HomeMy WebLinkAboutBID - 8135 ROOF REPLACEMENT AT 281 N COLLEGE (2)Addendum 2 – 8135 Roof Replacement at 281 N Collge Page 1 of 4
ADDENDUM NO. 2
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 8135: Roof Rplacement at 281 N College
OPENING DATE: 3:00 PM (Our Clock) July 24, 2015
To all prospective bidders under the specifications and contract documents described above,
the following changes/additions are hereby made and detailed in the following sections of this
addendum:
Exhibit 1 – Questions & Answers
Please contact Doug Clapp, CPPB, Senior Buyer at (970) 221-6776 with any questions
regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Addendum 2 – 8135 Roof Replacement at 281 N Collge Page 2 of 4
EXHIBIT 1 – QUESTIONS & ANSWERS
Questions from Pre-Bid walk:
1. When is expected start date?
After signed contract and notice to proceed.
2. Confirm insulation thickness and is it required?
Roofing insulation is not required for this project. However the roof does need
to meet a Class A fire rating.
3. HVAC units on the roof - who is to handle covering up? Moving lines etc.
City of Fort Collins HVAC technicians and Electricians.
4. Where is the staging area to be?
In the alleyway on the south side of the building
5. Windows on the upper area on the South facing side – how to handle if insulation is
required?
As noted above roofing insulation is not required for this project.
6. Asbestos – has the roof been tested?
No asbestos on roof – came back as non-detect.
7. Is any of the coping to be replaced? If so is there a metalwork specification?
No
8. Please provide information on the roof decking?
1x12 wood planks
9. Are skylight replacements to be included in the bid?
No
10. If insulation required, who is to cover cost to raise the HVAC units?
As noted above roofing insulation is not required
11. Is there attic insulation? If so is roof insulation required?
Yes, as noted above roofing insulation is not required
12. Are crickets required on backside of HVAC units?
Yes to allow for positive drainage away from the HVAC units
Addendum 2 – 8135 Roof Replacement at 281 N Collge Page 3 of 4
Questions from Contractors:
1. Does the existing roofing include any asbestos?
No
2. Is there a cost associated with obtaining the necessary permit from City of Fort Collins for
blocking the alleyway [for staging/loading/unloading/dumpsters/dump trucks, etc.] at the
south side of the building?
Any costs for alley closures or parking permits are the responsibility of the
successful bidder.
If so, can how do find out what the cost is? Can you provide the contact information for
the appropriate individuals or department who can provide a price quote?
For the South side alley there is a $10/90 day encroachment permit
(http://www.fcgov.com/engineering/pdf/encroachmentpermit_digital.pdf) and if the
sidewalk is blocked or required to be block such as crane use then there is a
$35.00 fee and a traffic control plan required. Contact Fred Jones
(fjones@fcgov.com)
3. Is there a a cost associated with obtaining the necessary permits in order to utilize the
parking lot at west side of building, the street parking spaces at north side of building, and
the street parking at the east side of building [for loading/unloading/etc.] ?
If so, how do we find out what this cost is? Can you provide the contact information for the
appropriate individuals or department who can provide a price?
No cost for parking permits, however parking spaces are limited. Parking
passes are required and available through Parking Services. City is not
responsible for any parking tickets.
4. Is the lower roof area near the northeast corner, the one that has been reroofed with TPO
single-ply, included in the work for this bid?
This section of roof is excluded from the Base & Alternate Bids.
If so, is it to be included with the Alternate Bid No. 1, or the Base Bid?
See answer above.
5. Is a vapor barrier required to be part of the new roof assembly? Section 07220 [Roof and
Deck Insulation], Part 1, 1.01, A. makes reference to a vapor barrier.
No Vapor barrier required, however the roof is required to meet a Class A Fire
Rating
6. What is the minimum R Value that we are to achieve with the new roof insulation?
N/A
Section 07220 [Roof and Deck Insulation], 2.02, A., 2., states that the thickness is to be "
4" or as required to meet thermal requirements specified above." Is the thermal
requirement, or R Value, specified anywhere? I have not been able to find its location.
No roofing insulation is required.
Addendum 2 – 8135 Roof Replacement at 281 N Collge Page 4 of 4
7. If the minimum R Value of the new roof insulation is such that its thickness will require the
raising of HVAC units & curbs, duct penetrations and condenser units, as well as the
service hook-ups [electrical, gas & refrigerant lines], will this HVAC/plumbing/electrical
work be done by City of Fort Collins directly, i.e.: would the City contract directly and
independently with a mechanical contractor? N/A Or, will this work be made part of the
roof replacement contract with the roofers thereby becoming general, or prime, contractors
to a mechanical subcontractor?
No since no roofing insulation is required.
8. If the minimum R Value of the new roof insulation is such that its thickness will necessitate
modifying [raising] the windows at the well roofs, who will be responsible for this window
modification work?
N/A
Will the City of Ft. Collins hire a separate contractor to perform this work or will it be the
responsibility of the roofer to become a general, or prime, contractor and hire the
appropriate subcontractor to perform this work?
N/A
Will there interior finish work involved?
N/A
If the roofer is to be the prime contractor for this work, will the City issue specifications that
will describe the materials, methods, and scope of this work?
No since no roofing insulation is required.
9. Regarding the skylight curbs. They also may be too low [depending on the thickness of the
new roof insulation] and will have to be raised. Is this work to be incorporated in the
roofer's contractor [i.e.: to perform with in-house forces or to subcontract out] or will it be
done by the City contracting directly with a separate contractor?
N/A
If raising the skylight curbs will be the responsibility of the roofers, will there be new
interior finish work [i.e.: drywall, painting] required?
N/A
Will the City provide specifications that will describe the materials, methods and scope of
this work?
N/A. skylights are not in the scope of work and will not need to be raise etc.
since there is no roofing insulation required.
10. Would the City consider extending the bid due date?
See Addendum 1 – the bid date changed to July 24th (from July 10th).