HomeMy WebLinkAboutRFP - 8104 EPIC POOL REPAIR DESIGN (3)RFP 8104 EPIC Pool Repair Design Page 1 of 17
REQUEST FOR PROPOSAL
8104 EPIC POOL REPAIR DESIGN
The City of Fort Collins is requesting proposals from qualified firms to provide all design
services, including architectural, structural and mechanical, per the attached scope of work for
the Edora Pool and Ice Center (EPIC) indoor swimming pool located at 1801 Riverside Ave.
As part of the City’s commitment to Sustainable Purchasing, proposals submission via
email is preferred. Proposals shall be submitted in a single Microsoft Word or PDF file
under 20MB and e-mailed to: purchasing@fcgov.com. If electing to submit hard copy
proposals instead, five (5) copies, will be received at the City of Fort Collins' Purchasing
Division, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Proposals must be
received before 3:00 p.m. (our clock), April 21, 2015 and referenced as Proposal No.
8104. If delivered, they are to be sent to 215 North Mason Street, 2nd Floor, Fort Collins,
Colorado 80524. If mailed, the address is P.O. Box 580, Fort Collins, 80522-0580. Please
note, additional time is required for bids mailed to the PO Box to be received at the
Purchasing Office.
The City encourages all Disadvantaged Business Enterprises (DBEs) to submit proposals in
response to all requests for proposals. No individual or business will be discriminated against
on the grounds of race, color, sex, or national origin. It is the City’s policy to create a level
playing field on which DBEs can compete fairly and to ensure nondiscrimination in the award
and administration of all contracts.
Questions concerning the scope of the bid should be directed to Project Manager, Ethan
Cozzens at ecozzens@fcgov.com.
Questions regarding bid submittal or process should be directed to John Stephen,
CPPO, LEED AP, Senior Buyer at (970) 221-6777 or jstephen@fcgov.com.
A pre-proposal conference and job walk with representatives of prospective Bidders will
be held at 2:00 PM on April 8, 2015, at the site 1801 Riverside Ave, Fort Collins.
All questions must be submitted in writing via email to Ethan Cozzens , with a copy to
John Stephen, no later than 5:00 PM our clock on April 13, 2015. Questions received after
this deadline will not be answered.
A copy of the RFP may be obtained at www.rockymountainbidsystem.com.
The City of Fort Collins is subject to public information laws, which permit access to most
records and documents. Proprietary information in your response must be clearly identified and
will be protected to the extent legally permissible. Proposals may not be marked ‘Proprietary’ in
their entirety. All provisions of any contract resulting from this request for proposal will be
public information.
New Vendors:
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
RFP 8104 EPIC Pool Repair Design Page 2 of 17
The City requires new vendors receiving awards from the City to fill out and submit an IRS form
W-9 and to register for Direct Deposit (Electronic) payment. If needed, the W-9 form and the
Vendor Direct Deposit Authorization Form can be found on the City’s Purchasing website at
www.fcgov.com/purchasing under Vendor Reference Documents.
Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have
a financial interest in the sale to the City of any real or personal property, equipment, material,
supplies or services where such officer or employee exercises directly or indirectly any decision-
making authority concerning such sale or any supervisory authority over the services to be
rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift,
gratuity favor, entertainment, kickback or any items of monetary value from any person who has
or is seeking to do business with the City of Fort Collins is prohibited.
Collusive or sham proposals: Any proposal deemed to be collusive or a sham proposal will be
rejected and reported to authorities as such. Your authorized signature of this proposal assures
that such proposal is genuine and is not a collusive or sham proposal.
The City of Fort Collins reserves the right to reject any and all proposals and to waive any
irregularities or informalities.
Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow other
state and local governmental agencies, political subdivisions, and/or school districts to utilize the
resulting award under all terms and conditions specified and upon agreement by all parties.
Usage by any other entity shall not have a negative impact on the City of Fort Collins in the
current term or in any future terms.
Sustainability: Consulting firms/teams participating in the proposal are to provide an overview of
the organization’s philosophy and approach to Sustainability. In no more than two (2) pages
please describe how your organization strives to be sustainable in the use of materials,
equipment, vehicles, fuel, recycling, office practices, etc. The City of Fort Collins incorporates
the Triple Bottom Line into our decision process by including economic (or financial),
environmental, and social factors in our evaluation.
