Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7658 MISCELLANEOUS CONCRETE ANNUALJuly 7, 2015 Lightfield Enterprises dba Vogel Concrete Inc Attn: Keith Lightfield mail@vogelconcrete.com 6330 S College Ave Fort Collins, CO 80525 RE: Renewal, 7658 Miscellaneous Concrete Annual Dear Mr. Lightfield: The City of Fort Collins wishes to extend the agreement term for the above captioned proposal per the existing terms and conditions and the following: 1) The term will be extended for one (1) additional year, July 15, 2015 through July 14, 2016. 2) Revised contract unit rates, effective July 15, 2015, as defined on attachment. If the renewal is acceptable to your firm, please sign this letter in the space provided and include a current copy of insurance certificate naming the City as an additional insured for General and Automotive Liability within the next fifteen (15) days. If this extension is not agreeable with your firm, we ask that you send us a written notice stating that you do not wish to renew the contract and state the reason for non-renewal. Please contact John D. Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 if you have any questions regarding this matter. Sincerely, Gerry S. Paul Director of Purchasing __________________________________________ ________________ Signature Date (Please indicate your desire to renew 7658 by signing this letter and returning it to Purchasing Division within the next fifteen days.) GSP:jg Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707- fax fcgov.com/purchasing DocuSign Envelope ID: E484A7CE-4CD3-40A8-9D09-B3608A96A32C 7/13/2015 Page 1 Bid Schedule 1 - Base Bid (Standard/Non-Federal) Item Description Qty Unit Unit Cost Total Cost 202.01 Sawcut Concrete/Asphalt (0" < 4") 20 LF $ 3.30 $ 66.00 202.02 Sawcut Concrete/Asphalt (4" < 6") 20 LF $ 3.50 $ 70.00 202.03 Sawcut Concrete/Asphalt (6" < 8") 20 LF $ 3.80 $ 76.00 202.04 Sawcut Concrete/Asphalt (8" = 10") 20 LF $ 4.90 $ 98.00 202.05 Sawcut - Additional 1" Depth 25 LF $ 1.20 $ 30.00 202.06 Remove Concrete Sidewalk 2,100 SF $ 2.88 $ 6,056.40 202.07 Remove Concrete Curb & Gutter 850 LF $ 4.02 $ 3,414.45 202.08 Remove Monolithic Curb, Gutter & Sidewalk 1,300 SF $ 2.99 $ 3,883.10 202.09 Remove Concrete Driveway/Apron/Crosspan 3,000 SF $ 2.88 $ 8,652.00 202.10 Remove Concrete Pavement - 10" 300 SF $ 4.17 $ 1,251.45 202.11 Remove Concrete Pavement - Additional 1" Depth 100 SF $ 1.03 $ 103.00 202.12 Remove Asphalt - 6" 200 SF $ 2.16 $ 432.60 202.13 Remove Asphalt - Additional 1" Depth 500 SF $ 1.03 $ 515.00 202.14 Remove Inlet 5 Ea $ 515.00 $ 2,575.00 202.15 Remove and Haul Driveway Fillet 5 Ea $ 50.00 $ 250.00 202.16 Remove Flagstone 200 SF $ 3.00 $ 600.00 203.01 Excavation - General Less Than 50 CY 25 CY $ 45.00 $ 1,125.00 203.02 Excavation - General Over 50 CY 125 CY $ 35.00 $ 4,375.00 203.03 Excavation - Walls Only 100 CY $ 11.50 $ 1,150.00 203.04 Excavation - New Inlet 5 Ea $ 405.00 $ 2,025.00 203.05 Borrow - Less than 100 Ton 50 Ton $ 25.00 $ 1,250.00 