HomeMy WebLinkAboutRESPONSE - BID - 8136 SENIOR CENTER HVAC RENOVATION PHASE ISECTION 00300 BID FORM PROJECT: 8136 Senior Center HVAC Renovation Phase I Place: Purchasing Division Date: July 10, 2015 1. ln compliance with your Invitation to Bid dated June 19 , 201§_ and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership; Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes tp furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 3% of Bid Bond ($ ) in accordance with the Invitation To Bid and Instructions to ·Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) caler)dar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment Bonds is as follows: Granite Re, Inc., 14001 Quailbrook Drive, Oklahoma City. OK 73134 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in .accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. ---'--through 2 8. BID SCHEDULE (Base Bid) LUMP SUM BASE BID $._1_0_9_,6_1_7._o_o ____ ~'."'""':":"'" (Please note: the new large rooftop unit will be supplied by Owner. Contract is to install unit with the other remaining Scope of Work) IN WORDS: One Hundred Nine Thousand, Six Hundred Seventeen Dollars 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. - Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or pric.:es of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECTFULLY SUBMITTED: _7/10/15 Date President Title H-1695 I 3096-H(C) License Number (If Applicable) (Seal - if Bid is by corporation) Attest:-}(,IL.l.J..!-~E::.~~~~~'2!J:.:=:::: ______ ~ Telephone 970-461-3553 Email Johnd@kuckmechanical.com SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned Kuck Mechanical contractors, LLC as Principal, and Granite Re, Inc. , as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of$ Five Percent of the Amount Bid (5%) for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, 8136 Senior Center HVAC Renovation Phase I. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this day of July 1 O , 201.§_, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL SURETY Name: Kuck Mechanical Contractors, LLC Granite Re, Inc. Address: 395 W. 67th Street 14001 Quailbrook Drive Oklahoma City, OK 73134 Title : Sarah C. Brown, Attorney-in-Fact ATTEST: (SEAL) 1-· I ' I . I . I I I . I I ! l i GRANITE RE, INC. GENERAL POWER OF ATIORNEY Know all Men by these Presents: That GRANITE RE, INC., a corporation organized and existing under the laws of the State of OKLAHOMA and having its principal office at the City of OKLAHOMA CITY in the State of OKLAHOMA does hereby constitute and appoint: DONALD E. APPLEBY; TODD D. BENGFORD; MARK H. SWEIGART; SARAH C. BROWN its true and lawful Attorney-in-Fact(s) for the following purposes, to wit: To sign its name as surety to, and to execute, seal and acknowledge any and all bonds, and to respectively do and perform any and all acts and things set forth in the resolution of the Board of Directors of the said GRANITE RE, INC. a certified copy of which is hereto annexed and made a part of this Power of Attorney; and the said GRANITE RE, INC. through us, its Board of Directors, hereby ratifies and confirms all and whatsoever the said: DONALD E. APPLEBY; TODD D. BENGFORD; MARK H. SWEIGART; SARAH C. BROWN may lawfully do in the premises by virtue of these presents. In Witness Whereof, the said GRANITE RE, INC. has caused this instrument to be sealed with its corporate seal, duly attested by the signatures of its President and Secretaryffreasurer, this 301 h day of April, 2015. · Kenneth D. Whittin on, President STATE OF OKLAHOMA ) ) SS: .!6{~~e.,u<e< COUNTY OF OKLAHOMA ) On this 30 1 h day of April, 2015, before me personally came Kenneth D. Whittington, President of the GRANITE RE, INC. Company and Kyle P. McDonald, Secretaryff reasurer of said Company, with both of whom I am personally acquainted, who being by me severally duly sworn, said, that they, the said Kenneth D. Whittington and Kyle P. McDonald were respectively the President and the Secretaryff reasurer of GRANITE RE, INC., the corporation described in and which executed the foregoing Power of Attorney; that they each knew the seal of said corporation; that the seal affixed to said Power of Attorney was such corporate seal, that it was so fixed by order of the Board of Directors of said corporation, and that they signed their name thereto by like order as President and Secretaryff reasurer, respectively, of the Company . My Commission Expires: August 8, 201 7 Commission #: 0101325 7 No~~ GRANITE RE, INC. Certificate THE UNDERSIGNED, being the duly elected and acting Secretary(freasurer of Granite Re, Inc., an Oklahoma Corporation, HEREBY CERTIFIES that the following resolution is a true and correct excerpt from the July 15, 1987, minutes of the meeting of the Board of Directors of Granite Re, Inc. and that said Power of Attorney has not been revoked and is now in full force and effect. "RESOLVED, that the President, any Vice President, the Secretary, and any Assistant Vice President shall each have authority to appoint individuals as attorneys-in-fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety bonds and other documents of similar charncter issued by the Company in the course of its business. On any instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond or undertaking of the Company, the seal, or a facsimile thereof, may be impressed or affixed or in any other manner reproduced; provided, however, that the seal shall not be necessary to the validity of any such instrument or undertaking." IN WITNESS WH~he undersigned has subscribed this Certificate and affixed the corporate seal of the Corporation this !o+h day of '-. 1 , 2o_ffL.__. ~ '" ,··=".~ -,·· , ~ ~ I n ~ Kylei.McDonald, Secretary(f reasurer GROB00-1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Kuck Mechanical Contractors LLC -----------~~-----~~-------------- 2. Permanent main office address: __ 3_9_5_W_._6_7t_h_S_t. _, _ L_o_v_el_a_nd....:..,_c_o_so_5_3_8 ______ _ 3. When organized: ___ 1_99_9 _____________________ _ 4. If a corporation, where incorporated: __ N_IA _______________ _ 5. How many years have you been engaged i11 the contracting business under your present firm or trade name? ___ 1_6_Y_e_a_rs __________________ _ 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) See Attached Schedule - Exhibit A 7. General character of Work performed by your company: HVAC Sheet Metal Installation and Fabrication 8. Have you ever failed to complete any Work awarded to you? __ No _______ _ If so, where.and why? ______________________ _,_ 9. Have you ever defaultecranacontract? __ ~::.;;;o'--------------- If so, where and why? ___ __:.N.::.:IA:..:.__ _________________ _ 10. Are you debarred by any government agency? _ __.:..N:..:::o~------------ If yes list agency name.