The selected Service Provider shall be expected to sign the City’s standard Agreement without
revision prior to commencing Services (see sample attached to this Proposal).
Sincerely,
Gerry S. Paul
Director of Purchasing & Risk Management
RFP 8104 EPIC Pool Repair Design Page 3 of 17
REQUEST FOR PROPOSAL
8104 EPIC POOL REPAIR DESIGN
PROJECT DESCRIPTION AND SCOPE OF WORK
The City of Fort Collins is requesting proposals from qualified firms to provide all design
services including architectural, structural and mechanical per the scope of work for the Edora
Pool and Ice Center (EPIC) indoor swimming pool located at 1801 Riverside, Ft Collins.
Attached is a report from Ohlson Lavoie Collaborative dated February 12, 2013 that evaluated
the pool facility for structural integrity, equipment operational integrity and operational
efficiencies.
RFP SCHEDULE
• Pre-proposal meeting April 8, 2015, 2:00 p.m.
• Final Day for Questions: April 13, 2015 (5:00 p.m.)
• Proposals Due: April 21, 2015 (3:00 p.m.)
• Notify Consultants to be Interviewed: Week of April 27, 2015
• Interviews: Week of May 4, 2015
SUBMITTAL REQUIREMENTS
All respondents are required to include the following information in the submittal as a minimum.
1. Project Understanding: Provide a brief summary of your understanding of the project.
2. Approach: Describe your recommended approach to achieve each of the tasks
outlined in the Scope of Work. Responses are encouraged to think beyond the outlined
Scope of Work and provide innovative and cost effective ideas to create a successful
plan.
3. Deliverables: Provide a description or examples of how you will present the
deliverables and the tools that will be used to execute each task.
4. Team Profile: Provide relevant information regarding the team you propose to work on
this project including:
a. Overview of firm(s)
b. Example of recent and relevant projects with location and reference contacts
c. People (availability, commitment, qualifications, and experience)
d. Proposed team organization (org chart) of key personnel with titles and specific
tasks
5. Schedule: Provide a detailed project schedule showing key milestones and deliverable
dates.
6. Costs: Please provide a lump sum cost for all design work and provide hourly rates for
all consultants.
A maximum number of 15 double-sided pages (30 pages total) are allowed for this proposal. All
sheets except resumes and samples of work are included in this total.
RFP 8104 EPIC Pool Repair Design Page 4 of 17
SCOPE OF WORK
- Provide all design services. Including architectural, structural, & mechanical.
- Pool renovation design team will be required to coordinate with the Farnsworth Group
regarding the HVAC design work for the bleacher area.
- Design work and construction work must adhere to the City of Fort Collins approved
design standards located at: http://www.fcgov.com/opserv/design-standards.php
- Design and construction work must conform to the new requirements for Fort Collins
Utilities Integrated Design Assistance Program (IDAP) described at:
http://www.fcgov.com/utilities/business/conserve/rebates-incentives/integrated-design-
assistance
- Upon completion of record drawings, the electronic media (cad or revit) files must be
provided to the City of Fort Collins, Operation Services Department.
- At the end of the project, a commissioning process to demonstrate and inform
appropriate City Staff regarding all such building systems shall be carried out in advance
of Substantial Completion to the Design Team and Contractor.
- All Pool and HVAC external communications must be provided that will tie into the
current City Operation Services system, which is from Johnson Controls.
