Design Change 3/4/2016 BIC - A&P
COR Notes
Price associated with 8 Week quick ship - expediting the main gear.
Approved via Email on 2 16 2016.
PCO Description Proposed Amount
Potential Change Order Details
078 - Gregory Electric Expedite Charges for the Switch Gear per Quote Dated 2 $7,156
16 2016- approved per CoFC email 2-16-2016
078 - 0.65% Performance Bond $47
078 - 1.00% General Liability Ins $72
078 - 1.25% Subguard Insurance $91
078 - 1.75% Fee $129
Total for PCO 078 $7,494
Approved By:
Signature
Printed Name
Date 3/3/16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 067 Date: 2/19/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
January Weather Conditions $9,071 0
COR Reference Reason Required By Status
Field Condition 3/16/2016 BIC - Owner
COR Notes
GC - Weather Conditions for January Includes
Material, Small Tools, and Equipment rental.
PCO Description Proposed Amount
Potential Change Order Details
070 - January material invoices for Weather Conditions $7,086
070 - Power to Ground Thaw per Gregory Electric cost dated 1/29/2016. $1,575
070 - Credit Back Weather Condition Allowance -$60,000
070 - Add for Approved Weather Condition Cost in October 2015 Pay Application $728
070 - Add for Approved Weather Condition Cost in November 2015 Pay $2,621
Application
070 - Add for Approved Weather Condition Cost in December 2015 Pay $10,527
Application
070 - Add for Weather Condition Cost in January 2016 Pay Application $46,124
070 - 0.65% Performance Bond $56
070 - 1.00% General Liability Ins $87
070 - 1.25% Subguard Insurance $110
070 - 1.75% Fee $156
Total for PCO 070 $9,071
Approved By:
Signature
Printed Name
Date 3-22-16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 069 Date: 3/2/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
PR 039 Level 3 SE Office SAT $11,613 0
COR Reference Reason Required By Status
PR-32/SK2, EA103, M-103B, E203, E403 Design Change 3/9/2016 BIC - Owner
COR Notes
* Create Office 301A at southeast corner of Open Office 301.
Install gypsum board and steel stud walls; Office walls to bottom of joists; wing wall to
60” a.f.f.; refer to attached SK1. Install Full Glass wall up to 8’-0” a.f.f.; refer to attached SK1. Install door marked 301 A with CR Laurence
door kits. Reference Cat. No.
BP4SA12SL; door to be ½” clear fully tempered glass.
* Remove 5 CAPs ceiling tiles at Office 301A.
Add lay-in SAT ceiling at 10’-0” AFF, center in Office 301A; refer to attached SK2
* The following revisions have been made to lighting at Open Office 301 to account for the
addition of Office 301A
*Revise location of thermostat for WSHP-3-7 to Office 301A
Add additional thermostat in Open Office 301. Both thermostats in Open Office 301
and Office 301A are averaging type thermostats
Add return air grille in Office 301A
* Relocate four furniture junction boxes to accommodate new office 301A
Add three duplex and one 4-ples receptacles and three data drops to new Office
301A.
