Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (8)July 7, 2015 Banner Concrete Attn: Tyson Vogel bannerconcrete@gmail.com 715 Peterson Street Fort Collins, CO 80524 RE: Renewal, 7658 Miscellaneous Concrete Annual Dear Mr. Vogel: The City of Fort Collins wishes to extend the agreement term for the above captioned proposal per the existing terms and conditions and the following: 1) The term will be extended for one (1) additional year, July 15, 2015 through July 14, 2016. 2) Revised contract unit rates, effective July 15, 2015, as defined on attachment. If the renewal is acceptable to your firm, please sign this letter in the space provided and include a current copy of insurance certificate naming the City as an additional insured for General and Automotive Liability within the next fifteen (15) days. If this extension is not agreeable with your firm, we ask that you send us a written notice stating that you do not wish to renew the contract and state the reason for non-renewal. Please contact John D. Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 if you have any questions regarding this matter. Sincerely, Gerry S. Paul Director of Purchasing __________________________________________ ________________ Signature Date (Please indicate your desire to renew 7658 by signing this letter and returning it to Purchasing Division within the next fifteen days.) GSP:jg Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707- fax fcgov.com/purchasing DocuSign Envelope ID: 7CEEBCBB-7FAA-45DD-A8CE-2B131FAE2BE7 7/21/2015 202.01 Sawcut Concrete/Asphalt (0" < 4") Lineal Foot 20 $3.50 $70.00 $3.75 202.02 Sawcut Concrete/Asphalt (4" < 6") Lineal Foot 20 $4.50 $90.00 $4.82 202.03 Sawcut Concrete/Asphalt (6" < 8") Lineal Foot 20 $5.50 $110.00 $5.89 202.04 Sawcut Concrete/Asphalt (8" ≤ 10") Lineal Foot 20 $6.00 $120.00 $6.42 202.05 Sawcut - Additional 1" Depth Lineal Foot 25 $1.00 $25.00 $1.07 202.06 Remove Concrete Sidewalk Square Foot 2100 $3.25 $6,825.00 $3.48 202.07 Remove Concrete Curb & Gutter Lineal Foot 850 $7.50 $6,375.00 $8.03 202.08 Remove Monolithic Curb, Gutter & Sidewalk Square Foot 1300 $3.25 $4,225.00 $3.48 202.09 Remove Concrete Driveway/Apron/Crosspan Square Foot 3000 $3.45 $10,350.00 $3.69 202.10 Remove Concrete Pavement - 10" Square Foot 300 $4.00 $1,200.00 $4.28 202.11 Remove Concrete Pavement - Additional 1" Depth Square Foot 100 $0.50 $50.00 $0.54 202.12 Remove Asphalt - 6" Square Foot 200 $3.25 $650.00 $3.48 202.13 Remove Asphalt - Additional 1" Depth Square Foot 500 $0.25 $125.00 $0.27 202.14 Remove Inlet Each 5 $500.00 $2,500.00 $535.00 202.15 Remove and Haul Driveway Fillet Each 5 $50.00 $250.00 $53.50 202.16 Remove Flagstone Square Foot 200 $2.00 $400.00 $2.14 203.01 Excavation - General Less Than 50 CY Cubic Yard 25 $90.00 $2,250.00 $96.30 203.02 Excavation - General Over 50 CY Cubic Yard 125 $25.00 $3,125.00 $26.75 203.03 Excavation - Walls Only Cubic Yard 100 $12.00 $1,200.00 $12.84 203.04 Excavation - New Inlet Each 5 $400.00 $2,000.00 $428.00 203.05 Borrow - Less than 100 Ton Ton 50 $30.00 $1,500.00 $32.10 203.06 Borrow - Over 100 Ton Ton 125 $15.00 $1,875.00 $16.05 207.01 Imported Topsoil Cubic Yard 25 $50.00 $1,250.00 $53.50 208.01 Stormwater Protection - Rock Filled Wattle Lineal Foot 100 $6.00 $600.00 $6.42 208.02 Stormwater Protection - Recycled Rubber Filled Wattle Lineal Foot 25 $8.00 $200.00 $8.56 208.03 Stormwater Protection - Straw Bales Each 5 $25.00 $125.00 $26.75 210.01 Reset Flagstone Square Foot 100 $5.00 $500.00 $5.35 210.02 Reset Brick Pavers Square Foot 250 $6.00 $1,500.00 $6.42 210.03 Adjust Manhole Each 10 $60.00 $600.00 $64.20 210.04 Adjust Valve Box Each 10 $60.00 $600.00 $64.20 Item No. Contract Quantity Description Unit Unit Price Total 2015 Revised Unit Price 602.01 Reinforcing Steel Pound 250 $2.00 $500.00 $2.14 602.02 Reinforcing Steel - Epoxy Coated Pound 250 $3.00 $750.00 $3.21 604.01 Install New Area Inlet Each 5 $1,300.00 $6,500.00 $1,391.00 604.02 Area Inlet – Additional Foot Depth Lineal Foot 5 $100.00 $500.00 $107.00 604.03 Reconstruct Area Inlet Deck – Remove & Replace Each 5 $675.00 $3,375.00 $722.25 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace Lineal Foot 5 $115.00 $575.00 $123.05 604.05 Reconstruct Catch Basin Deck - Remove & Replace Each 10 $300.00 $3,000.00 $321.00 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace Lineal Foot 10 $25.00 $250.00 $26.75 604.07 Install New Curb Inlet – 4’ Opening Each 5 $2,500.00 $12,500.00 $2,675.00 604.08 Curb Inlet – Additional Foot Depth Lineal Foot 10 $75.00 $750.00 $80.25 604.09 Reconstruct Curb Inlet Deck – Remove and Replace Each 10 $450.00 $4,500.00 $481.50 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 15 $50.00 $750.00 $53.50 604.11 Install New Type R Inlet - 5' Opening Each 10 $3,700.00 $37,000.00 $3,959.00 604.12 Type R Inlet – Additional Foot Depth Lineal Foot 15 $100.00 $1,500.00 $107.00 604.13 Reconstruct Type R Inlet Deck – Remove and Replace Each 10 $550.00 $5,500.00 $588.50 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 10 $100.00 $1,000.00 $107.00 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) Each 5 $1,900.00 $9,500.00 $2,033.00 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth Lineal Foot 10 $100.00 $1,000.00 $107.00 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace Each 6 $900.00 $5,400.00 $963.00 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 10 $170.00 $1,700.00 $181.90 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) Each 5 $850.00 $4,250.00 $909.50 604.20 Concrete Sidewalk Culvert – 4’ opening Each 5 $500.00 $2,500.00 $535.00 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Each 4 $1,000.00 $4,000.00 $1,070.00 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Each 5 $1,100.00 $5,500.00 $1,177.00 604.23 Additional Square Foot 5/8" Plate Square Foot 15 $150.00 $2,250.00 $160.50 608.01 Driveover Curb, Gutter & 6" Sidewalk Lineal Foot 1,200 $26.00 $31,200.00 $27.82 608.02 Driveover Curb and Gutter - No Sidewalk Lineal Foot 525 $19.00 $9,975.00 $20.33 608.03 Vertical Curb, Gutter and 6" Sidewalk Lineal Foot 1000 $27.50 $27,500.00 $29.43 608.04 Vertical Curb and Gutter - No Sidewalk Lineal Foot 2300 $20.50 $47,150.00 $21.94 608.05 Out Fall Curb & Gutter Lineal Foot 100 $19.00 $1,900.00 $20.33 608.06 Hollywood Curb, Gutter and 6" Sidewalk Lineal Foot 500 $24.75 $12,375.00 $26.48 608.07 