AQUATIC RECOMMENDATIONS
1. LAP POOL
1. External Access to Chemical Controller
a) Connect to accessible computer for maintenance
2. pH Switchover for Chemical Controller
a) Provide switch over for pH control, AquatiControl unit
3. Leak Detection Services
a) American Leak Detection for reviewing the pool possible leaking
4. Replace Gutter & Plumbing
a) Demo Existing Gutter
• Demo of existing gutter to prepare for the new stainless gutter
b) New Gutter
• Raised stainless steel gutter for competition with dropouts with lip to
hold bulkhead
c) Re-plumb Plumbing from Gutter to Tank
• Circulation of pool supply line and dropout lines back to tank
d) Repair Circulation Pump
e) Refinishing of the Tank Finish
• Refinish waterproofing the tank as needed
f) Provide Valves to Balance Tank
• Provide float, drain, and tank valves with fittings
RFP 8104 EPIC Pool Repair Design Page 5 of 17
g) Relocate existing anchors and install additional anchors in new gutter for lane
lines - Coordinate with City of Fort Collins for locations and quantities
5. Pool Bulkheads – Two Total
a) Neptune Benson / Stark stainless steel top roller bulkheads to replace
existing
b) Top and sides of stainless steel bulkhead structure will be made of FRP,
Fiberglass Reinforced Plastic.
c) The bulkhead shall consist of a one piece double box construction type that
spans the width of the swimming pool and extends out over the gutter on the
sides of the pool and matches the end walls.
d) The bulkhead shall be designed to support a unified live load with ½”
maximum deflection in addition to all dead loads of 5,600 lbs on bulkhead
walk area without the assistance of constant foam or additional air to assist
with the support of such load. The Safety Factor for all live and dead loads
shall be at least 10. In addition the bulkhead shall be designed to withstand a
uniform lateral live load of at least 30 pounds per linear foot and a point load
of at least 500 pounds at the center with a maximum deflection of ½”. Racing
cup anchors shall be designed to resist pullout loads of at least 400 pounds
each.
e) Neptune Benson / Stark bulkheads will provide the owner a full set of shop
drawings (submittals) for review by the owner or his representatives showing
design, dimensions, features, special conditions for the installation or
preparation of installation.
6. Blocks
a) Re-use existing starting blocks
b) Anchors to be coordinated with existing starting blocks
7. Replace Starter Platform Anchors
a) Starter platforms anchors to be put into new bulkhead
• Anchors to be coordinated with existing blocks
8. Replace the Pool Deck Tile
a) Replace with either tile or concrete for the deck
b) Resistance to slip resistance on the deck must, at a minimum, meet the
existing tile or be greater then
• Slip resistance to be measured on existing tile as a baseline
9. Ultra Violet (UV) Upgrade
a) Changing UV unit to treat all of flow if current unit is insufficient
10. Re-plumbing of Circulation Lines
a) Re-plumb plumbing from tank/return line in equipment room with fittings and
valves
11. Replace Circulation Pump
RFP 8104 EPIC Pool Repair Design Page 6 of 17
a) Change in pump completely with larger impeller to 1680 GPM
12. New Regenerative Filter – Filter Already Purchased by the City of Fort Collins
a) Neptune Benson filter, plumbing, compressor, valves, and controls
13. Review of Auto Fill
a) If auto fill needs to be changed out with solenoid
14. Remove 3 Meter Diving Board Tower
a) Removal of the 3 meter boards without replacing them
15. Core drill flag post holes on both sides of the east and west ends of the deck to
accommodate turn flags for 25 yard lanes
2. THERAPY POOL
1. External Access to Chemical Controller
a) Connect to accessible computer for maintenance
2. pH Switchover for Chemical Controller
a) Provide switch over for pH control, AquatiControl unit
3. Leak Detection Services
a) Leak detection testing (maybe less if combined with other pools)
4. Replacing Gutter & Plumbing
a) Demo Existing Gutter
• Demo of existing gutter to prepare for the new stainless gutter
b) New Gutter
• Stainless steel gutter with dropouts
c) Plumbing to Tank
• Circulation of pool supply line and dropout lines back to tank
d) Refinishing the Tank Finish
• Refinish waterproofing the tank as needed
e) Provide Valves to Balance Tank
• Provide float, drain, and tank valves with fittings
f) Provide Supply Line to Gutter
• Supply line integral to gutter to two different locations along gutter
5. Replace Pump and Motor
6. Additional Filter
a) Add another Pentair TR140C to the system with plumbing
7. Replace Pool Tile
a) Retile or Plaster the pool
b) Waterproofing
RFP 8104 EPIC Pool Repair Design Page 7 of 17
8. Regenerative Filter – Use existing Neptune Benson filter
9. Provide Auto Fill
a) If auto fill needs to be changed out with solenoid and plumbing loop
3. KIDS POOL
1. External Access to Chemical Controller
a) Connect to accessible computer for maintenance
2. pH Switchover for Chemical Controller
a) Provide switch over for pH control, AquatiControl unit
3. Leak Detection Services
a) Leak detection testing (maybe less if combined with other pools)
4. Provide New Pump
a) At a minimum 7.5 HP or greater – Design Team to verify
5. Slope to Deep End
a) Per ADA the pool needs a ramp
• Zero entry to accommodate ADA needs
• Could a lift be bought instead?
