HomeMy WebLinkAboutRESPONSE - BID - 8136 SENIOR CENTER HVAC RENOVATION PHASE ISECTION 00300
BID FORM
PROJECT: 8136 Senior Center HVAC Renovation Phase I
Place: Purchasing Division
Date: July 10, 2015
1. ln compliance with your Invitation to Bid dated June 19 , 201§_ and subject to
all conditions thereof, the undersigned a (Corporation, Limited Liability Company,
Partnership; Joint Venture, or Sole Proprietor) authorized to do business in the State of
Colorado hereby proposes tp furnish and do everything required by the Contract
Documents to which this refers for the construction of all items listed on the following Bid
Schedule or Bid Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in
good faith, without collusion or connection with any other person or persons Bidding for
the same Work, and that it is made in pursuance of and subject to all the terms and
conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the
detailed Specifications, and the Drawings pertaining to the Work to be done, all of which
have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum
of 3% of Bid Bond
($ ) in accordance with the Invitation To Bid and Instructions to
·Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and
a Payment Bond for the amount of the total of this Bid within fifteen (15) caler)dar days
from the date when the written notice of the award of the contract is delivered to him at
the address given on this Bid. The name and address of the corporate surety with which
the Bidder proposes to furnish the specified performance and payment Bonds is as
follows: Granite Re, Inc., 14001 Quailbrook Drive, Oklahoma City. OK 73134
5. All the various phases of Work enumerated in the Contract Documents with their
individual jobs and overhead, whether specifically mentioned, included by implication or
appurtenant thereto, are to be performed by the CONTRACTOR under one of the items
listed in the Bid Schedule, irrespective of whether it is named in said list.
6. Payment for Work performed will be in .accordance with the Bid Schedule or Bid
Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No. ---'--through
2
8. BID SCHEDULE (Base Bid)
LUMP SUM BASE BID $._1_0_9_,6_1_7._o_o ____ ~'."'""':":"'"
(Please note: the new large rooftop unit will be supplied by Owner. Contract is to install
unit with the other remaining Scope of Work)
IN WORDS: One Hundred Nine Thousand, Six Hundred Seventeen Dollars
9. PRICES
The foregoing prices shall include all labor, materials, transportation, shoring, removal,
dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the
several kinds called for. -
Bidder acknowledges that the OWNER has the right to delete items in the Bid or change
quantities at his sole discretion without affecting the Agreement or pric.:es of any item so
long as the deletion or change does not exceed twenty-five percent (25%) of the total
Agreement Price.
RESPECTFULLY SUBMITTED:
_7/10/15
Date
President
Title
H-1695 I 3096-H(C)
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest:-}(,IL.l.J..!-~E::.~~~~~'2!J:.:=:::: ______ ~
Telephone 970-461-3553
Email Johnd@kuckmechanical.com
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned Kuck Mechanical contractors, LLC
as Principal, and Granite Re, Inc. , as Surety, are hereby held and firmly
bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of$ Five Percent of the Amount Bid (5%)
for the payment of which, well and truly to be made, we hereby jointly and severally bind
ourselves, successors, and assigns.
THE CONDITION of this obligation is such that whereas the Principal has submitted to the City
of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a
Construction Agreement for the construction of Fort Collins Project, 8136 Senior Center HVAC
Renovation Phase I.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the
form of Contract attached hereto (properly completed in accordance with said Bid) and
shall furnish a BOND for his faithful performance of said Contract, and for payment of all
persons performing labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid, then this
obligation shall be void; otherwise the same shall remain in force and effect, it being
expressly understood and agreed that the liability of the Surety for any and all claims
hereunder shall, in no event, exceed the penal amount of this obligation as herein
stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety
and its BOND shall be in no way impaired or affected by any extension of the time within which
the OWNER may accept such Bid; and said Surety does hereby waive notice of any such
extension.
Surety Companies executing bonds must be authorized to transact business in the State of
Colorado and be accepted by the OWNER.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals
this day of July 1 O , 201.§_, and such of them as are corporations have caused
their corporate seals to be hereto affixed and these presents to be signed by their proper
officers, the day and year first set forth above.
PRINCIPAL SURETY
Name: Kuck Mechanical Contractors, LLC Granite Re, Inc.
Address: 395 W. 67th Street 14001 Quailbrook Drive
Oklahoma City, OK 73134
Title : Sarah C. Brown, Attorney-in-Fact
ATTEST:
(SEAL)
1-·
I '
I
.
I
. I
I
I
. I
I
!
l
i
GRANITE RE, INC.
GENERAL POWER OF ATIORNEY
Know all Men by these Presents:
That GRANITE RE, INC., a corporation organized and existing under the laws of the State of OKLAHOMA and having its principal office
at the City of OKLAHOMA CITY in the State of OKLAHOMA does hereby constitute and appoint:
DONALD E. APPLEBY; TODD D. BENGFORD; MARK H. SWEIGART; SARAH C. BROWN its true and lawful Attorney-in-Fact(s) for the
following purposes, to wit:
To sign its name as surety to, and to execute, seal and acknowledge any and all bonds, and to respectively do and perform any and all
acts and things set forth in the resolution of the Board of Directors of the said GRANITE RE, INC. a certified copy of which is hereto annexed
and made a part of this Power of Attorney; and the said GRANITE RE, INC. through us, its Board of Directors, hereby ratifies and confirms all
and whatsoever the said:
DONALD E. APPLEBY; TODD D. BENGFORD; MARK H. SWEIGART; SARAH C. BROWN may lawfully do in the premises by virtue of these
presents.
In Witness Whereof, the said GRANITE RE, INC. has caused this instrument to be sealed with its corporate seal, duly attested by the
signatures of its President and Secretaryffreasurer, this 301
h day of April, 2015.
· Kenneth D. Whittin on, President
STATE OF OKLAHOMA ) ) SS: .!6{~~e.,u<e<
COUNTY OF OKLAHOMA )
On this 30
1
h day of April, 2015, before me personally came Kenneth D. Whittington, President of the GRANITE RE, INC. Company and
Kyle P. McDonald, Secretaryff reasurer of said Company, with both of whom I am personally acquainted, who being by me severally duly
sworn, said, that they, the said Kenneth D. Whittington and Kyle P. McDonald were respectively the President and the Secretaryff reasurer of
GRANITE RE, INC., the corporation described in and which executed the foregoing Power of Attorney; that they each knew the seal of said
corporation; that the seal affixed to said Power of Attorney was such corporate seal, that it was so fixed by order of the Board of Directors of
said corporation, and that they signed their name thereto by like order as President and Secretaryff reasurer, respectively, of the Company .
My Commission Expires:
August 8, 201 7
Commission #: 0101325 7
No~~
GRANITE RE, INC.
Certificate
THE UNDERSIGNED, being the duly elected and acting Secretary(freasurer of Granite Re, Inc., an Oklahoma Corporation, HEREBY CERTIFIES
that the following resolution is a true and correct excerpt from the July 15, 1987, minutes of the meeting of the Board of Directors of Granite
Re, Inc. and that said Power of Attorney has not been revoked and is now in full force and effect.
"RESOLVED, that the President, any Vice President, the Secretary, and any Assistant Vice President shall each have authority to appoint
individuals as attorneys-in-fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety
bonds and other documents of similar charncter issued by the Company in the course of its business. On any instrument making or
evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond
or undertaking of the Company, the seal, or a facsimile thereof, may be impressed or affixed or in any other manner reproduced;
provided, however, that the seal shall not be necessary to the validity of any such instrument or undertaking."
IN WITNESS WH~he undersigned has subscribed this Certificate and affixed the corporate seal of the Corporation this
!o+h day of '-. 1 , 2o_ffL.__. ~ '" ,··=".~ -,·· , ~ ~ I n ~
Kylei.McDonald, Secretary(f reasurer
GROB00-1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and comprehensive. This
statement must be notarized. If necessary, questions may be answered on separate attached
sheets. The Bidder may submit any additional information he desires.
1. Name of Bidder: Kuck Mechanical Contractors LLC
-----------~~-----~~--------------
2. Permanent main office address: __ 3_9_5_W_._6_7t_h_S_t. _, _ L_o_v_el_a_nd....:..,_c_o_so_5_3_8 ______ _
3. When organized: ___ 1_99_9 _____________________ _
4. If a corporation, where incorporated: __ N_IA _______________ _
5. How many years have you been engaged i11 the contracting business under your present
firm or trade name? ___ 1_6_Y_e_a_rs __________________ _
6. Contracts on hand: (Schedule these, showing the amount of each contract and the
appropriate anticipated dates of completion.)
