Loading...
HomeMy WebLinkAbout460317 BELLA ENERGY/ OAK LEAF SOLAR VIII LLC - CONTRACT - AGREEMENT MISC - BELLA ENERGY INCJuly 2, 2015 City of Fort Collins 215 North Mason Fort Collins, CO 80522 Attn: Gerry Paul CC: Mr. John Hereford Oak Leaf Energy Partners Ohio, LLC 2645 East 2 nd Avenue, Suite 206 Denver, CO 80206 RE: Consent to Assignment of the Power Purchase Agreement and the Interconnection Agreement for the LaPorte Project Dear Mr. Jim Welch and John Hereford: Bella Energy, Inc. (“Bella”) and the City of Fort Collins (the “City”) previously entered into that certain Power Purchase Agreement, dated February 24, 2015 (the “PPA”), and that certain Solar Generator Interconnection Agreement, dated May 3, 2015 (the “Interconnection”). Both agreements pertain to the solar photovoltaic system to be located at 1912 LaPorte Ave., Fort Collins, CO 80521 (the “System”). In connection with the financing of the System, Bella desires to assign its rights, powers and remedies as principal operator of the System, under the PPA and Interconnection to Oak Leaf Solar VIII, LLC, a Colorado limited liability company (“Oak Leaf”). Pursuant to PPA Section 11.3.1 and Interconnection Section 8.1, the parties herein confirm their consent to these assignments upon the conditions stated herein by signing below. Oak Leaf hereby accepts the assignment and agrees to be bound, as principal operator of the System, by all of the terms and conditions of the PPA and Interconnection, including all obligations, duties, responsibilities, and liabilities of Bella thereunder; and Bella hereby agrees and acknowledges, the assignment to, and assumption by, Oak Leaf of the PPA and the Interconnection as provided above; and Upon the successful closing of financing and transfer of title to the System from Bella to Oak Leaf, scheduled to occur on July 7, 2015 (“Closing”), the City consents to the transfer and assignment of principal performance under the PPA and the Interconnection by Bella Energy, Inc. to Oak Leaf Solar VIII, LLC, and acknowledges and agrees that Oak Leaf shall assume all rights, duties and obligations of Bella as set forth under this Agreement, effective as of the date of Closing (the “Effective Date”). For purposes of facilitating Oak Leaf’s assumption of obligations, as described herein, upon the Effective Date, the address for delivery of notices to the System “Owner”, as defined in the PPA and Interconnection, shall be as follows: DocuSign Envelope ID: 6B1C93DE-DBD1-4974-B9BD-8A8BF6BFFD75 2 Oak Leaf Solar VIII, LLC 2645 East 2 nd Avenue, Suite 206 Denver, CO 80206 Attn: Mr. John Hereford Thank you for your time and attention. We look forward to installing the System. Sincerely, BELLA ENERGY, INC. __________________________________________ Name: Jim Welch Title: Accepted on _________ by: OAK LEAF SOLAR VIII, LLC Name: John Hereford Title: Accepted on _______ by: CITY OF FORT COLLINS ________________________________ Name: Gerry Paul Title: Director of Purchasing ATTEST: ________________________ City Clerk APPROVED AS TO FORM: ________________________ Asst City Attorney DocuSign Envelope ID: 6B1C93DE-DBD1-4974-B9BD-8A8BF6BFFD75 CEO 7/6/2015 Member 7/6/2015