6. Re-plumbing Circulation Lines
a) Re-plumb plumbing from tank to return line in equipment room with fittings
and valves
7. New Regenerative Filter - Filter Already Purchased by the City of Fort Collins
a) Neptune Benson filter, plumbing, compressor, valves, and controls
8. Replace Pool Tile
a) Retile or Plaster the pool
b) Waterproofing
9. Provide Auto Fill
a) If auto fill needs to be changed out with static line, solenoid and plumbing
loop
4. ADDITIONAL LINE ITEMS OF POSSIBLE WORK FOR THE AWARDED CONTRACTOR
1. Paint floor and ceiling in Pool Equipment Room
2. Repair damaged electrical conduit as needed
3. Remove pool tile and replace with either new tile or plaster
4. Re-grout pool when drained
a) Repair damaged tile as needed
5. Additional Swim Lanes
RFP 8104 EPIC Pool Repair Design Page 8 of 17
a) Line pool bottom north to south with additional lanes – Coordinate with City of
Fort Collins for locations and quantities
b) Install targets in sidewalls in additional lanes – Coordinate with City of Fort
Collins for locations and quantities
c) Install additional anchors in new gutter for lane lines - Coordinate with City of
Fort Collins for locations and quantities
6. Additional coring and sleeves to be added for flagging - Coordinate with City of Fort
Collins for locations and quantities
REVIEW AND ASSESSMENT
Professional firms will be evaluated on the following criteria. These criteria will be the basis for
review and assessment of the written proposals and optional interview session. At the
discretion of the City, interviews of the top rated firms may be conducted.
The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average rating, and
5 being an outstanding rating.
WEIGHTING
FACTOR QUALIFICATION STANDARD
2.0 Scope of Proposal
Does the proposal address all elements of the RFP?
Does the proposal show an understanding of the project
objectives, methodology to be used and
results/outcomes required by the project? Are there
any exceptions to the specifications, Scope of Work, or
agreement?
2.0 Assigned Personnel
Do the persons who will be working on the project have
the necessary skills and qualifications? Are sufficient
people of the requisite skills and qualifications assigned
to the project?
1.0 Availability
Can the work be completed in the necessary time? Can
the target start and completion dates be met? Are other
qualified personnel available to assist in meeting the
project schedule if required? Is the project team
available to attend meetings as required by the Scope
of Work?
1.0 Sustainability/TBL
Methodology
Does the firm demonstrate a commitment to
Sustainability and incorporate Triple Bottom Line
methodology in both their Scope of Work for the project,
and their day-to-day business operating processes and
procedures?
2.0
Cost and
Work Hours
Does the proposal included detailed cost break-down
for each cost element as applicable and are the line-
item costs competitive? Do the proposed cost and work
hours compare favorably with the Project Manager's
estimate? Are the work hours presented reasonable for
the effort required by each project task or phase?
RFP 8104 EPIC Pool Repair Design Page 9 of 17
2.0 Firm Capability
Does the firm have the resources, financial strength,
capacity and support capabilities required to
successfully complete the project on-time and in-
budget? Has the firm successfully completed previous
projects of this type and scope?
Definitions
Sustainable Purchasing is a process for selecting products or services that have a lesser or
reduced negative effect on human health and the environment when compared with competing
products or services that serve the same purpose. This process is also known as
“Environmentally Preferable Purchasing” (EPP), or “Green Purchasing”.
