HomeMy WebLinkAboutRESPONSE - BID - 7653 TRANSFORMERS 300KVA PADMOUNTED 3-PHASEe
EXHIBIT 1 - REVISED BID SHEET
FIRM NAME: tJ"_ V-rl ( Jn't J
CITY OF FORT COLLINS
7653 TRANSFORMERS, 300 KVA PAD -MOUNTED, 3 PHASE
WE HEREBY ENTER OUR BID FOR THE CITY OF FORT COLLINS' REQUIREMENTS FOR
Transformers, 300 kVA, 3Phase, Pad -Mounted, PER THE BID INVITATION AND ANY
REFERENCED SPECIFICATIONS.
QUANTITY: DESCRIPTION: C� �
15 ea. T300-030 transformer, 300 kva pad -mounted compartmental -type,
three phase distribution with separable insulated load break high -
voltage connectors. High voltage rating: 13200 grdy/7620. Low
voltage rating: 208Y/120. Serial number 030 to be in accordance
with Specification #368-300-030, Revision PP.
PLEASE COMPLETE THE ATTACHED EXCEL SPREAD SHEET
FOR BID SUBMITTAL.
IF YOU ELECT TO PASSWORD PROTECT YOUR BID, PLEASE
NOTE THAT PASSWORD BELOW.
*Any surcharges or additional costs shall be noted & included in bid submittal.
The items being bid meet or exceed the specifications. VbiYes No. If not, please
list exceptions (specifying paragraph reference number) on a separate sheet of paper and
submit with your bid documents.
Escalation is is not applicable for the transformers bid. If escalation applies, the
bidder shall indicate in his the sp
ecific items or materials subject to escalation, and shall give
the method and indices to be used in computing the amount thereof. Escalation occurring after
the quoted delivery date will not be paid unless delays are the result of actions by the city.
Escalation occurring after acceptance, if purchaser exercises the option to delay shipment after
manufacturing is completed, will not be paid.
Delivery lead time may be a consideration of bid award
For purposes of warranty and service ONLY approved manufacturers or distributors authorized
by an approved manufacturer to serve the Fort Collins area may bid.
The City of Fort Collins reserves the right to split the bid award in whatever percentages are
most advantageous to the City.
Future orders of Transformers, 300kVA, Pad -Mounted, 3 Phase may be authorized, at the
option of the City, from this bid for a period of five years after date of award. Satisfactory pricing
and delivery is required for future orders based on this bid.
Addendum 2 — 7653 Transformers 300kVA Padmounted 3-Phase Page 2 of 2
CG Power Systems USA Inc TECHNICAL SPECS
cir Registered 011ice 8 Plant.
One Pauwels Drive. Washington, Missouri 63090, USA Date: 6/3/2014
1:063623993MF.06362399295W:www.cgglobal.com Quotation Number: 95904752
Item Number: 10
Customer Line No.:
368-300-030
Quantitv:
IS
�r Unit Price:
$ 8 314.0 0
Three Phase Pad -Mount Transformer(s)
kVA Rating:
300 kVA
Model #:
Mineral Oil Immersed
Cooling Class:
ONAN
High -Altitude considerations
Frequency:
60 Hz
@ 3300 Feet
Avg. Winding Temp.
65 °C
Primary Voltage:
13200 GrdY/7620 volts
Secondary Voltage:
208Y/120 volts
Primary BIL Rating:
95 kV
Secondary BIL Rating:
30 kV
HV Winding Mat]:
Aluminum
LV Winding Matt:
Aluminum
High Voltage Taps:
B Taps - Two 2.5% Taps below Nominal
and Two 2.5% Taps above
Nominal
No Load Loss: 679
Watts Load Loss:
2033 Watts
Total Loss: 2712 Watts
Impedance:
2.52 %
Tank Enclosure:
Welded Cover w/(1) Handhole(s) - 1Ox16
Cabinet Depth: 19 Inches, Pentahead Security Bolts
Steel HV-LV Barrier
Bushings:
Loop Feed Custom Dimensions
Dead Front Primary Terminations: Wells
Secondary Terminations: Epoxy Bushings wfrhread-on 4 Hole Aluminum H Spades, Spade Support
Protection:
Fault Sensing Bayonet Fusing (353C10), Plastic Dripshield (), PRCLF (CBUC15080C100)
Accessories:
Pressure Relief Valve IFD, Drain valve w/Sampler
Liquid Temperature Gauge
1" UPPER FILTER PRESS & FILLING PLUG
UPPER FILTER PRESS AND FILLING PLUG (C
Switching:
HOXO Removable Link
Paint Color:
DESERT TAN (MUNSELL 10YR6.0/3/0), Coal Tar Under Powder,
Standards:
Ouoted in compliance with the latest applicable ANSI standards unless otherwise specified by the customer.
Shipment: 7 to 9 weeks
Printed by PSUS-Sally Kleekamp on 6/3/2014
Order/Quotation: 495904752-0010
kVA: 300 Cabinet Height (mm): 1473 (58")
HV: 13200YI7620 Weight (Ibs): 3967
LV. 208Y/120 Coolant (gallons): 141
TRANSFORMER OVERHEAD VIEW
--------------- ---- --------------------------------------
38 (1.5")lip
S�
r--------------------------------------------- ------
iw
50 (2) lip
I m
w
38 (1. 5") lip --------------------
972
Q& T-) 1743
(68 6" ;i
Dimensions are preliminary and not for construction.