----------"--------------- 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. Edora Pool - City of Fort Collins, Final Contract Amount: $176,293, Completed 11/1/2013- HVAC Remodel CSU ADL RTU Replacement - Fort Collins, Final Contract Amount: $263, 176, Completed 10/15/2014 - HVAC Equip Repl. Avago Consoldiation - Fort Collins, Final Contract Amount: $335, 179, Completed 12/12/2014 - HVAC Remodel Also See attached Exhibit B. 12. List your major equipment available for this contract. Duct Coil Line, Plasma Cutter, Insulation Cutting Table, Forming & Rolling Equipment, Robotic Welder, Spiral Pipe Machine, Break Press, Shearing, Trucks, Lifts 13. Experience in construction Work similar in importance to this project: Ted Kuck was the Original HVAC Project Manager when the Senior Center was originally built. Poudre High School Renovation CSU Student Recreation Center 14. Background and experience of the principal members of your organization, including officers: See attached Resumes 15. 16. Credit available: $ __ l_3_. M_i_llio_n ____________________ _ Bank Reference: Great Western Bank - Jenny Shultz - 970-660-9028 ---,-------,:____--------------~ 17. Will you, upon request, fill out a detailed financial statement and furnish any other · information that may be required by the OWNER? ___ Y_e_s _________ _ 18. Are you licensed as a· General Contractor? ___ N_o_-_L_ic_en_s_e_d_H_V_A_c_c_o_n_tra_c_to_r_in_F_o_rt_c_o_ll_in_s_ 19. 20. If yes, in what city, county and state?------------------ What class, license and numbers?------------------- Do you anticipate subcontracting Work underthis Contract? __ Y_es _______ _ If yes, what percent of total contract? ____ 4_5°_Yo ______________ _ Andtowhom? __ J_o_h_ns_o_n_C_o_n_tro_l_s,_L_aw_re_nc_e_F_i_nn_&_A_ss_o_c._(~TA_B~)---------~ Are any lawsuits pending against you or your firm at this time? ___ N_o ______ _ IFyes,DETAIL~~~~~~~~~~~~-~~~~--~~~~ 21. What are the limits of your public liability? DETAIL $2 Million with $5 Million Umbrella What company? . Flood & Peterson 22. What are your company's bonding limitations? __ u_p_t_o_$_2_M_il_lio_n ________ _ 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising ---------tl'.Jis-Statement-0f--Bidder~s-QualificatiGr-is~. ----------------------- _J_u .ly ..... ______ , 20~. Printed: Theodore A. Kuck State of Colorado County of __ La_r_im_e_r - - ------ _..;1-J.. --h'--'- u_;;,,_d_;;;_ I_JYi -"t_' 4_._.~...;....U.;;. .;.(~k-.,, · '= =------ being duly sworn deposes and says that he is __ fi _r._t~S"~~-t~nt ____ of l!u<kfnu)t.AJti~a-( Untnu4ys, lLC.. (Name) (Organization) and that the answers to the foregoing questions and all statements therein contained are true and correct. . . . . -II<. . . Subscribed and sworn to before me this f () day of~, 20/:>. N~ ~tJ~ . · My commission expires: oz/o~ / to/1. (Seal) BOSSfJEAN WARNER NOTARY PUBLIC STATE OF COLORADO NOTARY ID 19984022395 MY COMMISSION EXPIRES FEBRUARY 06, 2019 KUCK MEC/IANICAL CONTRACTOR~ LLC To: City of Fort Collins Date: 7/10/2015 Re: 8136 Senior Center HVAC Renovation Phase I Attn: Purchasing Division We propose to furnish labor, material and tools of the trade to do the HVAC work as per plans and specifications dated 6/05/2015. This price includes the following: • Sheet Metal duct • Air Balance • Round duct • Crane • Liner & Wrap • Start up • Roof top Unit provided by owner ( 1) • Johnson Controls • Big Ass Fans provided by owner (1) • Commissioning Assist • Grilles, Registers & Diffusers • Demolition HVAC related only Total Base Bid ..... . .. . .. . ..... . .. ....... .. . ... ..... . .. .. ... .... ........ .. ... $109,617.00 Kuck Mechanical has reviewed 2 Addenda This price excludes the following: Bond Permit Davis Bacon Wage Overtime Temporary Heat Rubbish Removal Cut & Patch Concrete Core and saw cut Painting Masonry Lintels or Structural Steel Concrete Pads Roofing Line Voltage Electrical Conduit Frequency Drives Magnetic Starters Smoke Detectors by EC Architectural Louvers Seismic Restraints Hydronic Equipment Hydronic Piping Piping of any Kind Gas Piping Plumbing PVC Wtr Htr & Boiler flues Condensate Piping Sound Caulking Fire Caulking Engineering or Drawings 3D CAD Drawings Commissioning Taxes Scaffold, work platform or lifts for work above the pool. Block walls In discussion with other trades it is agreed that the "General Contractor" should provide an OSHA Approved working platform for the Big Ass fans over the pool area that all the trades involved can use. 7/10/2015 1314 1320 1340 1345 1402 1403 1405 1416 1420 1424 1430 1434 1436 1438 1439 1443 1444 1446 1450 1452 1454 1455 1460 1462 1463 1501 1503 1504 1505 1506 1507 1508 1509 1511 1512 1513 1514 1515 1516 1517 1518 1519 1520 1522 1523 1524 1525 1526. 1527 1528 1529 1530 1531 1532 1533 EXHIBIT A KUCK MECHANICAL CONTRACTORS, LLC CURRENT PROJECTS ON HAND Job Name Contract Change Total Contract 7/10/2015 Exhibit B KUCK MECHANICAL CONTRACTORS, LLC Project Completed CONTRACTOR NA-M~E_O_F_P_R_O~J~E~C--T----~--~--+-----G~E~NERAL Owner ENGINEER AMOUNT ARCHITECT/ CONTRACT Libby Hall Dining CU Kimmel Mechanical, Inc. CU Shaffer Baucom Engineering $ 111,866.00 Mead Middle Schoo-I Central Mechanical, Inc. - St. Vrain School Distr. RMH Group - $ 497,095.00 ELCO Water RC Heath Elco Wat~r Distr. Performance Engineering $ 91,653.00 I Laramie Las Vegas Community WWTP Rec Ctr. -- Mechanical Kimmel Mechanical, Systems, Inc. Inc. _City City of of Las Laramie Vegas CH2M Ohison Hill Lavole Collab_()_rtive ----$$ ------s.44,96,463.529.00 00 UNC Dining Facility Central Mechanical, Inc. University of Northern CO Bennett Wagner & Grady $ 195,987.00_, Copper MTNWWTF Expansion Southwest Contracting Copper Mnt. Water Distr. Rottiberg,Tamburini & Winsor $ 159,081.00 Loveland Service Center KMC City of Loveland RMH Group $ 367,203.00 Pioneer Charter School Alliance Construction SolutionS-Ploneer Charter School_ Architecture West, LLC I $ - 241,526.00 St. John's Phase II Corporate Plumbing St. Johns Church RMH Group $ 186,438.00 1111_i~tary Science CSU CSU Facilities Management CSU Gator Ruma & Associates $ 83,665.00 Lansing Elementary School Kimmel Mechanical, Inc. Aurora Public Schools LKA Partners $ 140,000.00 1 Park Lane Elementary School Kimmel Mechanical, Inc. Aurora Public Schools _ LKA Partners $ 172,000.00 Northrid_ge Elementary School Kimmel Mechanical, Inc. __ Douglas County School District _ Envision $ 142,725.00 1 South Middle School Gerald H. Phipps Aurora Public Schools Eidos Architects, LLC $ -~05,30Q:OO The Dakota Lofts Buchanan Yonushewski Group HomeToDenver LLC Buchanan Yonushewski Group $ 479,000.00 Northern Water Reclamation Fae Western Summit City of Colorado Springs Brown & Caldwell $ 1,048,405:00 Pepsi Warehouse Central Mechanical, Inc. Pepsi Co. A&E Group $ 200,000:00 New Frontier Bank Thissen Construction, CO New Frontier Bank A&E Group $ 358,513.00 CSU/ERC Lab Remodel Wray Plumbing CSU ____ - Aller.Lingle Architects, P.C. $ 65,853.00 Morris Elem/Yuma Middle School Wray Plumbing Yuma School Distr. Bennett Wagner & Grody $ 450,511.00 St. Vrain #8 Middle School C & B Plumbing St. Vrain School Distr. Systems Engineering Group $ 523,000.00 Eaglecrest H/S Central Mechanical, Inc. Cherry Creek School