The Triple Bottom Line (TBL) is an accounting framework that incorporates three dimensions of
performance: economic, or financial; environmental, and social. The generally accepted
definition of Andrew Savitz for TBL is that it “captures the essence of sustainability by
measuring the impact of an organization’s activities on the world…including both its profitability
and shareholders values and its social, human, and environmental capital.”
REFERENCE EVALUATION (TOP RATED FIRM)
The Project Manager will check references using the following criteria. The evaluation rankings
will be labeled Satisfactory/Unsatisfactory.
QUALIFICATION STANDARD
Overall Performance Would you hire this Professional again? Did they
show the skills required by this project?
Timetable
Was the original Scope of Work completed within the
specified time? Were interim deadlines met in a
timely manner?
Completeness
Was the Professional responsive to client needs; did
the Professional anticipate problems? Were
problems solved quickly and effectively?
Budget Was the original Scope of Work completed within the
project budget?
Job Knowledge
a) If a study, did it meet the Scope of Work?
b) If Professional administered a construction
contract, was the project functional upon
completion and did it operate properly? Were
problems corrected quickly and effectively?
Professional Services Agreement
Page 10 of 17
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT made and entered into the day and year set forth below, by and
between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter
referred to as the "City" and , hereinafter referred to as "Professional".
WITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed
by and between the parties hereto as follows:
1. Scope of Services. The Professional agrees to provide services in accordance with the
scope of services attached hereto as Exhibit "A", consisting of ( ) pages, and
incorporated herein by this reference. Irrespective of references in Exhibit A to certain
named third parties, Professional shall be solely responsible for performance of all duties
hereunder.
2. The Work Schedule. [Optional] The services to be performed pursuant to this Agreement
shall be performed in accordance with the Work Schedule attached hereto as Exhibit "B",
consisting of ( ) pages, and incorporated herein by this reference.
3. Contract Period. This Agreement shall commence , 200 , and shall continue
in full force and effect until , 200 , unless sooner terminated as herein
provided. In addition, at the option of the City, the Agreement may be extended for
additional one year periods not to exceed four (4) additional one year periods. Renewals
and pricing changes shall be negotiated by and agreed to by both parties. Written notice of
renewal shall be provided to the Professional and mailed no later than thirty (30) days prior
to contract end.
4. Early Termination by City. Notwithstanding the time periods contained herein, the City
may terminate this Agreement at any time without cause by providing written notice of
termination to the Professional. Such notice shall be delivered at least fifteen (15) days
prior to the termination date contained in said notice unless otherwise agreed in writing by
the parties.
All notices provided under this Agreement shall be effective when mailed, postage prepaid
and sent to the following addresses:
Professional: City: Copy to:
Attn:
City of Fort Collins
Attn:
PO Box 580
Fort Collins, CO 80522
City of Fort Collins
Attn: Purchasing Dept.
PO Box 580
Fort Collins, CO 80522
In the event of any such early termination by the City, the Professional shall be paid for
services rendered prior to the date of termination, subject only to the satisfactory
Professional Services Agreement
Page 11 of 17
performance of the Professional's obligations under this Agreement. Such payment shall
be the Professional's sole right and remedy for such termination.
5. Design, Project Indemnity and Insurance Responsibility. The Professional shall be
responsible for the professional quality, technical accuracy, timely completion and the
coordination of all services rendered by the Professional, including but not limited to
designs, plans, reports, specifications, and drawings and shall, without additional
compensation, promptly remedy and correct any errors, omissions, or other deficiencies.
The Professional shall indemnify, save and hold harmless the City, its officers and
employees in accordance with Colorado law, from all damages whatsoever claimed by
third parties against the City; and for the City's costs and reasonable attorneys fees,
arising directly or indirectly out of the Professional's negligent performance of any of the
services furnished under this Agreement. The Professional shall maintain insurance in
accordance with Exhibit , consisting of one (1) page, attached hereto and
incorporated herein.