*Revise Panel L3A for new circuit 15, added for new receptacles noted above
PCO Description Proposed Amount
Potential Change Order Details
087 - PR 039 Level 3 SE Office SAT Holsinger CO COR # 06 Dated 2 11 2016 $2,683
087 - PR 039 Level 3 SE Office SAT Gregory Electric Quote dated 2 9 2016 $4,977
087 - PR 039 Level 3 SE Office SAT Painting Maximum Paint dated 2 4 2016 $577
087 - PR 039 Level 3 SE Office SAT Glass Commercial Glass on City Form dated $2,852
2 29 2016
087 - PR 039 Level 3 SE Office SAT US Engineering NO Cost per EMAIL 02 11 $0
2016 NO Cost for JCI per Email 2 11 2016
087 - 0.65% Performance Bond $72
087 - 1.00% General Liability Ins $112
087 - 1.25% Subguard Insurance $141
087 - 1.75% Fee $200
Total for PCO 087 $11,613
Approved By:
Signature
Printed Name
Date 3/24/16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 070 Date: 3/2/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
RFI 069 Anchor Bolt Correction Detail $0 0
COR Reference Reason Required By Status
RFI # 069 Contingency 3/9/2016 BIC - Owner
COR Notes
RFI #69 was created to provide a Detail for AB's being in the incorrect position. SFI Provided All Thread, Pipe Sleeve and Couplers to
correct the issue. Superior Steel Connectors provided the labor to install
PCO Description Proposed Amount
Potential Change Order Details
082 - RFI # 069 Anchor Bolt Correction Detail Steel Fabricators CO 003 Dated 1 $1,163
16 2016
082 - Construction Contingency -$1,163
Total for PCO 082 $0
Approved By:
Signature
Printed Name
Date 3-21-16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 071 Date: 3/2/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
PR 033 Transfer Air Revisions $4,689 0
COR Reference Reason Required By Status
M101, M-102, M103, M104 Design Change 3/17/2016 BIC - Owner
COR Notes
* Added: Add transfer air openings and z-duct as necessary to
provide return air paths for heat pumps
*Added: Add transfer air openings and z-duct as necessary to
provide return air paths for heat pumps
*Added: Added detail for “Z” transfer duct
PCO Description Proposed Amount
Potential Change Order Details
083 - PR 033 Add transfer grilles (each side of wall) and z-duct -US Engineering $3,332
COR # 015 dated 1 29 2016
083 - PR 033 Transfer Air Revisions Holsinger COR # 7 Dated 2/18/2016- Frame $1,145
and Cut 28 transfer air openings above ceiling.
083 - 0.65% Performance Bond $29
083 - 1.00% General Liability Ins $45
083 - 1.25% Subguard Insurance $57
083 - 1.75% Fee $81
Total for PCO 083 $4,689
Approved By:
Signature
Printed Name
Date 3/15/16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 072 Date: 3/2/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
RFI 057 Acrylic Panel Thickness -$2,915 0
COR Reference Reason Required By Status
RFI # 057 Acrylic Panel Thickness- AF001 Field Condition 3/9/2016 BIC - Owner
COR Notes
Q: After requesting physical samples of the Designtex Acrylic Panels (GP-1A, GP-1B, GP-1C), it was discovered that the 3/8"
thick material has recently been discontinued by the manufacturer.
A: The 1/4" material shall be provided in 2'x8' panels with a "H" trim at vertical seams. In addition to the "H" trim at the
seams, a "U" channel support shall be provided at the ends of the panel system.
PCO Description Proposed Amount
Potential Change Order Details
085 - RFI # 057 Acrylic Panel Thickness LA Woodworks COR 2 Credit for Product -$2,783
Change
085 - 0.65% Performance Bond -$18
085 - 1.00% General Liability Ins -$28
085 - 1.25% Subguard Insurance -$35
085 - 1.75% Fee -$50
Total for PCO 085 -$2,915
Approved By:
Signature
Printed Name
Date 3-8-16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 074 Date: 3/24/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
PR 044 Vapor Retarder Deduct -$3,183 0
COR Reference Reason Required By Status
PR 044 - 07 54 23 2.05 Field Condition 3/25/2016 BIC - A&P
COR Notes
Delete, in its entirety, paragraph 2.05 from specification section 07 54 23
Thermoplastic Polyolefin (TPO) Roofing for the self-adhering sheet vapor
retarder.
• The vapor retarder shall also be removed from any related
details within the construction documents.
PCO Description Proposed Amount
Potential Change Order Details
096 - Roof Check Credit COR Dated 3 8 2016 on City of Ft. Collins Form for PR -$3,039