Distr. Shaffer Baucom Engineering - $ 102,669.00 Villa's@ Sunny Acres Quality Mech Systems, Inc. Centura Health A. E. Ass_()_ciates, Inc. $ 381,784.00 Best Western Phase II Delehoy Construction, Inc. Best Western CE Group $ 99,935.00 Judy Farr Center (UNC) Thissen Construction, Inc. UNC _ Gordon Gumeson & Assoc. $ 66,259.00 Metro WWTP PAR 861 Glacier Construction Metro Wastewater Reel. Brown & Caldwell $ 317,899.00 Hampton Inn Alliance Construction Solutions Hampton Inn Pahl, Pahl, Phal $ 1,318, 194.00 Avon WWTP Stanek Constructors, Inc. Avon Water Distr. Brown & Caldwell $ 67,990.00 Greeley Ice Haus Wray Plumbing & Heating City of Greeley KBN Engineers $ 325,800.00 Lone Tree Creek WWTP Velocity Constructors, Inc. Arapahoe County Water Auth. RMH Group $ 70,792.00 Edwards WWTP Asian Construction Co Eagle River Water Burke Associates, Inc. $ 383,228.00 DPS Northeast Bus Terminal Kimmel Mechanical, Inc. Denver Pub-lie Schools M E Group $ 323,326.00 'Wheeling Elementary School Kimmel Mechanical, Inc. Aurora Public Schools Ballard Group $ 421,510.00 Dunstan Middle School · Kimmel Mechanical, Inc. Jeffco School Distr. McGrath, Incorporated $ 536,778.00 I Par 813-Metro-WWTP Braconier Plumbing & Heating Metro Wastewater Reel. Swanson/Rink Consulting $ 181,433.00 Kinard Jr. High School Allen Plumbing & Heating PSD Schools EMC Engineering, Inc. $ 582,350.00_ Niwot High School Allen Plumbing & Heating St. Vrain School Distr. RMH Group $ 360,932.00 1NCMC Cardiac Rehab Thissen Construction, Inc. Northern Colorado Medical Center Davis Partnership, P.C. $ 71,140.00 -Village --- Walk Beaver Creek R. A. Nelson Village Walk LLC Gwathmey Pratt Schultz- $ 1,398,372.00 7/10/2015 NAME OF PROJECT Buckley Support Facility Blue Sky Breckenridge Hilton Garden Inn GilletteWWTP Mtn. Vista Animal Clinic Courtyard Marriott Colorado School of Mines Rec. Center Heritage High School DIA Concourse B Basalt Elementary School Basalt Middle School ------· Basalt High School New Frontier Bank-Longmont Routt County Justice Center Trans. Building-Longmont Centennial Elem School-Loveland Winona Elem School-Loveland Limelight/Monarch Boulder County Vehicle Storage WANG Carrison Control WANG Airlift Support Nederland Community Center A-Basin Midway Lodge Millennium Bank DVR City Center Marriott Sam Hobbs Regional WWTFI DU-Lambda Chi Alphia 75th Street WWTP AspenWWTF Centennial Elem RTU-1 & RTU-2 Coyote Ridge Elementary CSU Regulated_ Mat'ls Handling NCMC 3rd Floor Phase 1 Agilent Tech Calibration LAB Union Colony Prep School St.Vrain Elementary No.23 St. Vrain Elementary No.24 Mountain View High School St.Vrain Elementary No.25 Lucile Erwin MS Addition Exhibit B KUCK MECHANICAL CONTRACTORS, LLC Project Completed CONTRACTOR Owner GENERAL PCL Construction Buckley AFB Kimmel Mechanical, Inc. Blue Sky Resorts Alliance Construction Solutions Hilton Garney Wyoming, Inc. City of Gillette J&J Construction Mtn. Vista Animal Clinic Kimmel Mechanical, Inc. Marriott Pinkard Construction Colorado School Of Mines W.O. Danielson Construction Littleton Public Schools PCL Construction City of Denver Kimmel Mechanical, Inc. Roaring Fork School Distr. Kimmel Mechanical, Inc. Roaring Fork School Distr. Kimmel Mechanical, Inc. Roaring Fork School Distr. 7/10/2015 NAME OF PROJECT Prairie Water Treatment Plant CRMC Tomography Aspen Recreation Center - Colorado Plains Medical Center New Castle Middle School Vail Mtn.View on Gore Creek TLFVQ Buckley AFB ~ail Valley Medical Center - Summit Charter M/School List Residence, Vail, CO - Nordy's BBQ Restaurant Vail WWTP Odor Control Riverton WWTF Union Colony Prep School - Grandvie:iv Elemen_!_~-- Sheraton West Tower Newspaper Printing Centre Fitz Bldg 500 Phase 3A Cont' - Oak Creek Schools Foothills/Eiber Elementary CSU-___AIDL ____ .. Snowmass Bldg 4,6,7 -~ Sheraton East Tower ~?U Forestry __ Cornerstone Residences Redeemer Church Red Willow Facility EStes Park Medical Center Fraser Recreation Center Bldg.500 AHU Upgrade Pinedale Warehouse Burns Elementary TSO Transp Facility Buckley AFB BRAC DFA Project Epic DFA Raw Receiving HVAC 1st United Medthodist Low Point WWTP Renaissance Uptown Lo~s P-8 Aurora Public Schools Exhibit B KUCK MECHANICAL CONTRACTORS, LLC Project Completed CONTRACTOR Owner GENERAL Western Summit Aurora Water Alliance Construction Solutions Cheyenne Regional Medical Center Long Energy Solutions_ City of Aspen Bellendir Mechanical Colorado Plains Medical Center FCl-Grand Junction New Castle Comm. Schools Kimmel Mechanical, Inc. Vail Properties Haselden Construction Buckley AFB 7/10/2015 NAME OF PROJECT Buffalo WWTP Cheyenne Reional Medical Center Morgue Windsor MS VAV's --- -- Wyoming Game & Fish Sunflower Market N.M. Ft. Morgan Community College Garden City Medical Office Building McKee Simulation Lab NiWot High School Metro PAR 1094 McCook Community Hospital Ft. Lupton Readiness Center JBS Swift Amenia Smokey Hill H/S Pool & Add Glenwood Springs WWTP Summitville Mine OU5 WTP CSM Residence Hall Lyons Middle & High Schools Red Rocks Medical Office Bldg RM Arsenal Visitors Center Crested Butte WWTF McKee AHU Replacement Pioneer Elementary Lamar Lift Station Loveland HS Pool Perl Mack Li~rary FRCC Facilities ECCV Membrane WTP JBS Hide, Fleshers, EPI Golden Gate State Park WWTF CRMC - EP Lab Remodel JBS Carriers Office Upgrade Grand Junction VA Hospital DPS Vista Academy Red Rocks Medical Office Tenant Finish #4 Lincoln School Community Ctr. Weld County_ Sykes Bldg PVHS Greeley Infusion Center Memorial Hospital MRI Repl. Larkspur Elementary Exhibit B KUCK MECHANICAL CONTRACTORS, LLC Project Completed CONTRACTOR Owner GENERAL Hydro Construction City of Buffalo Town & Country Plumbing . Cheyenne Regional Medical Center Trane Weld County School Distr. Heather Plumbing State Of Wyoming Sunflower Const. Sunflower Companies Alliance Construction Solutions Ft. Morgan Community College MSI Mechanical Garden City Medical Office Building Corman Mechanical Banner Health Phillips Plumbing & Mechanical St. Vrain School Distr. WSI Denver Metro Wastewater Midlands Mechanical McCook Community Hospital Midlands Mechanical Colorado National Guard 7/10/2015 Exhibit B KUCK MECHANICAL CONTRACTORS, LLC Project Completed CONTRACTOR I Owner + ENGINEER AMOUNT 1_N_A_M_E_O_F_P_R_O_J_E_C_T _________ --j _____ G_E_N_E__RA _ L ____ t - ----- ARCHITECT/ CONTRACT I Kaiser Hidden Lake Medical Office Bldg Midlands Mechanical Kaiser Foundation Health Plan Gator Ruma & Associates $ 218,221.00 CAEDA Business Innovation Center _ FCI -CAEDA Business Development GSG Architecture --$ 1, 172,670.00 Aspen Grove Community Church Aspen Grove Community Church Aspen Grove Community Church Belfay Engineering $ 59,328.00 University of WY - SFSF Mechanical Systems, Inc. University of WY --MKK Consulting/Pappas $ 2,125,690.00 Clyfford Still Museum Design Mechanical Clyfford St~I Museum _ Design Mechanical $ 92,005.00- SE Wyoming Visitors Center Mechanical Systems, Inc. State Of Wyoming Anderson Mason Dale $ 278,682.00 Benkelman WTP Asian