Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7291 GEOTECHNICAL TESTING SERVICES (31)400 North Link Lane | Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 April 22, 2015 City of Fort Collins Engineering Department 281 N. College Avenue P.O. Box 580 Fort Collins, Colorado 80522-0580 Attention: Mr. Tim Kemp Subject: Fee Estimate for Construction Observation and Materials Testing Services Vine Drive and Shields Street Fort Collins, Colorado Fee Estimate No. FC 15-0130 At your request, CTL|Thompson, Inc. is pleased to provide this fee estimate for Construction Observation and Materials Testing services for the Vine Drive and Shields Street project project located in Fort Collins, Colorado. We understand that the city will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms and conditions of our professional services agreement with the City of Fort Collins and are presented below. Earthwork: Compaction testing will be required for curb subgrade, pavement subgrade, sidewalk subgrade, and median subgrade. We estimate a total of 45 site visits will be necessary for testing and 1 additional site visit may be required to pick up a proctor sample. Engineering Technician 46 days x 2 hrs/day x $60/hr $5,520.00 Proctor 3 tests x $80/ea $240.00 Atterberg Limits 3 tests x $60/ea $180.00 Gradation 3 tests x $70/ea $210.00 Subtotal: $6,150.00 Concrete Testing: Concrete testing will be required for the curb, sidewalk, round-about, and median. We estimate 56 concrete tests consisting of 4 cylinders each will be necessary. Concrete Cylinders 56 tests x $160/test $8,960.00 Subtotal: $8,960.00 CITY OF FORT COLLINS VINE DRIVE AND SHIELDS STREET CTL | T FEE ESTIMATE NO. FC-15-0130 2 Asphalt Testing: Compaction testing will be required for asphalt paving on Shields Street. We estimate the project will require 4 days of asphalt compaction testing and 4 laboratory samples. Engineering Technician 4 days x 6 hrs/day x $60/hr $1,440.00 Lab Density (Rice) 4 tests x $80/ea $320.00 AC Content/Gradation 4 tests x $150/ea $600.00 Subtotal: $2,360.00 TOTAL ESTIMATED FEE: $17,470.00 It should be emphasized that this estimate is based upon assumptions of actual quantities and contractor’s schedule. The fee will be charged only for the actual hours and unit rates presented for tests and observations requested by the owner, contractor or subcontractors who schedule the services. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL | THOMPSON, INC. Heather Grubb Field Department Manager