Hollywood Curb and Gutter - No Sidewalk Lineal Foot 300 $14.00 $4,200.00 $14.98 608.08 Highback Curb and Gutter - No Sidewalk Lineal Foot 500 $29.00 $14,500.00 $31.03 608.09 Barrier Curb - 6" x 18" Lineal Foot 100 $23.00 $2,300.00 $24.61 608.10 Barrier Curb - Key Way Style Lineal Foot 100 $13.00 $1,300.00 $13.91 608.11 Barrier Curb - Epoxy Lineal Foot 150 $20.00 $3,000.00 $21.40 Page 2 of 4 DocuSign Envelope ID: 7CEEBCBB-7FAA-45DD-A8CE-2B131FAE2BE7 Item No. Contract Quantity Description Unit Unit Price Total 2015 Revised Unit Price 608.12 Mountable Curb - 12" x 18" Lineal Foot 125 $25.00 $3,125.00 $26.75 608.13 Mountable Curb - Keyway Style Lineal Foot 125 $13.00 $1,625.00 $13.91 608.14 Mountable Curb – Epoxy Lineal Foot 100 $17.00 $1,700.00 $18.19 608.15 Pedestrian Access Ramp Square Foot 750 $5.50 $4,125.00 $5.89 608.16 Pedestrian Access Ramp, Highback Curb Square Foot 375 $6.50 $2,437.50 $6.96 608.17 Truncated Dome Panel Square Foot 100 $30.00 $3,000.00 $32.10 608.18 Apron - 8" Square Foot 1450 $5.00 $7,250.00 $5.35 608.19 Crosspan - 8" Square Foot 1200 $5.00 $6,000.00 $5.35 608.20 Valley Pan - 6" Square Foot 500 $7.00 $3,500.00 $7.49 608.21 Flatwork - 4" Square Foot 1,850 $2.85 $5,272.50 $3.05 608.22 Flatwork - 6" Square Foot 3,800 $3.50 $13,300.00 $3.75 608.23 Replace Flatwork - 1" Additional Depth Square Foot 250 $0.50 $125.00 $0.54 608.24 Concrete Pavement 8" (Joints Sealed) Square Foot 1,500 $5.50 $8,250.00 $5.89 608.25 Alley Approach - 8" Square Foot 1000 $5.00 $5,000.00 $5.35 608.26 Enhanced Crosswalk - 10" Tile Red Square Foot 450 $9.00 $4,050.00 $9.63 608.27 Enhanced Crosswalk - 10" San Diego Buff Square Foot Item No. Contract Quantity Description Unit Unit Price Total 2015 Revised Unit Price 630.01 "NO PARKING" Sign With Stand Per Each Per Day 375 $1.89 $708.75 $1.98 630.02 Vertical Panel Without Light Per Each Per Day 400 $0.76 $304.00 $0.80 630.03 Channelizing Barrels Per Each Per Day 650 $0.86 $559.00 $0.90 630.04 Type I/II Barricade Without Light Per Each Per Day 800 $0.54 $432.00 $0.57 630.05 Type III Barricade Without Light Per Each Per Day 25 $3.51 $87.75 $3.69 630.06 Size A Sign With Stand Per Each Per Day 350 $1.62 $567.00 $1.70 630.07 Size B Sign With Stand Per Each Per Day 75 $1.89 $141.75 $1.98 630.08 Size A Specialty Sign - Cost of Manufacturing Each 2 $70.00 $140.00 $73.50 630.09 Size B Specialty Sign - Cost of Manufacturing Each 2 $81.00 $162.00 $85.05 630.10 Cone With Reflective Strip Per Each Per Day 3500 $0.70 $2,450.00 $0.74 630.11 Safety Fence Per Roll Per Day 20 $3.78 $75.60 $3.97 630.12 Light Per Each Per Day 20 $0.43 $8.60 $0.45 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Each Per Day 15 $70.00 $1,050.00 $73.50 630.14 Variable Message Board Per Each Per Day 110 $135.00 $14,850.00 $141.75 630.15 Traffic Control Supervisor Per Day 25 $335.00 $8,375.00 $351.75 630.16 Traffic Control Supervisor Hour 450 $33.50 $15,075.00 $35.18 630.17 Flagging Hour 650 $22.70 $14,755.00 $23.84 FA1 Laborer Hour 15 $30.00 $450.00 $32.10 202.01 Sawcut Concrete/Asphalt (0" < 4") Lineal Foot 10 $3.67 $ 36.70 $3.93 202.02 Sawcut Concrete/Asphalt 4" < 6" Lineal Foot 10 $4.72 $ 47.20 $5.05 202.03 Sawcut Concrete/Asphalt 6" < 