203.06 Borrow - Over 100 Ton 125 Ton $ 22.00 $ 2,750.00 207.01 Imported Topsoil 25 CY $ 29.00 $ 725.00 208.01 Stormwater Protection - Rock Filled Wattle 100 LF $ 11.00 $ 1,100.00 208.02 Stormwater Protection - Recycled Rubber Filled Wattle 25 LF $ 15.00 $ 375.00 208.03 Stormwater Protection - Straw Bales 5 Ea $ 20.00 $ 100.00 210.01 Reset Flagstone 100 SF $ 4.00 $ 400.00 210.02 Reset Brick Pavers 250 SF $ 8.00 $ 2,000.00 210.03 Adjust Manhole 10 Ea $ 100.00 $ 1,000.00 210.04 Adjust Valve Box 10 Ea $ 100.00 $ 1,000.00 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons 75 Ton $ 32.96 $ 2,472.00 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons 50 Ton $ 30.90 $ 1,545.00 304.03 Recycled Asphalt Base 25 Ton $ 25.00 $ 625.00 403.01 Temporary Asphalt Patching 100 Ton $ 175.10 $ 17,510.00 601.01 Exposed Sand Finish - Additional Charge 500 SF $ 3.40 $ 1,699.50 602.01 Reinforcing Steel 250 Pound $ 1.45 $ 362.50 602.02 Reinforcing Steel - Epoxy Coated 250 Pound $ 1.85 $ 462.50 604.01 Install New Area Inlet 5 Ea $ 1,313.25 $ 6,566.25 604.02 Area Inlet – Additional Foot Depth 5 LF $ 123.60 $ 618.00 604.03 Reconstruct Area Inlet Deck – Remove & Replace 5 Ea $ 1,421.40 $ 7,107.00 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace 5 LF $ 123.60 $ 618.00 604.05 Reconstruct Catch Basin Deck - Remove & Replace 10 Ea $ 694.22 $ 6,942.20 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace 10 LF $ 136.99 $ 1,369.90 604.07 Install New Curb Inlet – 4’ Opening 5 Ea $ 1,755.12 $ 8,775.60 604.08 Curb Inlet – Additional Foot Depth 10 LF $ 106.09 $ 1,060.90 604.09 Reconstruct Curb Inlet Deck – Remove and Replace 10 Ea $ 689.07 $ 6,890.70 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace 15 LF $ 124.63 $ 1,869.45 604.11 Install New Type R Inlet - 5' Opening 10 Ea $ 3,248.62 $ 32,486.20 604.12 Type R Inlet – Additional Foot Depth 15 LF $ 161.09 $ 2,416.38 604.13 Reconstruct Type R Inlet Deck – Remove and Replace 10 Ea $ 1,162.25 $ 11,622.52 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace 10 LF $ 119.48 $ 1,194.80 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) 5 Ea $ 2,373.12 $ 11,865.60 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth 10 LF $ 157.59 $ 1,575.90 Page 2 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped 450 SF $ 12.60 $ 5,668.61 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown 400 SF $ 6.12 $ 2,447.28 608.30 Mow Strip - 4" x 12" 150 LF $ 9.53 $ 1,429.13 608.31 Splashblock - 4" Exposed Aggregate 325 SF $ 6.85 $ 2,226.09 608.32 Splashblock - 4" San Diego Buff 350 SF $ 7.16 $ 2,505.48 608.33 Median Cover - 4" San Diego Buff 400 SF $ 7.16 $ 2,863.40 608.34 Fibermesh - Added to Any Item - Additional Charge 75 Pounds /CY $ 9.39 $ 704.52 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge 25 CY $ 17.77 $ 444.19 608.36 Stamp Pattern - Added to Any Item, Additional Charge 150 SF $ 2.75 $ 412.50 608.37 6" Concrete Bollard 5 Ea $ 422.30 $ 2,111.50 608.38 8" Concrete Bollard 5 Ea $ 525.30 $ 2,626.50 608.39 Flowable