Construction City of Benkelman -- Baseline $ 57,845:00 I - - ·-···- . ----· City of Greeley Boilers & RTU Corman Mechanical City of Greeley Sole Engineering $ 85,518.00 Redstone WWTP Hy~ro Construction Redstone Water & Sanitation Schmueser/Gordon/Meyer $ 79,853.00 Boulder 75th Street WWTP Stanek Constructors, Inc. Boulder County Brown & Caldwell $ 213,353.00 Boulder County Justice AHU -Univ. of CO at Boulder Univ. of CO at Bouider Univ. of CO at Boulder -$--136 688 00 I - ---- ' . J Larimer County Detention Ctr Delehoy Construction, Inc. Larimer County CE Group $ 103,433.00 Climax Molybdenum Mine Catamount Constructors Feeport-McMoran Company Jacobs --- -$1,842,137.00 I - St. Vrain WWTP Glacier Construction St. Vrain Sanitation District Frachetti Engineering $ 1, 112,773.00 Independence Pass Residence Kimmel Mechanical, Inc. Independence Pass, LLC _____ Bohlin Cywinski Jacksoo _____ -$332,845:00 St. Francis of Assisi Church Krische Construction St. Francis of Assisi Church McGrath Engineering $ 180,017.00 Seminole Primary & HS - MWsuilders -- Seminole Independent School Dist. Parkhill Smith & Cooper $ 1,718,609.00 -Cargill Chemistry Lab Dohn Construction Cargill Inc. - Allen D. Curtis Architect $ 104,432.00 CRMC Imaging Medical Office Building Mechanical Systems, Inc. Cheyenne Regional Medical Ctr Smith Seckman Reid, inc: $ -W1, 173.00 Denver University Avademic Commons Gerald H. Phipps Denver University -· H&L Architecture $ 732,788.00 !Boulder County Probation Kimmel Mechanical, Inc. Boulder County Boulder County Architects _!_ __ __§~058.00 West End Health Center FCI Constructors Colorado Coalition for Homeless __ Humphrie_s Poli Architects $ 123,209.00 Battle Command Training Center Kimmel Mechanical, Inc. US Army Corps of Engineers - Omaha US Army Corps of Engineers - Or $ 762,679.00 ~ Williams Monaco WWTP Glacier Construction South Adams County WSD Burns & McDonnell $ 11,226.00 Northglenn Recreation Center DS Constructors City of Northglenn Beaudin Ganze $ 505,288.00 CRMC PET & CT Town & Country Plumbing Cheyenne Regional Medical Center Davis Partnership Architects $--40,893-:00 1 CRMC SPD OR Town & Country Plumbing Cheyenne Regional Medical Center Davis Partnership Architects $ 39,541.00 Poudre High Schooi Phase 1 Wray Plumbing & Heating Poudre School District Architecture Plus $ 658,53~._9Q_ RTU Replacement FCI Constructors FCI Constructors N/A $ 29,I_~~:OO CRMC PACE Mechanical Systems, Inc. Cheyenne Regional Medical Center Davis Partnership Architects $ 40,056.00 1---------- ·- - JCMD Pump Station Garney Companies Jefferson Ctr Metro Dist #2 TST, Inc of Fort Collins $ 16,325.00 Kaiser Tenant Improvements Bryan Construction Kaiser Foundation Health Plan Bennett Wagner & Grody $ 444,060:00 Poudre Valley Hospital - Greeley Wray Plumbing & Heating Poudre Valley Health Care H+L Architecture -$ 483,282.00 Laramie River Station Basin Electric Power Coop Basin Electric Power Coop _Basin Electric Coop $ --59,232.00 Westin Snowmass Resort McGuire Builders Silver Tree Properties Beaudin Ganze $ 2,167,260.00 1McCook Community Hospital Phase 2 Midlands Mechanical McCook Community Hospital HOR Architecture $ 115,723.00 EGO Building 5 - Denver Public Schools Midlands Mechanical Denver Public Schools DLR Group $ 312,632.00 Ball WE-2 Office Thal Construction, Inc. Ball Aerospace & Technologies Corporation Studio H:T, Inc. $ 46, 163.00 CSU - Alder Hall Delehoy Construction, Inc. CSU _ I CSU Facilities Management $ 50,483.00 Suncor Office Bldg Design Mechanical Suncor Properties $ 88,753.00 7/10/2015 Exhibit B KUCK MECHANICAL CONTRACTORS, LLC Project Completed CONTRACTOR Owner NAME OF PROJECT -------~----~- GENERAL ENGINEER AMOUNT ARCHITECT/ CONTRACT Resurrection School Addition Wray Plumbing & Heating Ressurection Christian School Stone Bridge Partners, LLC $ 536,350.00 Eagle -Avon WWTF · Glacier Construction Eagle River Water & Sanitation Dist. Frachetti Engineering, Inc. -$ 530,374.00 Castle Creek Campus Shaw Builders LLC AMFS/ACDS Harry Teague Architects $ 443,962.00- Denver Mint Sales Offce Krische Construction US Mint Studio DH Architecture $ 37,354.00 Garney Office Construction Garney Companies Garney Companies - BCER Engineering __ $ ____ 16, 185.00 Holy Name Catholic Church Grand Lake Plumbing Holy Name Catholic Church Eidos Architects, LLC $ 275,950.00 I Chambers Dam Pump Station Velocity Constructors, Inc. Arapahoe County Water Auth. Burns & McDonnell $ 81,353.00-] Baggs Water Pretreatment Facility Hydro Constructi()~ - Town of Baggs, WY Lidstone & Associates $ 19,633.00 J Monarch Casino Remodel Kimmel Mecha_nical, Inc. City of Black Hawk, CO __ MBA Architecture & Interior Desit $ 14,323.00 Enterprise Compressor Station WILLBROS Construction Evans, CO $ 28,353.00 GE Oil & Gas Ford Construction Simpson Company ____ Integrated Mechanical, LLC $ 66,322.00 Woolley's Suites Hotel Alliance Construction Solutions Woolley's Classic Suites James Fabbri $ 4,032,586.00 All~n WTP Asian Construction, Inc. ·City of Englewood, CO ___ CDM Smith _________________ $--4o~490~ Tufts LDS Corporate Plumbing _ Church of Jesus Christ of Latter Day Saints NBW Architects P.A. $ 43,394.00 Vail WWTP AHU Replacement Eagle River Water & Sanitatoin Dis· Eagle River Water & Sanitation Dist. Kennedy/Jenks Consultants $ 55,859.00 Black Hawk WWTP _ RN Civil Construction Black Hawk Central City Sanitation Dist. TST, Inc of Denver $ 11,853.00 Train Swift RTU Trane U.S., Inc. S\JVift & Company JV~_n_corated $ 130, 108.00 Kirkland's Marketplace Build Retail Inc Build Retail Inc _ Sargenti Architects $ 22,253.00 Halliburton Control Building FCI USA Tank Sales Miller Boskus Lack Architects $ 49,483.00 Dellenbach Motors Dohn Construction Dellenbach Motors __ VFLA Architects $ 51,533.00 550 15th Street Alliance Construction Solutions 550 15th Owner, LLC Pahl Architecture $ 25,205.00 1 8est Western Southwest Mechanical & Piping, Inc: Greg Tally/Best Western SW Pahl Architecture $ -~9,~:!_:_Q()__ Roacl__34 Expansion Delehoy Construction, Inc. Road 34 ln~eg_r:_ated Mechanical, LLC $ 9,553.00 Woodward Iron Mountain T&D Wray Plumbing & Heating Woodward GHAFARI Assoc., LLC $ 14,700.00 Cunningham FS#3 W.O. Danielson Construction Cunningham Fire Protection Yon Tanner Architecture, PC $ 40,472.00 Margery Reed Hall Hyder Construction, Inc University of Denver Slater Paull Architects -- $ 343,620.00 I Northglenn Marcy Gulch WWTP WWTP J.Fischer R. Filanc Construction, Construction, Inc Co. City Centennial of Northglenn Water & Sanitation Dist. CH2M HDR Engineering HILL $ $ 148,2z-975.;650:00 00 JBS Odor Control Stack JBS USA LLC JBS USA LLC JVA lncorated $ 870,230.00 - - FJ Young Elementary Kimmel Mechanical, Inc. Seminole Independent School Dist. Parkhill Smith & Cooper $ 357,059.