8" Lineal Foot 10 $5.78 $ 57.80 $6.18 202.04 Sawcut Concrete/Asphalt 8" ≤ 10" Lineal Foot 10 $6.30 $ 63.00 $6.74 202.05 Sawcut - Additional 1" Depth Lineal Foot 10 $1.05 $ 10.50 $1.12 202.06 Remove Concrete Sidewalk Square Foot 100 $3.41 $ 341.00 $3.65 202.07 Remove Concrete Curb and Gutter Lineal Foot 100 $7.88 $ 788.00 $8.43 202.08 Remove Monolithic Curb, Gutter & Sidewalk Square Foot 100 $3.41 $ 341.00 $3.65 202.09 Remove Concrete Driveway/Apron/Crosspan Square Foot 100 $3.62 $ 362.00 $3.87 202.10 Remove Concrete Pavement - 10" Square Foot 500 $4.20 $ 2,100.00 $4.49 202.11 Remove Concrete Pavement - Additional 1" Depth Square Foot 100 $0.53 $ 53.00 $0.57 202.12 Remove Asphalt - 6" Square Foot 100 $3.41 $ 341.00 $3.65 202.13 Remove Asphalt - Additional 1" Depth Square Foot 100 $0.26 $ 26.00 $0.28 202.14 Remove Inlet Each 1 $525.00 $ 525.00 $561.75 202.15 Remove and Haul Driveway Fillet Each 1 $52.50 $ 52.50 $56.18 202.16 Remove Flagstone Square Foot 50 $2.10 $ 105.00 $2.25 203.01 Excavation - General Less Than 50 CY Cubic 2015 Revised Item No. Description Unit Unit Price Total Unit Price Contract Quantity 602.02 Reinforcing Steel - Epoxy Coated Pound 150 $3.15 $ 472.50 $3.37 604.01 Install New Area Inlet Each 1 $1,365.00 $ 1,365.00 $1,460.55 604.02 Area Inlet – Additional Foot Depth Lineal Foot 5 $105.00 $ 525.00 $112.35 604.03 Reconstruct Area Inlet Deck – Remove & Replace Each 1 $709.00 $ 709.00 $758.63 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace Lineal Foot 5 $121.00 $ 605.00 $129.47 604.05 Reconstruct Catch Basin Deck - Remove & Replace Each 1 $315.00 $ 315.00 $337.05 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace Lineal Foot 5 $26.25 $ 131.25 $28.09 604.07 Install New Curb Inlet – 4’ Opening Each 1 $2,625.00 $ 2,625.00 $2,808.75 604.08 Curb Inlet – Additional Foot Depth Lineal Foot 5 $78.75 $ 393.75 $84.26 604.09 Reconstruct Curb Inlet Deck – Remove and Replace Each 1 $472.50 $ 472.50 $505.58 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 5 $52.50 $ 262.50 $56.18 604.11 Install New Type R Inlet - 5' Opening Each 1 $3,885.00 $ 3,885.00 $4,156.95 604.12 Type R Inlet – Additional Foot Depth Lineal Foot 5 $105.00 $ 525.00 $112.35 604.13 Reconstruct Type R Inlet Deck – Remove and Replace Each 1 $577.50 $ 577.50 $617.93 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 5 $105.00 $ 525.00 $112.35 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) Each 1 $1,995.00 $ 1,995.00 $2,134.65 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth Lineal Foot 5 $105.00 $ 525.00 $112.35 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace Each 1 $945.00 $ 945.00 $1,011.15 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 5 $178.05 $ 890.25 $190.51 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) Each 2 $892.00 $ 1,784.00 $954.44 2015 Revised Item No. Description Unit Unit Price Total Unit Price Contract Quantity 608.13 Mountable Curb - Keyway Style Lineal Foot 25 $13.65 $ 341.25 $14.61 608.14 Mountable Curb – Epoxy Lineal Foot 25 $17.85 $ 446.25 $19.10 608.15 Pedestrian Access Ramp Square Foot 300 $5.78 $ 1,734.00 $6.18 608.16 Pedestrian Access Ramp, Highback Curb Square Foot 50 $6.83 $ 341.50 $7.31 608.17 Truncated Dome Panel Square Foot 25 $31.50 $ 787.50 $33.71 608.18 Apron - 8" Square Foot 20 $5.25 $ 105.00 $5.62 608.19 Crosspan - 8" Square Foot 20 $5.25 $ 105.00 $5.62 608.20 Valley Pan - 6" Square Foot 20 $7.35 $ 147.00 $7.86 608.21 Flatwork - 4" Square Foot 25 $2.99 $ 74.75 $3.20 608.22 Flatwork - 6" Square Foot 100 $3.68 $ 368.00 $3.94 608.23 Replace Flatwork - 1" Additional Depth Square Foot 960 $0.53 $ 508.80 $0.57 608.24 Concrete Pavement 8" (Joints Sealed) Square Foot 500 $5.78 $ 2,890.00 $6.18 608.25 Alley Approach - 8" Square Foot 25 $5.25 $ 131.25 $5.62 608.26 Enhanced Crosswalk - 10" Tile Red Square Foot 2015 Revised Item No. Description Unit Unit Price Total Unit Price Contract Quantity 630.03 Channelizing Barrels Per Day Per Each 25 $0.86 $ 21.50 $0.90 630.04 Type I/II Barricade Without Light Per Day Per Each 25 $0.54 $ 13.50 $0.57 630.05 Type III Barricade Without Light Per Day Per Each 10 $3.51 $ 35.10 $3.69 630.06 Size A Sign With Stand Per Day Per Each 10 $1.62 $ 16.20 $1.70 630.07 Size B Sign With Stand Per Day Per Each 10 $1.89 $ 18.90 $1.98 630.08 Size A Specialty Sign - Cost of Manufacturing Each 2 $70.00 $ 140.00 $73.50 630.09 Size B Specialty Sign - Cost of Manufacturing Each 2 $81.00 $ 162.00 $85.05 630.10 Cone With Reflective Strip Per Day Per Each 100 $0.76 $ 76.00 $0.80 630.11 Safety Fence Per Roll Per Day 5 $3.24 $ 16.20 $3.40 630.12 Light Per Day Per Each 25 $0.43 $ 10.75 $0.45 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Day Per Each 10 $75.00 $ 750.00 $78.75 630.14 Variable Message Board Per Day Per Each 10 $135.00 $ 1,350.00 $141.75 630.15 Traffic Control Supervisor Per Day 5 $390.00 $ 1,950.00 $409.50 630.16 Traffic Control Supervisor Hour 25 $39.00 $ 975.00 $40.95 630.17 Flagging Hour 25 $24.85 $ 621.25 $26.09 FA1 Laborer Hour 20 $31.50 $ 630.00 $33.71 FA2 Foreman Hour 20 $42.00 $ 840.00 $44.94 FA3 Finisher Hour 20 $37.00 $ 740.00 $39.59 FA4 Form Setter Hour 20 $32.00 $ 640.00 $34.24 FA5 Skid Steer Hour 20 $90.00 $ 1,800.00 $96.30 FA6 Mini Trackhoe Hour 20 $90.00 $ 1,800.00 $96.30 FA7 Dump Truck Hour 20 $85.00 $ 1,700.00 $90.95 FA8 Backhoe Hour 20 $90.00 $ 1,800.00 $96.30 TOTAL COST $ 93,936.90 ADDITIONAL SERVICES DocuSign Envelope ID: 7CEEBCBB-7FAA-45DD-A8CE-2B131FAE2BE7 Page 4 of 4 DocuSign Envelope ID: 7CEEBCBB-7FAA-45DD-A8CE-2B131FAE2BE7 25 $9.45 $ 236.25 $10.11 608.27 Enhanced Crosswalk - 10" San Diego Buff Square Foot 25 $8.40 $ 210.00 $8.99 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped Square Foot 25 $12.60 $ 315.00 $13.48 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown Square Foot 25 $5.78 $ 144.50 $6.18 608.30 Mow Strip - 4" x 12" Lineal Foot 25 $19.95 $ 498.75 $21.35 608.31 Splashblock - 4" Exposed Aggregate Square Foot 25 $10.50 $ 262.50 $11.24 608.32 Splashblock - 4" San Diego Buff Square Foot 25 $9.45 $ 236.25 $10.11 608.33 Median Cover - 4" San Diego Buff Square Foot 25 $9.45 $ 236.25 $10.11 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds / Cubic Yard 25 $10.50 $ 262.50 $11.24 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge Cubic Yard 20 $26.25 $ 525.00 $28.09 608.36 Stamp Pattern - Added to Any Item, Additional Charge Square Foot 25 $2.52 $ 63.00 $2.70 608.37 6" Concrete Bollard Each 5 $262.50 $ 1,312.50 $280.88 608.38 8" Concrete Bollard Each 5 $304.50 $ 1,522.50 $325.82 608.39 Flowable Fill Cubic Yard 25 $94.50 $ 2,362.50 $101.12 608.40 Non-reinforced Concrete Wall - 8" Square Face Foot 25 $15.75 $ 393.75 $16.85 608.41 Non-reinforced Concrete Footer - 8" Square Foot 25 $10.50 $ 262.50 $11.24 608.42 Concrete Staining/Sealing Square Foot 25 $2.10 $ 52.50 $2.25 608.43 Expansion and Caulking Lineal Foot 50 $5.51 $ 275.50 $5.90 608.44 Joint Sealant (Pavement) Lineal Foot 50 $4.20 $ 210.00 $4.49 608.45 Irrigation Sleeve Lineal Foot 25 $10.50 $ 262.50 $11.24 608.46 Dump Fee Ton 25 $21.00 $ 525.00 $22.47 630.01 "NO PARKING" Sign With Stand Per Day Per Each 25 $1.89 $ 47.25 $1.98 630.02 Vertical Panel Without Light Per Day Per Each 25 $0.76 $ 19.00 $0.80 Page 3 of 4 DocuSign Envelope ID: 7CEEBCBB-7FAA-45DD-A8CE-2B131FAE2BE7 604.20 Concrete Sidewalk Culvert – 4’ opening Each 1 $525.00 $ 525.00 $561.75 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Each 1 $1,050.00 $ 1,050.00 $1,123.50 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Each 1 $1,155.00 $ 1,155.00 $1,235.85 604.23 Additional Square Foot 5/8" Plate Square Foot 5 $167.30 $ 836.50 $179.01 608.01 Driveover Curb, Gutter & 6" Sidewalk Lineal Foot 150 $27.30 $ 4,095.00 $29.21 608.02 Driveover Curb and Gutter - No Sidewalk Lineal Foot 25 $19.95 $ 498.75 $21.35 608.03 Vertical Curb, Gutter and 6" Sidewalk Lineal Foot 50 $28.87 $ 1,443.50 $30.89 608.04 Vertical Curb and Gutter - No Sidewalk Lineal Foot 50 $21.53 $ 1,076.50 $23.04 608.05 Out Fall Curb & Gutter Lineal Foot 25 $19.95 $ 498.75 $21.35 608.06 Hollywood Curb, Gutter and 6" Sidewalk Lineal Foot 25 $25.98 $ 649.50 $27.80 608.07 Hollywood Curb and Gutter - No Sidewalk Lineal Foot 25 $14.70 $ 367.50 $15.73 608.08 Highback Curb and Gutter - No Sidewalk Lineal Foot 50 $30.45 $ 1,522.50 $32.58 608.09 Barrier Curb - 6" x 18" Lineal Foot 25 $24.15 $ 603.75 $25.84 608.10 Barrier Curb - Key Way Style Lineal Foot 25 $13.65 $ 341.25 $14.61 608.11 Barrier Curb - Epoxy Lineal Foot 25 $21.00 $ 525.00 $22.47 608.12 Mountable Curb - 12" x 18" Lineal Foot 25 $26.25 $ 656.25 $28.09 Page 2 of 4 DocuSign Envelope ID: 7CEEBCBB-7FAA-45DD-A8CE-2B131FAE2BE7 Yard 25 $94.50 $ 2,362.50 $101.12 203.02 Excavation - General Over 50 CY Cubic Yard 100 $26.25 $ 2,625.00 $28.09 203.03 Excavation - Walls Only Cubic Yard 25 $12.60 $ 315.00 $13.48 203.04 Excavation - New Inlet Each 1 $420.00 $ 420.00 $449.40 203.05 Borrow - Less than 100 Ton Ton 25 $31.50 $ 787.50 $33.71 203.06 Borrow - Over 100 Ton Ton 100 $15.75 $ 1,575.00 $16.85 208.01 Stormwater Protection - Rock Filled Wattle Lineal Foot 25 $6.30 $ 157.50 $6.74 208.02 Stormwater Protection - Recycled Rubber Filled Wattle Lineal Foot 25 $8.40 $ 210.00 $8.99 208.03 Stormwater Protection - Straw Bales Each 25 $26.25 $ 656.25 $28.09 210.01 Reset Flagstone Square Foot 50 $5.25 $ 262.50 $5.62 210.02 Reset Brick Pavers Square Foot 250 $6.30 $ 1,575.00 $6.74 210.03 Adjust Manhole Each 1 $63.00 $ 63.00 $67.41 210.04 Adjust Valve Box Each 1 $63.00 $ 63.00 $67.41 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton 5 $40.95 $ 204.75 $43.82 