Fill 25 CY $ 106.85 $ 2,671.31 608.40 Non-reinforced Concrete Wall - 8" 400 Sq Face Foot $ 16.05 $ 6,420.00 608.41 Non-reinforced Concrete Footer - 8" 200 SF $ 16.05 $ 3,210.00 608.42 Concrete Staining/Sealing 150 SF $ 3.75 $ 562.50 608.43 Expansion and Caulking 250 LF $ 3.30 $ 824.00 608.44 Joint Sealant (Pavement) 100 LF $ 3.35 $ 334.75 608.45 Irrigation Sleeve 20 20 $ 4.00 $ 80.00 608.46 Dump Fee 5 5 $ 53.56 $ 267.80 608.47 Asphalt Paving Preservation 500 LF $ 5.15 $ 2,575.00 630.01 "NO PARKING" Sign With Stand 375 Ea Per Day $ 2.00 $ 750.00 630.02 Vertical Panel Without Light 400 Ea Per Day $ 1.10 $ 440.00 630.03 Channelizing Barrels 650 Ea Per Day $ 1.40 $ 910.00 630.04 Type I/II Barricade Without Light 800 Ea Per Day $ 0.65 $ 520.00 630.05 Type III Barricade Without Light 25 Ea Per Day $ 3.75 $ 93.75 630.06 Size A Sign With Stand 350 Ea Per Day $ 1.80 $ 630.00 630.07 Size B Sign With Stand 75 Ea Per Day $ 2.00 $ 150.00 630.08 Size A Specialty Sign - Cost of Manufacturing 2 Ea $ 70.00 $ 140.00 630.09 Size B Specialty Sign - Cost of Manufacturing 2 Ea $ 75.00 $ 150.00 630.10 Cone With Reflective Strip 3,500 Ea Per Day Page 3 304.01 Aggregate Base Course/Recycled Concrete Base = 5 Tons 5 Ton $ 33.99 $ 169.95 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons 50 Ton $ 31.93 $ 1,596.50 304.03 Recycled Asphalt Base 10 Ton $ 26.00 $ 260.00 403.01 Temporary Asphalt Patching 20 Ton $ 180.25 $ 3,605.00 601.01 Exposed Sand Finish - Additional Charge 500 SF $ 3.50 $ 1,751.00 602.01 Reinforcing Steel 150 Pound $ 1.55 $ 232.50 602.02 Reinforcing Steel - Epoxy Coated 150 Pound $ 1.95 $ 292.50 604.01 Install New Area Inlet 1 Ea $ 1,333.85 $ 1,333.85 604.02 Area Inlet – Additional Foot Depth 5 LF $ 128.75 $ 643.75 604.03 Reconstruct Area Inlet Deck – Remove & Replace 1 Ea $ 1,436.85 $ 1,436.85 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace 5 LF $ 128.75 $ 643.75 604.05 Reconstruct Catch Basin Deck - Remove & Replace 1 Ea $ 709.67 $ 709.67 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace 5 LF $ 142.14 $ 710.70 604.07 Install New Curb Inlet – 4’ Opening 1 Ea $ 1,780.87 $ 1,780.87 604.08 Curb Inlet – Additional Foot Depth 5 LF $ 116.39 $ 581.95 604.09 Reconstruct Curb Inlet Deck – Remove and Replace 1 Ea $ 704.52 $ 704.52 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace 5 LF $ 129.78 $ 648.90 604.11 Install New Type R Inlet - 5' Opening 1 Ea $ 3,300.12 $ 3,300.12 604.12 Type R Inlet – Additional Foot Depth 5 LF $ 166.24 $ 831.21 604.13 Reconstruct Type R Inlet Deck – Remove and Replace 1 Ea $ 1,172.55 $ 1,172.55 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace 5 LF $ 124.63 $ 623.15 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) 1 Ea $ 2,424.62 $ 2,424.62 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth 5 LF $ 162.74 $ 813.70 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace 1 Ea $ 1,610.30 $ 1,610.30 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace 5 LF $ 243.08 $ 1,215.40 