See Attached Schedule - Exhibit A
7. General character of Work performed by your company:
HVAC Sheet Metal Installation and Fabrication
8. Have you ever failed to complete any Work awarded to you? __ No _______ _
If so, where.and why? ______________________ _,_
9. Have you ever defaultecranacontract? __ ~::.;;;o'---------------
If so, where and why? ___ __:.N.::.:IA:..:.__ _________________ _
10. Are you debarred by any government agency? _ __.:..N:..:::o~------------
If yes list agency name.----------"---------------
11. List the more important projects recently completed by your company, stating the
approximate cost of each, and the month and year completed, location and type of
construction.
Edora Pool - City of Fort Collins, Final Contract Amount: $176,293, Completed 11/1/2013- HVAC Remodel
CSU ADL RTU Replacement - Fort Collins, Final Contract Amount: $263, 176, Completed 10/15/2014 - HVAC Equip Repl.
Avago Consoldiation - Fort Collins, Final Contract Amount: $335, 179, Completed 12/12/2014 - HVAC Remodel
Also See attached Exhibit B.
12. List your major equipment available for this contract.
Duct Coil Line, Plasma Cutter, Insulation Cutting Table, Forming & Rolling Equipment,
Robotic Welder, Spiral Pipe Machine, Break Press, Shearing, Trucks, Lifts
13. Experience in construction Work similar in importance to this project:
Ted Kuck was the Original HVAC Project Manager when the Senior Center was originally built.
Poudre High School Renovation
CSU Student Recreation Center
14. Background and experience of the principal members of your organization, including
officers:
See attached Resumes
15.
16.
Credit available: $ __ l_3_. M_i_llio_n ____________________ _
Bank Reference: Great Western Bank - Jenny Shultz - 970-660-9028
---,-------,:____--------------~
17. Will you, upon request, fill out a detailed financial statement and furnish any other ·
information that may be required by the OWNER? ___ Y_e_s _________ _
18. Are you licensed as a· General Contractor? ___ N_o_-_L_ic_en_s_e_d_H_V_A_c_c_o_n_tra_c_to_r_in_F_o_rt_c_o_ll_in_s_
19.
20.
If yes, in what city, county and state?------------------
What class, license and numbers?-------------------
Do you anticipate subcontracting Work underthis Contract? __ Y_es _______ _
If yes, what percent of total contract? ____ 4_5°_Yo ______________ _
Andtowhom? __ J_o_h_ns_o_n_C_o_n_tro_l_s,_L_aw_re_nc_e_F_i_nn_&_A_ss_o_c._(~TA_B~)---------~
Are any lawsuits pending against you or your firm at this time? ___ N_o ______ _
IFyes,DETAIL~~~~~~~~~~~~-~~~~--~~~~
21. What are the limits of your public liability? DETAIL $2 Million with $5 Million Umbrella
What company? . Flood & Peterson
22. What are your company's bonding limitations? __ u_p_t_o_$_2_M_il_lio_n ________ _
23. The undersigned hereby authorizes and requests any person, firm or corporation to
furnish any information requested by the OWNER in verification of the recital comprising
---------tl'.Jis-Statement-0f--Bidder~s-QualificatiGr-is~. -----------------------
_J_u .ly ..... ______ , 20~.
Printed: Theodore A. Kuck
State of Colorado
County of __ La_r_im_e_r - - ------
_..;1-J.. --h'--'- u_;;,,_d_;;;_ I_JYi -"t_' 4_._.~...;....U.;;. .;.(~k-.,, · '= =------ being duly sworn deposes and says that he
is __ fi _r._t~S"~~-t~nt ____ of l!u<kfnu)t.AJti~a-( Untnu4ys, lLC..
(Name) (Organization)
and that the answers to the foregoing questions and all statements therein contained are true
and correct. . .
. . -II<. . .
Subscribed and sworn to before me this f () day of~, 20/:>.
N~ ~tJ~ . ·
My commission expires: oz/o~ / to/1.
(Seal)
BOSSfJEAN WARNER
NOTARY PUBLIC
STATE OF COLORADO
NOTARY ID 19984022395
MY COMMISSION EXPIRES FEBRUARY 06, 2019
KUCK MEC/IANICAL
CONTRACTOR~ LLC
To: City of Fort Collins Date: 7/10/2015
Re: 8136 Senior Center HVAC Renovation Phase I
Attn: Purchasing Division
We propose to furnish labor, material and tools of the trade to do the HVAC work
as per plans and specifications dated 6/05/2015.
This price includes the following:
• Sheet Metal duct • Air Balance
• Round duct • Crane
• Liner & Wrap • Start up
• Roof top Unit provided by owner ( 1) • Johnson Controls
• Big Ass Fans provided by owner (1) • Commissioning Assist
• Grilles, Registers & Diffusers
• Demolition HVAC related only
Total Base Bid ..... . .. . .. . ..... . .. ....... .. . ... ..... . .. .. ... .... ........ .. ... $109,617.00
Kuck Mechanical has reviewed 2 Addenda
This price excludes the following:
Bond
Permit
Davis Bacon Wage
Overtime
Temporary Heat
Rubbish Removal
Cut & Patch
Concrete Core
and saw cut
Painting
Masonry
Lintels or Structural
Steel
Concrete Pads
Roofing
Line Voltage Electrical
Conduit
Frequency Drives
Magnetic Starters
Smoke Detectors by EC
Architectural Louvers
Seismic Restraints
Hydronic Equipment
Hydronic Piping
Piping of any Kind
Gas Piping
Plumbing
PVC Wtr Htr & Boiler
flues
Condensate Piping
Sound Caulking
Fire Caulking
Engineering or Drawings
3D CAD Drawings
Commissioning
Taxes
Scaffold, work platform
or lifts for work above
the pool.
Block walls
In discussion with other trades it is agreed that the "General Contractor" should provide an OSHA Approved
working platform for the Big Ass fans over the pool area that all the trades involved can use.
7/10/2015
1314
1320
1340
1345
1402
1403
1405
1416
1420
1424
1430
1434
1436
1438
1439
1443
1444
1446
1450
1452
1454
1455
1460
1462
1463
1501
1503
1504
1505
1506
1507
1508
1509
1511
1512
1513
1514
1515
1516
1517
1518
1519
1520
1522
1523
1524
1525
1526.
1527
1528
1529
1530
1531
1532
1533
EXHIBIT A
KUCK MECHANICAL CONTRACTORS, LLC
CURRENT PROJECTS ON HAND
Job Name Contract Change Total Contract
7/10/2015 Exhibit B
KUCK MECHANICAL CONTRACTORS, LLC
Project Completed
CONTRACTOR
NA-M~E_O_F_P_R_O~J~E~C--T----~--~--+-----G~E~NERAL
Owner ENGINEER AMOUNT
ARCHITECT/ CONTRACT
Libby Hall Dining CU Kimmel Mechanical, Inc. CU Shaffer Baucom Engineering $ 111,866.00
Mead Middle Schoo-I Central Mechanical, Inc. - St. Vrain School Distr. RMH Group - $ 497,095.00
ELCO Water RC Heath Elco Wat~r Distr. Performance Engineering $ 91,653.00
I Laramie Las Vegas Community WWTP Rec Ctr. -- Mechanical Kimmel Mechanical, Systems, Inc. Inc. _City City of of Las Laramie Vegas CH2M Ohison Hill Lavole Collab_()_rtive ----$$ ------s.44,96,463.529.00
00
UNC Dining Facility Central Mechanical, Inc. University of Northern CO Bennett Wagner & Grady $ 195,987.00_,
Copper MTNWWTF Expansion Southwest Contracting Copper Mnt. Water Distr. Rottiberg,Tamburini & Winsor $ 159,081.00
Loveland Service Center KMC City of Loveland RMH Group $ 367,203.00
Pioneer Charter School Alliance Construction SolutionS-Ploneer Charter School_ Architecture West, LLC I $ - 241,526.00
St. John's Phase II Corporate Plumbing St. Johns Church RMH Group $ 186,438.00
1111_i~tary Science CSU CSU Facilities Management CSU Gator Ruma & Associates $ 83,665.00
Lansing Elementary School Kimmel Mechanical, Inc. Aurora Public Schools LKA Partners $ 140,000.00
1