6. Compensation. [Use this paragraph or Option 1 below.] In consideration of the
services to be performed pursuant to this Agreement, the City agrees to pay Professional
a fixed fee in the amount of ($ ) plus reimbursable direct costs. All such fees
and costs shall not exceed ($ ). Monthly partial payments based upon the
Professional's billings and itemized statements are permissible. The amounts of all such
partial payments shall be based upon the Professional's City-verified progress in
completing the services to be performed pursuant hereto and upon the City's approval of
the Professional's actual reimbursable expenses. [Optional] Insert Subcontractor Clause
Final payment shall be made following acceptance of the work by the City. Upon final
payment, all designs, plans, reports, specifications, drawings, and other services rendered
by the Professional shall become the sole property of the City.
6. Compensation. [Option 1] In consideration of the services to be performed pursuant to
this Agreement, the City agrees to pay Professional on a time and reimbursable direct cost
basis according to the following schedule:
Hourly billing rates:
Reimbursable direct costs:
with maximum compensation (for both Professional's time and reimbursable direct costs)
not to exceed ($ ). Monthly partial payments based upon the Professional's
billings and itemized statements of reimbursable direct costs are permissible. The
amounts of all such partial payments shall be based upon the Professional's City-verified
progress in completing the services to be performed pursuant hereto and upon the City's
approval of the Professional's reimbursable direct costs. Final payment shall be made
following acceptance of the work by the City. Upon final payment, all designs, plans,
reports, specifications, drawings and other services rendered by the Professional shall
become the sole property of the City.
Professional Services Agreement
Page 12 of 17
7. City Representative. The City will designate, prior to commencement of work, its project
representative who shall make, within the scope of his or her authority, all necessary and
proper decisions with reference to the project. All requests for contract interpretations,
change orders, and other clarification or instruction shall be directed to the City
Representative.
8. Project Drawings. [Optional] Upon conclusion of the project and before final payment, the
Professional shall provide the City with reproducible drawings of the project containing
accurate information on the project as constructed. Drawings shall be of archival,
prepared on stable Mylar base material using a non-fading process to provide for long
storage and high quality reproduction. "CD" disc of the as-built drawings shall also be
submitted to the City in an AutoCAD version no older then the established city standard.
9. Monthly Report. Commencing thirty (30) days after the date of execution of this
Agreement and every thirty (30) days thereafter, Professional is required to provide the
City Representative with a written report of the status of the work with respect to the
Scope of Services, Work Schedule, and other material information. Failure to provide any
required monthly report may, at the option of the City, suspend the processing of any
partial payment request.
10. Independent Contractor. The services to be performed by Professional are those of an
independent contractor and not of an employee of the City of Fort Collins. The City shall
not be responsible for withholding any portion of Professional's compensation hereunder
for the payment of FICA, Workers' Compensation, other taxes or benefits or for any other
purpose.
11. Subcontractors. Professional may not subcontract any of the Work set forth in the Exhibit
A, Statement of Work without the prior written consent of the city, which shall not be
unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent of
the City), then the following provisions shall apply: (a) the subcontractor must be a
reputable, qualified firm with an established record of successful performance in its
respective trade performing identical or substantially similar work, (b) the subcontractor will
be required to comply with all applicable terms of this Agreement, (c) the subcontract will
not create any contractual relationship between any such subcontractor and the City, nor
will it obligate the City to pay or see to the payment of any subcontractor, and (d) the work
of the subcontractor will be subject to inspection by the City to the same extent as the
work of the Professional.
12. Personal Services. It is understood that the City enters into the Agreement based on the
special abilities of the Professional and that this Agreement shall be considered as an
agreement for personal services. Accordingly, the Professional shall neither assign any
responsibilities nor delegate any duties arising under the Agreement without the prior
written consent of the City.
13. Acceptance Not Waiver. The City's approval of drawings, designs, plans, specifications,
Professional Services Agreement
Page 13 of 17
reports, and incidental work or materials furnished hereunder shall not in any way relieve
the Professional of responsibility for the quality or technical accuracy of the work. The
City's approval or acceptance of, or payment for, any of the services shall not be
construed to operate as a waiver of any rights or benefits provided to the City under this
Agreement.
14. Default. Each and every term and condition hereof shall be deemed to be a material
element of this Agreement. In the event either party should fail or refuse to perform
according to the terms of this agreement, such party may be declared in default.
