Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9154131All Phase Restoration POI �15(03 / All Phase Restoration 7355 Greenridge Rd Unit C Windsor CO 80550 Client: City Of Fort Collins Property: 1420 E Stuart St Fort Collins, CO 80525 Operator: TBOONE Estimator: Todd Boone Company: All Phase Restoration Business: 7355 Greenridge Rd Unit C Windsor, CO 80550 Type of Estimate: Smoke Date Entered: 7/6/2015 Date Est. Completed: 7/6/2015 Date Assigned: Date Job Completed: Price List: COFC8X_APR15 Labor Efficiency: Restoration/Service/Remodel Estimate: 2015-07-06-0926 Z 1- 119 ,iZ �,6.OZ �,£ 6 Ilz III 119,91 65--� E 0 Zt � o 3 O ce a a 0 N All Phase Restoration All Phase Restoration 7355 Greenridge Rd Unit C Windsor CO 80550 2015-07-06-0926 Main Level General DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL 1. Asbestos test fee - full service 1.00 EA 0.00 475.00 0.00 95.00 570.00 asbestos survey 2. Dumpster load - Approx. 20 yards, 4 1.00 EA 446.40 0.00 0.00 89.28 535.68 tons of debris 3. Add for personal protective 12.00 EA 0.00 17.56 13.70 44.88 269.30 equipment - Heavy duty 4. Respirator cartridge - HEPA only 4.00 EA 0.00 10.63 2.76 9.06 54.34 (per pair) 149. Plumbing (Bid Item) 1.00 EA 0.00 0.00 0.00 0.00 0.00 150. Electrical (Bid Item) 1.00 EA 0.00 0.00 0.00 0.00 0.00 Totals: General 16.46 238.22 1,429.32 f-9' 10" - rty ffo ff 11"+ ens a 1 o� DESCRIPTION Mens 910.07 SF Walls 1,102.04 SF Walls & Ceiling 21.34 SY Flooring 70.01 LF Ceil. Perimeter QTY REMOVE REPLACE 114. Tear out and bag wet insulation 191.97 SF 115. Tear out wet drywall, cleanup, 311.97 SF bag for disposal 116. Clean with pressure/chemical 1,102.10 SF spray - Very heavy 117. Deodorize building - Ozone & 2,496.35 CIF hydroxyl treatment 118. Clean toilet partition - per stall - 1.00 EA Heavy 119. Blown -in insulation - 14" depth - 191.97 SF R38 120. 1/2" drywall - hung, taped, ready 311.97 SF for texture 122. Texture drywall - heavy hand 311.97 SF texture 123. Seal/prime then paint more than 1,222.04 SF the walls and ceiling (2 coats) 2015-07-06-0926 Height: 13' 191.97 SF Ceiling 192.03 SF Floor 70.01 LF Floor Perimeter TAX O&P TOTAL 0.83 0.00 0.75 32.02 192.11 0.99 0.00 3.04 62.38 374.27 0.00 0.80 1.43 176.62 1,059.73 0.00 0.04 0.00 19.98 119.83 0.00 36.24 0.04 7.24 43.52 0.00 1.01 8.86 40.56 243.31 0.00 1.48 10.34 94.40 566.46 0.00 0.65 2.84 41.12 246.74 0.00 0.64 11.92 158.80 952.83 7/6/2015 Page:2 All Phase Restoration All Phase Restoration 7355 Greenridge Rd Unit C Windsor CO 80550 CONTINUED - Mens DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL 124. Trim board - 1" x 4" - installed 70.01 LF 0.00 3.01 5.78 43.30 259.81 (pine) 126. Paint baseboard - two coats 70.01 LF 0.00 0.95 0.50 13.40 80.41 trim around ceiling 127. R&R Fluorescent light fixture - 2.00 EA 12.73 132.64 12.13 60.58 363.45 High grade 128. R&R Soap dish - Wall mounted 1.00 EA 5.72 21.15 0.71 5.52 33.10 130. R&R Hot air hand dryer - High 1.00 EA 41.25 637.68 27.73 141.34 848.00 grade 131. R&R Toilet paper holder - High 1.00 EA 4.57 33.46 1.29 7.88 47.20 grade 132. Clean door (per side) 2.00 EA 0.00 7.41 0.02 2.96 17.80 146. Paint door slab only - 2 coats (per 2.00 EA 0.00 21.24 0.83 8.66 51.97 side) 147. Paint door or window opening - 2 2.00 EA 0.00 21.02 0.50 8.50 51.04 coats (per side) 133. Clean bathroom fixtures - Large 1.00 EA 0.00 170.23 0.04 34.04 204.31 bathroom - Heavy Totals: Mens 88.75 959.30 5,755.89 F-5' 1"-i Utility Room 9, _ a Ro ,s 16" 1 DESCRIPTION 526.50 SF Walls 600.13 SF Walls & Ceiling 8.18 SY Flooring 40.50 LF Ceil. Perimeter QTY REMOVE REPLACE Height: 13' 73.63 SF Ceiling 73.63 SF Floor 40.50 LF Floor Perimeter TAX O&P TOTAL 148. Deodorize building - Ozone & 957.13 CF 0.00 0.04 0.00 7.66 45.95 hydroxyl treatment Totals: Utility Room 0.00 7.66 45.95 2015-07-06-0926 7/6/2015 Page:3 All Phase Restoration All Phase Restoration 7355 Greenridge Rd Unit C Windsor CO 