()_()_ Groove Toyota Design Mechanical Groove Toyota Nudell Architects $ 39,843.00 Trailblazer Elementary Kimmel Mechanical, Inc. Douglas County School District Mellin & Associates Architect $ ----15~53:00- --~-- I Metro Flashing Garney Companies Metro Wastewater Reel. Dist. CH2M HILL $ 13,995.00 Arete Surgical Design Mechanical Arete Surgical Center R4 Architects $ 42,000.00 Englewood High School Design Mechanical Englewood School District MOA Architecture $ 148, 163.00 American Academy Design Mec_hanical Douglas County School District RE-1 Hutton Architecture $ 1_05,753._()_()__ Tucson Rogers Garney Companies, Inc. City of Thornton RJH Consultanats, Inc _ $ 71,576.00 Renaissance Hotel Fireplace Alliance Construction Solutions CBD Denver Suites, LLC Klipp a division of GKKWorks $ 61,791.00 1 I Stanley Fairgrounds Dohn Construction Town of Estes Park O'Bryan Partnership Inc $ ·-190,----535.----00 --- JBS Dry Ice C02 Exhaust JBS USA LLC JBS USA LLC JBS USA LLC $ 13,953.00 7/10/2015 NAME OF PROJECT Exhibit B KUCK MECHANICAL CONTRACTORS, LLC Project Completed CONTRACTOR Owner GENERAL ENGINEER AMOUNT ARCHITECT/ CONTRACT Texas Instruments Horizon West PGMT Horizon West Property $ 11,553.00 Ft Morgan HS Dust Collector Morgan c·ounty School Dist RE-3 Morgan County School Dist RE-3 WOLD Architects $ 64,621.00 I . . ---··---- Sterling WTS DWIS Hydro Construction City of Sterling Hatch Mott MacDonald $ 32,253.00 Dunkirk Elementary Central Mechanical, Inc. Denver Public Schools Slater Paull Architects $ 419,806.00 Ft Collins Veterinary Clinic Horizon West PGMT ·- Horizon West PGMT $ 19, 162.00 City of Greeley Dewatering City of Greeley City of Greeley Sole Engineering=~=--==~~---~----_1~553.00 Sagewood Middle School W.O. Danielson Construction Douglas County School District RE-1 Christiansen Reece & Partners $ 12,857.00 Elbert Burnsley PK-Apartments 12 School Kimmel Mechanical Mechanical, & Piping, Inc. Inc. RedPeak Elbert School Properties District #200 SlaterPaull f3NL Des~g~-Arcilltects-- ___·-_--_ --~$!_ -_--_ -463,17~57.910.00-001 1 Union Station Apartments Design Mechanical Union Station $ 269,553.00 Englewood Campus Design Mechanical DPS $ 140,353.00 Edora Pool City of Ft. Collins - City of Ft. Collins RB+B Architects $ 176,293.00 1 DPS Eastbridge Elementary'· Central Mechanical, Inc. Denver Public Schools Humphries Poli Architects $ 597,771.00 CSU Student Rec Center - Wray Plumbing-& Heating CSU Hastings+ Chivetta Architects $ 13,930.o(f Sonnelap Resort Kimmel Mechanical, Inc. Sonnelap Resort · ·-Architectural Engineering Consu1($ ___ 26,615.00 Crunchy Grocer N/A . Crunchy Grocer ·--------Integrated Mechanical~LC- _$ ___ 44;399.00 Larimer County ASU Remodel Wray Plumbing & Heating _-Larimer County __ The Architects' Studio $ 275,713.00 Aveda Salon - Centerra Aveda Spa and Salon Aveda Spa and Salon DTJ Design $ 36,553.00 1 HD Eye Care W.O. Danielson Construction Austivia Properties, LLC Yon Tanner Architecture, PC $ 12,343.00 1 Xanadu Med Spa IGES Spine Correction Center of the Rockies VFLA Architects $ 18,493.00 Aveda Salon - Centerra Central Mechanical, Inc. Otis School District R-3 WOLD Architec-ts___ $--835,779.0o 1550 & 1560 Market Street Design Mechanical $ 108,899.00 Westminster Rec Center Adolfson & Peterson City of Westminster The Ballard Group r$--44, 737.oo Sheridan Middle School I $ 503,618.00 The Laboratory Restaurant Spectrum General Con!~actors The Punchlin~, LLC dba The Laboratory Oglesby C?e;:~ign -- $ 75,038.00 1 • Marriott Denver City Center Alliance Construction Solutions CHSP Denver, LLC Elliott Wheeler $ 50,255.00 -. I King Soopers #136 Avalanche Mechanical King Soopers $ 23,930.00 Titan.Machinery Equipment Install Titan Machinery Titan Machinery Installation Only $ 11,017.00 Warren AFB Dining Facility HMC Incorporated Sodexo America, LLC/ FE Warren AFB HMC Incorporated $ 93,691.00 Fairitiew Elementary · Braconier Plumbing & Heating Adams County School District 50 DAO Architecture $ 175,216.00 Elm Hall Design Mechanical Fabrication Project -- $ ---132,577.00 Metz Elementary - Braconier Plumbing & Heating Adam~ County School District 50 DAO Architecture __ $ 157 ;903.00 Starwood Sheraton Summit DCK LLC Starwood Steamboat LLC Eric Smith Associates $ 48, 100.00 Sherrelwood Elementary Braconier Plumbing & Heating Adams County School District 50 DAO Archite_9__!1.Jre $ 117,529.00 1 Pioneer Ridge Elementary FCI Constructors Weld County School Distr. RE-5J H+L Architecture $ 73,553.00 The LaboratorY Restaurant -RTU Spectrum General Contractors The Punchline, LLC dba The Laboratory Oglesby Design $ 21,061.00 I . ------- Joyner Residence Bill Joyner Bill Joyner NIA $ 14,286.00 fs~lud Pharmacy Heath Construction Salud Family H~~lth Center TW Beck Architects $ 35,221.00 I cs_u ADL RTU Replacement Colorado State University Colorado State University Gator Ruma & Associates $ 263, 176.00 Silver Creek High School Mechanical & Piping, Inc. St. Vrain Valley School District Slater Paull Architects $ 8,936.00 7/10/2015 NAME OF PROJECT L YFE Kitchen -- Rainbow Bridge Pet Crematorium Aleph Mountain LLC - Lulzbot Salud Dental Remodel JBS Spray Cabinet Exhaust Retro Exhibit B KUCK MECHANICAL CONTRACTORS, LLC Project Completed CONTRACTOR Owner GENERAL Parkway Constr~_ction & Assoc. L YFE Kitchen, Inc Rainbow Bridge Pet Crematorium Rainbow Bridge Pet Crematorium Aleph Mountain, LLC Aleph Mountain, LLC Heath Construction Co Salud Family Health Center JBS USA LLC JBS USA LLC --f----· ENGINEER ··--~c~~~:~T ARCHITECT/ Gensler '$ 194,909.00 ----·-------- SRB 1$ 13,658.00 ·---~-~~----·- ··- ~~~sociate~l::l_aynes Mech $ 53,437.00 TW Beck Architects $ 36,962.00 -----~-- JBS USA LLC $ 114,406.00 THEODORE KUCK Kuck Mechanical Contractors, LLC President I am and have been involved in all phases of the sheet metal industry including ownership, management, shop fabrication, field labor management, and journeyman installer. At the age of 18, I became a sheet metal installer. I worked as an installer several years for different firms before I left the Ft. Collins area to join Young's Inc., a mechanical contractor in Topeka Kansas, as Estimator and Controller of the sheet metal division. In March of 1993, I returned to Ft. Collins to become Vice President of Operations at Horizon Sheet Metal, Inc. During my tenure at Horizon, the company achieved record growth and profitability as witnessed with total revenues reaching over 6.5 million dollars in the year of 1998. In August 1999, I founded Kuck Mechanical Contractors, LLC. Although in business a relatively short period oftime, Kuck Mechanical has already grown from the initial three principals to one hundred (100) employees with contractual projects totaling more than 13 million dollars. This growth is credited to long lasting previous relationships, a past track record of caring about our projects as well as the people involved in completing the work in a timely manner and the quality of workmanship which has helped to build my personal reputation. Licenses • City and County of Denver, CO #A23351 • City of Casper #95 • Aurora, CO #A20237 / 155678 • Town of Castlerock #03-0413 • Pikes Peak Regional Building Department #14677 • City of Centennial #CEN-13-00969 • City of Greeley # 17 41 I 1013 79 • City of Cheyenne