15. Remedies. In the event a party has been declared in default, such defaulting party shall
be allowed a period of ten (10) days within which to cure said default. In the event the
default remains uncorrected, the party declaring default may elect to (a) terminate the
Agreement and seek damages; (b) treat the Agreement as continuing and require specific
performance; or (c) avail himself of any other remedy at law or equity. If the non-
defaulting party commences legal or equitable actions against the defaulting party, the
defaulting party shall be liable to the non-defaulting party for the non-defaulting party's
reasonable attorney fees and costs incurred because of the default.
16. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire
agreement between the parties and shall be binding upon said parties, their officers,
employees, agents and assigns and shall inure to the benefit of the respective survivors,
heirs, personal representatives, successors and assigns of said parties.
17. Law/Severability. The laws of the State of Colorado shall govern the construction,
interpretation, execution and enforcement of this Agreement. In the event any provision
of this Agreement shall be held invalid or unenforceable by any court of competent
jurisdiction, such holding shall not invalidate or render unenforceable any other provision
of this Agreement.
17. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et.
seq., Professional represents and agrees that:
a. As of the date of this Agreement:
1. Professional does not knowingly employ or contract with an illegal alien who will
perform work under this Agreement; and
2. Professional will participate in either the e-Verify program created in Public Law
208, 104th Congress, as amended, and expanded in Public Law 156, 108th
Congress, as amended, administered by the United States Department of
Homeland Security (the “e-Verify Program”) or the Department Program (the
“Department Program”), an employment verification program established pursuant
to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of
all newly hired employees to perform work under this Agreement.
Professional Services Agreement
Page 14 of 17
b. Professional shall not knowingly employ or contract with an illegal alien to perform
work under this Agreement or knowingly enter into a contract with a subcontractor that
knowingly employs or contracts with an illegal alien to perform work under this
Agreement.
c. Professional is prohibited from using the e-Verify Program or Department Program
procedures to undertake pre-employment screening of job applicants while this
Agreement is being performed.
d. If Professional obtains actual knowledge that a subcontractor performing work under
this Agreement knowingly employs or contracts with an illegal alien, Professional shall:
1. Notify such subcontractor and the City within three days that Professional has
actual knowledge that the subcontractor is employing or contracting with an illegal
alien; and
2. Terminate the subcontract with the subcontractor if within three days of receiving
the notice required pursuant to this section the subcontractor does not cease
employing or contracting with the illegal alien; except that Professional shall not
terminate the contract with the subcontractor if during such three days the
subcontractor provides information to establish that the subcontractor has not
knowingly employed or contracted with an illegal alien.
e. Professional shall comply with any reasonable request by the Colorado Department of
Labor and Employment (the “Department”) made in the course of an investigation that
the Department undertakes or is undertaking pursuant to the authority established in
Subsection 8-17.5-102 (5), C.R.S.
f. If Professional violates any provision of this Agreement pertaining to the duties
imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If
this Agreement is so terminated, Professional shall be liable for actual and
consequential damages to the City arising out of Professional’s violation of Subsection
8-17.5-102, C.R.S.
g. The City will notify the Office of the Secretary of State if Professional violates this
provision of this Agreement and the City terminates the Agreement for such breach.
19. Special Provisions. Special provisions or conditions relating to the services to be
performed pursuant to this Agreement are set forth in Exhibit " " - Confidentiality,
consisting of one (1) pages, attached hereto and incorporated herein by this reference.
Professional Services Agreement
Page 15 of 17
THE CITY OF FORT COLLINS, COLORADO
By: _________________________________
Gerry Paul
Director of Purchasing & Risk Management
DATE: ______________________________
ATTEST:
_________________________________
City Clerk
APPROVED AS TO FORM:
________________________________
Assistant City Attorney
PROFESSIONAL
By: __________________________________
Title: _______________________________
CORPORATE PRESIDENT OR VICE PRESIDENT
Date: _______________________________
Professional Services Agreement
Page 16 of 17
EXHIBIT
INSURANCE REQUIREMENTS
1. The Professional will provide, from insurance companies acceptable to the City, the
insurance coverage designated hereinafter and pay all costs. Before commencing work
under this bid, the Professional shall furnish the City with certificates of insurance
showing the type, amount, class of operations covered, effective dates and date of
expiration of policies, and containing substantially the following statement:
“The insurance evidenced by this Certificate will not reduce coverage or limits and
will not be cancelled, except after thirty (30) days written notice has been received
by the City of Fort Collins.”