Park Lane Elementary School Kimmel Mechanical, Inc. Aurora Public Schools _ LKA Partners $ 172,000.00
Northrid_ge Elementary School Kimmel Mechanical, Inc. __ Douglas County School District _ Envision $ 142,725.00
1
South Middle School Gerald H. Phipps Aurora Public Schools Eidos Architects, LLC $ -~05,30Q:OO
The Dakota Lofts Buchanan Yonushewski Group HomeToDenver LLC Buchanan Yonushewski Group $ 479,000.00
Northern Water Reclamation Fae Western Summit City of Colorado Springs Brown & Caldwell $ 1,048,405:00
Pepsi Warehouse Central Mechanical, Inc. Pepsi Co. A&E Group $ 200,000:00
New Frontier Bank Thissen Construction, CO New Frontier Bank A&E Group $ 358,513.00
CSU/ERC Lab Remodel Wray Plumbing CSU ____ - Aller.Lingle Architects, P.C. $ 65,853.00
Morris Elem/Yuma Middle School Wray Plumbing Yuma School Distr. Bennett Wagner & Grody $ 450,511.00
St. Vrain #8 Middle School C & B Plumbing St. Vrain School Distr. Systems Engineering Group $ 523,000.00
Eaglecrest H/S Central Mechanical, Inc. Cherry Creek School Distr. Shaffer Baucom Engineering - $ 102,669.00
Villa's@ Sunny Acres Quality Mech Systems, Inc. Centura Health A. E. Ass_()_ciates, Inc. $ 381,784.00
Best Western Phase II Delehoy Construction, Inc. Best Western CE Group $ 99,935.00
Judy Farr Center (UNC) Thissen Construction, Inc. UNC _ Gordon Gumeson & Assoc. $ 66,259.00
Metro WWTP PAR 861 Glacier Construction Metro Wastewater Reel. Brown & Caldwell $ 317,899.00
Hampton Inn Alliance Construction Solutions Hampton Inn Pahl, Pahl, Phal $ 1,318, 194.00
Avon WWTP Stanek Constructors, Inc. Avon Water Distr. Brown & Caldwell $ 67,990.00
Greeley Ice Haus Wray Plumbing & Heating City of Greeley KBN Engineers $ 325,800.00
Lone Tree Creek WWTP Velocity Constructors, Inc. Arapahoe County Water Auth. RMH Group $ 70,792.00
Edwards WWTP Asian Construction Co Eagle River Water Burke Associates, Inc. $ 383,228.00
DPS Northeast Bus Terminal Kimmel Mechanical, Inc. Denver Pub-lie Schools M E Group $ 323,326.00
'Wheeling Elementary School Kimmel Mechanical, Inc. Aurora Public Schools Ballard Group $ 421,510.00
Dunstan Middle School · Kimmel Mechanical, Inc. Jeffco School Distr. McGrath, Incorporated $ 536,778.00
I
Par 813-Metro-WWTP Braconier Plumbing & Heating Metro Wastewater Reel. Swanson/Rink Consulting $ 181,433.00
Kinard Jr. High School Allen Plumbing & Heating PSD Schools EMC Engineering, Inc. $ 582,350.00_
Niwot High School Allen Plumbing & Heating St. Vrain School Distr. RMH Group $ 360,932.00
1NCMC Cardiac Rehab Thissen Construction, Inc. Northern Colorado Medical Center Davis Partnership, P.C. $ 71,140.00
-Village --- Walk Beaver Creek R. A. Nelson Village Walk LLC Gwathmey Pratt Schultz- $ 1,398,372.00
7/10/2015
NAME OF PROJECT
Buckley Support Facility
Blue Sky Breckenridge
Hilton Garden Inn
GilletteWWTP
Mtn. Vista Animal Clinic
Courtyard Marriott
Colorado School of Mines Rec. Center
Heritage High School
DIA Concourse B
Basalt Elementary School
Basalt Middle School
------·
Basalt High School
New Frontier Bank-Longmont
Routt County Justice Center
Trans. Building-Longmont
Centennial Elem School-Loveland
Winona Elem School-Loveland
Limelight/Monarch
Boulder County Vehicle Storage
WANG Carrison Control
WANG Airlift Support
Nederland Community Center
A-Basin Midway Lodge
Millennium Bank
DVR City Center Marriott
Sam Hobbs Regional WWTFI
DU-Lambda Chi Alphia
75th Street WWTP
AspenWWTF
Centennial Elem RTU-1 & RTU-2
Coyote Ridge Elementary
CSU Regulated_ Mat'ls Handling
NCMC 3rd Floor Phase 1
Agilent Tech Calibration LAB
Union Colony Prep School
St.Vrain Elementary No.23
St. Vrain Elementary No.24
Mountain View High School
St.Vrain Elementary No.25
Lucile Erwin MS Addition
Exhibit B
KUCK MECHANICAL CONTRACTORS, LLC
Project Completed
CONTRACTOR Owner
GENERAL
PCL Construction Buckley AFB
Kimmel Mechanical, Inc. Blue Sky Resorts
Alliance Construction Solutions Hilton
Garney Wyoming, Inc. City of Gillette
J&J Construction Mtn. Vista Animal Clinic
Kimmel Mechanical, Inc. Marriott
Pinkard Construction Colorado School Of Mines
W.O. Danielson Construction Littleton Public Schools
PCL Construction City of Denver
Kimmel Mechanical, Inc. Roaring Fork School Distr.
Kimmel Mechanical, Inc. Roaring Fork School Distr.
Kimmel Mechanical, Inc. Roaring Fork School Distr.
7/10/2015
NAME OF PROJECT
Prairie Water Treatment Plant
CRMC Tomography
Aspen Recreation Center
-
Colorado Plains Medical Center
New Castle Middle School
Vail Mtn.View on Gore Creek
TLFVQ Buckley AFB
~ail Valley Medical Center
-
Summit Charter M/School
List Residence, Vail, CO
-
Nordy's BBQ Restaurant
Vail WWTP Odor Control
Riverton WWTF
Union Colony Prep School
-
Grandvie:iv Elemen_!_~--
Sheraton West Tower
Newspaper Printing Centre
Fitz Bldg 500 Phase 3A Cont'
-
Oak Creek Schools
Foothills/Eiber Elementary
CSU-___AIDL ____ ..
Snowmass Bldg 4,6,7
-~
Sheraton East Tower
~?U Forestry __
Cornerstone Residences
Redeemer Church
Red Willow Facility
EStes Park Medical Center
Fraser Recreation Center
Bldg.500 AHU Upgrade
Pinedale Warehouse
Burns Elementary
TSO Transp Facility
Buckley AFB BRAC
DFA Project Epic
DFA Raw Receiving HVAC
1st United Medthodist
Low Point WWTP
Renaissance Uptown Lo~s
P-8 Aurora Public Schools
Exhibit B
KUCK MECHANICAL CONTRACTORS, LLC
Project Completed
CONTRACTOR Owner
GENERAL
Western Summit Aurora Water
Alliance Construction Solutions Cheyenne Regional Medical Center
Long Energy Solutions_ City of Aspen
Bellendir Mechanical Colorado Plains Medical Center
FCl-Grand Junction New Castle Comm. Schools
Kimmel Mechanical, Inc. Vail Properties
Haselden Construction Buckley AFB
7/10/2015
NAME OF PROJECT
Buffalo WWTP
Cheyenne Reional Medical Center Morgue
Windsor MS VAV's
--- --
Wyoming Game & Fish
Sunflower Market N.M.
Ft. Morgan Community College
Garden City Medical Office Building
McKee Simulation Lab
NiWot High School
Metro PAR 1094
McCook Community Hospital
Ft. Lupton Readiness Center
JBS Swift Amenia
Smokey Hill H/S Pool & Add
Glenwood Springs WWTP
Summitville Mine OU5 WTP
CSM Residence Hall
Lyons Middle & High Schools
Red Rocks Medical Office Bldg
RM Arsenal Visitors Center
Crested Butte WWTF
McKee AHU Replacement
Pioneer Elementary
Lamar Lift Station
Loveland HS Pool
Perl Mack Li~rary
FRCC Facilities
ECCV Membrane WTP
JBS Hide, Fleshers, EPI
Golden Gate State Park WWTF
CRMC - EP Lab Remodel
JBS Carriers Office Upgrade
Grand Junction VA Hospital
DPS Vista Academy
Red Rocks Medical Office Tenant Finish #4
Lincoln School Community Ctr.
Weld County_ Sykes Bldg
PVHS Greeley Infusion Center
Memorial Hospital MRI Repl.
Larkspur Elementary
Exhibit B
KUCK MECHANICAL CONTRACTORS, LLC
Project Completed
CONTRACTOR Owner
GENERAL
Hydro Construction City of Buffalo
Town & Country Plumbing . Cheyenne Regional Medical Center
Trane Weld County School Distr.
Heather Plumbing State Of Wyoming
Sunflower Const. Sunflower Companies
Alliance Construction Solutions Ft. Morgan Community College
MSI Mechanical Garden City Medical Office Building
Corman Mechanical Banner Health
Phillips Plumbing & Mechanical St. Vrain School Distr.