044 Vapor Retarder - includes the delta for the restocking fee.
096 - 0.65% Performance Bond -$20
096 - 1.00% General Liability Ins -$31
096 - 1.25% Subguard Insurance -$39
096 - 1.75% Fee -$55
Total for PCO 096 -$3,183
Approved By:
Signature
Printed Name
Date 3-24-16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 075 Date: 3/14/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
Weather Conditions for February $49,830 0
COR Reference Reason Required By Status
Field Condition 3/25/2016 BIC - A&P
COR Notes
Winter Conditions / Weather Conditions for February 2016
Cost include: Temp Heat, Equipment, Small Tools, and Labor
PCO Description Proposed Amount
Potential Change Order Details
081 - Equipment Rental Temp Heat associated with Winter Protection / Weather $32,554
conditions for Month of February 2016
081 - Labor Costs associated with Winter Protection / Weather conditions for $14,616
Month of February 2016
081 - Sales Taxes Paid for CoFC - Weather Conditions Period 1/1/2016 - $410
1/31/2016 Billed 2/17/2016
081 - 0.65% Performance Bond $309
081 - 1.00% General Liability Ins $479
081 - 1.25% Subguard Insurance $605
081 - 1.75% Fee $857
Total for PCO 081 $49,830
Approved By:
Signature
Printed Name
Date
3-22-16
Brian Hergott - Project Manager
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 077 Date: 3/16/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
Change Order Request Description Proposed Amount Days Req
PR 042 Add Storage Doors $4,890 0
COR Reference Reason Required By Status
Design Change 3/23/2016 BIC - A&P
COR Notes
PR 042 Add Storage Doors
Colorado Doorways
AP Labor
PCO Description Proposed Amount
Potential Change Order Details
097 - Holsinger NO Cost Email dated 2 26 2016 for PR 042 to add doors at 3 $0
locations
097 - AP Labor Costs dated 3 16 2016 on City Form 4.5 hours per door includes $722
handling
097 - Colorado Doorways COR 07 dated 3 3 2016- For PR 042- The following is $3,948
to add 3 openings 130A, 317A & 336A per PR 42.
3ea 3070 flush wood doors $891.30
3ea 3070 alum. Frames 487 CLRA $476.25
9ea Hinges 5BB1 4 1/2" $44.82
3ea Locks ND80TD $836.70
3ea Cores 20-740 $227.85
3ea Closers 4011 REG $712.62
3ea Kickplates 8400 10x34 $53.94
3ea Wall Bumpers WS407 $4.50
Freight $185
Sub Total $3,432.98
15% $514.95
097 - 0.65% Performance Bond $30
097 - 1.00% General Liability Ins $47
097 - 1.25% Subguard Insurance $59
097 - 1.75% Fee $84
Total for PCO 097 $4,890
Approved By:
Signature
Printed Name
Date 3-22-16
Brian Hergott - Project Manager
Detailed, Grouped by Each Number
Change Order Request
BLOCK 32 UAB CONST PHASE Project # 7106.00 AP MOUNTAIN STATES, LLC
222 LAPORTE AVE, FORT COLLINS, CO 80522 Tel: Fax:
Change Order Request: 078 Date: 3/16/2016
To: Brian Hergott From: Rick Ritter
CITY OF FORT COLLINS ADOLFSON & PETERSON, INC.
797 VENTURA ST.
AURORA, CO 80011
215 N Mason Street
Fort Collins, CO 80522
Description Category Status
Correct UAB FGMP Amount and Terms & Conditions BIC - Owner
Reference Required By Days Req Amt Req
3/23/2016 0 -37,000
Notes
This COR is being submitted in order to correct the FGMP amount and modify the General Conditions of the Construction Contract . The
delta between the IGMP amount and the FGMP amount is being credited to the City of Fort Collins . See attached letter dated 3/16/2016
further explaining PCO's 98, 99, 100, 101 & 102.
PCO No Date Reference Amt Prop Days Req Category Reason
Description Notes
098 3/16/2016 0 0 Reimbursable Bid Omission
Allow Bonds and Insurance as Cost of Work
099 3/16/2016 0 0 Reimbursable Bid Omission
Reduce Requirement for Self Performed Work to 12%
100 3/16/2016 7,000 0 Reimbursable Owner Change
Additional Pre-Construction Services UAB - Correct Change Order
#2 on PO 9143478
101 3/16/2016 4,200 0 Reimbursable Owner Change
Additional Pre-Construction Services UAB - Extend from August
2015 to November 2015
102 3/16/2016 -48,200 0 Reimbursable Owner Change
Credit Back Pre-Construction Services included in FGMP and PO
#9143478 & #9143189
Approved By:
Signature
Name Date
Prolog Converge Printed on: 3/16/2016 cm_projects Page 1
3-22-16
Brian Hergott - Project Manager
March 16, 2016
Brian Hergott, Project Manager
City of Fort Collins
215 North Mason Street
PO Box 580
Fort Collins, CO 80522
RE: Utility Administration Building (UAB) – 222 Laporte Avenue – CoFC PO Number 9155486
COR #078 – Initial Guaranteed Max Price (IGMP) to Final Guaranteed Max Price (FGMP)
Explanation of PCO’s included in COR #078
Brian,
We are attaching this letter to COR #078 to further explain the PCO’s that have been included.