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton 50 $36.75 $ 1,837.50 $39.32 304.03 Recycled Asphalt Base Ton 10 $26.25 $ 262.50 $28.09 403.01 Temporary Asphalt Patching Ton 20 $199.50 $ 3,990.00 $213.47 601.01 Exposed Sand Finish - Additional Charge Square Foot 500 $2.62 $ 1,310.00 $2.80 602.01 Reinforcing Steel Pound 150 $2.10 $ 315.00 $2.25 2015 Revised Unit Price ADDENDUM 2 BID SCHEDULE 2 - FEDERAL REQUIREMENTS WITH DAVIS BACON Item No. Description Unit Unit Price Total Contract Quantity Page 1 of 4 DocuSign Envelope ID: 7CEEBCBB-7FAA-45DD-A8CE-2B131FAE2BE7 FA2 Foreman Hour 15 $40.00 $600.00 $42.80 FA3 Finisher Hour 15 $35.00 $525.00 $37.45 FA4 Form Setter Hour 15 $30.00 $450.00 $32.10 FA5 Skid Steer Hour 75 $85.00 $6,375.00 $90.95 FA6 Mini Trackhoe Hour 15 $85.00 $1,275.00 $90.95 FA7 Dump Truck Hour 15 $80.00 $1,200.00 $85.60 FA8 Backhoe Hour 15 $85.00 $1,275.00 $90.95 TOTAL COST $530,388.95 FORCE ACCOUNT Page 4 of 4 DocuSign Envelope ID: 7CEEBCBB-7FAA-45DD-A8CE-2B131FAE2BE7 450 $8.00 $3,600.00 $8.56 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped Square Foot 450 $12.00 $5,400.00 $12.84 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown Square Foot 400 $5.50 $2,200.00 $5.89 608.30 Mow Strip - 4" x 12" Lineal Foot 150 $19.00 $2,850.00 $20.33 608.31 Splashblock - 4" Exposed Aggregate Square Foot 325 $10.00 $3,250.00 $10.70 608.32 Splashblock - 4" San Diego Buff Square Foot 350 $9.00 $3,150.00 $9.63 608.33 Median Cover - 4" San Diego Buff Square Foot 400 $9.00 $3,600.00 $9.63 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds / Cubic Yard 75 $10.00 $750.00 $10.70 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge Cubic Yard 25 $25.00 $625.00 $26.75 608.36 Stamp Pattern - Added to Any Item, Additional Charge Square Foot 150 $2.40 $360.00 $2.57 608.37 6" Concrete Bollard Each 5 $250.00 $1,250.00 $267.50 608.38 8" Concrete Bollard Each 5 $290.00 $1,450.00 $310.30 608.39 Flowable Fill Cubic Yard 25 $90.00 $2,250.00 $96.30 608.40 Non-reinforced Concrete Wall - 8" Square Face Foot 400 $15.00 $6,000.00 $16.05 608.41 Non-reinforced Concrete Footer - 8" Square Foot 200 $10.00 $2,000.00 $10.70 608.42 Concrete Staining/Sealing Square Foot 150 $2.00 $300.00 $2.14 608.43 Expansion and Caulking Lineal Foot 250 $5.25 $1,312.50 $5.62 608.44 Joint Sealant (Pavement) Lineal Foot 100 $4.00 $400.00 $4.28 608.45 Irrigation Sleeve Lineal Foot 20 $10.00 $200.00 $10.70 608.46 Dump Fee Ton 5 $20.00 $100.00 $21.40 608.47 Asphalt Pavement Preservation Lineal Foot 500 $4.00 $2,000.00 $4.28 Page 3 of 4 DocuSign Envelope ID: 7CEEBCBB-7FAA-45DD-A8CE-2B131FAE2BE7 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton 75 $39.00 $2,925.00 $41.73 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton 50 $35.00 $1,750.00 $37.45 304.03 Recycled Asphalt Base Ton 25 $25.00 $625.00 $26.75 403.01 Temporary Asphalt Patching Ton 100 $190.00 $19,000.00 $203.30 601.01 Exposed Sand Finish - Additional Charge Square Foot 500 $2.50 $1,250.00 $2.68 Item No. ADDENDUM 2 BID SCHEDULE 1 - BASE BID (Non-Federal) Contract Quantity Description Unit Unit Price Total 2015 Revised Unit Price Page 1 of 4 DocuSign Envelope ID: 7CEEBCBB-7FAA-45DD-A8CE-2B131FAE2BE7