WSI Denver Metro Wastewater
Midlands Mechanical McCook Community Hospital
Midlands Mechanical Colorado National Guard
7/10/2015 Exhibit B
KUCK MECHANICAL CONTRACTORS, LLC
Project Completed
CONTRACTOR I Owner + ENGINEER AMOUNT
1_N_A_M_E_O_F_P_R_O_J_E_C_T _________ --j _____ G_E_N_E__RA _ L ____ t - ----- ARCHITECT/ CONTRACT
I Kaiser Hidden Lake Medical Office Bldg Midlands Mechanical Kaiser Foundation Health Plan Gator Ruma & Associates $ 218,221.00
CAEDA Business Innovation Center _ FCI -CAEDA Business Development GSG Architecture --$ 1, 172,670.00
Aspen Grove Community Church Aspen Grove Community Church Aspen Grove Community Church Belfay Engineering $ 59,328.00
University of WY - SFSF Mechanical Systems, Inc. University of WY --MKK Consulting/Pappas $ 2,125,690.00
Clyfford Still Museum Design Mechanical Clyfford St~I Museum _ Design Mechanical $ 92,005.00-
SE Wyoming Visitors Center Mechanical Systems, Inc. State Of Wyoming Anderson Mason Dale $ 278,682.00
Benkelman WTP Asian Construction City of Benkelman -- Baseline $ 57,845:00
I - - ·-···- . ----·
City of Greeley Boilers & RTU Corman Mechanical City of Greeley Sole Engineering $ 85,518.00
Redstone WWTP Hy~ro Construction Redstone Water & Sanitation Schmueser/Gordon/Meyer $ 79,853.00
Boulder 75th Street WWTP Stanek Constructors, Inc. Boulder County Brown & Caldwell $ 213,353.00
Boulder County Justice AHU -Univ. of CO at Boulder Univ. of CO at Bouider Univ. of CO at Boulder -$--136 688 00
I - ---- ' . J
Larimer County Detention Ctr Delehoy Construction, Inc. Larimer County CE Group $ 103,433.00
Climax Molybdenum Mine Catamount Constructors Feeport-McMoran Company Jacobs --- -$1,842,137.00
I -
St. Vrain WWTP Glacier Construction St. Vrain Sanitation District Frachetti Engineering $ 1, 112,773.00
Independence Pass Residence Kimmel Mechanical, Inc. Independence Pass, LLC _____ Bohlin Cywinski Jacksoo _____ -$332,845:00
St. Francis of Assisi Church Krische Construction St. Francis of Assisi Church McGrath Engineering $ 180,017.00
Seminole Primary & HS - MWsuilders -- Seminole Independent School Dist. Parkhill Smith & Cooper $ 1,718,609.00
-Cargill Chemistry Lab Dohn Construction Cargill Inc. - Allen D. Curtis Architect $ 104,432.00
CRMC Imaging Medical Office Building Mechanical Systems, Inc. Cheyenne Regional Medical Ctr Smith Seckman Reid, inc: $ -W1, 173.00
Denver University Avademic Commons Gerald H. Phipps Denver University -· H&L Architecture $ 732,788.00
!Boulder County Probation Kimmel Mechanical, Inc. Boulder County Boulder County Architects _!_ __ __§~058.00
West End Health Center FCI Constructors Colorado Coalition for Homeless __ Humphrie_s Poli Architects $ 123,209.00
Battle Command Training Center Kimmel Mechanical, Inc. US Army Corps of Engineers - Omaha US Army Corps of Engineers - Or $ 762,679.00
~ Williams Monaco WWTP Glacier Construction South Adams County WSD Burns & McDonnell $ 11,226.00
Northglenn Recreation Center DS Constructors City of Northglenn Beaudin Ganze $ 505,288.00
CRMC PET & CT Town & Country Plumbing Cheyenne Regional Medical Center Davis Partnership Architects $--40,893-:00
1
CRMC SPD OR Town & Country Plumbing Cheyenne Regional Medical Center Davis Partnership Architects $ 39,541.00
Poudre High Schooi Phase 1 Wray Plumbing & Heating Poudre School District Architecture Plus $ 658,53~._9Q_
RTU Replacement FCI Constructors FCI Constructors N/A $ 29,I_~~:OO
CRMC PACE Mechanical Systems, Inc. Cheyenne Regional Medical Center Davis Partnership Architects $ 40,056.00
1---------- ·- -
JCMD Pump Station Garney Companies Jefferson Ctr Metro Dist #2 TST, Inc of Fort Collins $ 16,325.00
Kaiser Tenant Improvements Bryan Construction Kaiser Foundation Health Plan Bennett Wagner & Grody $ 444,060:00
Poudre Valley Hospital - Greeley Wray Plumbing & Heating Poudre Valley Health Care H+L Architecture -$ 483,282.00
Laramie River Station Basin Electric Power Coop Basin Electric Power Coop _Basin Electric Coop $ --59,232.00
Westin Snowmass Resort McGuire Builders Silver Tree Properties Beaudin Ganze $ 2,167,260.00
1McCook Community Hospital Phase 2 Midlands Mechanical McCook Community Hospital HOR Architecture $ 115,723.00
EGO Building 5 - Denver Public Schools Midlands Mechanical Denver Public Schools DLR Group $ 312,632.00
Ball WE-2 Office Thal Construction, Inc. Ball Aerospace & Technologies Corporation Studio H:T, Inc. $ 46, 163.00
CSU - Alder Hall Delehoy Construction, Inc. CSU _ I CSU Facilities Management $ 50,483.00
Suncor Office Bldg Design Mechanical Suncor Properties $ 88,753.00
7/10/2015 Exhibit B
KUCK MECHANICAL CONTRACTORS, LLC
Project Completed
CONTRACTOR Owner
NAME OF PROJECT -------~----~- GENERAL
ENGINEER AMOUNT
ARCHITECT/ CONTRACT
Resurrection School Addition Wray Plumbing & Heating Ressurection Christian School Stone Bridge Partners, LLC $ 536,350.00
Eagle -Avon WWTF · Glacier Construction Eagle River Water & Sanitation Dist. Frachetti Engineering, Inc. -$ 530,374.00
Castle Creek Campus Shaw Builders LLC AMFS/ACDS Harry Teague Architects $ 443,962.00-
Denver Mint Sales Offce Krische Construction US Mint Studio DH Architecture $ 37,354.00
Garney Office Construction Garney Companies Garney Companies - BCER Engineering __ $ ____ 16, 185.00
Holy Name Catholic Church Grand Lake Plumbing Holy Name Catholic Church Eidos Architects, LLC $ 275,950.00 I
Chambers Dam Pump Station Velocity Constructors, Inc. Arapahoe County Water Auth. Burns & McDonnell $ 81,353.00-]
Baggs Water Pretreatment Facility Hydro Constructi()~ - Town of Baggs, WY Lidstone & Associates $ 19,633.00 J
Monarch Casino Remodel Kimmel Mecha_nical, Inc. City of Black Hawk, CO __ MBA Architecture & Interior Desit $ 14,323.00
Enterprise Compressor Station WILLBROS Construction Evans, CO $ 28,353.00
GE Oil & Gas Ford Construction Simpson Company ____ Integrated Mechanical, LLC $ 66,322.00
Woolley's Suites Hotel Alliance Construction Solutions Woolley's Classic Suites James Fabbri $ 4,032,586.00
All~n WTP Asian Construction, Inc. ·City of Englewood, CO ___ CDM Smith _________________ $--4o~490~
Tufts LDS Corporate Plumbing _ Church of Jesus Christ of Latter Day Saints NBW Architects P.A. $ 43,394.00
Vail WWTP AHU Replacement Eagle River Water & Sanitatoin Dis· Eagle River Water & Sanitation Dist. Kennedy/Jenks Consultants $ 55,859.00
Black Hawk WWTP _ RN Civil Construction Black Hawk Central City Sanitation Dist. TST, Inc of Denver $ 11,853.00
Train Swift RTU Trane U.S., Inc. S\JVift & Company JV~_n_corated $ 130, 108.00
Kirkland's Marketplace Build Retail Inc Build Retail Inc _ Sargenti Architects $ 22,253.00
Halliburton Control Building FCI USA Tank Sales Miller Boskus Lack Architects $ 49,483.00
Dellenbach Motors Dohn Construction Dellenbach Motors __ VFLA Architects $ 51,533.00
550 15th Street Alliance Construction Solutions 550 15th Owner, LLC Pahl Architecture $ 25,205.00
1
8est Western Southwest Mechanical & Piping, Inc: Greg Tally/Best Western SW Pahl Architecture $ -~9,~:!_:_Q()__
Roacl__34 Expansion Delehoy Construction, Inc. Road 34 ln~eg_r:_ated Mechanical, LLC $ 9,553.00
Woodward Iron Mountain T&D Wray Plumbing & Heating Woodward GHAFARI Assoc., LLC $ 14,700.00
Cunningham FS#3 W.O. Danielson Construction Cunningham Fire Protection Yon Tanner Architecture, PC $ 40,472.00
Margery Reed Hall Hyder Construction, Inc University of Denver Slater Paull Architects -- $ 343,620.00
