Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 8139 LINCOLN CORRIDOR PROJECT - FINAL DESIGN (2)Change Order #1 Lincoln Avenue Corridor Improvements Final Design April 20, 2016 Senior Project Manager Project Manager Senior Project Engineer Project Engineer Project Designer Admin. Interwest Totals CTL Thompson BHA Design Anderson Consulting Engineers Fox Tuttle Hernandez Loris Associates Alta Cedar Creek Colo. Utility Finders ESC King Hines Irrig. GRAND TOTAL ‐‐‐‐ Labor Plus Reimbursables Billing Rate $120.00 $115.00 $105.00 $100.00 $95.00 $65.00 INTERWEST Lemay Avenue Southbound Right Turn Lane 20 40 17.5 $ 8,750.00 Lincoln Avenue (Bridge to 1st Street) 65% - Bid Packages 150 120 60 98.5 100 20 $ 58,750.00 Mitigation Plans (18 Properties Assumed at $750 each) 35.5 25 67 $ 13,500.00 Reimbursables $ 1,600.00 CTL Thompson 206 185 60 116 167 20 Hazardous Material Tests at Buckingham Park $ 1,086.00 Percolation Testing (3 locations) $ 1,500.00 Piezometer Borings for Groundwater Evaluatioin $ 750.00 Reimbursables $ - BHA Design Landscape and Urban Design (65%-Bid Packages) $ 73,747.00 Public Involvement (Bridge to 1st Street) $ 2,610.00 Refinement of Lincoln Bridge Urban Design $ 4,761.00 Bidding Services $ 2,000.00 Reimbursables $ - Anderson Consulting Engineers $ - Fox Tuttle Hernandez Transportation Group Traffic Count Analysis $ 1,577.50 Reimbursables (Traffic Counts) $ 2,199.80 Loris Associates $ - Alta Planning + Design $ - Cedar Creek Associates $ - Colorado Utility Finders $ - ESC Electrical Plans and Specs (65% - Bid Package) $ 16,200.00 Bidding Services $ 3,200.00 Reimbursables $ 1,000.00 King Surveyors Lincoln and Lemay Intersection Topographic Survey $ 4,404.00 In-Situ Outfall Topographic Survey $ 1,092.00 Wetland Flagging Mapping $ 546.00 Woodward, 3rd Street and Additional River Topo Survey $ 2,136.00 Right of Way and Easement Field Staking $ 2,824.00 Hines Irrigation Project Meetings and Coordination $ 1,850.00 Irrigation Plans and Specs (65% - Bid Packages) $ 10,900.00 Construction Specifications and Details $ 450.00 Bidding Services $ 450.00 Reimbursables $ 100.00 Labor Subtotal $ 81,000.00 $ 3,336.00 $ 83,118.00 $ - $ 1,577.50 $ - $ - $ - $ - $ 19,400.00 $ 11,002.00 $ 13,650.00 $ 213,083.50 Reimbursables Subtotal $ 1,600.00 $ - $ - $ - $ 2,199.80 $ - $ - $ - $ - $ 1,000.00 $ - $ 100.00 $ 4,899.80 Totals $ 82,600.00 $ 3,336.00 $ 83,118.00 $ - $ 3,777.30 $ - $ - $ - $ - $ 20,400.00 $ 11,002.00 $ 13,750.00 $ 217,983.30 Interwest CTL Thompson BHA Design Anderson Consulting Engineers Fox Tuttle Hernandez Loris Associates Alta Cedar Creek Colo. Utility Finders ESC King Hines Irrig. GRAND TOTAL ‐‐‐‐ Labor Plus Reimbursables Interwest Consulting Group