In case of the breach of any provision of the Insurance Requirements, the City, at its
option, may take out and maintain, at the expense of the Professional, such insurance
as the City may deem proper and may deduct the cost of such insurance from any
monies which may be due or become due the Professional under this Agreement. The
City, its officers, agents and employees shall be named as additional insureds on the
Professional 's general liability and automobile liability insurance policies for any claims
arising out of work performed under this Agreement.
2. Insurance coverages shall be as follows:
A. Workers' Compensation & Employer's Liability. The Professional shall maintain
during the life of this Agreement for all of the Professional's employees engaged in
work performed under this agreement:
1. Workers' Compensation insurance with statutory limits as required by
Colorado law.
2. Employer's Liability insurance with limits of $100,000 per accident,
$500,000 disease aggregate, and $100,000 disease each employee.
B. Commercial General & Vehicle Liability. The Professional shall maintain during the
life of this Agreement such commercial general liability and automobile liability
insurance as will provide coverage for damage claims of personal injury, including
accidental death, as well as for claims for property damage, which may arise
directly or indirectly from the performance of work under this Agreement.
Coverage for property damage shall be on a "broad form" basis. The amount of
insurance for each coverage, Commercial General and Vehicle, shall not be less
than $1,000,000 combined single limits for bodily injury and property damage.
In the event any work is performed by a subcontractor, the Professional shall be
responsible for any liability directly or indirectly arising out of the work performed
under this Agreement by a subcontractor, which liability is not covered by the
subcontractor's insurance.
C. Errors & Omissions. The Professional shall maintain errors and omissions
insurance in the amount of $1,000,000.
Professional Services Agreement
Page 17 of 17
EXHIBIT
CONFIDENTIALITY
IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the “City”) pursuant to
this Agreement (the “Agreement”), the Professional hereby acknowledges that it has been
informed that the City has established policies and procedures with regard to the handling of
confidential information and other sensitive materials.
In consideration of access to certain information, data and material (hereinafter individually and
collectively, regardless of nature, referred to as “information”) that are the property of and/or
relate to the City or its employees, customers or suppliers, which access is related to the
performance of services that the Professional has agreed to perform, the Professional hereby
acknowledges and agrees as follows:
That information that has or will come into its possession or knowledge in connection with the
performance of services for the City may be confidential and/or proprietary. The Professional
agrees to treat as confidential (a) all information that is owned by the City, or that relates to the
business of the City, or that is used by the City in carrying on business, and (b) all information
that is proprietary to a third party (including but not limited to customers and suppliers of the
City). The Professional shall not disclose any such information to any person not having a
legitimate need-to-know for purposes authorized by the City. Further, the Professional shall not
use such information to obtain any economic or other benefit for itself, or any third party, except
as specifically authorized by the City.
The foregoing to the contrary notwithstanding, the Professional understands that it shall have no
obligation under this Agreement with respect to information and material that (a) becomes
generally known to the public by publication or some means other than a breach of duty of this
Agreement, or (b) is required by law, regulation or court order to be disclosed, provided that the
request for such disclosure is proper and the disclosure does not exceed that which is required.
In the event of any disclosure under (b) above, the Professional shall furnish a copy of this
Agreement to anyone to whom it is required to make such disclosure and shall promptly advise
the City in writing of each such disclosure.
In the event that the Professional ceases to perform services for the City, or the City so requests
for any reason, the Professional shall promptly return to the City any and all information
described hereinabove, including all copies, notes and/or summaries (handwritten or
mechanically produced) thereof, in its possession or control or as to which it otherwise has
access.
The Professional understands and agrees that the City’s remedies at law for a breach of the
Professional’s obligations under this Confidentiality Agreement may be inadequate and that the
City shall, in the event of any such breach, be entitled to seek equitable relief (including without
limitation preliminary and permanent injunctive relief and specific performance) in addition to all
other remedies provided hereunder or available at law.