80550 Womans 782.17 SF Walls 975.83 SF Walls & Ceiling 21.52 SY Flooring 60.17 LF Ceil. Perimeter Height: 13' 193.67 SF Ceiling 193.67 SF Floor 60.17 LF Floor Perimeter DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL 134. Tear out and bag wet insulation 193.67 SF 0.83 0.00 0.76 32.32 193.83 135. Clean the ceiling - Heavy 193.67 SF 0.00 0.45 0.13 17.46 104.74 136. Clean with pressure/chemical 975.83 SF 0.00 0.80 1.27 156.40 938.33 spray - Very heavy 137. Deodorize building - Ozone & 2,517.67 CF 0.00 0.04 0.00 20.14 120.85 hydroxyl treatment 138. Clean toilet partition - per stall - 1.00 EA 0.00 36.24 0.04 7.24 43.52 Heavy 139. Blown -in insulation - 14" depth - 193.67 SF 0.00 1.01 8.94 40.90 245.45 R38 140. Seal/prime then paint the ceiling 193.67 SF 0.00 0.64 1.89 25.18 151.02 (2 coats) 141. Paint baseboard -two coats 60.17 LF 0.00 0.95 0.43 11.52 69.11 trim board around ceiling 142. Fluorescent light fixture - High 2.00 EA 0.00 132.64 12.13 55.48 332.89 grade 143. Clean bathroom fixtures - Large 1.00 EA 0.00 170.23 0.04 34.04 204.31 bathroom - Heavy 144. Clean door (per side) 2.00 EA 0.00 7.41 0.02 2.96 17.80 145. Clean door / window opening 2.00 EA 0.00 13.40 0.01 5.36 32.17 (per side) Totals: Womans 25.66 409.00 2,454.02 Total: Main Level 130.87 1,614.18 9,685.18 Labor Minimums Applied DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL 16. Insulation labor minimum 1.00 EA 0.00 38.80 0.00 7.76 46.56 125. Finish carpentry labor minimum 1.00 EA 0.00 62.76 0.00 12.56 75.32 Totals: Labor Minimums Applied 0.00 20.32 121.88 Line Item Totals: 2015-07-06-0926 130.87 1,634.50 9,807.06 2015-07-06-0926 7/6/2015 Page:4 All Phase Restoration All Phase Restoration 7355 Greenridge Rd Unit C Windsor CO 80550 Grand Total Areas: 2,218.74 SF Walls 459.32 SF Floor 0.00 SF Long Wall 459.32 Floor Area 1,439.67 Exterior Wall Area 0.00 Surface Area 0.00 Total Ridge Length 459.26 SF Ceiling 51.04 SY Flooring 0.00 SF Short Wall 505.13 Total Area 102.83 Exterior Perimeter of Walls 0.00 Number of Squares 0.00 Total Hip Length 2,678.00 SF Walls and Ceiling 170.67 LF Floor Perimeter 170.67 LF Ceil. Perimeter 2,350.98 Interior Wall Area 0.00 Total Perimeter Length 2015-07-06-0926 7/6/2015 Page:5 All Phase Restoration All Phase Restoration 7355 Greenridge Rd Unit C Windsor CO 80550 Summary Line Item Total 8,041.69 Material Sales Tax 130.87 Subtotal 8,172.56 Overhead 817.25 Profit 817.25 Replacement Cost Value $9,807.06 Net Claim $9,807.06 Todd Boone 2015-07-06-0926 7/6/2015 Page:6 All Phase Restoration All Phase Restoration 7355 Greenridge Rd Unit C Windsor CO 80550 Recap of Taxes, Overhead and Profit Overhead (10%) Profit (10%) Material Sales Tax (6.5%) ManuE Home Tax (6.5%) Storage Rental Tax (6.5%) Local Food Tax (3.6%) Line Items 817.25 817.25 130.87 0.00 0.00 0.00 Total 817.25 817.25 130.87 0.00 0.00 0.00 2015-07-06-0926 7/6/2015 Page:7 All Phase Restoration All Phase Restoration 7355 Greenridge Rd Unit C Windsor CO 80550 Recap by Room Estimate: 2015-07-06-0926 Area: Main Level General 1,174.64 14.61 % Mens 4,707.84 58.54% Utility Room 38.29 0.48% Womans 2,019.36 25.11% Area Subtotal: Main Level 7,940.13 98.74% Labor Minimums Applied 101.56 1.26% Subtotal of Areas 8,041.69 100.00% Total 8,041.69 100.00% 2015-07-06-0926 7/6/2015 Page:8 All Phase Restoration All Phase Restoration 7355 Greenridge Rd Unit C Windsor CO 80550 Recap by Category O&P Items Total CLEANING 2,457.72 25.06% GENERAL DEMOLITION 1,152.34 11.75% DRYWALL 664.50 6.78% PERMITS AND FEES 475.00 4.84% FINISH CARPENTRY / TRIMWORK 273.49 2.79% FINISH HARDWARE 54.61 0.56% INSULATION 428.30 4.37% LIGHT FIXTURES 530.56 5.41% PAINTING 1,114.25 11.36% TOILET & BATH ACCESSORIES 637.68 6.50% WATER EXTRACTION & REMEDIATION 253.24 2.58% O&P Items Subtotal 8,041.69 82.00% Material Sales Tax 130.87 1.33% Overhead 817.25 8.33% Profit 817.25 8.33% Total 9,807.06 100.00% 2015-07-06-0926 7/6/2015 Page:9