I Northglenn Marcy Gulch WWTP WWTP J.Fischer R. Filanc Construction, Construction, Inc Co. City Centennial of Northglenn Water & Sanitation Dist. CH2M HDR Engineering HILL $ $ 148,2z-975.;650:00
00
JBS Odor Control Stack JBS USA LLC JBS USA LLC JVA lncorated $ 870,230.00
- -
FJ Young Elementary Kimmel Mechanical, Inc. Seminole Independent School Dist. Parkhill Smith & Cooper $ 357,059.()_()_
Groove Toyota Design Mechanical Groove Toyota Nudell Architects $ 39,843.00
Trailblazer Elementary Kimmel Mechanical, Inc. Douglas County School District Mellin & Associates Architect $ ----15~53:00-
--~-- I
Metro Flashing Garney Companies Metro Wastewater Reel. Dist. CH2M HILL $ 13,995.00
Arete Surgical Design Mechanical Arete Surgical Center R4 Architects $ 42,000.00
Englewood High School Design Mechanical Englewood School District MOA Architecture $ 148, 163.00
American Academy Design Mec_hanical Douglas County School District RE-1 Hutton Architecture $ 1_05,753._()_()__
Tucson Rogers Garney Companies, Inc. City of Thornton RJH Consultanats, Inc _ $ 71,576.00
Renaissance Hotel Fireplace Alliance Construction Solutions CBD Denver Suites, LLC Klipp a division of GKKWorks $ 61,791.00
1
I Stanley Fairgrounds Dohn Construction Town of Estes Park O'Bryan Partnership Inc $ ·-190,----535.----00 ---
JBS Dry Ice C02 Exhaust JBS USA LLC JBS USA LLC JBS USA LLC $ 13,953.00
7/10/2015
NAME OF PROJECT
Exhibit B
KUCK MECHANICAL CONTRACTORS, LLC
Project Completed
CONTRACTOR Owner
GENERAL
ENGINEER AMOUNT
ARCHITECT/ CONTRACT
Texas Instruments Horizon West PGMT Horizon West Property $ 11,553.00
Ft Morgan HS Dust Collector Morgan c·ounty School Dist RE-3 Morgan County School Dist RE-3 WOLD Architects $ 64,621.00
I . . ---··----
Sterling WTS DWIS Hydro Construction City of Sterling Hatch Mott MacDonald $ 32,253.00
Dunkirk Elementary Central Mechanical, Inc. Denver Public Schools Slater Paull Architects $ 419,806.00
Ft Collins Veterinary Clinic Horizon West PGMT ·- Horizon West PGMT $ 19, 162.00
City of Greeley Dewatering City of Greeley City of Greeley Sole Engineering=~=--==~~---~----_1~553.00
Sagewood Middle School W.O. Danielson Construction Douglas County School District RE-1 Christiansen Reece & Partners $ 12,857.00
Elbert Burnsley PK-Apartments 12 School Kimmel Mechanical Mechanical, & Piping, Inc. Inc. RedPeak Elbert School Properties District #200 SlaterPaull f3NL Des~g~-Arcilltects-- ___·-_--_
--~$!_ -_--_ -463,17~57.910.00-001 1
Union Station Apartments Design Mechanical Union Station $ 269,553.00
Englewood Campus Design Mechanical DPS $ 140,353.00
Edora Pool City of Ft. Collins - City of Ft. Collins RB+B Architects $ 176,293.00
1
DPS Eastbridge Elementary'· Central Mechanical, Inc. Denver Public Schools Humphries Poli Architects $ 597,771.00
CSU Student Rec Center - Wray Plumbing-& Heating CSU Hastings+ Chivetta Architects $ 13,930.o(f
Sonnelap Resort Kimmel Mechanical, Inc. Sonnelap Resort · ·-Architectural Engineering Consu1($ ___ 26,615.00
Crunchy Grocer N/A . Crunchy Grocer ·--------Integrated Mechanical~LC- _$ ___ 44;399.00
Larimer County ASU Remodel Wray Plumbing & Heating _-Larimer County __ The Architects' Studio $ 275,713.00
Aveda Salon - Centerra Aveda Spa and Salon Aveda Spa and Salon DTJ Design $ 36,553.00
1
HD Eye Care W.O. Danielson Construction Austivia Properties, LLC Yon Tanner Architecture, PC $ 12,343.00
1
Xanadu Med Spa IGES Spine Correction Center of the Rockies VFLA Architects $ 18,493.00
Aveda Salon - Centerra Central Mechanical, Inc. Otis School District R-3 WOLD Architec-ts___ $--835,779.0o
1550 & 1560 Market Street Design Mechanical $ 108,899.00
Westminster Rec Center Adolfson & Peterson City of Westminster The Ballard Group r$--44, 737.oo
Sheridan Middle School I $ 503,618.00
The Laboratory Restaurant Spectrum General Con!~actors The Punchlin~, LLC dba The Laboratory Oglesby C?e;:~ign -- $ 75,038.00
1
•
Marriott Denver City Center Alliance Construction Solutions CHSP Denver, LLC Elliott Wheeler $ 50,255.00
-. I
King Soopers #136 Avalanche Mechanical King Soopers $ 23,930.00
Titan.Machinery Equipment Install Titan Machinery Titan Machinery Installation Only $ 11,017.00
Warren AFB Dining Facility HMC Incorporated Sodexo America, LLC/ FE Warren AFB HMC Incorporated $ 93,691.00
Fairitiew Elementary · Braconier Plumbing & Heating Adams County School District 50 DAO Architecture $ 175,216.00
Elm Hall Design Mechanical Fabrication Project -- $ ---132,577.00
Metz Elementary - Braconier Plumbing & Heating Adam~ County School District 50 DAO Architecture __ $ 157 ;903.00
Starwood Sheraton Summit DCK LLC Starwood Steamboat LLC Eric Smith Associates $ 48, 100.00
Sherrelwood Elementary Braconier Plumbing & Heating Adams County School District 50 DAO Archite_9__!1.Jre $ 117,529.00
1
Pioneer Ridge Elementary FCI Constructors Weld County School Distr. RE-5J H+L Architecture $ 73,553.00
The LaboratorY Restaurant -RTU Spectrum General Contractors The Punchline, LLC dba The Laboratory Oglesby Design $ 21,061.00
I . -------
Joyner Residence Bill Joyner Bill Joyner NIA $ 14,286.00
fs~lud Pharmacy Heath Construction Salud Family H~~lth Center TW Beck Architects $ 35,221.00
I cs_u ADL RTU Replacement Colorado State University Colorado State University Gator Ruma & Associates $ 263, 176.00
Silver Creek High School Mechanical & Piping, Inc. St. Vrain Valley School District Slater Paull Architects $ 8,936.00
7/10/2015
NAME OF PROJECT
L YFE Kitchen
--
Rainbow Bridge Pet Crematorium
Aleph Mountain LLC - Lulzbot
Salud Dental Remodel
JBS Spray Cabinet Exhaust Retro
Exhibit B
KUCK MECHANICAL CONTRACTORS, LLC
Project Completed
CONTRACTOR Owner
GENERAL
Parkway Constr~_ction & Assoc. L YFE Kitchen, Inc
Rainbow Bridge Pet Crematorium Rainbow Bridge Pet Crematorium
Aleph Mountain, LLC Aleph Mountain, LLC
Heath Construction Co Salud Family Health Center
JBS USA LLC JBS USA LLC
--f----· ENGINEER ··--~c~~~:~T
ARCHITECT/
Gensler '$ 194,909.00
----·--------
SRB 1$ 13,658.00
·---~-~~----·-
··- ~~~sociate~l::l_aynes Mech $ 53,437.00
TW Beck Architects $ 36,962.00
-----~--
JBS USA LLC $ 114,406.00
THEODORE KUCK
Kuck Mechanical Contractors, LLC
President
I am and have been involved in all phases of the sheet metal industry including ownership, management, shop fabrication, field
labor management, and journeyman installer. At the age of 18, I became a sheet metal installer. I worked as an installer
several years for different firms before I left the Ft. Collins area to join Young's Inc., a mechanical contractor in Topeka
Kansas, as Estimator and Controller of the sheet metal division. In March of 1993, I returned to Ft. Collins to become Vice
President of Operations at Horizon Sheet Metal, Inc. During my tenure at Horizon, the company achieved record growth and
profitability as witnessed with total revenues reaching over 6.5 million dollars in the year of 1998.
In August 1999, I founded Kuck Mechanical Contractors, LLC. Although in business a relatively short period oftime, Kuck
Mechanical has already grown from the initial three principals to one hundred (100) employees with contractual projects
totaling more than 13 million dollars. This growth is credited to long lasting previous relationships, a past track record of
caring about our projects as well as the people involved in completing the work in a timely manner and the quality of
workmanship which has helped to build my personal reputation.