'r
CG Power Systems USA Inc
Registered Office 8 Plant:
One Pauwels Drive, Washington, Missouri 63090. USA
T +1 636 239 9300 F: +1 636 239 9395 W www.cgglabal.com cap
WARRANTY TERMS
WARRANTY: Company warrants to Purchaser
that the equipment to be delivered to Purchaser
will be free from defects in material and
workmanship when used under proper and normal
use for a period of 12 months after the equipment
is put into service. Not to exceed 24 months from
the date the equipment is delivered (whether by
sale, lease or rental). Organic insulation materials
are sold with the express understanding that
their life and fitness for purpose are indeterminate
and largely depend on application and operating
circumstances and continuing maintenance.
Should any failure to conform to the above (or to
any additional warranty contained in the special
conditions of sale set forth in the applicable
product -line price sheet) appear with within one (1)
year after the date of shipment by Company, the
Company agrees, upon prompt notification thereof
and conformation that the equipment has been
stored, installed, operated and maintained in
accordance with recommendations of the
Company and standard industry practice, to
correct the nonconformity at Company's option
either by repairing any defective part or parts or by
making available at Company's plant a repaired or
replacement part. The liability of Company to
Purchaser arising out of the supplying of said
equipment or its use, whether on warranty,
contract or negligence, shall not in any event
exceed the cost of correcting defects in the
equipment as herein provided, and upon the
expiration of said one (1) year, all such liability
Snnarl solutions.
Strong relationships.
shall terminate. The foregoing shall constitute
the sole remedy of the Purchaser and the sole
liability of Company. The Warranty does not and
shall not include reimbursement for the expenses
which may be incurred by Purchaser. Before any
material is returned, Purchaser must contact
Company, as outlined under Returned Goods. No
warranty is made with respect to equipment not
manufactured by Company, such being subject
only to warranties made by their respective
manufacturers. Company shall in no event be
responsible or liable for modifications, alterations,
misapplication or repairs made to its products or
equipment by Purchaser or others, or for damage
caused thereto by negligence, accident,
overloading or improper use by Purchaser or
others.
THE FOREGOING WARRANTY IS EXCLUSIVE
AND IN LIEU OF ALL OTHER WARRANTIES
WHETHER WRITTEN, ORAL OR IMPLIED
(INCLUDING ANY WARRANTY ON
MERCHANTABILITY OR FITNESS FOR
PURPOSE). THE ONLY WARRANTIES OF
MERCHANTABILITY AND FITNESS FOR
PURPOSE ARE THOSE EXPRESSED ABOVE
AND THERE ARE NO IMPLIED WARRANTIES
OF MERCHANTABILITY OR FITNESS FOR
PURPOSE.
ONE PAUWELS DRIVE WASHINGTON, MO 63090 PHONE: 636.239.9300 FAX: 636.239.9398
0
The controlled copy of this document is located on the PSUS Intranet Site.
This copy was printed on 10/23/2012 at 10:23 AM.
Quotation Number: 495904752
Customer: WESTERN UNITED ELEC SUP CORP
100 BROMLEY BUSINESS PARKWAY
BRIGHTON, Colorado 80603
USA
Attention: DAVE BAUER
Quotation Comments:
C _7
Smart solutions.
Strong relationships.
Date: 06/03/2014
Cust. Code: 1000089
Region: 200400
QUOTED NEW COOPER FUSES (PRCLF). TABULATED FUSES ARE NOT AVAILABLE
PRICING IS FIRM FOR 30 DAYS AND ESCALATIONS DO NOT APPLY.
3.2.2.10--SPECIFIED CURRENT -LIMITING FUSES ARE BEING DISCONTINUED BY
COOPER. WE HAVE SELECTED FUSES FROM COOPER'S ONLINE PROGRAM.
TEST REPORTS WILL BE SENT WITH INVOICE, RATHER THAN AT TIME OF
SHIPMENT.
PLEASE REFER TO THE STANDARD ANSI ELECTRICAL TEST PER ANSI C57.12.90
THAT IS PERFORMED ON EVERY UNIT. IF ADDITIONAL TESTING IS REQUIRED,
PLEASE ADVISE AS PRICE ADDER MAY BE REQUIRED.
TRANSFORMER(S) SHALL NOT BE RETURNED TO CG POWER WITHOUT PRIOR
WRITTEN APPROVAL FROM CG MANAGEMENT.
PLEASE REFER TO CG POWER'S TERMS & CONDITIONS AND CANCELLATION
SCHEDULE WHICH ARE INCLUDED WITH THE PROPOSAL.
CG POWER CANNOT GIVE DELIVERY DATES, ONLY CURRENT LEAD TIMES IN
NUMBER OF WEEKS AFTER RECEIPT OF ORDER. THESE LEAD TIMES ARE SUBJECT
TO CHANGE BASED ON PRODUCTION AVAILABILITY.
Due to the volatility of the raw materials market, strict interpretation of our 30 day quotation
validation period must be adhered to. if your quote has expired, please consult your Account
Specialist/Product Engineer for a quotation update.
Accurate and detailed ship to address and contact information is required at time of purchase
order to assure correct shipping and handling.
Orders entered 'on HOLD for APPROVAL' and NOT released within three (3) weeks after
receiving factory approval type drawings are subject to price increases at the time of release.
If approval drawings are required, quoted lead times begin after drawings have been approved
You are requested to please refer to CG's Customer and Supplier Privacy Policy available on CG's website /�
www.cgglobal.com to understand and familiarise yourself with CG's Privacy Policy towards its business (� J�'
partners with respect to sharing of personal data.
AVANTHA
GROUP COMPANY