CT-13-24209/24210 • Boulder, CO #3637 I LIC-0006701-22 • City of Commerce City #1599 • Summit County Building Department #6565 • City of Fort Morgan #555 • Englewood, CO #12776 • City of Gillette #6208 • Douglas County #02090 • City of Glenwood Springs # 10-0102 • Arvada, CO #7M-0383 • Grand County #MA050019 • Fort Collins, CO #H-169513096 • City of Golden #4068 • Loveland, CO #2852 • City of Lakewood #19226 • Longmont, CO #M00000352 • City of Laramie #3783 • City of Aspen #C005762 • City of Littleton #DI 1375 • City of Avon #CC00685 • Town of Snowmass #0003384 • Town of Breckenridge #42741 • City of Sterling #2012-210 • City of Brighton #CL-08695 • City of Thornton #18356 • City of Broomfield #OL-13-06923 • Town of Windsor #4167 • Boulder County #CON-11-0156 • Town of Vail #M09-0075 Proiects $100.000 - $499.000 Pro iects$500.000-$3.500.000 CSU Eddy Hall; Fort Collins, CO Perkins County Community Hospital; Grant, NE CSU ADL Replacement; Fort Collins, CO Enzi Stem Laboratory Facility; Laramie, WY Independence Pass Residence; Aspen, CO Metro PAR 1088 NTP; Denver, CO Dunkirk Elementary; Denver, CO Ft. Carson Battle Command Ctr; Fort Carson, CO PVH Greeley Emergency Center; Greeley, CO Eastbridge Elementary; Denver, CO SE WY Visitors Center; Cheyenne, WY JBS Swift Odor Control; Greeley, CO Laramie WWTP; Laramie, WY Woollev's Hotel; Denver, CO Vail Mountain View; Vail, CO Westin Resort; Snowmass Village, CO Summitville Mine OU5 WTP; Del Norte, CO CAEDA Business Innovation Center; Casper, WY Grand County Courthouse; Hot Sulphur Springs, CO NCMC 3rd Floor; Greeley, CO Aspen WWTP; Aspen , CO Prairie Waters WWTP; Aurora, CO St. Vrain Schools; Erie, CO Renaissance Uptown Lofts; Denver, CO RM Arsenal Visitors Center; Commerce City, CO Buckley TLF/TV; Denver, CO Buffalo, WY WWTP; Buffalo, WY Mountain View HS; Loveland, CO Denver Public Schools; Vista Academy, CO Climax Molybdenum Mine; Climax, CO \ Lamar Lift Station; Lamar, CO Glenwood Springs WWTF; CO CSM Residence Hall; Golden, CO McCook Community Hospital; WY ROBERT KUCK Kuck Mechanical Contractors, LLC Vice President/Superintendent For the past twenty-seven years, I have been involved in multiple phases of heating, ventilation and air conditioning construction industry. I began my career as a stock boy, then truck driver. I was employed as a sheet metal pre- apprentice before enrolling and graduating from the Union Sheet Metal Apprentice 5-year Program (Local 265, Addison, IL). Since my graduation as a sheet metal journeyman, I have been employed as job foreman and superintendent. My current position is field superintendent and co-owner of Kuck Mechanical Contractors, LLC. While employed by Simonetti Mechanical in Addison, Illinois, I worked on hospitals, schools, industrial plants, office buildings and other commercial construction projects. In 1997, I relocated and accepted a position as field foreman with Horizon Sheet Metal, Inc., Ft. Collins, Colorado in an effort to further my career and give me an opportunity to learn the different aspects of the HVAC business. I worked on design build projects such as DIA Hilton and Ft. Collins Marriott Residence Inn along with commercial projects such as wastewater treatment plants, water treatment plants and many miscellaneous projects at Colorado State University. I also fine-tuned my management skills such as scheduling, purchasing and human relations. In August of 1999, I co-founded Kuck Mechanical Contractors, LLC. I believe that my work ethic, professionalism and craftsmanship and working relationships with other trades as well as surrounding myself with top quality, experienced people will help my business grow and prosper. Training Certified Master Trainer - National Center for Construction Education and Research (NCCER) Master HVAC -Wyoming, Colorado Local 265 Sheet Metal Five-Year Apprenticeship Program, Addison, Illinois Certified Test and Balance Asbestos Abatement Refrigeration Recovery Technical Service OSHA 10 Hour Construction Safety PROJECTS Present: Enzi Stem Laboratory Facility, University of Wyominq, Laramie, WY Salud Dental Remodel, Fort Collins, CO Salud Pharmacy, Fort Collins, CO Hilton Garden Inn, Cheyenne, Wy Past: Denver Public Schools Eastbridge Elementary, Denver, CO Tavelli-Shepardson Elementary, Fort Collins, CO Salud Dental Remodel, Fort Collins CO The Laboratorv-RTU, Fort Collins CO Larimer County ASU Remodel, Fort Collins, CO Edora Pool, Fort Collins, CO Aveda Salon - Centerra, Loveland, CO Xanadu Med Spa, Fort Collins, CO JBS Odor Control; Greeley, CO Poudre High School; Fort Collins, CO Rennaissance Hotel Fireplaces, Denver, CO JBS Dry Ice C02 Exhaust, Greeley, CO Seminole Primarv & HS; Seminole, CO Resurrection School Addition; Loveland, CO Denver University; Denver, CO Holy Name Catholic Church; Steamboat Sprinqs; CO Westin Resort; Snowmass Village, CO Bob Kuck Re&urrie Page 2 PROJECTS Williams Monaco WWTP; Henderson, CO University of WY SFSF; Laramie, WY Glenwood Springs WWTP; Glenwood SPrinqs, CO Memorial Hospital MRI Replacement; Rock Sorinas, WY Crested Butte WWTP; Crested Butte, CO McCook Community Hospital; McCook, NE Laramie River Station; Wheatland, WY Perl Mack Library; Denver, CO Bio Science Fitzsimons; Denver, CO CSU/ERC Lab Remodel; Fort Collins, CO CSU Regulated Materials Handlina; Fort Collins, CO CSU AIDL; Fort Collins, CO Loveland Library; Loveland, CO Kearnev Wastewater Treatment Plant; Kearney, CO Loveland High School Pool; Loveland, CO Colorado School of Mines Residence Hall; Golden, CO Buffalo WWTP; Buffalo, WY Heritaae Hiah School, Littleton, CO Cherry Creek Library; Denver, CO WANG Air Lift; Cheyenne, WY Ted Goggin Kuck Mechanical Contractors, LLC Project Manager Over 22 years of experience in all aspects ofHVAC operations, experience in numerous facets of building construction including; adjusting, project management, quality control, contractor, materials requisition, estimation, and consulting. As owner of a custom home construction company, my responsibilities included production home building, enforcement of building codes, ICC code books, and scheduling, managing projects from ground up to delivery of the finished product. Experience also includes blueprint and plan reading, job site supervision, safety regulations, MSDS log books, and energy requirements. I have excellent working knowledge ofXactimate estimating with Sketch and XactAnalysis. Training/Education/ Affiliations Adjusting 101, Xactimate I, Xactimate II, - US Staffing Adjusting Services, Dallas TX (01/2007) Carpentry-Larimer County Voe-Tech, Fort Collins, CO (08/1996-05/1988) OSHA 30 Hour Certification Projects Present: Sol Nacienda AG Apartments, Fort Morgan, CO Melissa Memorial Hospital, Holyoke, CO Boys & Girls Club of Weld County, Greeley, CO Elderhaus Remodel, Fort Collins, CO Hensel Phelps Fitness Center, Greeley, CO AV AGO Consolidation, Fort Collins, CO Perkins County Community Hospital, Grant, NE Mirasol Green House Homes, Loveland, CO French Hall Northeast Junior