Loading...
HomeMy WebLinkAboutRFP - 8115 ENGINEERING SERVICES FOR WATER RECLAMATION & BIOSOLIDS FACILITY DESIGN & CONSTRUCTIONAddendum 1 8115 Engineering Services for Water Reclamation & Biosolids Facility Design & Construction Page 1 of 2 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 8115: Engineering Services for Water Reclamation & Biosolids Facility Design & Construction OPENING DATE: 3:00 PM (Our Clock) May 18, 2015 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Questions & Answers Please contact Pat Johnson, CPPB, Senior Buyer at (970) 221-6816 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 1 8115 Engineering Services for Water Reclamation & Biosolids Facility Design & Construction Page 2 of 2 EXHIBIT 1 – QUESTION & ANSWERS Q1. Is it possible to obtain the as-builts for existing Drake WRF chlorine contact channel? This will help in understanding if the structure can be reused for the UV system. A1. In addendum #1, the plan sheets that show the effluent piping are also the ones that show the chlorine contact chamber information. Q2. The RFP requests a full resume for the Project Engineer position. Can you clarify what the City is looking for here? Do you want all the projects the proposed person has performed or just a summary? A2. The Project Engineer position resume should be formatted as if it were being used for a job application. Q3. In Section III.B.6 on Page 6 of the Request for Proposal, information on the “… beginning price, ending price, and any change orders” is requested. Is the beginning and ending price the engineering fee? Are the change orders the change orders issued to contractors for construction? A3. The requested price information for the projects should be listed separately for both design costs and construction costs of the project.