Licenses
• City and County of Denver, CO #A23351 •
City of Casper #95
• Aurora, CO #A20237 / 155678 • Town of Castlerock #03-0413
• Pikes Peak Regional Building Department #14677 • City of Centennial #CEN-13-00969
• City of Greeley # 17 41 I 1013 79 • City of Cheyenne CT-13-24209/24210
• Boulder, CO #3637 I LIC-0006701-22 •
City of Commerce City #1599
• Summit County Building Department #6565 •
City of Fort Morgan #555
• Englewood, CO #12776 • City of Gillette #6208
• Douglas County #02090 • City of Glenwood Springs # 10-0102
• Arvada, CO #7M-0383 • Grand County #MA050019
• Fort Collins, CO #H-169513096 • City of Golden #4068
• Loveland, CO #2852 • City of Lakewood #19226
• Longmont, CO #M00000352 • City of Laramie #3783
• City of Aspen #C005762 • City of Littleton #DI 1375
• City of Avon #CC00685 • Town of Snowmass #0003384
• Town of Breckenridge #42741 •
City of Sterling #2012-210
• City of Brighton #CL-08695 •
City of Thornton #18356
• City of Broomfield #OL-13-06923 • Town of Windsor #4167
• Boulder County #CON-11-0156 • Town of Vail #M09-0075
Proiects $100.000 - $499.000 Pro iects$500.000-$3.500.000
CSU Eddy Hall; Fort Collins, CO Perkins County Community Hospital; Grant, NE
CSU ADL Replacement; Fort Collins, CO Enzi Stem Laboratory Facility; Laramie, WY
Independence Pass Residence; Aspen, CO Metro PAR 1088 NTP; Denver, CO
Dunkirk Elementary; Denver, CO Ft. Carson Battle Command Ctr; Fort Carson, CO
PVH Greeley Emergency Center; Greeley, CO Eastbridge Elementary; Denver, CO
SE WY Visitors Center; Cheyenne, WY JBS Swift Odor Control; Greeley, CO
Laramie WWTP; Laramie, WY Woollev's Hotel; Denver, CO
Vail Mountain View; Vail, CO Westin Resort; Snowmass Village, CO
Summitville Mine OU5 WTP; Del Norte, CO CAEDA Business Innovation Center; Casper, WY
Grand County Courthouse; Hot Sulphur Springs, CO NCMC 3rd Floor; Greeley, CO
Aspen WWTP; Aspen , CO Prairie Waters WWTP; Aurora, CO
St. Vrain Schools; Erie, CO Renaissance Uptown Lofts; Denver, CO
RM Arsenal Visitors Center; Commerce City, CO Buckley TLF/TV; Denver, CO
Buffalo, WY WWTP; Buffalo, WY Mountain View HS; Loveland, CO
Denver Public Schools; Vista Academy, CO Climax Molybdenum Mine; Climax, CO \
Lamar Lift Station; Lamar, CO Glenwood Springs WWTF; CO
CSM Residence Hall; Golden, CO McCook Community Hospital; WY
ROBERT KUCK
Kuck Mechanical Contractors, LLC
Vice President/Superintendent
For the past twenty-seven years, I have been involved in multiple phases of heating, ventilation and air conditioning
construction industry. I began my career as a stock boy, then truck driver. I was employed as a sheet metal pre-
apprentice before enrolling and graduating from the Union Sheet Metal Apprentice 5-year Program (Local 265, Addison,
IL). Since my graduation as a sheet metal journeyman, I have been employed as job foreman and superintendent. My
current position is field superintendent and co-owner of Kuck Mechanical Contractors, LLC.
While employed by Simonetti Mechanical in Addison, Illinois, I worked on hospitals, schools, industrial plants, office
buildings and other commercial construction projects. In 1997, I relocated and accepted a position as field foreman with
Horizon Sheet Metal, Inc., Ft. Collins, Colorado in an effort to further my career and give me an opportunity to learn the
different aspects of the HVAC business. I worked on design build projects such as DIA Hilton and Ft. Collins Marriott
Residence Inn along with commercial projects such as wastewater treatment plants, water treatment plants and many
miscellaneous projects at Colorado State University. I also fine-tuned my management skills such as scheduling,
purchasing and human relations.
In August of 1999, I co-founded Kuck Mechanical Contractors, LLC. I believe that my work ethic, professionalism and
craftsmanship and working relationships with other trades as well as surrounding myself with top quality, experienced
people will help my business grow and prosper.
Training
Certified Master Trainer - National Center for Construction Education and Research (NCCER)
Master HVAC -Wyoming, Colorado
Local 265 Sheet Metal Five-Year Apprenticeship Program, Addison, Illinois
Certified Test and Balance
Asbestos Abatement
Refrigeration Recovery
Technical Service
OSHA 10 Hour Construction Safety
PROJECTS
Present:
Enzi Stem Laboratory Facility, University of Wyominq, Laramie, WY
Salud Dental Remodel, Fort Collins, CO
Salud Pharmacy, Fort Collins, CO
Hilton Garden Inn, Cheyenne, Wy
Past:
Denver Public Schools Eastbridge Elementary, Denver, CO
Tavelli-Shepardson Elementary, Fort Collins, CO
Salud Dental Remodel, Fort Collins CO
The Laboratorv-RTU, Fort Collins CO
Larimer County ASU Remodel, Fort Collins, CO
Edora Pool, Fort Collins, CO
Aveda Salon - Centerra, Loveland, CO
Xanadu Med Spa, Fort Collins, CO
JBS Odor Control; Greeley, CO
Poudre High School; Fort Collins, CO
Rennaissance Hotel Fireplaces, Denver, CO
JBS Dry Ice C02 Exhaust, Greeley, CO
Seminole Primarv & HS; Seminole, CO
Resurrection School Addition; Loveland, CO
Denver University; Denver, CO
Holy Name Catholic Church; Steamboat Sprinqs; CO
Westin Resort; Snowmass Village, CO
Bob Kuck
Re&urrie
Page 2
PROJECTS
Williams Monaco WWTP; Henderson, CO
University of WY SFSF; Laramie, WY
Glenwood Springs WWTP; Glenwood SPrinqs, CO
Memorial Hospital MRI Replacement; Rock Sorinas, WY
Crested Butte WWTP; Crested Butte, CO
McCook Community Hospital; McCook, NE
Laramie River Station; Wheatland, WY
Perl Mack Library; Denver, CO
Bio Science Fitzsimons; Denver, CO
CSU/ERC Lab Remodel; Fort Collins, CO
CSU Regulated Materials Handlina; Fort Collins, CO
CSU AIDL; Fort Collins, CO
Loveland Library; Loveland, CO
Kearnev Wastewater Treatment Plant; Kearney, CO
Loveland High School Pool; Loveland, CO
Colorado School of Mines Residence Hall; Golden, CO
Buffalo WWTP; Buffalo, WY
Heritaae Hiah School, Littleton, CO
Cherry Creek Library; Denver, CO
WANG Air Lift; Cheyenne, WY
Ted Goggin
Kuck Mechanical Contractors, LLC
Project Manager
Over 22 years of experience in all aspects ofHVAC operations, experience in numerous facets of building construction
including; adjusting, project management, quality control, contractor, materials requisition, estimation, and consulting. As
owner of a custom home construction company, my responsibilities included production home building, enforcement of
building codes, ICC code books, and scheduling, managing projects from ground up to delivery of the finished product.
Experience also includes blueprint and plan reading, job site supervision, safety regulations, MSDS log books, and energy
requirements. I have excellent working knowledge ofXactimate estimating with Sketch and XactAnalysis.
Training/Education/ Affiliations
Adjusting 101, Xactimate I, Xactimate II, - US Staffing Adjusting Services, Dallas TX (01/2007)
Carpentry-Larimer County Voe-Tech, Fort Collins, CO (08/1996-05/1988)
OSHA 30 Hour Certification
Projects
Present:
Sol Nacienda AG Apartments, Fort Morgan, CO
Melissa Memorial Hospital, Holyoke, CO
Boys & Girls Club of Weld County, Greeley, CO
Elderhaus Remodel, Fort Collins, CO
Hensel Phelps Fitness Center, Greeley, CO
AV AGO Consolidation, Fort Collins, CO
Perkins County Community Hospital, Grant, NE
Mirasol Green House Homes, Loveland, CO
French Hall Northeast Junior College, Sterling, CO
Bank of America, Denver, CO
Hammer Reservoir, Thornton, CO
Maniott Denver City Center Renovation, Denver, CO
Past:
Industrial Piping Specialists, Loveland, CO
Metz Elementary, Denver, CO
Fairview Elementary, Denver, CO
Sheridan Middle School, Englewood, CO
Otis PK-12 School, Otis, CO
Garda World, Denver, CO
Barone Site Development, Arvada, CO
Tucson Rogers Gravel Pit, Brighton CO
Xanadu Med Spa, Fort Collins, CO
Maniott Denver City Center, Denver, CO
The Laboratory Restaurant, Fort Collins, CO
The Laboratory- RTU, Fort Collins, CO
Westminster Recreation Center, Westminster, CO
Renaissance Hotel Fireplaces, Denver, CO
A veda Salon, Loveland, CO
N01thglenn WTP, Northglenn, CO
Sagewood Middle School, Parker, CO
Edora Pool, Fort Collins, CO
Crunchy Grocer, Loveland, CO
HD Eye Care, Highlands Ranch, CO
Projects
Cunningham Fire Station, Centennial, CO
Best W estem, Lakewood, CO
Allen WTP, Englewood, CO
Dellenbach Motors, Fort Collins, CO
CSU Recreation Center, Fort Collins, CO
Gary Engell
Kuck Mechanical Contractors, LLC
Superintendent/Foreman
More than 30 years experience in the sheet metal industry. Experience includes shop fabrication, field labor,
journeyman installer, project superintendent and currently as a project manager. Since 1990, I have specialized in
Industrial HV AC, Odor Controls/Installs involving numerous raw water/waste water, hydro electric, and coal fired
power plant projects.