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) 2 Ea $ 684.95 $ 1,369.90 604.20 Concrete Sidewalk Culvert – 4’ opening 1 Ea $ 578.24 $ 578.24 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace 1 Ea $ 460.20 $ 460.20 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only 1 Ea $ 1,890.05 $ 1,890.05 604.23 Additional Square Foot 5/8" Plate 5 SF $ 195.70 $ 978.50 608.01 Driveover Curb, Gutter & 6" Sidewalk 150 LF $ 40.61 $ 6,091.94 608.02 Driveover Curb and Gutter - No Sidewalk 25 LF $ 22.32 $ 558.00 608.03 Vertical Curb, Gutter and 6" Sidewalk 50 LF $ 41.78 $ 2,088.84 608.04 Vertical Curb and Gutter - No Sidewalk 50 LF $ 25.41 $ 1,270.51 608.05 Out Fall Curb & Gutter 25 LF $ 20.54 $ 513.46 608.06 Hollywood Curb, Gutter and 6" Sidewalk 25 LF $ 28.84 $ 721.00 608.07 Hollywood Curb and Gutter - No Sidewalk 25 LF $ 17.51 $ 437.75 608.08 Highback Curb and Gutter - No Sidewalk 50 LF $ 34.44 $ 1,722.16 608.09 Barrier Curb - 6" x 18" 25 LF $ 23.08 $ 577.00 608.10 Barrier Curb - Key Way Style 25 LF $ 22.97 $ 574.25 608.11 Barrier Curb - Epoxy 25 LF $ 19.72 $ 493.00 608.12 Mountable Curb - 12" x 18" 25 LF $ 24.17 $ 604.25 608.13 Mountable Curb - Keyway Style 25 LF $ 22.63 $ 565.75 608.14 Mountable Curb – Epoxy 25 LF $ 23.63 $ 590.75 608.15 Pedestrian Access Ramp 300 SF $ 6.77 $ 2,030.13 608.16 Pedestrian Access Ramp, Highback Curb 50 SF $ 7.85 $ 392.43 608.17 Truncated Dome Panel 25 SF $ 48.41 $ 1,210.25 608.18 Apron - 8" 20 SF $ 7.16 $ 143.17 608.19 Crosspan - 8" 20 SF $ 7.16 $ 143.17 608.20 Valley Pan - 6" 20 SF $ 7.08 $ 141.52 608.21 Flatwork - 4" 25 SF $ 4.22 $ 105.58 608.22 Flatwork - 6" 100 SF $ 5.02 $ 501.61 608.23 Replace Flatwork - 1" Additional Depth 960 SF $ 1.17 $ 1,127.23 608.24 Concrete Pavement 8" (Joints Sealed) 500 SF $ 7.42 $ 3,708.00 608.25 Alley Approach - 8" 25 SF $ 6.95 $ 173.81 608.26 Enhanced Crosswalk - 10" Tile Red 25 SF $ 12.24 $ 305.91 608.27 Enhanced Crosswalk - 10" San Diego Buff 25 SF $ 10.85 $ 271.15 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped 25 SF $ 12.65 $ 316.21 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown 25 SF $ 6.22 $ 155.53 Page 4 630.07 Size B Sign With Stand 10 Per Day Per Ea $ 2.05 $ 20.50 630.08 Size A Specialty Sign - Cost of Manufacturing 2 Ea $ 75.00 $ 150.00 630.09 Size B Specialty Sign - Cost of Manufacturing 2 Ea $ 77.50 $ 155.00 630.10 Cone With Reflective Strip 100 Per Day Per Ea $ 0.90 $ 90.00 630.11 Safety Fence 5 Per Day Per Ea $ 5.00 $ 25.00 630.12 Light 25 Per Day Per Ea $ 0.55 $ 13.75 630.13 Advance Warning Flashing or Sequencing Arrow Panel 10 Per Day Per Ea $ 85.00 $ 850.00 630.14 Variable Message Board 10 Per Day $ 180.00 $ 1,800.00 630.15 Traffic Control Supervisor 5 Hr $ 375.95 $ 1,879.75 630.16 Traffic Control Supervisor 25 Hr $ 42.00 $ 1,050.00 630.17 Flagging 25 Hr $ 28.00 $ 700.00 FA1 Laborer 20 Hr $ 29.50 $ 590.00 FA2 Foreman 20 Hr $ 41.00 $ 820.00 FA3 Finisher 20 Hr $ 37.00 $ 740.00 FA4 Form Setter 20 Hr $ 35.50 $ 710.00 FA5 Skid Steer 20 Hr $ 90.00 $ 1,800.00 FA6 Mini Trackhoe 20 Hr $ 95.00 $ 1,900.00 FA7 Dump Truck 20 Hr $ 80.00 $ 1,600.00 FA8 Backhoe 20 Hr $ 95.00 $ 1,900.00 Total Standard/Non-Federal $ 628,580.50 Federal $ 107,635.44 2015-2016 Total DocuSign Envelope ID: E484A7CE-4CD3-40A8-9D09-B3608A96A32C 07/13/2015 Security Insurance Group, LLC 8219 W 20th St, Ste A Greeley, CO 80634 Tad Borrett 970-378-4818 970-378-4820 sig@securityinsurancegroup.net 00004297-77619 3 Lightfield Enterprises, Inc DBA Vogel Concrete, Inc 2601 Riverbend Ct Fort Collins, CO 80525-4411 Colony Insurance Company A Y Y 3256216 04/21/2015 04/21/2016 X X X 1,000,000 100,000 5,000 1,000,000 2,000,000 2,000,000 Auto Owners Insurance B Y Y 50-333466-00 04/21/2015 04/21/2016 X X X 1,000,000 First Mercury Insurance Company C X X Y Y CAEX0000053666 04/21/2015 04/21/2016 10,000 1,000,000 1,000,000 Pinnacol Assurance D Y 4173268 05/01/2015 05/01/2016 X 1,000,000 1,000,000 1,000,000 RE: Miscellaneous Concrete Contract (Bid #7658). If required by written agreement, the certificate holder is included as additional insured for ongoing operations under general liability and auto liabilty. City of Fort Collins PO Box 580 Fort Collins, CO 80522 (TCB) Printed by TCB on July 13, 2015 at 02:34PM ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? INSR ADDL SUBR LTR INSR WVD DATE (MM/DD/YYYY) PRODUCER CONTACT NAME: PHONE FAX (A/C, No, Ext): (A/C, No): E-MAIL ADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER TYPE OF INSURANCE POLICY EFF POLICY EXP LIMITS (MM/DD/YYYY) (MM/DD/YYYY) GENERAL LIABILITY AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATION AND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) AUTHORIZED REPRESENTATIVE EACH OCCURRENCE $ DAMAGE TO RENTED COMMERCIAL GENERAL LIABILITY PREMISES (Ea occurrence) $ CLAIMS-MADE OCCUR MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GENERAL AGGREGATE $ GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ PRO- $ POLICY JECT LOC COMBINED SINGLE LIMIT (Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ ALL OWNED SCHEDULED BODILY INJURY (Per accident) $ AUTOS AUTOS HIRED AUTOS NON-OWNED PROPERTY DAMAGE $ AUTOS (Per accident) $ OCCUR EACH OCCURRENCE $ CLAIMS-MADE AGGREGATE $ DED RETENTION $ $ WC STATU- OTH- TORY LIMITS ER E.L. EACH ACCIDENT $ E.L. DISEASE - EA EMPLOYEE $ If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ INSURER(S) AFFORDING COVERAGE NAIC # Y / N N / A (Mandatory in NH) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD CERTIFICATE OF LIABILITY INSURANCE DocuSign Envelope ID: E484A7CE-4CD3-40A8-9D09-B3608A96A32C 608.30 Mow Strip - 4" x 12" 25 LF $ 9.63 $ 240.76 608.31 Splashblock - 4" Exposed Aggregate 25 SF $ 6.95 $ 173.81 608.32 Splashblock - 4" San Diego Buff 25 SF $ 7.26 $ 181.54 608.33 Median Cover - 4" San Diego Buff 25 SF $ 7.26 $ 181.54 608.34 Fibermesh - Added to Any Item - Additional Charge 25 Pounds /CY $ 9.45 $ 236.13 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge 20 CY $ 18.03 $ 360.50 608.36 Stamp Pattern - Added to Any Item, Additional Charge 25 SF $ 2.85 $ 71.25 608.37 6" Concrete Bollard 5 Ea $ 432.60 $ 2,163.00 608.38 8" Concrete Bollard 5 Ea $ 525.30 $ 2,626.50 608.39 Flowable Fill 25 CY $ 112.00 $ 2,800.06 608.40 Non-reinforced Concrete Wall - 8" 25 Sq Face Foot $ 16.15 $ 403.75 608.41 Non-reinforced Concrete Footer - 8" 25 $ 16.15 $ 403.75 608.42 Concrete Staining/Sealing 25 SF $ 3.85 $ 96.25 608.43 Expansion and Caulking 50 LF $ 3.40 $ 169.95 608.44 Joint Sealant (Pavement) 50 LF $ 3.45 $ 172.53 608.45 Irrigation Sleeve 25 LF $ 4.20 $ 105.00 608.46 Dump Fee 25 Ton $ 54.59 $ 1,364.75 626.01 Mobilization – Invoices Under $500 5 LS $ - 630.01 "NO PARKING" Sign With Stand 25 Per Day Per Ea $ 2.16 $ 54.08 630.02 Vertical Panel Without Light 25 Per Day Per Ea $ 1.15 $ 28.75 630.03 Channelizing Barrels 25 Per Day Per Ea $ 1.45 $ 36.25 630.04 Type I/II Barricade Without Light 25 Per Day Per Ea $ 0.70 $ 17.50 630.05 Type III Barricade Without Light 10 Per Day Per Ea $ 3.80 $ 38.00 630.06 Size A Sign With Stand 10 Per Day Per Ea $ 1.85 $ 18.50 DocuSign Envelope ID: E484A7CE-4CD3-40A8-9D09-B3608A96A32C $ 0.80 $ 2,800.00 630.11 Safety Fence 20 Ea Per Day $ 4.25 $ 85.00 630.12 Light 20 Ea Per Day $ 0.50 $ 10.00 630.13 Advance Warning Flashing or Sequencing Arrow Panel 15 Ea Per Day $ 75.00 $ 1,125.00 630.14 Variable Message Board 110 Ea Per Day $ 175.00 $ 19,250.00 630.15 Traffic Control Supervisor 25 Per Day $ 365.65 $ 9,141.25 630.16 Traffic Control Supervisor 450 Per Day $ 41.00 $ 18,450.00 630.17 Flagging 650 Hour $ 27.00 $ 17,550.00 FA1 Laborer 15 Hour $ 28.50 $ 427.50 FA2 Foreman 15 Hour $ 40.50 $ 607.50 FA3 Finisher 15 Hour $ 36.50 $ 547.50 FA4 Form Setter 15 Hour $ 35.00 $ 525.00 FA5 Skid Steer 75 Hour $ 88.00 $ 6,600.00 FA6 Mini Trackhoe 15 Hour $ 90.00 $ 1,350.00 FA7 Dump Truck 15 Hour $ 75.00 $ 1,125.00 FA8 Backhoe 15 Hour $ 90.00 $ 1,350.00 Bid Schedule 2 - Federal Requirements with Davis Bacon Item Description Qty Unit Unit Cost Total Cost 202.01 Sawcut Concrete/Asphalt (0" < 4") 10 LF $ 3.35 $ 33.50 202.02 Sawcut Concrete/Asphalt (4" < 6") 10 LF $ 3.55 $ 35.50 202.03 Sawcut Concrete/Asphalt (6" < 8") 10 LF $ 3.85 $ 38.50 202.04 Sawcut Concrete/Asphalt (8" = 10") 10 LF $ 4.95 $ 49.50 202.05 Sawcut - Additional 1" Depth 10 LF $ 1.25 $ 12.50 202.06 Remove Concrete Sidewalk 100 SF $ 2.94 $ 293.55 202.07 Remove Concrete Curb & Gutter 100 LF $ 4.07 $ 406.85 202.08 Remove Monolithic Curb, Gutter & Sidewalk 100 SF $ 3.04 $ 303.85 202.09 Remove Concrete Driveway/Apron/Crosspan 100 SF $ 2.94 $ 293.55 202.10 Remove Concrete Pavement - 10" 500 SF $ 4.22 $ 2,111.50 202.11 Remove Concrete Pavement - Additional 1" Depth 100 SF $ 1.03 $ 103.00 202.12 Remove Asphalt - 6" 100 SF $ 2.21 $ 221.45 202.13 Remove Asphalt - Additional 1" Depth 100 SF $ 1.03 $ 103.00 202.14 Remove Inlet 1 Ea $ 566.50 $ 566.50 202.15 Remove and Haul Driveway Fillet 1 Ea $ 55.00 $ 55.00 202.16 Remove Flagstone 50 SF $ 3.10 $ 155.00 203.01 Excavation - General Less Than 50 CY 25 CY $ 46.00 $ 1,150.00 203.02 Excavation - General Over 