College, Sterling, CO Bank of America, Denver, CO Hammer Reservoir, Thornton, CO Maniott Denver City Center Renovation, Denver, CO Past: Industrial Piping Specialists, Loveland, CO Metz Elementary, Denver, CO Fairview Elementary, Denver, CO Sheridan Middle School, Englewood, CO Otis PK-12 School, Otis, CO Garda World, Denver, CO Barone Site Development, Arvada, CO Tucson Rogers Gravel Pit, Brighton CO Xanadu Med Spa, Fort Collins, CO Maniott Denver City Center, Denver, CO The Laboratory Restaurant, Fort Collins, CO The Laboratory- RTU, Fort Collins, CO Westminster Recreation Center, Westminster, CO Renaissance Hotel Fireplaces, Denver, CO A veda Salon, Loveland, CO N01thglenn WTP, Northglenn, CO Sagewood Middle School, Parker, CO Edora Pool, Fort Collins, CO Crunchy Grocer, Loveland, CO HD Eye Care, Highlands Ranch, CO Projects Cunningham Fire Station, Centennial, CO Best W estem, Lakewood, CO Allen WTP, Englewood, CO Dellenbach Motors, Fort Collins, CO CSU Recreation Center, Fort Collins, CO Gary Engell Kuck Mechanical Contractors, LLC Superintendent/Foreman More than 30 years experience in the sheet metal industry. Experience includes shop fabrication, field labor, journeyman installer, project superintendent and currently as a project manager. Since 1990, I have specialized in Industrial HV AC, Odor Controls/Installs involving numerous raw water/waste water, hydro electric, and coal fired power plant projects. Training/Education/ Affiliations OSHA 10 Hour Construction Safety Projects Present: A vago Consolidation; Fort Collins, CO Boulder County Justice Center; Boulder, CO Wash Works Car Wash; Loveland, CO Microsoft Laboratory; Fort Collins, CO Vitamin Cottage; Englewood, CO Battle Command Training Center; Fort Carson, CO Past: CSU Animal Disease Laboratory; Fort Collins, CO Larimer County ASU; Fort Collins, CO Eastbridge Elementary; Denver, CO Dunkirk Elementary; Denver, CO Denver Metro PAR 1085; Denver, CO Marston WTP Headworks; Denver, CO Dakota Lofts; Denver, CO Webber Middle School; Fort Collins, CO Denver Public Housing Residences; Denver, CO Silver Creek High School; Longmont, CO St. Vrain School District Elementary #23, 24, 25 & 26; St Vrain; CO City Service Center; Fort Collins, CO Lincoln Center; Fort Collins, CO Aurora Water Prairie WWTP; Aurora, CO Denver Metro PAR 942; Denver, CO Renaissance Uptown Lofts; Denver, CO Glenwood Springs WWTF; Glenwood Springs, CO University of WY SFSF; Laramie, WY Boulder 75111 St. WWTP; Boulder, CO Vail WWTP, Vail, CO Gillette WY WWTP; Gillette, WY Greeley WWTP; Greeley, CO Jackson WY WWTP; Jackson, WY Longmont WWTP; Longmont, CO Crested Butte WWTP; Crested Butte, CO Aspen/Mid Valley WWTP; Aspen, CO Johnstown WWTP; Johnstown, CO Berthoud WWTP; Berthoud, CO Lone Tree WWTP; Lone Tree, CO SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 20% of the contract. ITEM SUBCONTRACTOR Controls Johnson Controls JBS USA LLC JBS USA LLC Midlands Mechanical Cherry Creek School Distr. Moltz Construction City of Glenwood Moltz Construction CO Dept of Public Health Adams County Plumbing Colorado School Of Mines FCI St. Vrain School Distr. GH Phipps Red Rocks Medical Office Properties C&B Plumbing US Fish & Wildlife Asian Construction Town of Crested Butte Coe Construction Banner Health WO Danielson Boulder Valley School Distr. Asian Construction City of Lamar Corporate Plumbing Thompson School Distr. Phillips P&H Rangeview Library Distr. McCauley Constrcutors Front Range Comm. College Garney Companies East Cherry Creek Valley Water JBS USA LLC JBS USA LLC RN Civil CO Dept of Natural Resources Mechanical Systems, Inc. Cheyenne Reg. Med. Center Red Willow JBS USA LLC Design Mechanical Dept. of Veterans Affairs Phillips P&H Denver Public Schools Adams County Plumbing Red Rocks Medical Mechanical Systems, Inc. Albany County MD Heating & Air Weld County School Distr. Brinkman Construction Poudre Valley Health Care Alliance Construction Solutions Memorial Hospital Midlands Mechanical Douglas County School District ENGINEER AMOUNT ARCHITECT/ CONTRACT States West Water Resources $ 392,922.00 MKK ·--~--97;493:00 NIKA Engineering --··r-162,274.oo MKK $ 878,532.00 --·---C-A. -· E. Associates, Inc. $ 52,500.00 ------- Beaudin Ganze $ 552,000.00 URS $--98,358.00 Gator Ruma & Associates $ 68,021.00 RMH Group $ 195,550.00 Black & Veatch $ 144,129.00 . HOR ... $ 885,609.00 HB&A $ 221,583.00 JBS USA LLC $ 251,784.00 H&L $ 278,507.00 Tetra Tech $ 717,745.00 EMC Engineers $ 490,807.00 H&L .. $ 329,312.00 Hutton Architecture $ 167,324.00 Gator Ruma & Associates $ 269,999.00 US Dept. of Interior $ 312,907.00 HOR $ 49,753.00 ---- Gator Ruma & Associates ··--- -$--524,177.00 Envision Mechanical Eng. $ 898,738.00 ------ ---------- The Engineering Company $ 115,553.00 ME i::ngineers, Inc. ~$ 191,790.00 - --·-.---------- Animas Engineering $ 69,784.00 SBEC Engineering $ 64,377.00 COM $ 384,843.00 JBS USA LLC $ 52,619.00 The Engineering Company $ 117,777.00 Davis Partnership, P.C. $ 66,808.00 JBS USA LLC $ 189,953.00 Design Mechanical $ 155,000.00 ME Engineers, Inc. $ 327,703.00 Boulder Associates $ 86,078.00 Malone Belton Abel/MKK $ 106,728.00 MD Heating & Air $ 92,081.00 -··- Gator Ruma & Associates $ 264,722.00 -·-· Smith Seckman Reid.inc. $ 75,893.00 --- Yon Tanner Architecture, PC $ 160,710.00 Kimmel Mechanical, Inc. Vail Valley Medical Center Phillips Plumbing & Mechanical Boulder Valley School Distr. Kimmel Mechanical, Inc. List Residence LLC Primus General Constrctors Nordy's BBQ Glacier Construction City of Vail Garney Companies City of Riverton ·----- Alliance Construction Solutions Peleton Cycles Dohn Construction Windsor School District RE-4 Kimmel Mechanical, Inc .. Sheraton Phillips Plumbing & Mechanical Lovelan~-Reporter Mechanical & Piping, Inc. cu Hurst & Burr Oak Creek School Distr. Braconier Plumbing Jeffco School Distr. Clark Construction Co, Inc. CSU Kimmel Mechanical, Inc. Snowmass Properties Kimmel Mechanical, Inc. Sheraton American Construction CSU Alliance Construction Solutions Cornerstone Residence Alliance Construction Solutions Redeemer Church Red Willow Red Willow Const. Adolfson & Peterson Estes Park Medical Center Big Valley Construction City of Fraser Braconier Plumbing University of Northern CO Hurst & Burr PW Enterprise Mechanical Systems, Inc. Laramie School District Corman Mechanical Tri-State Delivery --f-------... Mechanical & Piping, Inc. Buckley AFB Dairy Farmers of America Dairy Farmers of America Dairy Farmers of America Dairy Farmers of America MSI, Inc. 1st United Methodist Town of Johnstown, CO Town of Johstown Alliance Construction Solutions Colorado Coalition for Homeless Central Mechaincal, Inc. Aurora Public Schools ···---- ENGINEER -- AMOUNT ARCHITECT/ CONTRACT CH2MHILL $ 2,769,617.00 MKK $ 80,523.00 The Ball~~d Group $ 133,548.00 B P Engineering $ 36,531.00 The Ballard Group $ 755,353.00 Belfay Engineering $ 320,000.00 RNL De_l:lign $ 705,000.00 Kennedy/Jenks Consultants $ 60,488.00 Baudin/Ganz $ 87,333.00 DMCE Engineering $ 