PCO #098 – Allow Bonds and Insurance as Cost of Work:
The Request for Proposal (RFP) shows Bonds and Insurance as included in the General Conditions (GC’s).
AP excluded cost of Bonds and Insurance from the GC’s in response to RFP. CoFC agreed to pay the cost
of Bonds and Insurance outside of GC’s since they were not included the amounts submitted. The following
changes to the General Conditions of the Construction Contract are required to document this agreement:
Paragraph 11.4.5.9 – Modify this paragraph to read “Cost of premiums for all Bonds and all
insurances required.”
Paragraph 11.5.4 – Delete this paragraph since the cost of premiums for all Bonds and for all
Insurances are now included in the Cost of Work.
This item was discussed and agreed to by Brian Hergott in a meeting on 3/4/2016.
PCO #099 – Reduce Requirement for Self-Performed Work to 12%:
In order to obtain the most competitive pricing for this project, AP solicited bids from subcontractors for all
areas of work. As a result, AP cannot self-perform 20 percent of the work as stated in paragraph 6.8.1 of
the General Conditions of the Construction Contract. AP is requesting this requirement be lowered to 12%.
The resulting change in would be to substitute the number 12 for the number 20 in the three locations in the
last two sentences of this paragraph.
March 16, 2016
Chad Mapp
City of Fort Collins
USC - COR #001 – Initial Guaranteed Max Price (IGMP) to Final Guaranteed Max Price (FGMP)
Page 2 of 2
PCO #100 – Additional Pre-Construction Services USC – Correct Change Order #2 on PO #9143477:
In PCO #001 dated 6/12/2015, AP requested compensation for 12 of the 13 additional months of pre-
construction services extending that contract to July 31, 2015. In that PCO, AP calculated the monthly cost
of $2,800 for both the UAB and USC projects combined or $1,400 for each project using 12 months as the
duration of pre-construction agreement. The duration of the original preconstruction agreement is only 8
months so the correct monthly cost is $33,600/8 months equaling $4,200 for both the UAB and USC
projects combined or $2,100 for each project. CoFC agreed to compensate AP for 10 of the 13 additional
months and included an increase of $14,000 in change order #2 to PO #9143478 dated 7/27/2015. The
actual increase compensating AP for 10 of the 13 additional months of pre-construction should have been
$21,000. This PCO includes the $7,000 that was not included in change order #2. This item was discussed
and agreed to by Brian Hergott in a meeting on 3/4/2016.
PCO #101 – Additional Pre-Construction Services USC – Extend from August 2015 to November 2015
FGMP was submitted in November 2015, requiring an extension of the pre-construction services agreement
for 4 additional months. In consideration for the construction phase of UAB already starting, AP proposed
to reduce the monthly cost of pre-construction services to $1,050 per month for this extension. This PCO
includes 4 additional months of pre-construction services at $1,050 per month for the total increase of
$4,200. This item was discussed and agreed to by Brian Hergott in a meeting on 3/4/2016.
PCO #102 – Credit Back Pre-Construction Services included in FGMP and PO #9143478 & #9143189:
AP included $24,200 of pre-construction services for AP (see FGMP summary page), $10,000 pre-
construction services for MEP (see item #8 in the Electrical System Cost Breakouts on page 13 of the
detailed FGMP estimate) and $14,000 additional pre-construction services for AP (see FGMP summary
page) in the FGMP estimate. These pre-construction services were already included, invoiced and paid in
PO #9143478 & #9143189. This PCO credits back those amounts included in PO #9155486 back to CoFC.
This item was discussed and agreed to by Brian Hergott in a meeting on 3/4/2016.
Sincerely,
Adolfson & Peterson Construction
Rick Ritter
Senior Project Manager