50 CY 100 CY $ 36.00 $ 3,600.00 203.03 Excavation - Walls Only 25 CY $ 12.00 $ 300.00 203.04 Excavation - New Inlet 1 Ea $ 415.00 $ 415.00 203.05 Borrow - Less than 100 Ton 25 Ton $ 26.00 $ 650.00 203.06 Borrow - Over 100 Ton 100 Ton $ 23.00 $ 2,300.00 208.01 Stormwater Protection - Rock Filled Wattle 25 LF $ 12.00 $ 300.00 208.02 Stormwater Protection - Recycled Rubber Filled Wattle 25 LF $ 16.00 $ 400.00 208.03 Stormwater Protection - Straw Bales 25 Ea $ 21.00 $ 525.00 210.01 Reset Flagstone 50 SF $ 4.50 $ 225.00 210.02 Reset Brick Pavers 250 SF $ 8.50 $ 2,125.00 210.03 Adjust Manhole 1 Ea $ 110.00 $ 110.00 210.04 Adjust Valve Box 1 Ea $ 110.00 $ 110.00 DocuSign Envelope ID: E484A7CE-4CD3-40A8-9D09-B3608A96A32C 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace 6 Ea $ 1,579.40 $ 9,476.41 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace 10 LF $ 232.78 $ 2,327.80 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) 5 Ea $ 674.65 $ 3,373.25 604.20 Concrete Sidewalk Culvert – 4’ opening 5 Ea $ 567.94 $ 2,839.71 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace 4 Ea $ 455.05 $ 1,820.22 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only 5 Ea $ 1,879.75 $ 9,398.75 604.23 Additional Square Foot 5/8" Plate 15 SF $ 190.55 $ 2,858.25 608.01 Driveover Curb, Gutter & 6" Sidewalk 1,200 LF $ 38.55 $ 46,263.48 608.02 Driveover Curb and Gutter - No Sidewalk 525 LF $ 21.29 $ 11,177.30 608.03 Vertical Curb, Gutter and 6" Sidewalk 1,000 LF $ 40.23 $ 40,231.80 608.04 Vertical Curb and Gutter - No Sidewalk 2,300 LF $ 24.38 $ 56,074.23 608.05 Out Fall Curb & Gutter 100 LF $ 19.51 $ 1,950.82 608.06 Hollywood Curb, Gutter and 6" Sidewalk 500 LF $ 27.81 $ 13,905.00 608.07 Hollywood Curb and Gutter - No Sidewalk 300 LF $ 16.48 $ 4,944.00 608.08 Highback Curb and Gutter - No Sidewalk 500 LF $ 33.41 $ 16,706.60 608.09 Barrier Curb - 6" x 18" 100 LF $ 22.83 $ 2,283.00 608.10 Barrier Curb - Key Way Style 100 LF $ 22.72 $ 2,272.00 608.11 Barrier Curb - Epoxy 150 LF $ 19.22 $ 2,883.00 608.12 Mountable Curb - 12" x 18" 125 LF $ 23.92 $ 2,990.00 608.13 Mountable Curb - Keyway Style 125 LF $ 22.38 $ 2,797.50 608.14 Mountable Curb – Epoxy 100 LF $ 23.38 $ 2,338.00 608.15 Pedestrian Access Ramp 750 SF $ 6.61 $ 4,959.45 608.16 Pedestrian Access Ramp, Highback Curb 375 SF $ 7.75 $ 2,904.60 608.17 Truncated Dome Panel 100 SF $ 46.87 $ 4,686.50 608.18 Apron - 8" 1,450 SF $ 7.06 $ 10,230.48 608.19 Crosspan - 8" 1,200 SF $ 7.06 $ 8,466.60 608.20 Valley Pan - 6" 500 SF $ 6.97 $ 3,486.55 608.21 Flatwork - 4" 1,850 SF $ 4.12 $ 7,622.00 608.22 Flatwork - 6" 3,800 SF $ 4.91 $ 18,669.78 608.23 Replace Flatwork - 1" Additional Depth 250 SF $ 1.07 $ 267.80 608.24 Concrete Pavement 8" (Joints Sealed) 1,500 SF $ 7.31 $ 10,969.50 608.25 Alley Approach - 8" 1,000 SF $ 6.85 $ 6,849.50 608.26 Enhanced Crosswalk - 10" Tile Red 450 SF $ 12.18 $ 5,483.21 608.27 Enhanced Crosswalk - 10" San Diego Buff 450 SF $ 10.79 $ 4,857.48 DocuSign Envelope ID: E484A7CE-4CD3-40A8-9D09-B3608A96A32C