Training/Education/ Affiliations
OSHA 10 Hour Construction Safety
Projects
Present:
A vago Consolidation; Fort Collins, CO
Boulder County Justice Center; Boulder, CO
Wash Works Car Wash; Loveland, CO
Microsoft Laboratory; Fort Collins, CO
Vitamin Cottage; Englewood, CO
Battle Command Training Center; Fort Carson, CO
Past:
CSU Animal Disease Laboratory; Fort Collins, CO
Larimer County ASU; Fort Collins, CO
Eastbridge Elementary; Denver, CO
Dunkirk Elementary; Denver, CO
Denver Metro PAR 1085; Denver, CO
Marston WTP Headworks; Denver, CO
Dakota Lofts; Denver, CO
Webber Middle School; Fort Collins, CO
Denver Public Housing Residences; Denver, CO
Silver Creek High School; Longmont, CO
St. Vrain School District Elementary #23, 24, 25 & 26; St Vrain; CO
City Service Center; Fort Collins, CO
Lincoln Center; Fort Collins, CO
Aurora Water Prairie WWTP; Aurora, CO
Denver Metro PAR 942; Denver, CO
Renaissance Uptown Lofts; Denver, CO
Glenwood Springs WWTF; Glenwood Springs, CO
University of WY SFSF; Laramie, WY
Boulder 75111 St. WWTP; Boulder, CO
Vail WWTP, Vail, CO
Gillette WY WWTP; Gillette, WY
Greeley WWTP; Greeley, CO
Jackson WY WWTP; Jackson, WY
Longmont WWTP; Longmont, CO
Crested Butte WWTP; Crested Butte, CO
Aspen/Mid Valley WWTP; Aspen, CO
Johnstown WWTP; Johnstown, CO
Berthoud WWTP; Berthoud, CO
Lone Tree WWTP; Lone Tree, CO
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors performing over
20% of the contract.
ITEM SUBCONTRACTOR
Controls Johnson Controls
JBS USA LLC JBS USA LLC
Midlands Mechanical Cherry Creek School Distr.
Moltz Construction City of Glenwood
Moltz Construction CO Dept of Public Health
Adams County Plumbing Colorado School Of Mines
FCI St. Vrain School Distr.
GH Phipps Red Rocks Medical Office Properties
C&B Plumbing US Fish & Wildlife
Asian Construction Town of Crested Butte
Coe Construction Banner Health
WO Danielson Boulder Valley School Distr.
Asian Construction City of Lamar
Corporate Plumbing Thompson School Distr.
Phillips P&H Rangeview Library Distr.
McCauley Constrcutors Front Range Comm. College
Garney Companies East Cherry Creek Valley Water
JBS USA LLC JBS USA LLC
RN Civil CO Dept of Natural Resources
Mechanical Systems, Inc. Cheyenne Reg. Med. Center
Red Willow JBS USA LLC
Design Mechanical Dept. of Veterans Affairs
Phillips P&H Denver Public Schools
Adams County Plumbing Red Rocks Medical
Mechanical Systems, Inc. Albany County
MD Heating & Air Weld County School Distr.
Brinkman Construction Poudre Valley Health Care
Alliance Construction Solutions Memorial Hospital
Midlands Mechanical Douglas County School District
ENGINEER AMOUNT
ARCHITECT/ CONTRACT
States West Water Resources $ 392,922.00
MKK ·--~--97;493:00
NIKA Engineering --··r-162,274.oo
MKK $ 878,532.00
--·---C-A. -· E. Associates, Inc. $ 52,500.00
-------
Beaudin Ganze $ 552,000.00
URS $--98,358.00
Gator Ruma & Associates $ 68,021.00
RMH Group $ 195,550.00
Black & Veatch $ 144,129.00 .
HOR ... $ 885,609.00
HB&A $ 221,583.00
JBS USA LLC $ 251,784.00
H&L $ 278,507.00
Tetra Tech $ 717,745.00
EMC Engineers $ 490,807.00
H&L .. $ 329,312.00
Hutton Architecture $ 167,324.00
Gator Ruma & Associates $ 269,999.00
US Dept. of Interior $ 312,907.00
HOR $ 49,753.00
---- Gator Ruma & Associates ··--- -$--524,177.00
Envision Mechanical Eng. $ 898,738.00
------ ----------
The Engineering Company $ 115,553.00
ME i::ngineers, Inc.
~$
191,790.00
- --·-.----------
Animas Engineering $ 69,784.00
SBEC Engineering $ 64,377.00
COM $ 384,843.00
JBS USA LLC $ 52,619.00
The Engineering Company $ 117,777.00
Davis Partnership, P.C. $ 66,808.00
JBS USA LLC $ 189,953.00
Design Mechanical $ 155,000.00
ME Engineers, Inc. $ 327,703.00
Boulder Associates $ 86,078.00
Malone Belton Abel/MKK $ 106,728.00
MD Heating & Air $ 92,081.00
-··-
Gator Ruma & Associates $ 264,722.00
-·-·
Smith Seckman Reid.inc. $ 75,893.00
---
Yon Tanner Architecture, PC $ 160,710.00
Kimmel Mechanical, Inc. Vail Valley Medical Center
Phillips Plumbing & Mechanical Boulder Valley School Distr.
Kimmel Mechanical, Inc. List Residence LLC
Primus General Constrctors Nordy's BBQ
Glacier Construction City of Vail
Garney Companies City of Riverton
·-----
Alliance Construction Solutions Peleton Cycles
Dohn Construction Windsor School District RE-4
Kimmel Mechanical, Inc .. Sheraton
Phillips Plumbing & Mechanical Lovelan~-Reporter
Mechanical & Piping, Inc. cu
Hurst & Burr Oak Creek School Distr.
Braconier Plumbing Jeffco School Distr.
Clark Construction Co, Inc. CSU
Kimmel Mechanical, Inc. Snowmass Properties
Kimmel Mechanical, Inc. Sheraton
American Construction CSU
Alliance Construction Solutions Cornerstone Residence
Alliance Construction Solutions Redeemer Church
Red Willow Red Willow Const.
Adolfson & Peterson Estes Park Medical Center
Big Valley Construction City of Fraser
Braconier Plumbing University of Northern CO
Hurst & Burr PW Enterprise
Mechanical Systems, Inc. Laramie School District
Corman Mechanical Tri-State Delivery
--f-------...
Mechanical & Piping, Inc. Buckley AFB
Dairy Farmers of America Dairy Farmers of America
Dairy Farmers of America Dairy Farmers of America
MSI, Inc. 1st United Methodist
Town of Johnstown, CO Town of Johstown
Alliance Construction Solutions Colorado Coalition for Homeless
Central Mechaincal, Inc. Aurora Public Schools
···---- ENGINEER -- AMOUNT
ARCHITECT/ CONTRACT
CH2MHILL $ 2,769,617.00
MKK $ 80,523.00
The Ball~~d Group $ 133,548.00
B P Engineering $ 36,531.00
The Ballard Group $ 755,353.00
Belfay Engineering $ 320,000.00
RNL De_l:lign $ 705,000.00
Kennedy/Jenks Consultants $ 60,488.00
Baudin/Ganz $ 87,333.00
DMCE Engineering $ 197,850.00
Western States Engineering $ 122,753.00
Kennedy/Jenks Consultants $ 110,953.00
Burns & McDonnell $ 123,353.00
RMH $ 150,844.00
Shaffer Baucom Engineering $ 131,990.00
EMC $ 168,930.00
Cator Ruma & Associates $ 1,064,453.00
~haffer Baucom Engineering $ 222,693.00
RNL D~sign $ 230,155.00
McGrath, Incorporated $ 159,453.00
ME Engineers, Inc. $ 54,726.00
Kennedy/Jenks Consultants $ 415,980.00
EMC $ 752,853.00 -·
The CE Group $ 50,753.00
·------
The Ballard Group $ 165,009.00
Bruce Goff $ 253,628.00
-·
Red Willow $ 63,123.00
B P Engineering $ 327,953.00
ePageCity $ 830,595.00
URS $ 61,722.00
AEC, Inc. $ 203,253.00
Beaudin Ganze $ 581,553.00
Western States Engineering $ 400,894.00
CH2MHILL $ 59,350.00
CO Consulting Engineers $ 340,390.00
--··
CO Consulting Engineers $ 351,672.00
CE Group $ 166,990.00
S_ole Engineering $ 75,490.00
..Belfay Engineering $ 829,390.00
LKA Partners $ 543,987.00
Thissen Construction, Inc. New Frontier Bank
FCI Routt County
- .
