No preview available
HomeMy WebLinkAboutBID - 8131 MEDIAN RENOVATION AT HORSETOOTH & S LEMAYAddendum 1 – 8131 Median Renovations at E Horsetooth & S Lemay Page 1 of 3 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 8131: Median Renovation at E Horsetooth & S Lemay OPENING DATE: 3:00 PM (Our Clock) June 26, 2015 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: 1. Revisions to the Bid Document A. Item 29 on the Bid Schedule is revised as follows: “All traffic control including the traffic plan for this project will be provided by the Contractor” 2. Exhibit 1 – Revised Bid Schedule (Please note that the Bid Schedule has also been uploaded as a separate Microsoft Excel document. Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 1 – 8131 Median Renovations at E Horsetooth & S Lemay Page 2 of 3 EXHIBIT 1 – REVISED BID SCHEDULE ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT COST COST 1 Median #1: Demolition/removal of shrubs, mulch, veg., irr., clearing, etc. LS 1 $ - 2 Median #2: Demolition/removal of shrubs, mulch, veg., irr., clearing, etc. LS 1 $ - 3 Median #3: Demolition/removal of shrubs, mulch, veg., irr., clearing, etc. LS 1 $ - 4 Median #4: Demolition/removal of shrubs, mulch, veg., irr., clearing, etc. LS 1 $ - 5 Median #5: Demolition/removal of shrubs, mulch, veg., irr., clearing, etc. LS 1 $ - 6 Sod and Irrigation demolition/removal at intersection LS 1 $ - 7 Existing Tree Stump Removals (7 ex., 13 stumps from Forestry tree removals) EA 20 $ - 8 Tree Protection LS 1 $ - 9 Fine Grading of (3) berms EA 3 $ - 10 Berm Soil CY 18 $ - 11 Soil Amendment CY 70 $ - 12 Inorganic (Cobble) Mulch SF 3869 $ - 13 Weed Barrier (Under Cobble Mulch Only) SF 3869 $ - 14 Organic (Wood) Mulch SF 18400 $ - 15 Deciduous Canopy Tree - 3" Cal. EA 8 $ - 16 Deciduous Canopy Tree - 2" Cal. EA 9 $ - 17 Ornamental Tree - 2 1/2" Cal. EA 5 $ - 18 Ornamental Tree - 1 1/2" Cal. EA 19 $ - 19 Shrub (1 Gallon Container) EA 181 $ - 20 Shrub (5 Gallon Container) EA 437 $ - 21 Ornamental Grass (1 Gallon Container) EA 168 $ - 22 Perennials & Groundcovers (1 Gallon Container) EA 185 $ - 23 Perennials & Groundcovers (4" Pot) EA 130 $ - 24 Glory of the Snow - Bulbs EA 500 $ - 25 Sod SF 955 $ - 26 Steel Edger LF 225 $ - 27 Boulders EA 77 $ - 28 Boulder Retaining Wall - appx. 15" tall LF 36 $ - 29 Traffic Control (assume 45 days) - Traffic Control Plan and Traffic Control to be provided by the contractor EA 45 $ - LANDSCAPE SUBTOTAL $ - LANDSCAPE Addendum 1 – 8131 Median Renovations at E Horsetooth & S Lemay Page 3 of 3 30 Backflow Prevention Unit -3/4" ZURN 375B EA 2 $ - 31 Master Valve Assembly EA 2 $ - 32 Flow Sensor Assembly EA 2 $ - 33 Isolation Gate Valve Assembly EA 11 $ - 34 Quick Coupling Valve Assembly EA 14 $ - 35 Remote Control Drive Valve Assembly EA 20 $ - 36 Automatic Drip Valve Assembly EA 2 $ - 37 Flush Cap Assembly EA 26 $ - 38 Drip Indicator Assembly EA 15 $ - 39 Drip Drip Ring (Trees) EA 67 $ - 40 WeatherTRAK Central Pro3-2W48-SWM EA 1 $ - 41 #14 AWG Control Wire LF 3300 $ - 42 #12 AWG Common Wire LF 3300 $ - 43 1" Class 200 PVC Lateral Pipe LF 2400 $ - 44 1-1/4" Class 200 PVC Mainline Pipe LF 3000 $ - 45 3/4" Plyetheline Drip Lateral Pipe LF 6500 $ - 46 6" Pop-up spray heads EA 18 $ - $ - $ - $ - IN WORDS: TOTAL BASE BID IRRIGATION SUBTOTAL LANSCAPE & IRRIGATION SUBTOTAL MOBILIZATION, PERMITS, CONTRACTOR OVERHEAD, ETC. IRRIGATION