197,850.00 Western States Engineering $ 122,753.00 Kennedy/Jenks Consultants $ 110,953.00 Burns & McDonnell $ 123,353.00 RMH $ 150,844.00 Shaffer Baucom Engineering $ 131,990.00 EMC $ 168,930.00 Cator Ruma & Associates $ 1,064,453.00 ~haffer Baucom Engineering $ 222,693.00 RNL D~sign $ 230,155.00 McGrath, Incorporated $ 159,453.00 ME Engineers, Inc. $ 54,726.00 Kennedy/Jenks Consultants $ 415,980.00 EMC $ 752,853.00 -· The CE Group $ 50,753.00 ·------ The Ballard Group $ 165,009.00 Bruce Goff $ 253,628.00 -· Red Willow $ 63,123.00 B P Engineering $ 327,953.00 ePageCity $ 830,595.00 URS $ 61,722.00 AEC, Inc. $ 203,253.00 Beaudin Ganze $ 581,553.00 Western States Engineering $ 400,894.00 CH2MHILL $ 59,350.00 CO Consulting Engineers $ 340,390.00 --·· CO Consulting Engineers $ 351,672.00 CE Group $ 166,990.00 S_ole Engineering $ 75,490.00 ..Belfay Engineering $ 829,390.00 LKA Partners $ 543,987.00 Thissen Construction, Inc. New Frontier Bank FCI Routt County - . Theissen Construction, Inc. City of Longmont Wray Plumbing & Heating Thompson School Distr. Wray Plumbing & Heating Thompson Schoot Distr. Kimmel Mechanical, Inc. Limelight LLC Hahn Plumbing & Heating Boulder County Mechanical Systems, Inc. Squad Ops Mechanical Systems, Inc. Squad Ops Alliance Construction Solutions City of Nederland Myrian Enterprises A-Basin Big Valley Construction Millennium Bank Alliance Construction Solutions Marriott Garney Companies City of Casper Phillips Plumbing & Mechanical Denver University Garney Companies City of Boulder R. N. Civil Constructors City of Aspen Wray Plumbing & Heating Adams School Distr. Phillips Plumbing & Mechanical Adams School Distr. Sun Construction & Design CSU Harper Mechanical Northern Colorado Medical Center T. A. C. Agilent Technologies Growling Bear Co Inc. Union Colony Schools Central Mechaincal, Inc. St. Vrain School Distr. . Central Mechaincal, Inc. St. Vrain School Distr. R.C. Heath Thompson Sc_hool Distr. Central Mechaincal, Inc. St. Vrain School Distr. - Clark Construction Co, Inc. Thompson School Distr. ENGINEER AMOUNT ARCHITECT/ CONTRACT CH2MHILL $ 771,132.00 S,aker-Hogan-Houx $ 340,000.00 --·-·----- NIKA Engineering $ 430,245.00 Burns & McDonnell $ 495,653.00 Western States Engineering $ 99,805.00 CO Consulting Engineers $ 476,691.00 RMH Group, Inc. $ 463,000.00 - Ballard Group $ 1,254,722.00 DIA $ 204,734.00 MKK Consulting $ 299,671.00 MKK Consulting $ 88,164.00 MKK Consulting $ 131,068.00 A&E Group $ 115,117.00 HLM Design $ 456,605.00 -- -------- Abrahamson Engineering $ 91,334.00 Beaudin/Ganz $ 565,033.00 Beaudin/Ganz $ 371,544.00 A & E Engineering $ 1, 127,990.00 Western __ States Engineering $ 87,253.00 - CH2MHILL $ 180,657.00 ·-----· Gust & Johnson $ 400,806.00 EMC Engineering $ 549,000.00 ·-- AEC, Inc. $ 191,353.00 SSR/Gordon Gumeson $ 153,242.00 CE Group $ 228,353.00 ·- Burns & McDonnell $ 268,614.00 Shaffer Baucom Engineering $ 116,~-670.·--00 - RMH Group, Inc. $ 465,153.00 .. JVA $ 151,453.00 Baudin/Ganz $ 94,892.00 -·-··--- McGrath & Associates $ 240,423.00 Shaffer Baucom Engineering $ 282,803.00 URS $ 500,269.00 T. A. C. $ 61,353.00 Robert Shrieve Associates $ 444,353.00 Systems Engineering Group $ 278,653.00 Systems Engineering Group $ 274,238.00 Envision Mechanical Eng. $ 1,065,349.00 Systems Engineering Group $ 268,240.00 Kruegar Architects $ 76,475.00 Amount Orders Amount Metro PAR 1088 NTP 1,788,161.00 14,953.00 1,803, 114.00 Ashland Reservoir 52,553.00 52,553.00 Piranesi Apartments 378, 115.00 21,928.00 400,043.00 Mirasol Green House Homes 1,021,290.00 32,924.00 1,054,214.00 Enzi Stem Laboratory Facility 5,253,053.00 83,032.00 5,336,085.00 Prairie Wind Elementary 956,206.00 22,051.00 978,257.00 Rocky Mountain Deaf School 645,008.00 21,788.00 666,796.00 Hammer Reservior 79,953.00 5,300.00 85,253.00 Timnath Feed & Grain 104,853.00 104,853.00 CSU Eddy Hall Revitalization 284,653.00 65,523.00 350,176.00 Perkins County Community Hospital 1,265,763.00 49,574.00 1,315,337.00 Industrial Piping Warehouse 59,411.00 11,824.00 71,235.00 · Boulder County Justice Ctr Rooftop 217,353.00 217,353.00 Bank of America 21,853.00 21,853.00 N.E. Junior College - French Hall 540,381.00 15,548.00 555,929.00 Harmony Rehab Dining Hall 24,470.00 24,470.00 Road 34 Brew Pub Design Build 18,503.00 18,503.00 Red Willow Office Design Build 49,653.00 49,653.00 Wellington WWTP 10,953.00 10,953.00 Northeast ES Upgrades 313,653.00 404.00 314,057.00 JBS Chemical Storage Mech 155,053.00 155,053.00 JBS Chemical Storage Gas Pipe 29,710.00 2,991.00 32,701.00 Quail Campus Phase II 154,606.00 154,606.00 Collinwood Walkway 11,353.00 432.00 11,785.00 Right Coast Pizza 68,106.00 -9,685.00 58,421.00 Vitamin Cottage - Lakewood 7,500.00 7,500.00 JBS Hot Box Spray Chill Ventilation 112,453.00 -759.00 111,694.00 Elderhaus Remodel 57,653.00 57,653.00 Hyatt House & Place 36,500.00 36,500.00 Melt Tank Exhaust 15,653.00 15,653.00 Lyons WWTF Improvements 61,453.00 61,453.00 Touchstone Health 111,163.00 111, 163.00 Hensel Phelps Fitness Center 118,442.00 25,986.00 144,428.00 JBS C02 Mitigation 873,754.00 873,754.00 Sol Naciente Ag Apartments 396,428.00 396,428.00 Thompson K-8 1,094,420.00 1,094,420.00 Silverthorne Recreation Center 50,853.00 50,853.00 Boys & Girls Club of Weld County 5,408.00 5,408.00 Macy's Entries 58,453.00 58,453.00 Melissa Memorial Hospital 436,106.00 436,106.00 JBS Hide Plant MAU 180,953.00 180,953.00 Smash burger 25,462.00 25,462.00 Verizon 30,360.00 5,984.00 36,344.00 Coors Credit Union 34,853.00 Peabody Elementary 39,000.00 Sanberg Elementary 36,500.00 Finishline 38,653.00 Fairfiled Inn 489,653.00 Colorado Access 11,353.00 JBS Tripe & Box Room Exhaust 49,453.00 JBS Office RTU Repl. Lightfield Enterprises Opera Galleria City of Loveland HRU Repl. 181,653.00 Golds Gym - Longmont 75,166.00 TOTAL $18, 133,964.00 $369,798.00 $17,547,478.00 Note: TBD = Project Schedule not received yet. % Scheduled Com pl. Comp!. Date 49.5% 6/2016 10.5% 12/2015 22.1% 9/2015 99.9% 7/2015 91.7% 4/2015 99.0% 6/2015 98.8% 7/2015 73.4% 7/2015 11.6% 7/2015 99.9% 7/2015 52.2% 7/2015 92.8% 7/2015 98.1% 7/2015 2.1% TBD 72.7% 9/2015 65.5% 8/2015 84.1% 7/2015 58.3% 10/2015 83.4% 7/2015 27.2% 9/2015 94.3% 7/2015 70.5% 8/2015 99.9% 7/2015 79.6% 7/2015 94.3% 7/2015 4.9% 9/2015 94.9% 7/2015 24.0% 10/2015 96.2% 8/2015 69.7% 8/2015 16.0% 7/2015 71.6% 8/2015 68.3% 8/2015 36.7% 10/2015 1.0% 12/2015 1.0% 8/2016 1.3% 10/2015 17.6% 8/2015 3.0% 7/2015 1.0% TBD 4.2% 10/2015 7.6% 9/2015 8.1% 9/2015 2.2% 1/2016 21.2% 8/2015 78.4% 7/2015 1.0% 10/2015 1.0% 4/2016 14.8% 9/2015 1.0% 11/2015 0.0% 11/2015 0.0% TBD 0.0% 10/2015 0.0% TBD 0.0% TBD We thank you for the opportunity to quote this project, and hope that we may be favored with an order. The above quote will remain in effect for 30 days. If you have any questions or concerns, please do not hesitate to give me a call. Respectfully, Kuck Mechanical Contractors, LLC John D Dennehy P. O. Box 388 • 31S West 67th Street • Love/ant{ ColoraJo 80531-0388 • (170} 461-3553 Fax: (170) 461-3443