Theissen Construction, Inc. City of Longmont
Wray Plumbing & Heating Thompson School Distr.
Wray Plumbing & Heating Thompson Schoot Distr.
Kimmel Mechanical, Inc. Limelight LLC
Hahn Plumbing & Heating Boulder County
Mechanical Systems, Inc. Squad Ops
Mechanical Systems, Inc. Squad Ops
Alliance Construction Solutions City of Nederland
Myrian Enterprises A-Basin
Big Valley Construction Millennium Bank
Alliance Construction Solutions Marriott
Garney Companies City of Casper
Phillips Plumbing & Mechanical Denver University
Garney Companies City of Boulder
R. N. Civil Constructors City of Aspen
Wray Plumbing & Heating Adams School Distr.
Phillips Plumbing & Mechanical Adams School Distr.
Sun Construction & Design CSU
Harper Mechanical Northern Colorado Medical Center
T. A. C. Agilent Technologies
Growling Bear Co Inc. Union Colony Schools
Central Mechaincal, Inc. St. Vrain School Distr.
. Central Mechaincal, Inc. St. Vrain School Distr.
R.C. Heath Thompson Sc_hool Distr.
Central Mechaincal, Inc. St. Vrain School Distr.
-
Clark Construction Co, Inc. Thompson School Distr.
ENGINEER AMOUNT
ARCHITECT/ CONTRACT
CH2MHILL $ 771,132.00
S,aker-Hogan-Houx $ 340,000.00
--·-·-----
NIKA Engineering $ 430,245.00
Burns & McDonnell $ 495,653.00
Western States Engineering $ 99,805.00
CO Consulting Engineers $ 476,691.00
RMH Group, Inc. $ 463,000.00
-
Ballard Group $ 1,254,722.00
DIA $ 204,734.00
MKK Consulting $ 299,671.00
MKK Consulting $ 88,164.00
MKK Consulting $ 131,068.00
A&E Group $ 115,117.00
HLM Design $ 456,605.00
-- --------
Abrahamson Engineering $ 91,334.00
Beaudin/Ganz $ 565,033.00
Beaudin/Ganz $ 371,544.00
A & E Engineering $ 1, 127,990.00
Western __ States Engineering $ 87,253.00
-
CH2MHILL $ 180,657.00
·-----·
Gust & Johnson $ 400,806.00
EMC Engineering $ 549,000.00
·-- AEC, Inc. $ 191,353.00
SSR/Gordon Gumeson $ 153,242.00
CE Group $ 228,353.00
·-
Burns & McDonnell $ 268,614.00
Shaffer Baucom Engineering $ 116,~-670.·--00 -
RMH Group, Inc. $ 465,153.00
.. JVA $ 151,453.00
Baudin/Ganz $ 94,892.00
-·-··---
McGrath & Associates $ 240,423.00
Shaffer Baucom Engineering $ 282,803.00
URS $ 500,269.00
T. A. C. $ 61,353.00
Robert Shrieve Associates $ 444,353.00
Systems Engineering Group $ 278,653.00
Systems Engineering Group $ 274,238.00
Envision Mechanical Eng. $ 1,065,349.00
Systems Engineering Group $ 268,240.00
Kruegar Architects $ 76,475.00
Amount Orders Amount
Metro PAR 1088 NTP 1,788,161.00 14,953.00 1,803, 114.00
Ashland Reservoir 52,553.00 52,553.00
Piranesi Apartments 378, 115.00 21,928.00 400,043.00
Mirasol Green House Homes 1,021,290.00 32,924.00 1,054,214.00
Enzi Stem Laboratory Facility 5,253,053.00 83,032.00 5,336,085.00
Prairie Wind Elementary 956,206.00 22,051.00 978,257.00
Rocky Mountain Deaf School 645,008.00 21,788.00 666,796.00
Hammer Reservior 79,953.00 5,300.00 85,253.00
Timnath Feed & Grain 104,853.00 104,853.00
CSU Eddy Hall Revitalization 284,653.00 65,523.00 350,176.00
Perkins County Community Hospital 1,265,763.00 49,574.00 1,315,337.00
Industrial Piping Warehouse 59,411.00 11,824.00 71,235.00
· Boulder County Justice Ctr Rooftop 217,353.00 217,353.00
Bank of America 21,853.00 21,853.00
N.E. Junior College - French Hall 540,381.00 15,548.00 555,929.00
Harmony Rehab Dining Hall 24,470.00 24,470.00
Road 34 Brew Pub Design Build 18,503.00 18,503.00
Red Willow Office Design Build 49,653.00 49,653.00
Wellington WWTP 10,953.00 10,953.00
Northeast ES Upgrades 313,653.00 404.00 314,057.00
JBS Chemical Storage Mech 155,053.00 155,053.00
JBS Chemical Storage Gas Pipe 29,710.00 2,991.00 32,701.00
Quail Campus Phase II 154,606.00 154,606.00
Collinwood Walkway 11,353.00 432.00 11,785.00
Right Coast Pizza 68,106.00 -9,685.00 58,421.00
Vitamin Cottage - Lakewood 7,500.00 7,500.00
JBS Hot Box Spray Chill Ventilation 112,453.00 -759.00 111,694.00
Elderhaus Remodel 57,653.00 57,653.00
Hyatt House & Place 36,500.00 36,500.00
Melt Tank Exhaust 15,653.00 15,653.00
Lyons WWTF Improvements 61,453.00 61,453.00
Touchstone Health 111,163.00 111, 163.00
Hensel Phelps Fitness Center 118,442.00 25,986.00 144,428.00
JBS C02 Mitigation 873,754.00 873,754.00
Sol Naciente Ag Apartments 396,428.00 396,428.00
Thompson K-8 1,094,420.00 1,094,420.00
Silverthorne Recreation Center 50,853.00 50,853.00
Boys & Girls Club of Weld County 5,408.00 5,408.00
Macy's Entries 58,453.00 58,453.00
Melissa Memorial Hospital 436,106.00 436,106.00
JBS Hide Plant MAU 180,953.00 180,953.00
Smash burger 25,462.00 25,462.00
Verizon 30,360.00 5,984.00 36,344.00
Coors Credit Union 34,853.00
Peabody Elementary 39,000.00
Sanberg Elementary 36,500.00
Finishline 38,653.00
Fairfiled Inn 489,653.00
Colorado Access 11,353.00
JBS Tripe & Box Room Exhaust 49,453.00
JBS Office RTU Repl.
Lightfield Enterprises
Opera Galleria
City of Loveland HRU Repl. 181,653.00
Golds Gym - Longmont 75,166.00
TOTAL $18, 133,964.00 $369,798.00 $17,547,478.00
Note: TBD = Project Schedule not received yet.
% Scheduled
Com pl. Comp!. Date
49.5% 6/2016
10.5% 12/2015
22.1% 9/2015
99.9% 7/2015
91.7% 4/2015
99.0% 6/2015
98.8% 7/2015
73.4% 7/2015
11.6% 7/2015
99.9% 7/2015
52.2% 7/2015
92.8% 7/2015
98.1% 7/2015
2.1% TBD
72.7% 9/2015
65.5% 8/2015
84.1% 7/2015
58.3% 10/2015
83.4% 7/2015
27.2% 9/2015
94.3% 7/2015
70.5% 8/2015
99.9% 7/2015
79.6% 7/2015
94.3% 7/2015
4.9% 9/2015
94.9% 7/2015
24.0% 10/2015
96.2% 8/2015
69.7% 8/2015
16.0% 7/2015
71.6% 8/2015
68.3% 8/2015
36.7% 10/2015
1.0% 12/2015
1.0% 8/2016
1.3% 10/2015
17.6% 8/2015
3.0% 7/2015
1.0% TBD
4.2% 10/2015
7.6% 9/2015
8.1% 9/2015
2.2% 1/2016
21.2% 8/2015
78.4% 7/2015
1.0% 10/2015
1.0% 4/2016
14.8% 9/2015
1.0% 11/2015
0.0% 11/2015
0.0% TBD
0.0% 10/2015
0.0% TBD
0.0% TBD
We thank you for the opportunity to quote this project, and hope that we may be favored with an order. The above quote
will remain in effect for 30 days. If you have any questions or concerns, please do not hesitate to give me a call.
Respectfully,
Kuck Mechanical Contractors, LLC
John D Dennehy
P. O. Box 388 • 31S West 67th Street • Love/ant{ ColoraJo 80531-0388 • (170} 461-3553 Fax: (170) 461-3443